{"state":"al","name":"Alabama","updated":"2026-10-15","checked":"2026-10-15","bounds":[-88.471,30.247,-84.889,35.001],"stats":{"projects":0,"operating":0,"facilities":24,"rule_counties":0,"moratorium_counties":0,"source_records":24,"reviewed_records":24,"status_confirmed":0,"status_unknown":24,"unreviewed_excluded":3,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":27,"manual_source_context_records":24,"published_source_context_records":24,"excluded":{"no_manual_source_review":3},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"alabama-supercomputer-center-huntsville-al","state":"al","kind":"facility","name":"Alabama Supercomputer Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Huntsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Nearly24000squarefeet is not white-space area; no MW stated. Institution explicitly places facility in Cummings Research Park and recounts installation history. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://asc.edu/alabama-supercomputer-center","host":"asc.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.73652,"lng":-86.6731271,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Huntsville","campus":"Cummings Research Park","area_sqft_approx":24000,"area_basis":"whole facility including SOC,NOC,offices,data center","building_completed":"1987-10","latest_supercomputer_installation":"2023-10"},"notes":["Nearly24000squarefeet is not white-space area; no MW stated.","Institution explicitly places facility in Cummings Research Park and recounts installation history.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://asc.edu/alabama-supercomputer-center","host":"asc.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Huntsville · Madison · Source context reviewed"},{"id":"applied-digital-delta-forge-2-brookwood-al","state":"al","kind":"facility","name":"Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tuscaloosa"],"city":"Brookwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer announcement republished by telecom newswire, with planned quantities.. Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed. Company report of lease, not original confidential instrument.. Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Reporter account of operator presentation, not observed water use or signed permit.. Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified. Public index and short banner used for discovery, not independent site verification.. Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/","host":"tuscaloosathread.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/","host":"newswire.telecomramblings.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2","host":"ir.applieddigital.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://tuscaloosathread.com/applied-digital-brookwood-town-hall/","host":"tuscaloosathread.com","date":"2026-10-02","published":"2026-10-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.applieddigital.com/insights/july-site-update","host":"applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2556719,"lng":-87.3208336,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported TCEDA incentive vote for Brookwood Delta Forge 2, including projected abatements and community benefit commitments.","independently_verified_current_operating_status":null},"notes":["Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/","host":"tuscaloosathread.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer announcement republished by telecom newswire, with planned quantities.","fields":{"announcement_date":"2026-09-24","location":"Brookwood, Tuscaloosa County, Alabama","planned_combined_developer_tenant_investment_usd_more_than":3200000000,"leased_critical_it_load_mw":210,"anticipated_operations_year":2028,"community_benefit_commitment_usd":270000000,"community_benefit_term_years":20},"notes":["Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/","host":"newswire.telecomramblings.com","date":"2026-09-24","published":"2026-09-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Company report of lease, not original confidential instrument.","fields":{"announcement_date":"2026-06-08","company_reported_signed_critical_it_load_mw":210,"base_lease_years":15,"expected_base_lease_revenue_usd_approx":5200000000,"all_options_total_lease_years":30,"all_options_lease_revenue_usd_approx":12700000000,"initial_operations_forecast":"2028-Q1"},"notes":["Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2","host":"ir.applieddigital.com","date":"2026-06-08","published":"2026-06-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Reporter account of operator presentation, not observed water use or signed permit.","fields":{"report_date":"2026-10-02","developer_initial_water_fill_gallons_approx":1400000,"fill_components_gallons":{"fire_tank":500000,"cooling_loop":900000},"developer_ongoing_annual_water_gallons_approx":750000,"reported_permit_stage":"Packages submitted to city, under review."