{"state":"in","name":"Hobart, Indiana","updated":"2026-10-24","checked":"2026-10-15","bounds":[-87.43208,41.37712,-87.31586,41.47828],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aws-hobart-in","state":"in","kind":"facility","name":"AWS Hobart Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Hobart","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Northwest Indiana investment geography and Hobart announcement. 15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","host":"nwiforum.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.cityofhobart.org/AgendaCenter/ViewFile/Minutes/_03182026-2545","host":"www.cityofhobart.org","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":41.41712,"lng":-87.38208,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Northwest Indiana investment geography and Hobart announcement","fields":{"publisher_role":"Northwest Indiana regional economic-development organization","regional_planned_aws_investment_usd":15000000000,"regional_expected_new_jobs":1100,"statewide_aws_planned_total_usd":26000000000,"prior_st_joseph_county_commitment_usd":11000000000,"hobart_agreement_announcement_date":"2025-11-25"},"notes":["15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","host":"nwiforum.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 23","scope":"Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear.","fields":{"current_stage_evidence":{"outcome":"signed_city_discussion_and_current_notice_capture_holds_not_operating_phase","scope":"Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear."},"source_scope":{"city_meeting_on":"2026-03-18","all_four_signed_minutes_pages_visually_read":true,"public_comment_pages":[3,4],"secondhand_medical_and_new_carlisle_claims_not_verified":true,"current_notice_route_failure_not_project_cancellation":true}},"notes":["Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear.","The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."],"sources":[{"url":"https://www.cityofhobart.org/AgendaCenter/ViewFile/Minutes/_03182026-2545","host":"www.cityofhobart.org","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Hobart · Lake · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"18089"}},{"id":"powerhouse-hobart-lake-county-in","state":"in","kind":"facility","name":"PowerHouse Hobart","group":"proposed","status":"Developer-listed development","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Hobart","address":"","who":"PowerHouse Data Centers","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW. DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.powerhousedata.com/","host":"www.powerhousedata.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"loc":{"lat":41.43828,"lng":-87.36586,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW.","DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 1","scope":"PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.","fields":{"current_stage_evidence":{"outcome":"developer_listed_development","scope":"PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."}},"notes":["PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."],"sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","host":"www.powerhousedata.com","published":"","date":"","checked":"2026-10-22","label":"Reviewed operator source"}],"checked":"2026-10-22","whole_record_certified":false},{"overlay":"Company role source check72, October24,2026","scope":"The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.","fields":{"company_association":{"name":"PowerHouse Data Centers","role":"developer","identity_scope":"provider_brand_only","scope":"The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."},"provider_role":"developer"},"notes":["The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."],"sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","host":"www.powerhousedata.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"},{"url":"https://www.powerhousedata.com/","host":"www.powerhousedata.