{"state":"in","name":"Merom, Indiana","updated":"2026-10-24","checked":"2026-10-15","bounds":[-87.47718,39.04905,-87.36399,39.14114],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aboutbit-merom-sullivan-county-in","state":"in","kind":"facility","name":"AboutBit Merom Cryptocurrency Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Sullivan"],"city":"Merom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Merom historical cryptocurrency supply agreement announcement. Historicalforecastnotactualopening/current2026service. Original executedWINagreementnotinspected. Liquidcooling/noimpactpromises not measurednoise/environmental findings. MiningseparatefromAI/cloud. Existingpowerstationage notDCfounding;115MWnotstationgenerationandnotper-building. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-mining-facility/","host":"rejournals.com","date":"2022-05-18","published":"2022-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.08905,"lng":-87.41399,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Merom historical cryptocurrency supply agreement announcement","fields":{"company":"AboutBit LLC","location":"adjacent MeromGeneratingStation, SullivanCounty, Indiana","use":"cryptocurrency mining","reported_electricity_purchase_agreement_mw":115,"reported_agreement_years":5,"power_basis":"reported electricity supply agreement, not explicit IT or metered consumption","expected_new_jobs_max":15,"announced_opening_target":"within30days ofMay18,2022"},"notes":["Historicalforecastnotactualopening/current2026service. Original executedWINagreementnotinspected. Liquidcooling/noimpactpromises not measurednoise/environmental findings. MiningseparatefromAI/cloud. Existingpowerstationage notDCfounding;115MWnotstationgenerationandnotper-building.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-mining-facility/","host":"rejournals.com","date":"2022-05-18","published":"2022-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Merom · Sullivan · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"18153"}},{"id":"heartland-industrial-park-sullivan-county-in","state":"in","kind":"facility","name":"Heartland Industrial Park (Fluidstack Sullivan County Campus)","group":"proposed","status":"Project listed development","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Sullivan"],"city":"Merom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fluidstack Sullivan large planned valuation and scoped commitments. 65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sullivanfluidstack.io/","host":"sullivanfluidstack.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.10114,"lng":-87.42718,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Fluidstack Sullivan large planned valuation and scoped commitments","fields":{"developer":"Fluidstack","project":"Sullivan County Data Center","state":"Indiana","planned_development_value_usd":65000000000,"forecast_operations_start_year":2027,"community_enhancement_commitment_usd":50000000,"named_community_program_subset_usd":4500000,"land_donation_commitment_acres":15,"operator_named_power_provider":"WIN Energy REMC","voluntary_nearest_dwelling_sound_limit_db":55,"developer_claims_no_local_property_tax_incentives_sought":true},"notes":["65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sullivanfluidstack.io/","host":"sullivanfluidstack.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 23","scope":"The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.","fields":{"current_stage_evidence":{"outcome":"current_sullivan_project_proposal_not_future_benefits_as_actual_outcomes","scope":"The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed."}},"notes":["The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.","The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."],"sources":[{"url":"https://www.sullivanfluidstack.io/","host":"www.sullivanfluidstack.io","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Merom · Sullivan · Source context reviewed","status_scope":"The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"18153"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"aboutbit-merom-sullivan-county-in":{"fips":["18153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"heartland-industrial-park-sullivan-county-in":{"fips":["18153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Sullivan County","base_name":"Sullivan","fips":"18153","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":36,"retained_reviewed_reference":3,"county_display":36},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"in","name":"Merom","state_name":"Indiana","state_path":"/indiana/","slug":"merom","path":"/city/indiana/merom/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261023-c23-heartland-industrial-park-sullivan-county-in","subject_id":"site:heartland-industrial-park-sullivan-county-in","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"proposed","status_label":"Project listed development","scope":"The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://www.sullivanfluidstack.io/","publisher":"Fluidstack project information","source_type":"company_page","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:5baf1765410ee1072ac95f38"],"event_type":["source:5baf1765410ee1072ac95f38"],"occurred_on":["source:5baf1765410ee1072ac95f38"],"observed_on":["source:5baf1765410ee1072ac95f38"],"qualifies_status":["source:5baf1765410ee1072ac95f38"],"status_group":["source:5baf1765410ee1072ac95f38"],"status_label":["source:5baf1765410ee1072ac95f38"],"scope":["source:5baf1765410ee1072ac95f38"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-87.47718,39.04905,-87.36399,39.14114],"hub":[-87.420585,39.095095],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-85.9901,41.7597],[-84.807,41.7597],[-84.807,41.694],[-84.8016,40.5],[-84.818,39.1034],[-84.8947,39.0596],[-84.8125,38.7857],[-84.9878,38.7803],[-85.174,38.6872],[-85.4314,38.731],[-85.4205,38.5338],[-85.5902,38.4517],[-85.656,38.3257],[-85.8312,38.2764],[-85.9243,38.0245],[-86.0394,37.9587],[-86.2639,38.0518],[-86.3022,38.1669],[-86.5213,38.0409],[-86.5049,37.9313],[-86.7294,37.893],[-86.7952,37.9916],[-87.0471,37.893],[-87.1293,37.7889],[-87.3812,37.9368],[-87.5127,37.904],[-87.6003,37.9752],[-87.6824,37.904],[-87.9344,37.893],[-88.0275,37.7999],[-88.0603,37.8656],[-88.0001,38.1011],[-87.9234,38.1504],[-87.9508,38.2764],[-87.8358,38.2928],[-87.6551,38.5064],[-87.6222,38.6379],[-87.4962,38.7803],[-87.5127,38.9555],[-87.6386,39.1691],[-87.5291,39.3499],[-87.5236,41.7104],[-87.425,41.6447],[-87.1183,41.6447],[-86.8226,41.7597],[-85.9901,41.7597]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-85.9901,41.7597],[-84.807,41.7597],[-84.807,41.694],[-84.8016,40.5],[-84.818,39.1034],[-84.8947,39.0596],[-84.8125,38.7857],[-84.9878,38.7803],[-85.174,38.6872],[-85.4314,38.731],[-85.4205,38.5338],[-85.5902,38.4517],[-85.656,38.3257],[-85.8312,38.2764],[-85.9243,38.0245],[-86.0394,37.9587],[-86.2639,38.0518],[-86.3022,38.1669],[-86.5213,38.0409],[-86.5049,37.9313],[-86.7294,37.893],[-86.7952,37.9916],[-87.0471,37.893],[-87.1293,37.7889],[-87.3812,37.9368],[-87.5127,37.904],[-87.6003,37.9752],[-87.6824,37.904],[-87.9344,37.893],[-88.0275,37.7999],[-88.0603,37.8656],[-88.0001,38.1011],[-87.9234,38.1504],[-87.9508,38.2764],[-87.8358,38.2928],[-87.6551,38.5064],[-87.6222,38.6379],[-87.4962,38.7803],[-87.5127,38.9555],[-87.6386,39.1691],[-87.5291,39.3499],[-87.5236,41.7104],[-87.425,41.6447],[-87.1183,41.6447],[-86.8226,41.7597],[-85.9901,41.7597]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