},"notes":["Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tuscaloosathread.com/applied-digital-brookwood-town-hall/","host":"tuscaloosathread.com","date":"2026-10-02","published":"2026-10-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Public index and short banner used for discovery, not independent site verification.","fields":{},"notes":["Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.applieddigital.com/insights/july-site-update","host":"applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Brookwood · Tuscaloosa · Source context reviewed"},{"id":"beacon-calvert-al","state":"al","kind":"facility","name":"Calvert Infrastructure Hub","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mobile"],"city":"Calvert","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Developer claims about utilities, buffers, water and jobs are forecasts. Water supply and sewer quantities are separate, not additive consumption; no commissioned capacity established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact","host":"utv44.com","date":"2026-07-03","published":"2026-07-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.1551748,"lng":-88.0099997,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"UTV44 reports Beacon Calvert proposal, first-building 2027 target and pending studies, design and permitting.","independently_verified_current_operating_status":null},"notes":["Developer claims about utilities, buffers, water and jobs are forecasts. Water supply and sewer quantities are separate, not additive consumption; no commissioned capacity established.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact","host":"utv44.com","date":"2026-07-03","published":"2026-07-03","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Calvert · Mobile · Source context reviewed"},{"id":"construction-partners-dothan-al","state":"al","kind":"facility","name":"Construction Partners Corporate Headquarters and Data Processing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Houston"],"city":"Dothan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Dothan combined headquarters and data-processing proposal. Mixed headquarters and data-processing budget is not exclusively data-center capex. New-position capacity is a forecast, not current hires. Company founding in 2001 and corporate value of 3.5B do not date or price this facility. Construction expected to begin soon; no exact opening, parcel or IT MW established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/","host":"madeinalabama.com","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.2237285,"lng":-85.3934375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Dothan combined headquarters and data-processing proposal","fields":{"agency":"Alabama Department of Commerce","announcement_date":"2026-03-19","company":"Construction Partners Inc.","city":"Dothan","project":"new corporate headquarters and data processing center","planned_combined_investment_usd":20000000,"capacity_for_new_professional_positions_min_exclusive":60,"existing_area_employees_approx":50},"notes":["Mixed headquarters and data-processing budget is not exclusively data-center capex. New-position capacity is a forecast, not current hires. Company founding in 2001 and corporate value of 3.5B do not date or price this facility. Construction expected to begin soon; no exact opening, parcel or IT MW established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/","host":"madeinalabama.com","date":"2026-03-19","published":"2026-03-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Dothan · Houston · Source context reviewed"},{"id":"core-scientific-auburn-al","state":"al","kind":"facility","name":"Core Scientific Auburn Data Center (AUBix)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lee"],"city":"Auburn","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. AIenabledoperatorofferingnotindependentall50MWenergized/currentNVIDIAcertificatereview. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/auburn-al/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.6089,"lng":-85.4879,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"1571 W Samford Ave, Auburn, AL36832","advertised_total_power_capacity_mw":50,"campus_acres":6,"total_area_sqft":39202,"power_basis":"totalpowercapacity, not explicitlycriticalIT"},"notes":["AIenabledoperatorofferingnotindependentall50MWenergized/currentNVIDIAcertificatereview.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/auburn-al/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Auburn · Lee · Source context reviewed"},{"id":"dc-blox-birmingham-al","state":"al","kind":"facility","name":"DC BLOX Birmingham Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Birmingham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Pageheader294karea/49MWcommittedplanned/4centersdiffersfromlegacy200k/60MWexpansionlabels. Initialphaseandnewbuildableshellkeptseparate; no canonicalcurrentcampusMWorallphasesoperatingclaim. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/birmingham/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5006652,"lng":-86.8208315,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"433 6th Street South, Birmingham, AL35233","initial_facility_area_sqft":31000,"initial_critical_load_mw_max":5,"expansion_buildable_area_sqft":263000},"notes":["Pageheader294karea/49MWcommittedplanned/4centersdiffersfromlegacy200k/60MWexpansionlabels. Initialphaseandnewbuildableshellkeptseparate; no canonicalcurrentcampusMWorallphasesoperatingclaim.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/birmingham/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Birmingham · Jefferson · Source context reviewed"},{"id":"dc-blox-huntsville-al","state":"al","kind":"facility","name":"DC BLOX Huntsville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Huntsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Header38karea/9MWcommittedplanned/2centersandlegacyexpansionfiguresdifferentversions/scopes. Notall9MWoperationalandnot13.5MWplus9. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-centers/huntsville/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.7104202,"lng":-86.6921561,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"333 Diamond Drive NW, Huntsville, AL35806","initial_area_sqft":9000,"potential_expanded_area_sqft":52400,"potential_expanded_critical_load_mw_max":13.5},"notes":["Header38karea/9MWcommittedplanned/2centersandlegacyexpansionfiguresdifferentversions/scopes. Notall9MWoperationalandnot13.5MWplus9.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/huntsville/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Huntsville · Madison · Source context reviewed"},{"id":"dc-blox-montgomery-al","state":"al","kind":"facility","name":"DC BLOX Montgomery Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Montgomery","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. regional map mismatch. Regional12campuses/470MWcommittedplannednotMontgomerysite. DoesnotresolveexactMontgomeryaddressorcapacity; separateNovember14,2024releaseprovidesnameddevelopmentcontext. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/data-center-map/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3777111,"lng":-86.3090775,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"regional map mismatch","fields":{},"notes":["Regional12campuses/470MWcommittedplannednotMontgomerysite. DoesnotresolveexactMontgomeryaddressorcapacity; separateNovember14,2024releaseprovidesnameddevelopmentcontext.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-center-map/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montgomery · Montgomery · Source context reviewed"},{"id":"edged-gateway-prichard-al","state":"al","kind":"facility","name":"Edged Prichard Data Center (Project Gateway)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Mobile"],"city":"Prichard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Edged Gateway Prichard proposed building and forecast. 93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://projectgatewayal.com/","host":"projectgatewayal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.7387998,"lng":-88.0788889,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Edged Gateway Prichard proposed building and forecast","fields":{"developer":"Edged US","project":"Project Gateway","locality":"Prichard, Alabama","developer_described_stage":"proposed/evaluated campus","proposed_building_power_mw":8,"power_basis":"building capacity, not explicit critical IT","proposed_building_sqft":57000,"planned_investment_usd":93000000,"expected_permanent_jobs_min_inclusive":20},"notes":["93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://projectgatewayal.com/","host":"projectgatewayal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Prichard · Mobile · Source context reviewed"},{"id":"google-jackson-county-stevenson-al","state":"al","kind":"facility","name":"Google Jackson County Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jackson"],"city":"Stevenson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. Stevenson/Bridgeport/JacksonCounty aliases need parcelboundarycomparison; no independentcoordinatecorrection. USD1.5billionannouncedexpansion notspent or additivefirstphasewithoutscopecheck. TVAgridconnected not dedicatedrenewablehourly supply; countypermitstatement needsoriginaljurisdictionlaw. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.8842,"lng":-85.755,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.","fields":{"reported_context":"Local reporting describes Google at48809AlabamaHighway277Bridgeport, two buildings270000squarefeet on600acres,2019opening/initialUSD600million and later announcedUSD1.5billionthirdbuilding. Named localdevelopmentofficial describes approximately250workers.","independently_verified_current_operating_status":null},"notes":["Stevenson/Bridgeport/JacksonCounty aliases need parcelboundarycomparison; no independentcoordinatecorrection. USD1.5billionannouncedexpansion notspent or additivefirstphasewithoutscopecheck. TVAgridconnected not dedicatedrenewablehourly supply; countypermitstatement needsoriginaljurisdictionlaw.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Stevenson · Jackson · Source context reviewed"},{"id":"meta-huntsville-al","state":"al","kind":"facility","name":"Meta Huntsville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Huntsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.726,"lng":-86.647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"groundbreaking_year":2018,"investment_usd_min":1500000000,"investment_scope":"Huntsville, Alabama","operator_reported_operational_jobs_min":300,"peak_construction_workers":1200,"local_school_nonprofit_funding_usd_min":4500000,"jobs_qualification":"once completed"},"notes":["Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Huntsville · Madison · Source context reviewed"},{"id":"meta-montgomery-al","state":"al","kind":"facility","name":"Meta Montgomery Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Montgomery","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Nearly1.3Marea and1.5B+investment cover expanded campus.3B+Alabama total includes Huntsville;227MWis supported Alabama renewable generation, not campusIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2025/09/montgomery-were-growing/","host":"datacenters.atmeta.com","date":"2025-09-23","published":"2025-09-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.185,"lng":-86.273,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"expansion_new_buildings":2,"resulting_planned_campus_area_sqft_approx":1300000,"planned_campus_investment_usd_min_exclusive":1500000000,"peak_construction_jobs_min_exclusive":1000,"forecast_operational_jobs_min_exclusive":100},"notes":["Nearly1.3Marea and1.5B+investment cover expanded campus.3B+Alabama total includes Huntsville;227MWis supported Alabama renewable generation, not campusIT.