{"state":"ks","name":"Kansas City, Kansas","updated":"2026-10-24","checked":"2026-10-15","bounds":[-94.823,39.07479,-94.71502000000001,39.16211],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"red-wolf-dcd-properties-project-red-wolf-ks","state":"ks","kind":"facility","name":"Project Red Wolf","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wyandotte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Staff recommendation and scheduled meetings are not commission or board approval. The operating company is explicitly undisclosed. No power, current construction, commissioning or later outcome established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyandottenewsdaily.com/large-data-center-project-prompts-special-planning-commission-meeting/","host":"wyandottenewsdaily.com","date":"2025-05-27","published":"2025-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.12211,"lng":-94.773,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Wyandotte News Daily describes Red Wolf Park North rezoning and master-plan requests for over240acres and six proposed buildings, with a favorable staff recommendation and meetings scheduled.","independently_verified_current_operating_status":null},"notes":["Staff recommendation and scheduled meetings are not commission or board approval. The operating company is explicitly undisclosed. No power, current construction, commissioning or later outcome established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyandottenewsdaily.com/large-data-center-project-prompts-special-planning-commission-meeting/","host":"wyandottenewsdaily.com","date":"2025-05-27","published":"2025-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Kansas City · Wyandotte · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"20209"}},{"id":"powertransitions-project-yardbird-ks","state":"ks","kind":"facility","name":"Project Yardbird","group":"proposed","status":"Listed proposal","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Wyandotte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Issuer marketing and conceptual plan, not executed land/tenant/utility agreement, current operating campus or delivered criticalIT.161kVtransmission voltage is not MW; new150MWon-siteGENis not additive IT or proof built. StateSB98policy eligibility is not site-specific tax award. PartnersGroup170billionAUM and team50billionexperience are not campus capex. Planned demolition/permits and power-ready dates remain forecasts. Publicly served flipbook has confidentiality/distribution notice; retained for internal source evaluation, do not redistribute presentation/media as press asset or imply NDA execution. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","host":"wsp.cld.bz","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.11479,"lng":-94.76502,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Public PowerTransitions Quindaro presentation markets40acres at3601North12thStreet KansasCityKansas and option to purchase/lease, with150MWgridpower targetedQ1-2027 and150plusadditionalMWtargetedQ1-2028, totaling300plusMWGROSS. Presentation states nonbinding until definitive written agreement.","independently_verified_current_operating_status":null,"issuer_planned_gross_grid_mw_phase1":150,"issuer_planned_gross_grid_mw_phase2_lower_bound":150,"issuer_planned_gross_grid_mw_total_lower_bound":300,"phase1_power_target":"Q1 2027","phase2_power_target":"Q1 2028","critical_it_mw":null,"executed_utility_agreement_verified":false},"notes":["Issuer marketing and conceptual plan, not executed land/tenant/utility agreement, current operating campus or delivered criticalIT.161kVtransmission voltage is not MW; new150MWon-siteGENis not additive IT or proof built. StateSB98policy eligibility is not site-specific tax award. PartnersGroup170billionAUM and team50billionexperience are not campus capex. Planned demolition/permits and power-ready dates remain forecasts. Publicly served flipbook has confidentiality/distribution notice; retained for internal source evaluation, do not redistribute presentation/media as press asset or imply NDA execution.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","host":"wsp.cld.bz","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 65","scope":"The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made.","fields":{"current_stage_evidence":{"outcome":"original_quindaro_yardbird_marketed_proposal","scope":"The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made."},"source_read_scope":{"all6_publicly_served_visible_offering_pages_read":true,"month_only_not_invented_exact_day":true,"conceptual_timeline_not_actual_preparation":true,"power_generation_not_computing_load":true,"no_contact_nda_or_private_material_requested":true}},"notes":["The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made.","Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."],"sources":[{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","host":"wsp.cld.bz","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Kansas City · Wyandotte · Source context reviewed","status_scope":"The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"20209"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"red-wolf-dcd-properties-project-red-wolf-ks":{"fips":["20209"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"powertransitions-project-yardbird-ks":{"fips":["20209"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Wyandotte County","base_name":"Wyandotte","fips":"20209","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":9,"retained_reviewed_reference":5,"county_display":9},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"ks","name":"Kansas City","state_name":"Kansas","state_path":"/kansas/","slug":"kansas-city","path":"/city/kansas/kansas-city/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261023-c65-powertransitions-project-yardbird-ks","subject_id":"site:powertransitions-project-yardbird-ks","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"proposed","status_label":"Listed proposal","scope":"The complete original publicly served PowerTransitions Quindaro offering names PT Yardbird and describes a future data center opportunity at the former power station. This supports a listed proposal. Its November 2025 month label is not an exact publication day. Conceptual preparation dates, future power availability and infrastructure marketing do not independently establish current computing construction, delivered IT load or commissioned service. The public document invitation for further confidential material was not followed, and no contact or agreement was made.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","publisher":"PowerTransitions original public Quindaro offering","source_type":"company_page","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:11989930ab7ada657349a5ac"],"event_type":["source:11989930ab7ada657349a5ac"],"occurred_on":["source:11989930ab7ada657349a5ac"],"observed_on":["source:11989930ab7ada657349a5ac"],"qualifies_status":["source:11989930ab7ada657349a5ac"],"status_group":["source:11989930ab7ada657349a5ac"],"status_label":["source:11989930ab7ada657349a5ac"],"scope":["source:11989930ab7ada657349a5ac"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-94.823,39.07479,-94.71502000000001,39.16211],"hub":[-94.76901000000001,39.118449999999996],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-101.906,40.0016],[-95.3063,40.0016],[-95.2078,39.9085],[-94.8846,39.8318],[-95.1092,39.5416],[-94.9832,39.443],[-94.8244,39.2075],[-94.6108,39.1582],[-94.6162,37.0003],[-100.0877,37.0003],[-102.043,36.9948],[-102.0539,40.0016],[-101.906,40.0016]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-101.906,40.0016],[-95.3063,40.0016],[-95.2078,39.9085],[-94.8846,39.8318],[-95.1092,39.5416],[-94.9832,39.443],[-94.8244,39.2075],[-94.6108,39.1582],[-94.6162,37.0003],[-100.0877,37.0003],[-102.043,36.9948],[-102.0539,40.0016],[-101.906,40.0016]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
