{"state":"ga","name":"Rome, Georgia","updated":"2026-10-24","checked":"2026-10-15","bounds":[-85.28083,34.191,-85.16116000000001,34.31861],"stats":{"reviewed_records":3,"status_confirmed":0,"status_unknown":3,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"atlas-coosa-project-gracie-floyd-ga","state":"ga","kind":"facility","name":"Coosa Data Center (Project Gracie)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.26318,"lng":-85.21399,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Atlas Gracie versus Sassy proposal identity","fields":{"developer":"Atlas Development","separate_proposals":[{"name":"Project Gracie","locality":"Coosa, FloydCounty, Georgia","proposed_acres":200,"proposed_area_sqft":2400000,"proposed_buildings":7,"target_completion_month":"2032-12","reported_planning_recommendation":"4-3 in favor; CountyBoard decision still required"},{"name":"Project Sassy","locality":"Rome, Georgia","proposed_initial_acres":178,"sought_additional_acres":15}]},"notes":["Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Rome · Floyd · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"13115"}},{"id":"microsoft-firecracker-rome-ga","state":"ga","kind":"facility","name":"Microsoft Data Center Campus - Rome, GA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending. Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/","host":"allongeorgia.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://developromefloyd.com/targeted-sectors/technology/","host":"developromefloyd.com","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/","host":"developromefloyd.com","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"}],"loc":{"lat":34.231,"lng":-85.21116,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending.","Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/","host":"allongeorgia.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"encore-2026-10-17-batch2","scope":"Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.","fields":{"current_stage_evidence":{"outcome":"unresolved","scope":"The October 2023 acquisition account and its three-year estimate do not establish October 2026 completion. The development authority’s technology page is general company context; its Coosa article explicitly reprints news. Coosa, Jazzy and Battey site contexts are not transferred to Firecracker. Reprinted news does not become a signed permit or incentive award."}},"notes":["The October 2023 acquisition account and its three-year estimate do not establish October 2026 completion. The development authority’s technology page is general company context; its Coosa article explicitly reprints news. Coosa, Jazzy and Battey site contexts are not transferred to Firecracker. Reprinted news does not become a signed permit or incentive award."],"sources":[{"url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/","host":"allongeorgia.com","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://developromefloyd.com/targeted-sectors/technology/","host":"developromefloyd.com","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/","host":"developromefloyd.com","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"}],"checked":"2026-10-17","whole_record_certified":false},{"overlay":"Codex 3 research cohort 12","scope":"The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage.","fields":{"current_stage_evidence":{"outcome":"distinct_coosa_proposal_and_firecracker_current_stage_hold","scope":"The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage."},"identity_hold":{"coosa_school_proposal_distinct_from_microsoft_huffaker_purchase":true,"republication_not_independent_permit_verification":true,"current_firecracker_stage_verified":false,"minutes_request_state":"HTTP404"}},"notes":["The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage.","The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."],"sources":[{"url":"https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/","host":"developromefloyd.com","published":"","date":"","checked":"2026-10-22","label":"Reviewed government record"}],"checked":"2026-10-22","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Rome · Floyd · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"13115"}},{"id":"atlas-project-sassy-rome-ga","state":"ga","kind":"facility","name":"Project Sassy (Atlas Development Rome Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.27861,"lng":-85.23083,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Atlas Gracie versus Sassy proposal identity","fields":{"developer":"Atlas Development","separate_proposals":[{"name":"Project Gracie","locality":"Coosa, FloydCounty, Georgia","proposed_acres":200,"proposed_area_sqft":2400000,"proposed_buildings":7,"target_completion_month":"2032-12","reported_planning_recommendation":"4-3 in favor; CountyBoard decision still required"},{"name":"Project Sassy","locality":"Rome, Georgia","proposed_initial_acres":178,"sought_additional_acres":15}]},"notes":["Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Rome · Floyd · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"13115"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"atlas-coosa-project-gracie-floyd-ga":{"fips":["13115"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"microsoft-firecracker-rome-ga":{"fips":["13115"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"atlas-project-sassy-rome-ga":{"fips":["13115"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Floyd