{"state":"az","name":"Florence, Arizona","updated":"2026-10-24","checked":"2026-10-15","bounds":[-111.39482,32.79648,-111.28885,32.94444],"stats":{"reviewed_records":2,"status_confirmed":2,"status_unknown":0,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"edgecore-dobson-farms-east-florence-az","state":"az","kind":"facility","name":"Dobson Farms East","group":"proposed","status":"General plan amendment approved","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2025-10-07","Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 766 25 for the Dobson Farms East general plan place type change. This broad land use action is not a final individual data center entitlement, construction permit or opening."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","host":"www.florenceaz.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":32.90444,"lng":-111.34482,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Pinal Post reports October 7, 2025 Florence land-use amendments for three Dobson Farms areas totaling 1,619 acres.","independently_verified_current_operating_status":null},"notes":["Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 18","scope":"The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance.","fields":{"current_stage_evidence":{"outcome":"reported_general_plan_action_not_individual_datacenter_entitlement","scope":"The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance."},"government_record_scope":{"minutes_pdf_pages_read":[53,54,55],"operative_vote_page_visually_read":55,"executed_ordinance_independently_verified":false,"east_and_west_and_tech_park_actions_separate":true}},"notes":["The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance.","Roles, locations, individual physical identity, quantities and opening fields remain exact. Source dates, check dates and physical milestones stay separate."],"sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","host":"www.florenceaz.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Florence · Pinal · Source context reviewed","status_scope":"The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance.","event_evidence":[{"date":"2025-10-07","text":"Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 766 25 for the Dobson Farms East general plan place type change. This broad land use action is not a final individual data center entitlement, construction permit or opening.","kind":"approved","sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","host":"www.florenceaz.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"04021"}},{"id":"ryan-companies-florence-tech-park-az","state":"az","kind":"facility","name":"Florence Tech Park","group":"proposed","status":"PUD amendment approved","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2025-10-07","Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 769 25 for the Florence Tech Park PUD amendment. The action adds data centers within a broader light industrial use framework and is separate from individual building permits, utility delivery and operation."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","host":"www.florenceaz.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":32.83648,"lng":-111.33885,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Pinal Post reports October 7, 2025 Florence land-use amendments for three Dobson Farms areas totaling 1,619 acres.","independently_verified_current_operating_status":null},"notes":["Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 18","scope":"Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed.","fields":{"current_stage_evidence":{"outcome":"reported_pud_action_not_current_physical_building_stage","scope":"Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed."},"government_record_scope":{"minutes_pdf_pages_read":[56,57,58],"operative_vote_pages_visually_read":[57,58],"executed_ordinance_independently_verified":false,"rezoning_distinct_from_individual_building_permits":true}},"notes":["Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed.","Roles, locations, individual physical identity, quantities and opening fields remain exact. Source dates, check dates and physical milestones stay separate."],"sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","host":"www.florenceaz.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Florence · Pinal · Source context reviewed","status_scope":"Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed.","event_evidence":[{"date":"2025-10-07","text":"Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 769 25 for the Florence Tech Park PUD amendment. The action adds data centers within a broader light industrial use framework and is separate from individual building permits, utility delivery and operation.","kind":"approved","sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","host":"www.florenceaz.