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2025/09/montgomery-were-growing/","host":"datacenters.atmeta.com","date":"2025-09-23","published":"2025-09-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montgomery · Montgomery · Source context reviewed"},{"id":"nebius-bhm01-birmingham-al","state":"al","kind":"facility","name":"Nebius Birmingham AI Factory (BHM01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Birmingham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nebius Birmingham land, targets and fiscal scopes. SamepageFAQsayhundredsjobsversusheadline1000plus;countnotindependentlycertified.30yearincentiveoperatorclaimnotexecutedIDBagreementoractualforegone-taxsum.85.7Mcombinednotcityaloneoractualcollectedtax. TargetsQ12026permits/hearingsandQ22026constructionnotobservedoutcomes;do notcalendarpasttargetsasfutureevents. Q42026servicefutureasofOct14. No criticalITMWorfinalwaterdemand. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nebius.com/birminghamal","host":"nebius.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4556,"lng":-86.8131,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Nebius Birmingham land, targets and fiscal scopes","fields":{"developer":"Nebius","address":"201 Milan Parkway, Birmingham, Alabama","former_use":"Regions Bank back office","operator_reported_land_acquisition_month":"2025-09","land_acres":75,"historic_initial_commissioning_target_quarter":"2026-Q4","fullbuildout_target_through_year":2028,"operator_reported_tax_incentive_term_years":30,"estimated_average_annual_tax_usd":85700000,"tax_forecast_scope":"Birmingham City, Jefferson County and Alabama combined","expected_construction_jobs_min_exclusive":1000,"estimated_construction_duration_months_approx":30},"notes":["SamepageFAQsayhundredsjobsversusheadline1000plus;countnotindependentlycertified.30yearincentiveoperatorclaimnotexecutedIDBagreementoractualforegone-taxsum.85.7Mcombinednotcityaloneoractualcollectedtax. TargetsQ12026permits/hearingsandQ22026constructionnotobservedoutcomes;do notcalendarpasttargetsasfutureevents. Q42026servicefutureasofOct14. No criticalITMWorfinalwaterdemand.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nebius.com/birminghamal","host":"nebius.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Birmingham · Jefferson · Source context reviewed"},{"id":"patmos-fairfield-al","state":"al","kind":"facility","name":"Patmos Fairfield Colocation Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Fairfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The report says the local temporary ban excluded Patmos; exclusion is not project approval. Utility assurances and quieter-than-Walmart or water-only-impact claims are attributed, not independent environmental findings. Colocation is not inherently small. No later approval, construction or metered capacity is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/","host":"wbrc.com","date":"2026-08-13","published":"2026-08-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4916836,"lng":-86.9150283,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WBRC reports Patmos' former-Walmart Fairfield proposal, with city approval still needed and construction/phase openings forecast for 2026 to 2028.","independently_verified_current_operating_status":null},"notes":["The report says the local temporary ban excluded Patmos; exclusion is not project approval. Utility assurances and quieter-than-Walmart or water-only-impact claims are attributed, not independent environmental findings. Colocation is not inherently small. No later approval, construction or metered capacity is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/","host":"wbrc.com","date":"2026-08-13","published":"2026-08-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Fairfield · Jefferson · Source context reviewed"},{"id":"youngwoo-project-brookwood-al","state":"al","kind":"facility","name":"Project Brookwood Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tuscaloosa"],"city":"Brookwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Recommendation and future council hearing are not final approval.200 acresalreadyowned,374 acresundercontract and anotherowner’s 680 acres are overlapping/different land scopes, not automatically one summed campus. AppliedDigital’s 1300 acres/two-million-square-footproject is explicitly separate developer and property; never assign itsIT, lease or investment toYoungwoo. Petition names DataCenterCampus despite counsel saying future uses uncertain. No disclosedITMW, capex, tenant, current construction or observedSeptember 15 outcome. School-relocation suggestion is not adopted relocation plan or proven impact. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://tuscaloosathread.com/second-brookwood-data-center/","host":"tuscaloosathread.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.2112238,"lng":-87.2715693,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"TuscaloosaThread reports planning commission unanimously recommended 374 acreannexation/rezoning for Youngwoo’sProjectBrookwoodLLC, with council final vote scheduledSeptember 15.","independently_verified_current_operating_status":null},"notes":["Recommendation and future council hearing are not final approval.200 acresalreadyowned,374 acresundercontract and anotherowner’s 680 acres are overlapping/different land scopes, not automatically one summed campus. AppliedDigital’s 1300 acres/two-million-square-footproject is explicitly separate developer and property; never assign itsIT, lease or investment toYoungwoo. Petition names DataCenterCampus despite counsel saying future uses uncertain. No disclosedITMW, capex, tenant, current construction or observedSeptember 15 outcome. School-relocation suggestion is not adopted relocation plan or proven impact.