{"state":"az","name":"Eloy, Arizona","updated":"2026-10-24","checked":"2026-10-15","bounds":[-111.48980999999999,32.84763,-111.24399,33.01074],"stats":{"reviewed_records":2,"status_confirmed":0,"status_unknown":2,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"vermaland-la-osa-eloy-az","state":"az","kind":"facility","name":"La Osa Data Center Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Eloy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. URL datedAugust 26 but body says updatedSeptember 29; preserve update provenance and distinguish new denial section from older future-hearing paragraph still on page. Reported denial is not independently examined original resolution, appeal judgment or permanent prohibition. Same update says Pima adopted 120 daypauseSeptember 22 andTucsonnewrulesAugust 5; those are different jurisdictions and require original scope/exception review. This later-dated Pima claim differs from round 32 Sept 24 story’s future-meeting wording; exact signed county instrument remains a follow-up, not a calendar-inferred resolution. No La Osa MW/approved water/operation inferred. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sonorandesert.org/2026/08/26/data-centers-update/","host":"sonorandesert.org","date":"2026-09-29","published":"2026-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://public.destinyhosted.com/pinaldocs/2025/PZ/20251016_135/784_PZPA01125-_La_Osa_PKT-P%26Z.pdf","host":"public.destinyhosted.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":32.88763,"lng":-111.43981,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Coalition for Sonoran Desert Protection’s update explicitly reports Pinal supervisors denied La Osa rezoning onAugust 26,2026, after conservation-group opposition.","independently_verified_current_operating_status":null,"advocacy_reported_rezoning_denial_date":"2026-08-26","original_decision_verified":false},"notes":["URL datedAugust 26 but body says updatedSeptember 29; preserve update provenance and distinguish new denial section from older future-hearing paragraph still on page. Reported denial is not independently examined original resolution, appeal judgment or permanent prohibition. Same update says Pima adopted 120 daypauseSeptember 22 andTucsonnewrulesAugust 5; those are different jurisdictions and require original scope/exception review. This later-dated Pima claim differs from round 32 Sept 24 story’s future-meeting wording; exact signed county instrument remains a follow-up, not a calendar-inferred resolution. No La Osa MW/approved water/operation inferred.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sonorandesert.org/2026/08/26/data-centers-update/","host":"sonorandesert.org","date":"2026-09-29","published":"2026-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 18","scope":"The Pinal October 16, 2025 staff packet reports a Citizen Advisory Committee recommendation and records concerns about drainage, fire safety, water, trails and open space. It describes a comprehensive plan request that would allow later rezoning work. The recommendation is not a Board approval or current physical stage. Later reported August 2026 denial leads were not verified in an original decision record during this bounded review, so no cancellation, permanent closure or final legal outcome is adopted.","fields":{"current_stage_evidence":{"outcome":"historical_advisory_recommendation_not_final_board_or_physical_outcome","scope":"The Pinal October 16, 2025 staff packet reports a Citizen Advisory Committee recommendation and records concerns about drainage, fire safety, water, trails and open space. It describes a comprehensive plan request that would allow later rezoning work. The recommendation is not a Board approval or current physical stage. Later reported August 2026 denial leads were not verified in an original decision record during this bounded review, so no cancellation, permanent closure or final legal outcome is adopted."},"source_read_scope":{"staff_report_text_pages_read":[1,2,3,4,5],"staff_summary_page_visually_read":1,"advisory_recommendation_not_final_board_approval":true,"later_reported_outcome_primary_verification_held":true}},"notes":["The Pinal October 16, 2025 staff packet reports a Citizen Advisory Committee recommendation and records concerns about drainage, fire safety, water, trails and open space. It describes a comprehensive plan request that would allow later rezoning work. The recommendation is not a Board approval or current physical stage. Later reported August 2026 denial leads were not verified in an original decision record during this bounded review, so no cancellation, permanent closure or final legal outcome is adopted.","Roles, locations, individual physical identity, quantities and opening fields remain exact. Source dates, check dates and physical milestones stay separate."],"sources":[{"url":"https://public.destinyhosted.com/pinaldocs/2025/PZ/20251016_135/784_PZPA01125-_La_Osa_PKT-P%26Z.pdf","host":"public.destinyhosted.