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Hobart · Lake · Source context reviewed","status_scope":"PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"18089"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"aws-hobart-in":{"fips":["18089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"powerhouse-hobart-lake-county-in":{"fips":["18089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Lake County","base_name":"Lake","fips":"18089","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[{"id":"local-rule:county-review:20261023:c03:18089","jurisdiction":{"state":"IN","county_fips":"18089","municipality":null},"rule_type":"county_research_review","status":"policy_context_found","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Lake County","adopted_on":null,"conditions":["Lake County Plan Commission states its authority extends to unincorporated areas and excludes incorporated areas. It lists zoning and subdivision review, building permits, inspections and certificates of occupancy among its functions.","Agency responsibility does not establish that a specific facility has a permit or occupancy certificate. The complete development ordinance, exceptions and individual city rules were not audited."],"scope":"Bounded county area source review, not an enacted legal instrument, complete legal corpus, legal advice or parcel permission. County association does not establish parcel jurisdiction. Check dates are not legal effective dates.","label":"Policy context found","checked_on":"2026-10-23","sources":[{"url":"https://lakecountyin.gov/departments/planning-commission","publisher":"Lake County","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-23","archive_sha256":"23c7cf2c8564a11553c044e9c97223d19b4e21e0a76e034b67365d410686d703","capture_format":"raw_response_bytes"}]}],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":36,"retained_reviewed_reference":3,"county_display":36},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"in","name":"Hobart","state_name":"Indiana","state_path":"/indiana/","slug":"hobart","path":"/city/indiana/hobart/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261022-c01-powerhouse-hobart-lake-county-in","subject_id":"site:powerhouse-hobart-lake-county-in","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-22","qualifies_status":true,"status_group":"proposed","status_label":"Developer-listed development","scope":"PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.","display_category":"source_check","display_date":"2026-10-22","sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","publisher":"PowerHouse","source_type":"company_page","retrieved_on":"2026-10-22"}],"field_sources":{"subject_id":["source:aad305d62f579135d5e2dcb9"],"event_type":["source:aad305d62f579135d5e2dcb9"],"occurred_on":["source:aad305d62f579135d5e2dcb9"],"observed_on":["source:aad305d62f579135d5e2dcb9"],"qualifies_status":["source:aad305d62f579135d5e2dcb9"],"status_group":["source:aad305d62f579135d5e2dcb9"],"status_label":["source:aad305d62f579135d5e2dcb9"],"scope":["source:aad305d62f579135d5e2dcb9"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/amazon-web-services/","name":"Amazon Web Services (AWS)"},{"path":"/company/powerhouse-data-centers/","name":"PowerHouse Data Centers"}],"map_settings":{"bounds":[-87.43208,41.37712,-87.31586,41.47828],"hub":[-87.37397,41.4277],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-85.9901,41.7597],[-84.807,41.7597],[-84.807,41.694],[-84.8016,40.5],[-84.818,39.1034],[-84.8947,39.0596],[-84.8125,38.7857],[-84.9878,38.7803],[-85.174,38.6872],[-85.4314,38.731],[-85.4205,38.5338],[-85.5902,38.4517],[-85.656,38.3257],[-85.8312,38.2764],[-85.9243,38.0245],[-86.0394,37.9587],[-86.2639,38.0518],[-86.3022,38.1669],[-86.5213,38.0409],[-86.5049,37.9313],[-86.7294,37.893],[-86.7952,37.9916],[-87.0471,37.893],[-87.1293,37.7889],[-87.3812,37.9368],[-87.5127,37.904],[-87.6003,37.9752],[-87.6824,37.904],[-87.9344,37.893],[-88.0275,37.7999],[-88.0603,37.8656],[-88.0001,38.1011],[-87.9234,38.1504],[-87.9508,38.2764],[-87.8358,38.2928],[-87.6551,38.5064],[-87.6222,38.6379],[-87.4962,38.7803],[-87.5127,38.9555],[-87.6386,39.1691],[-87.5291,39.3499],[-87.5236,41.7104],[-87.425,41.6447],[-87.1183,41.6447],[-86.8226,41.7597],[-85.9901,41.7597]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-85.9901,41.7597],[-84.807,41.7597],[-84.807,41.694],[-84.8016,40.5],[-84.818,39.1034],[-84.8947,39.0596],[-84.8125,38.7857],[-84.9878,38.7803],[-85.174,38.6872],[-85.4314,38.731],[-85.4205,38.5338],[-85.5902,38.4517],[-85.656,38.3257],[-85.8312,38.2764],[-85.9243,38.0245],[-86.0394,37.9587],[-86.2639,38.0518],[-86.3022,38.1669],[-86.5213,38.0409],[-86.5049,37.9313],[-86.7294,37.893],[-86.7952,37.9916],[-87.0471,37.893],[-87.1293,37.7889],[-87.3812,37.9368],[-87.5127,37.904],[-87.6003,37.9752],[-87.6824,37.904],[-87.9344,37.893],[-88.0275,37.7999],[-88.0603,37.8656],[-88.0001,38.1011],[-87.9234,38.1504],[-87.9508,38.2764],[-87.8358,38.2928],[-87.6551,38.5064],[-87.6222,38.6379],[-87.4962,38.7803],[-87.5127,38.9555],[-87.6386,39.1691],[-87.5291,39.3499],[-87.5236,41.7104],[-87.425,41.6447],[-87.1183,41.6447],[-86.8226,41.7597],[-85.9901,41.7597]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