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tuscaloosathread.com/second-brookwood-data-center/","host":"tuscaloosathread.com","date":"2026-08-12","published":"2026-08-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Brookwood · Tuscaloosa · Source context reviewed"},{"id":"cloverleaf-red-clay-lowndes-al","state":"al","kind":"facility","name":"Project Red Clay","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lowndes"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Red Clay developer project and fiscal scopes. Developer economic projections, not actual tax collections. Do not add2.8Btotal to1.6Bschoolsubset or multiply annual average into guarantee. Up-to10Mcommitment not funds disbursed. No signed CBA or regulator order read. Developer intends to find eventual operator after approvals; no named tenant inferred. Closed-loop not zero site water. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://redclaydatacenter.com/","host":"redclaydatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.2700221,"lng":-86.5128035,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Red Clay developer project and fiscal scopes","fields":{"project_name":"Project Red Clay","locality":"Lowndes County, Alabama","expected_construction_jobs_min_exclusive":1000,"expected_construction_duration_years_max":5,"expected_initial_fulltime_jobs":225,"expected_full_scale_fulltime_jobs_min_exclusive":300,"developer_estimated_average_annual_local_tax_usd":124000000,"developer_estimated_local_funding_through_2050_usd_min_exclusive":2800000000,"developer_estimated_school_funding_through_2050_usd_min_exclusive":1600000000,"developer_community_benefits_commitment_usd_max":10000000,"named_cba_partner":"Central Alabama Community Foundation"},"notes":["Developer economic projections, not actual tax collections. Do not add2.8Btotal to1.6Bschoolsubset or multiply annual average into guarantee. Up-to10Mcommitment not funds disbursed. No signed CBA or regulator order read. Developer intends to find eventual operator after approvals; no named tenant inferred. Closed-loop not zero site water.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://redclaydatacenter.com/","host":"redclaydatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lowndes · Source context reviewed"},{"id":"qts-marvel-bessemer-al","state":"al","kind":"facility","name":"QTS Bessemer (Project Marvel)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Bessemer","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This is2025reporting, not a2026vote. QTS is not identified in the readable body. The claimed100-acre site and other land/building descriptions are inconsistent and not reconciled. Opponents' water, power, incentives and environmental claims are not approved amounts, measured impacts or current IT demand. No later rezoning result adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://tuscaloosathread.com/bessemer-data-center-concerns/","host":"tuscaloosathread.com","date":"2025-10-14","published":"2025-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.44,"lng":-86.97,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Tuscaloosa Thread describes Project Marvel's October7 zoning-use action and a future November18 rezoning hearing, with local opposition and developer details incomplete.","independently_verified_current_operating_status":null,"operator_or_exact_site_identity_needs_crosswalk":true},"notes":["This is2025reporting, not a2026vote. QTS is not identified in the readable body. The claimed100-acre site and other land/building descriptions are inconsistent and not reconciled. Opponents' water, power, incentives and environmental claims are not approved amounts, measured impacts or current IT demand. No later rezoning result adopted.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://tuscaloosathread.com/bessemer-data-center-concerns/","host":"tuscaloosathread.com","date":"2025-10-14","published":"2025-10-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Bessemer · Jefferson · Source context reviewed"},{"id":"rsa-dexter-avenue-montgomery-al","state":"al","kind":"facility","name":"RSA Dexter Avenue Datacenter","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"Montgomery","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RSA Dexter Avenue colocation facility and internal specification conflicts. Six internal spaces not six distinct physical buildings. Area nearly42000versus44000sqft and UPS2times1.6MWversus2MWtotal conflict; canonical area/ITcapacity held. Backup generators not usable ITMW. Footer201SUnion isRSAoffice not independently site street. Operator compliance statement not underlying audit review. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/","host":"rsa-al.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.37803,"lng":-86.303007,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"RSA Dexter Avenue colocation facility and internal specification conflicts","fields":{"operator_reported_opening_date":"2012-10-04","operator_reported_manager":"NTTData","advertised_internal_colocation_spaces":6,"advertised_racks_min_exclusive":300,"backup_generators":2,"backup_generator_rating_mw_each":2.5},"notes":["Six internal spaces not six distinct physical buildings. Area nearly42000versus44000sqft and UPS2times1.6MWversus2MWtotal conflict; canonical area/ITcapacity held. Backup generators not usable ITMW. Footer201SUnion isRSAoffice not independently site street. Operator compliance statement not underlying audit review.