{"state":"la","name":"Blanchard, Louisiana","updated":"2026-10-25","checked":"2026-10-15","bounds":[-93.95396,32.54038,-93.83281000000001,32.63975],"stats":{"reviewed_records":2,"status_confirmed":2,"status_unknown":0,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aws-blanchard-caddo-parish-la","state":"la","kind":"facility","name":"Amazon Web Services Caddo Parish Campus (Blanchard)","group":"building","status":"Company reported construction","raw_status":"under construction","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Caddo"],"city":"Blanchard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-02-23","The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record."],["2026-06-10","The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","host":"www.stackinfra.com","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed operator source"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","host":"www.stackinfra.com","published":"2026-06-10","date":"2026-06-10","checked":"2026-10-24","label":"Reviewed operator source"}],"loc":{"lat":32.58038,"lng":-93.88281,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical two-campus regional project with potential duplicate operator/customer records","fields":{"historical_announcement_date":"2026-02-23","historical_regional_planned_investment_usd":12000000000,"expected_regional_direct_jobs":540,"expected_regional_indirect_jobs":1700,"expected_regional_construction_jobs_max":1500,"developer_owner":"STACK Infrastructure","customer":"Amazon","regional_scope":"Caddo and Bossier Parishes"},"notes":["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 77","scope":"The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.","fields":{"current_stage_evidence":{"outcome":"developer_explicit_named_parish_campus_construction","scope":"The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity."},"source_read_scope":{"complete_original_state_and_both_developer_release_bodies_read":true,"june10_explicit_construction_not_february_forecast_alone":true,"existing_company_records_not_four_new_physical_campuses":true,"no_identity_role_municipal_or_parcel_changes":true,"no_jobs_funding_resource_or_capacity_measurements_adopted":true}},"notes":["The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.","Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"www.opportunitylouisiana.gov","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed government record"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","host":"www.stackinfra.com","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed operator source"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","host":"www.stackinfra.com","published":"2026-06-10","date":"2026-06-10","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Blanchard · Caddo · Source context reviewed","status_scope":"The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.","event_evidence":[{"date":"2026-02-23","text":"The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.","kind":"announced","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"www.opportunitylouisiana.gov","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed government record"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","host":"www.stackinfra.com","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed operator source"}]},{"date":"2026-06-10","text":"The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.","kind":"announced","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","host":"www.stackinfra.com","published":"2026-06-10","date":"2026-06-10","checked":"2026-10-24","label":"Reviewed operator source"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"22017"}},{"id":"stack-caddo-parish-la","state":"la","kind":"facility","name":"Caddo Parish Campus (with Amazon)","group":"building","status":"Company reported construction","raw_status":"under construction","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Caddo"],"city":"Blanchard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-02-23","The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record."],["2026-06-10","The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","host":"www.stackinfra.com","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed operator source"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","host":"www.stackinfra.com","published":"2026-06-10","date":"2026-06-10","checked":"2026-10-24","label":"Reviewed operator source"}],"loc":{"lat":32.59975,"lng":-93.90396,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical two-campus regional project with potential duplicate operator/customer records","fields":{"historical_announcement_date":"2026-02-23","historical_regional_planned_investment_usd":12000000000,"expected_regional_direct_jobs":540,"expected_regional_indirect_jobs":1700,"expected_regional_construction_jobs_max":1500,"developer_owner":"STACK Infrastructure","customer":"Amazon","regional_scope":"Caddo and Bossier Parishes"},"notes":["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"opportunitylouisiana.gov","date":"2026-02-23","published":"2026-02-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 77","scope":"The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.","fields":{"current_stage_evidence":{"outcome":"developer_explicit_named_parish_campus_construction","scope":"The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity."},"source_read_scope":{"complete_original_state_and_both_developer_release_bodies_read":true,"june10_explicit_construction_not_february_forecast_alone":true,"existing_company_records_not_four_new_physical_campuses":true,"no_identity_role_municipal_or_parcel_changes":true,"no_jobs_funding_resource_or_capacity_measurements_adopted":true}},"notes":["The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.","Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."],"sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"www.opportunitylouisiana.gov","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed government record"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","host":"www.stackinfra.com","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed operator source"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","host":"www.stackinfra.com","published":"2026-06-10","date":"2026-06-10","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Blanchard · Caddo · Source context reviewed","status_scope":"The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.","event_evidence":[{"date":"2026-02-23","text":"The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.","kind":"announced","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","host":"www.opportunitylouisiana.gov","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed government record"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","host":"www.stackinfra.com","published":"2026-02-23","date":"2026-02-23","checked":"2026-10-24","label":"Reviewed operator source"}]},{"date":"2026-06-10","text":"The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.","kind":"announced","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","host":"www.stackinfra.com","published":"2026-06-10","date":"2026-06-10","checked":"2026-10-24","label":"Reviewed