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Eloy · Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"04021"}},{"id":"ryan-companies-southwest-crossing-data-park-eloy-az","state":"az","kind":"facility","name":"Southwest Crossing Data Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Eloy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Commission recommendation is not council adoption or construction. Three buildings exceeding 855,000 square feet differ from the economic study ceiling of 1.25 million square feet; do not merge both as final built area. 400 MW has no stated critical-IT basis. $687.5 million construction cost, more than $5.6 million annual direct tax and 4,800 direct construction jobs are consultant forecasts, not spending, collections or permanent jobs. Proposed 219,600 gallons/day average cap has a city-engineer exception and is not measured consumption or a claim of zero water use. End user is explicitly unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/","host":"azbex.com","date":"2025-01-21","published":"2025-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.97074,"lng":-111.29399,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"AZBEX reports Ryan Companies pivoted the Eloy industrial proposal to Southwest Crossing Data Park, with planning commission recommending the rezoning on January 15.","independently_verified_current_operating_status":null,"reported_water_design_average_gallons_per_day":219600,"water_figure_scope":"Proposed application limit with city-engineer exception; not measured consumption","executed_utility_agreement_verified":false},"notes":["Commission recommendation is not council adoption or construction. Three buildings exceeding 855,000 square feet differ from the economic study ceiling of 1.25 million square feet; do not merge both as final built area. 400 MW has no stated critical-IT basis. $687.5 million construction cost, more than $5.6 million annual direct tax and 4,800 direct construction jobs are consultant forecasts, not spending, collections or permanent jobs. Proposed 219,600 gallons/day average cap has a city-engineer exception and is not measured consumption or a claim of zero water use. End user is explicitly unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/","host":"azbex.com","date":"2025-01-21","published":"2025-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Eloy · Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"04021"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"vermaland-la-osa-eloy-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"ryan-companies-southwest-crossing-data-park-eloy-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Pinal County","base_name":"Pinal","fips":"04021","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[{"id":"local-rule:county-review:20261023:c03:04021","jurisdiction":{"state":"AZ","county_fips":"04021","municipality":null},"rule_type":"county_research_review","status":"source_access_limited","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Pinal County","adopted_on":null,"conditions":["The October 23 source attempt stopped at a robots response of HTTP 403. The target government document was not requested. No government policy content was reviewed from the selected target.","No restriction, permission, legal outcome or absence of law is established by this access only review. Other retained project packets have separate scopes and do not replace the inaccessible current code. No alternate identity or access bypass was used."],"scope":"Bounded county area source review, not an enacted legal instrument, complete legal corpus, legal advice or parcel permission. County association does not establish parcel jurisdiction. Check dates are not legal effective dates.","label":"Source access limited","checked_on":"2026-10-23","sources":[{"url":"https://www.pinal.gov/226/Planning","publisher":"Data Centers Atlas access check; government policy content not captured","source_type":"unclassified","published_on":null,"retrieved_on":"2026-10-23","archive_sha256":null,"capture_format":null}]}],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":33,"retained_reviewed_reference":13,"county_display":33},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"az","name":"Eloy","state_name":"Arizona","state_path":"/arizona/","slug":"eloy","path":"/city/arizona/eloy/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[],"city_companies":[],"map_settings":{"bounds":[-111.48980999999999,32.84763,-111.24399,33.01074],"hub":[-111.36689999999999,32.929185000000004],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-109.0425,37.0003],[-109.048,31.3316],[-111.0744,31.3316],[-112.2465,31.7041],[-114.8152,32.4927],[-114.7221,32.7173],[-114.5249,32.7556],[-114.4702,32.8433],[-114.5249,33.0295],[-114.6618,33.035],[-114.7276,33.4074],[-114.5249,33.5498],[-114.4975,33.6977],[-114.5359,33.9332],[-114.4154,34.1084],[-114.2566,34.1742],[-114.1361,34.3056],[-114.3332,34.448],[-114.4702,34.7109],[-114.6345,34.8752],[-114.6345,35.0012],[-114.5742,35.1381],[-114.5961,35.3243],[-114.6783,35.516],[-114.7385,36.102],[-114.3716,36.1404],[-114.2511,36.0199],[-114.1525,36.0254],[-114.0484,36.1952],[-114.0484,37.0003],[-110.4994,37.0057],[-109.0425,37.0003]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-109.0425,37.0003],[-109.048,31.3316],[-111.0744,31.3316],[-112.2465,31.7041],[-114.8152,32.4927],[-114.7221,32.7173],[-114.5249,32.7556],[-114.4702,32.8433],[-114.5249,33.0295],[-114.6618,33.035],[-114.7276,33.4074],[-114.5249,33.5498],[-114.4975,33.6977],[-114.5359,33.9332],[-114.4154,34.1084],[-114.2566,34.1742],[-114.1361,34.3056],[-114.3332,34.448],[-114.4702,34.7109],[-114.6345,34.8752],[-114.6345,35.0012],[-114.5742,35.1381],[-114.5961,35.3243],[-114.6783,35.516],[-114.7385,36.102],[-114.3716,36.1404],[-114.2511,36.0199],[-114.1525,36.0254],[-114.0484,36.1952],[-114.0484,37.0003],[-110.4994,37.0057],[-109.0425,37.0003]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