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/","host":"rsa-al.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Montgomery · Montgomery · Source context reviewed"},{"id":"simple-helix-huntsville-al","state":"al","kind":"facility","name":"Simple Helix Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Huntsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. 1.1MWwholefacility not perhall. Historical opening not independent2026operating verification. TierIIIis issuer label, not reviewed current certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://prnewswire.com/news-releases/simple-helix-announces-opening-of-new-tier-iii-data-center-in-huntsville-alabama-300488165.html","host":"prnewswire.com","date":"2017-07-14","published":"2017-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.744816340398,"lng":-86.691765682048,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"opening_announcement":"2017-07-14","advertised_capacity_mw":1.1,"data_halls":2,"power_basis":"facility capacity, not explicitly critical IT"},"notes":["1.1MWwholefacility not perhall. Historical opening not independent2026operating verification. TierIIIis issuer label, not reviewed current certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://prnewswire.com/news-releases/simple-helix-announces-opening-of-new-tier-iii-data-center-in-huntsville-alabama-300488165.html","host":"prnewswire.com","date":"2017-07-14","published":"2017-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Huntsville · Madison · Source context reviewed"},{"id":"sovereign-gazelle-somerville-al","state":"al","kind":"facility","name":"Sovereign Gazelle Bitcoin Mining Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Morgan"],"city":"Somerville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. County attorney/chair and developer counsel positions are attributed legal opinions, not a court ruling or independently examined statewide law. Do not map as a verified legally effective construction ban or erase the reported resolution. Utility says no permit application was submitted; preliminary route discussion/locates are not route approval or executed service. 50 MW is proposed electrical supply, not critical IT/current draw. Fifteen-acre $300,000 land purchase by affiliate is separate from planned ten-acre footprint and project capex. Sovereign Gazelle April 2026 incorporation does not change affiliate August 2025 land acquisition chronology. No RFS or approved noise limit. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hartselleenquirer.com/2026/08/17/morgan-county-says-cannot-stop-proposed-data-center/","host":"hartselleenquirer.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.457,"lng":-86.7603,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Hartselle Enquirer reports Sovereign Gazelle’s proposed 50 MW bitcoin site at 369 Union Road, with county officials describing an adopted 12-month unincorporated-area resolution as lacking an enforcement mechanism.","independently_verified_current_operating_status":null,"reported_moratorium_months":12,"legally_effective_moratorium_verified":false,"no_court_outcome_adopted":true},"notes":["County attorney/chair and developer counsel positions are attributed legal opinions, not a court ruling or independently examined statewide law. Do not map as a verified legally effective construction ban or erase the reported resolution. Utility says no permit application was submitted; preliminary route discussion/locates are not route approval or executed service. 50 MW is proposed electrical supply, not critical IT/current draw. Fifteen-acre $300,000 land purchase by affiliate is separate from planned ten-acre footprint and project capex. Sovereign Gazelle April 2026 incorporation does not change affiliate August 2025 land acquisition chronology. No RFS or approved noise limit.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hartselleenquirer.com/2026/08/17/morgan-county-says-cannot-stop-proposed-data-center/","host":"hartselleenquirer.com","date":"2026-08-17","published":"2026-08-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Somerville · Morgan · Source context reviewed"},{"id":"swift-willow-westover-al","state":"al","kind":"facility","name":"Swift Willow Westover Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Westover","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Possible withdrawal was not observed. MOU difficulties do not prove legal termination. Exact ordinance terms/expiry and later August 20 meeting outcome remain open. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wbrc.com/2026/08/19/westover-approves-6-month-moratorium-data-centers/","host":"wbrc.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.3596201,"lng":-86.5102435,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"six-month-moratorium-reported","reported_finding":"WBRC reports unanimous Westover six-month pause on August 18; developer might withdraw according to city attorney.","report_display_date":"2026-08-18","independently_verified_current_status":null},"notes":["Possible withdrawal was not observed. MOU difficulties do not prove legal termination. Exact ordinance terms/expiry and later August 20 meeting outcome remain open.