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"04021"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"edgecore-dobson-farms-east-florence-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"ryan-companies-florence-tech-park-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Pinal County","base_name":"Pinal","fips":"04021","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[{"id":"local-rule:county-review:20261023:c03:04021","jurisdiction":{"state":"AZ","county_fips":"04021","municipality":null},"rule_type":"county_research_review","status":"source_access_limited","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Pinal County","adopted_on":null,"conditions":["The October 23 source attempt stopped at a robots response of HTTP 403. The target government document was not requested. No government policy content was reviewed from the selected target.","No restriction, permission, legal outcome or absence of law is established by this access only review. Other retained project packets have separate scopes and do not replace the inaccessible current code. No alternate identity or access bypass was used."],"scope":"Bounded county area source review, not an enacted legal instrument, complete legal corpus, legal advice or parcel permission. County association does not establish parcel jurisdiction. Check dates are not legal effective dates.","label":"Source access limited","checked_on":"2026-10-23","sources":[{"url":"https://www.pinal.gov/226/Planning","publisher":"Data Centers Atlas access check; government policy content not captured","source_type":"unclassified","published_on":null,"retrieved_on":"2026-10-23","archive_sha256":null,"capture_format":null}]}],"stage_timelines":{"edgecore-dobson-farms-east-florence-az":{"stages":[{"id":"event:milestone:research-20261023-c18-edgecore-dobson-farms-east-florence-az:0","date":"2025-10-07","stage":"approved","scheduled":false,"basis":"primary source","scope":"Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 766 25 for the Dobson Farms East general plan place type change. This broad land use action is not a final individual data center entitlement, construction permit or opening.","sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","publisher":"Town of Florence"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"},"ryan-companies-florence-tech-park-az":{"stages":[{"id":"event:milestone:research-20261023-c18-ryan-companies-florence-tech-park-az:0","date":"2025-10-07","stage":"approved","scheduled":false,"basis":"primary source","scope":"Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 769 25 for the Florence Tech Park PUD amendment. The action adds data centers within a broader light industrial use framework and is separate from individual building permits, utility delivery and operation.","sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","publisher":"Town of Florence"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":33,"retained_reviewed_reference":13,"county_display":33},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"az","name":"Florence","state_name":"Arizona","state_path":"/arizona/","slug":"florence","path":"/city/arizona/florence/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261023-c18-ryan-companies-florence-tech-park-az","subject_id":"site:ryan-companies-florence-tech-park-az","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"proposed","status_label":"PUD amendment approved","scope":"Town of Florence minutes report October 7, 2025 adoption of Ordinance 769 25 for the Florence Tech Park PUD amendment, following a separate general plan action. PUD amendment approved describes this zoning context. The record names Ryan counsel and adds data centers among permitted light industrial uses, but does not certify an individual tenant, building permit, delivered power or operation. Separate Dobson Farms East and West general plan changes are not transferred to this component. The attached minutes report past votes and retain blank certification signatures; an executed ordinance was not separately reviewed.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","publisher":"Town of Florence","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:c9159519f4700920e25b9f2c"],"event_type":["source:c9159519f4700920e25b9f2c"],"occurred_on":["source:c9159519f4700920e25b9f2c"],"observed_on":["source:c9159519f4700920e25b9f2c"],"qualifies_status":["source:c9159519f4700920e25b9f2c"],"status_group":["source:c9159519f4700920e25b9f2c"],"status_label":["source:c9159519f4700920e25b9f2c"],"scope":["source:c9159519f4700920e25b9f2c"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:status:research-20261023-c18-edgecore-dobson-farms-east-florence-az","subject_id":"site:edgecore-dobson-farms-east-florence-az","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"proposed","status_label":"General plan amendment approved","scope":"The October 7, 2025 Town minutes report adoption of Ordinance 766 25, changing the Dobson Farms East area from a residential general plan place type to industrial. General plan amendment approved describes that land use action. The minutes say permitted uses still require rezoning review; data centers are among several contemplated industrial uses. This is distinct from the separate Florence Tech Park PUD action and does not certify EdgeCore ownership, an individual data center permit, physical construction or operation. The minutes are retained in a later agenda packet with blank signature lines, not a separately verified executed ordinance.