County","base_name":"Floyd","fips":"13115","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"site_specific_rules":[{"id":"local-rule:cartersville:indo:44-26","jurisdiction":{"state":"GA","county_fips":"13015","municipality":"Cartersville"},"rule_type":"site_specific_zoning_conditions","status":"adopted","effective_on":null,"expires_on":null,"legacy_rule":null,"subject_id":"site:databank-indo-cartersville-ga","rule_reference":"Z26-05; ordinance reference 44-26","adopted_on":"2026-09-03","conditions":["Conditioned on the submitted concept site plan, elevations and project descriptions, including a closed-loop water cooling system.","Principal use limited to data processing, storage, hosting and related services, with associated Technology-district and customary accessory uses.","No certificate of occupancy for a data center until a letter establishes electric power is available; individual buildings and subdivisions may be treated separately."],"scope":"Conditions attached to this specific rezoning and variance approval. Not a citywide/countywide data-center ordinance, a county rules sweep, or proof conditions have been discharged.","field_sources":{"jurisdiction":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"rule_type":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"status":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"effective_on":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"expires_on":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"legacy_rule":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"subject_id":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"rule_reference":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"adopted_on":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"conditions":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"scope":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}]},"field_confidence":{"jurisdiction":"inference","rule_type":"primary_record","status":"primary_record","effective_on":"inference","expires_on":"inference","legacy_rule":"inference","subject_id":"primary_record","rule_reference":"primary_record","adopted_on":"primary_record","conditions":"primary_record","scope":"primary_record"},"field_checked_on":{"jurisdiction":"2026-10-16","rule_type":"2026-10-16","status":"2026-10-16","effective_on":"2026-10-16","expires_on":"2026-10-16","legacy_rule":"2026-10-16","subject_id":"2026-10-16","rule_reference":"2026-10-16","adopted_on":"2026-10-16","conditions":"2026-10-16","scope":"2026-10-16"}}],"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":62,"retained_reviewed_reference":17,"county_display":62},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"ga","name":"Rome","state_name":"Georgia","state_path":"/georgia/","slug":"rome","path":"/city/georgia/rome/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[],"city_companies":[{"path":"/company/microsoft/","name":"Microsoft"}],"map_settings":{"bounds":[-85.28083,34.191,-85.16116000000001,34.31861],"hub":[-85.220995,34.254805000000005],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-83.1092,35.0012],[-83.3228,34.7876],[-83.3392,34.6835],[-83.0051,34.4699],[-82.9011,34.4863],[-82.7477,34.2673],[-82.7149,34.1523],[-82.556,33.9441],[-82.326,33.8182],[-82.1945,33.6319],[-81.9262,33.4622],[-81.9371,33.3471],[-81.7619,33.1609],[-81.4935,33.0076],[-81.4278,32.8433],[-81.4168,32.6297],[-81.2799,32.5585],[-81.1211,32.2901],[-81.1156,32.1203],[-80.8856,32.0327],[-81.132,31.6931],[-81.1758,31.5178],[-81.2799,31.3645],[-81.2908,31.2057],[-81.4004,31.1345],[-81.4442,30.7073],[-81.718,30.7456],[-81.9481,30.8278],[-82.0412,30.7511],[-82.0028,30.5649],[-82.0467,30.3622],[-82.1672,30.3567],[-82.2164,30.5703],[-83.4981,30.647],[-84.8673,30.7127],[-85.0042,31.003],[-85.1138,31.2769],[-85.0426,31.5398],[-85.1411,31.841],[-85.0535,32.0108],[-85.059,32.1367],[-84.8892,32.2627],[-85.0042,32.323],[-84.9604,32.4215],[-85.0699,32.5804],[-85.185,32.8597],[-85.4314,34.1249],[-85.6067,34.9847],[-84.3196,34.9902],[-83.6185,34.9847],[-83.1092,35.0012]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-83.1092,35.0012],[-83.3228,34.7876],[-83.3392,34.6835],[-83.0051,34.4699],[-82.9011,34.4863],[-82.7477,34.2673],[-82.7149,34.1523],[-82.556,33.9441],[-82.326,33.8182],[-82.1945,33.6319],[-81.9262,33.4622],[-81.9371,33.3471],[-81.7619,33.1609],[-81.4935,33.0076],[-81.4278,32.8433],[-81.4168,32.6297],[-81.2799,32.5585],[-81.1211,32.2901],[-81.1156,32.1203],[-80.8856,32.0327],[-81.132,31.6931],[-81.1758,31.5178],[-81.2799,31.3645],[-81.2908,31.2057],[-81.4004,31.1345],[-81.4442,30.7073],[-81.718,30.7456],[-81.9481,30.8278],[-82.0412,30.7511],[-82.0028,30.5649],[-82.0467,30.3622],[-82.1672,30.3567],[-82.2164,30.5703],[-83.4981,30.647],[-84.8673,30.7127],[-85.0042,31.003],[-85.1138,31.2769],[-85.0426,31.5398],[-85.1411,31.841],[-85.0535,32.0108],[-85.059,32.1367],[-84.8892,32.2627],[-85.0042,32.323],[-84.9604,32.4215],[-85.0699,32.5804],[-85.185,32.8597],[-85.4314,34.1249],[-85.6067,34.9847],[-84.3196,34.9902],[-83.6185,34.9847],[-83.1092,35.0012]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