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wbrc.com/2026/08/19/westover-approves-6-month-moratorium-data-centers/","host":"wbrc.com","date":"2026-08-18","published":"2026-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Westover · Shelby · Source context reviewed"},{"id":"synergy-south-russellville-al","state":"al","kind":"facility","name":"Synergy South Russellville Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Franklin"],"city":"Russellville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Operator website says neither of its two North Alabama facilities exceeds 12 MW; that is an upper-bound statement, not exactly 12 MW, current load or critical IT at Russellville. Proposed 50 MW belongs to Somerville. Residents’50 to 95 dB comparisons and forecasts of amplified noise are not measured Russellville or future Somerville impacts. Police saying no complaints filed does not establish absence of environmental/health effects. VoltCore involvement is reported development history, not proof of current ownership. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.waff.com/2026/09/01/somerville-homeowners-compare-russellville-bitcoin-mining-site-their-proposed-local-facility/","host":"waff.com","date":"2026-09-01","published":"2026-09-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.5041961,"lng":-87.7300015,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"WAFF reports Synergy South operates a bitcoin facility on Jackson Avenue in Russellville, compared by opponents with a separate proposed Somerville mine.","independently_verified_current_operating_status":null},"notes":["Operator website says neither of its two North Alabama facilities exceeds 12 MW; that is an upper-bound statement, not exactly 12 MW, current load or critical IT at Russellville. Proposed 50 MW belongs to Somerville. Residents’50 to 95 dB comparisons and forecasts of amplified noise are not measured Russellville or future Somerville impacts. Police saying no complaints filed does not establish absence of environmental/health effects. VoltCore involvement is reported development history, not proof of current ownership.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.waff.com/2026/09/01/somerville-homeowners-compare-russellville-bitcoin-mining-site-their-proposed-local-facility/","host":"waff.com","date":"2026-09-01","published":"2026-09-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Russellville · Franklin · Source context reviewed"},{"id":"tallassee-mill-data-center-al","state":"al","kind":"facility","name":"Tallassee 1852 Mill Data Center Proposal","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Elmore"],"city":"Tallassee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No adopted moratorium or permanent legal prohibition established. Historic mill potential location is not operating data center; future Tallapoosa projects not this site. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wsfa.com/2026/05/18/tallassee-pulls-plug-data-center-plan-now/","host":"wsfa.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.5333016,"lng":-85.8901615,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"mayoral-project-pause","reported_finding":"WSFA reports Tallassee mayor and council not moving forward for now, citing need for information and public process.","report_display_date":"2026-05-18","independently_verified_current_status":null},"notes":["No adopted moratorium or permanent legal prohibition established. Historic mill potential location is not operating data center; future Tallapoosa projects not this site.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wsfa.com/2026/05/18/tallassee-pulls-plug-data-center-plan-now/","host":"wsfa.com","date":"2026-05-18","published":"2026-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tallassee · Elmore · Source context reviewed"},{"id":"university-of-alabama-hpc-tuscaloosa-al","state":"al","kind":"facility","name":"University of Alabama High Performance Computing and Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Tuscaloosa"],"city":"Tuscaloosa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alabama future facility with unresolved capacity units/boundary. Internal power scope/unit conflict:14.6MWmasterplan versus5/16mWplus and cabinet ratings; no single canonical criticalITMW adopted. Do not multiply83rated350kWcabinets into actual facility demand.96Mforecastnotactualspent. Adjacent22500GSFsubstation not additional data hall. Early2027future, not operating now. Tier2plus wording not independent certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hpc.ua.edu/about/","host":"hpc.ua.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2120822,"lng":-87.5396735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Alabama future facility with unresolved capacity units/boundary","fields":{"institution":"University of Alabama","facility":"High Performance Computing and Data Center","address":"709 Johnny Stallings Drive, Tuscaloosa, Alabama","planned_gross_sqft":40000,"included_data_hall_sqft":10000,"planned_project_investment_usd":96000000,"opening_target":"early2027","published_masterplanned_computing_mw":14.6,"other_published_capacity_text":"5 mW+ available, scalable to16 mW+"},"notes":["Internal power scope/unit conflict:14.6MWmasterplan versus5/16mWplus and cabinet ratings; no single canonical criticalITMW adopted. Do not multiply83rated350kWcabinets into actual facility demand.96Mforecastnotactualspent. Adjacent22500GSFsubstation not additional data hall. Early2027future, not operating now. Tier2plus wording not independent certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hpc.ua.edu/about/","host":"hpc.ua.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tuscaloosa · Tuscaloosa · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}