{"state":"in","name":"New Carlisle, Indiana","updated":"2026-10-24","checked":"2026-10-15","bounds":[-86.33995999999999,41.55354,-86.23794000000001,41.65663],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"amazon-project-rainier-new-carlisle-in","state":"in","kind":"facility","name":"Amazon Project Rainier","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Joseph"],"city":"New Carlisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","host":"iedc.in.gov","date":"2024-04-25","published":"2024-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster?trk=test","host":"www.aboutamazon.com","published":"2025-06-24","date":"2025-06-24","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":41.61663,"lng":-86.28996,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county":"St. Joseph","announced_planned_investment_usd":11000000000,"forecast_jobs_minimum":1000,"announced_sales_tax_exemption_term_years":50,"performance_based_incentive_caps_usd":{"headcount_tax_credits":18300000,"training_grants":5000000,"hoosier_business_investment_credits":55000000,"redevelopment_credits":20000000},"road_infrastructure_contribution_usd_up_to":7000000},"notes":["Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","host":"iedc.in.gov","date":"2024-04-25","published":"2024-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 23","scope":"Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held.","fields":{"current_stage_evidence":{"outcome":"operational_multi_site_compute_cluster_not_complete_new_carlisle_campus","scope":"Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held."},"source_version_scope":{"article_published_at":"2025-06-24T09:40:35.203Z","article_modified_at":"2025-10-29T11:00:00Z","current_wording_not_backdated_to_original_publication":true,"multi_site_cluster_capacity_not_local_capacity":true,"no_individual_building_phase_or_provider_role_change":true}},"notes":["Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held.","The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."],"sources":[{"url":"https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster?trk=test","host":"www.aboutamazon.com","published":"2025-06-24","date":"2025-06-24","checked":"2026-10-23","label":"Reviewed operator source"},{"url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","host":"iedc.in.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Carlisle · St. Joseph · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"18141"}},{"id":"new-carlisle-chicago-trail-data-center-st-joseph-county-in","state":"in","kind":"facility","name":"New Carlisle Chicago Trail Data Center","group":"stopped","status":"Reported rezoning denial","raw_status":"stopped","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["St. Joseph"],"city":"New Carlisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","host":"wvpe.org","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.59354,"lng":-86.28794,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-denied","reported_finding":"WVPE reports St Joseph County Council rejected rezoning needed for Chicago Trail proposal near New Carlisle after overnight meeting.","report_display_date":"2025-12-10","independently_verified_current_status":null},"notes":["A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","host":"wvpe.org","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"orchestra-F1-label-review-2026-10-20","scope":"WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.","fields":{"identity_label_context":{"previous_name":"New Carlisle Chicago Trail Data Center (rezoning denied)","plain_name":"New Carlisle Chicago Trail Data Center","interpretation":"WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.","outcome_wording_is_not_identity":true},"current_stage_evidence":{"outcome":"reported_rezoning_denial","scope":"WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure."}},"notes":["WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.","Inherited inventory name: New Carlisle Chicago Trail Data Center (rezoning denied). The wording is retained as provenance, not as an independently verified outcome.","An application decision is separate from a current physical stage. No coordinate, address, parcel, company role, technical figure or physical milestone date is changed."],"sources":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","host":"www.wvpe.org","published":"2025-12-10","date":"2025-12-10","checked":"2026-10-20","label":"WVPE"}],"checked":"2026-10-20","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Carlisle · St. Joseph · Source context reviewed","status_scope":"WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"18141"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"amazon-project-rainier-new-carlisle-in":{"fips":["18141"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"new-carlisle-chicago-trail-data-center-st-joseph-county-in":{"fips":["18141"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"St. Joseph County","base_name":"St. Joseph","fips":"18141","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":36,"retained_reviewed_reference":3,"county_display":36},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"in","name":"New Carlisle","state_name":"Indiana","state_path":"/indiana/","slug":"new-carlisle","path":"/city/indiana/new-carlisle/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:orchestra-F1-label-new-carlisle-chicago-trail-data-center-st-joseph-county-in-20261020","subject_id":"site:new-carlisle-chicago-trail-data-center-st-joseph-county-in","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-20","qualifies_status":true,"status_group":"stopped","status_label":"Reported rezoning denial","scope":"WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.","display_category":"source_check","display_date":"2026-10-20","sources":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","publisher":"WVPE","source_type":"news","retrieved_on":"2026-10-20"}],"field_sources":{"subject_id":["source:dbfbb4c0587f70d83a5ac702"],"event_type":["source:dbfbb4c0587f70d83a5ac702"],"occurred_on":["source:dbfbb4c0587f70d83a5ac702"],"observed_on":["source:dbfbb4c0587f70d83a5ac702"],"qualifies_status":["source:dbfbb4c0587f70d83a5ac702"],"status_group":["source:dbfbb4c0587f70d83a5ac702"],"status_label":["source:dbfbb4c0587f70d83a5ac702"],"scope":["source:dbfbb4c0587f70d83a5ac702"]},"field_confidence":{"subject_id":"secondary_report","event_type":"secondary_report","occurred_on":"secondary_report","observed_on":"secondary_report","qualifies_status":"secondary_report","status_group":"secondary_report","status_label":"secondary_report","scope":"secondary_report"}}],"city_companies":[{"path":"/company/amazon-web-services/","name":"Amazon Web Services (AWS)"}],"map_settings":{"bounds":[-86.33995999999999,41.55354,-86.23794000000001,41.65663],"hub":[-86.28895,41.605085],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-85.9901,41.7597],[-84.807,41.7597],[-84.807,41.694],[-84.8016,40.5],[-84.818,39.1034],[-84.8947,39.0596],[-84.8125,38.7857],[-84.9878,38.7803],[-85.174,38.6872],[-85.4314,38.731],[-85.4205,38.5338],[-85.5902,38.4517],[-85.656,38.3257],[-85.8312,38.2764],[-85.9243,38.0245],[-86.0394,37.9587],[-86.2639,38.0518],[-86.3022,38.1669],[-86.5213,38.0409],[-86.5049,37.9313],[-86.7294,37.893],[-86.7952,37.9916],[-87.0471,37.893],[-87.1293,37.7889],[-87.3812,37.9368],[-87.5127,37.904],[-87.6003,37.9752],[-87.6824,37.904],[-87.9344,37.893],[-88.0275,37.7999],[-88.0603,37.8656],[-88.0001,38.1011],[-87.9234,38.1504],[-87.9508,38.2764],[-87.8358,38.2928],[-87.6551,38.5064],[-87.6222,38.6379],[-87.4962,38.7803],[-87.5127,38.9555],[-87.6386,39.1691],[-87.5291,39.3499],[-87.5236,41.7104],[-87.425,41.6447],[-87.1183,41.6447],[-86.8226,41.7597],[-85.9901,41.7597]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-85.9901,41.7597],[-84.807,41.7597],[-84.807,41.694],[-84.8016,40.5],[-84.818,39.1034],[-84.8947,39.0596],[-84.8125,38.7857],[-84.9878,38.7803],[-85.174,38.6872],[-85.4314,38.731],[-85.4205,38.5338],[-85.5902,38.4517],[-85.656,38.3257],[-85.8312,38.2764],[-85.9243,38.0245],[-86.0394,37.9587],[-86.2639,38.0518],[-86.3022,38.1669],[-86.5213,38.0409],[-86.5049,37.9313],[-86.7294,37.893],[-86.7952,37.9916],[-87.0471,37.893],[-87.1293,37.7889],[-87.3812,37.9368],[-87.5127,37.904],[-87.6003,37.9752],[-87.6824,37.904],[-87.9344,37.893],[-88.0275,37.7999],[-88.0603,37.8656],[-88.0001,38.1011],[-87.9234,38.1504],[-87.9508,38.2764],[-87.8358,38.2928],[-87.6551,38.5064],[-87.6222,38.6379],[-87.4962,38.7803],[-87.5127,38.9555],[-87.6386,39.1691],[-87.5291,39.3499],[-87.5236,41.7104],[-87.425,41.6447],[-87.1183,41.6447],[-86.8226,41.7597],[-85.9901,41.7597]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