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","publisher":"Town of Florence","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:c9159519f4700920e25b9f2c"],"event_type":["source:c9159519f4700920e25b9f2c"],"occurred_on":["source:c9159519f4700920e25b9f2c"],"observed_on":["source:c9159519f4700920e25b9f2c"],"qualifies_status":["source:c9159519f4700920e25b9f2c"],"status_group":["source:c9159519f4700920e25b9f2c"],"status_label":["source:c9159519f4700920e25b9f2c"],"scope":["source:c9159519f4700920e25b9f2c"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261023-c18-ryan-companies-florence-tech-park-az:0","subject_id":"site:ryan-companies-florence-tech-park-az","event_type":"approved","occurred_on":"2025-10-07","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 769 25 for the Florence Tech Park PUD amendment. The action adds data centers within a broader light industrial use framework and is separate from individual building permits, utility delivery and operation.","display_category":"recorded_event","display_date":"2025-10-07","sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","publisher":"Town of Florence","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:c9159519f4700920e25b9f2c"],"event_type":["source:c9159519f4700920e25b9f2c"],"occurred_on":["source:c9159519f4700920e25b9f2c"],"observed_on":["source:c9159519f4700920e25b9f2c"],"qualifies_status":["source:c9159519f4700920e25b9f2c"],"status_group":["source:c9159519f4700920e25b9f2c"],"status_label":["source:c9159519f4700920e25b9f2c"],"scope":["source:c9159519f4700920e25b9f2c"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261023-c18-edgecore-dobson-farms-east-florence-az:0","subject_id":"site:edgecore-dobson-farms-east-florence-az","event_type":"approved","occurred_on":"2025-10-07","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 766 25 for the Dobson Farms East general plan place type change. This broad land use action is not a final individual data center entitlement, construction permit or opening.","display_category":"recorded_event","display_date":"2025-10-07","sources":[{"url":"https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf","publisher":"Town of Florence","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:c9159519f4700920e25b9f2c"],"event_type":["source:c9159519f4700920e25b9f2c"],"occurred_on":["source:c9159519f4700920e25b9f2c"],"observed_on":["source:c9159519f4700920e25b9f2c"],"qualifies_status":["source:c9159519f4700920e25b9f2c"],"status_group":["source:c9159519f4700920e25b9f2c"],"status_label":["source:c9159519f4700920e25b9f2c"],"scope":["source:c9159519f4700920e25b9f2c"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-111.39482,32.79648,-111.28885,32.94444],"hub":[-111.341835,32.87046],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-109.0425,37.0003],[-109.048,31.3316],[-111.0744,31.3316],[-112.2465,31.7041],[-114.8152,32.4927],[-114.7221,32.7173],[-114.5249,32.7556],[-114.4702,32.8433],[-114.5249,33.0295],[-114.6618,33.035],[-114.7276,33.4074],[-114.5249,33.5498],[-114.4975,33.6977],[-114.5359,33.9332],[-114.4154,34.1084],[-114.2566,34.1742],[-114.1361,34.3056],[-114.3332,34.448],[-114.4702,34.7109],[-114.6345,34.8752],[-114.6345,35.0012],[-114.5742,35.1381],[-114.5961,35.3243],[-114.6783,35.516],[-114.7385,36.102],[-114.3716,36.1404],[-114.2511,36.0199],[-114.1525,36.0254],[-114.0484,36.1952],[-114.0484,37.0003],[-110.4994,37.0057],[-109.0425,37.0003]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-109.0425,37.0003],[-109.048,31.3316],[-111.0744,31.3316],[-112.2465,31.7041],[-114.8152,32.4927],[-114.7221,32.7173],[-114.5249,32.7556],[-114.4702,32.8433],[-114.5249,33.0295],[-114.6618,33.035],[-114.7276,33.4074],[-114.5249,33.5498],[-114.4975,33.6977],[-114.5359,33.9332],[-114.4154,34.1084],[-114.2566,34.1742],[-114.1361,34.3056],[-114.3332,34.448],[-114.4702,34.7109],[-114.6345,34.8752],[-114.6345,35.0012],[-114.5742,35.1381],[-114.5961,35.3243],[-114.6783,35.516],[-114.7385,36.102],[-114.3716,36.1404],[-114.2511,36.0199],[-114.1525,36.0254],[-114.0484,36.1952],[-114.0484,37.0003],[-110.4994,37.0057],[-109.0425,37.0003]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