operator source"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"22017"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"aws-blanchard-caddo-parish-la":{"fips":["22017"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"stack-caddo-parish-la":{"fips":["22017"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Caddo Parish","base_name":"Caddo","fips":"22017","kind":"Parish"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"stage_timelines":{"aws-blanchard-caddo-parish-la":{"stages":[{"id":"event:milestone:research-20261024-c77-aws-blanchard-caddo-parish-la:0","date":"2026-02-23","stage":"announced","scheduled":false,"basis":"primary source","scope":"The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","publisher":"Louisiana Economic Development original Amazon and STACK campus announcement"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","publisher":"STACK original Louisiana campus announcement"}]},{"id":"event:milestone:research-20261024-c77-aws-blanchard-caddo-parish-la:1","date":"2026-06-10","stage":"announced","scheduled":false,"basis":"primary source","scope":"The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","publisher":"STACK original current Louisiana campus construction statement"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"},"stack-caddo-parish-la":{"stages":[{"id":"event:milestone:research-20261024-c77-stack-caddo-parish-la:0","date":"2026-02-23","stage":"announced","scheduled":false,"basis":"primary source","scope":"The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","publisher":"Louisiana Economic Development original Amazon and STACK campus announcement"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","publisher":"STACK original Louisiana campus announcement"}]},{"id":"event:milestone:research-20261024-c77-stack-caddo-parish-la:1","date":"2026-06-10","stage":"announced","scheduled":false,"basis":"primary source","scope":"The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","publisher":"STACK original current Louisiana campus construction statement"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":12,"retained_reviewed_reference":2,"no_site_point":2,"county_display":14},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"la","name":"Blanchard","state_name":"Louisiana","state_path":"/louisiana/","slug":"blanchard","path":"/city/louisiana/blanchard/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","county_rule_reviews":[],"city_timeline":[{"id":"event:status:research-20261024-c77-stack-caddo-parish-la","subject_id":"site:stack-caddo-parish-la","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-24","qualifies_status":true,"status_group":"building","status_label":"Company reported construction","scope":"The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.","display_category":"source_check","display_date":"2026-10-24","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","publisher":"Louisiana Economic Development original Amazon and STACK campus announcement","source_type":"government_record","retrieved_on":"2026-10-24"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","publisher":"STACK original Louisiana campus announcement","source_type":"company_page","retrieved_on":"2026-10-24"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","publisher":"STACK original current Louisiana campus construction statement","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"event_type":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"occurred_on":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"observed_on":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"qualifies_status":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"status_group":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"status_label":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"scope":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:status:research-20261024-c77-aws-blanchard-caddo-parish-la","subject_id":"site:aws-blanchard-caddo-parish-la","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-24","qualifies_status":true,"status_group":"building","status_label":"Company reported construction","scope":"The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.","display_category":"source_check","display_date":"2026-10-24","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","publisher":"Louisiana Economic Development original Amazon and STACK campus announcement","source_type":"government_record","retrieved_on":"2026-10-24"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","publisher":"STACK original Louisiana campus announcement","source_type":"company_page","retrieved_on":"2026-10-24"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","publisher":"STACK original current Louisiana campus construction statement","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"event_type":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"occurred_on":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"observed_on":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"qualifies_status":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"status_group":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"status_label":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"],"scope":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26","source:ac317455d25e24dd9dea5ad8"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261024-c77-stack-caddo-parish-la:1","subject_id":"site:stack-caddo-parish-la","event_type":"announced","occurred_on":"2026-06-10","observed_on":"2026-10-24","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.","display_category":"recorded_event","display_date":"2026-06-10","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","publisher":"STACK original current Louisiana campus construction statement","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:ac317455d25e24dd9dea5ad8"],"event_type":["source:ac317455d25e24dd9dea5ad8"],"occurred_on":["source:ac317455d25e24dd9dea5ad8"],"observed_on":["source:ac317455d25e24dd9dea5ad8"],"qualifies_status":["source:ac317455d25e24dd9dea5ad8"],"status_group":["source:ac317455d25e24dd9dea5ad8"],"status_label":["source:ac317455d25e24dd9dea5ad8"],"scope":["source:ac317455d25e24dd9dea5ad8"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261024-c77-aws-blanchard-caddo-parish-la:1","subject_id":"site:aws-blanchard-caddo-parish-la","event_type":"announced","occurred_on":"2026-06-10","observed_on":"2026-10-24","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.","display_category":"recorded_event","display_date":"2026-06-10","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/","publisher":"STACK original current Louisiana campus construction statement","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:ac317455d25e24dd9dea5ad8"],"event_type":["source:ac317455d25e24dd9dea5ad8"],"occurred_on":["source:ac317455d25e24dd9dea5ad8"],"observed_on":["source:ac317455d25e24dd9dea5ad8"],"qualifies_status":["source:ac317455d25e24dd9dea5ad8"],"status_group":["source:ac317455d25e24dd9dea5ad8"],"status_label":["source:ac317455d25e24dd9dea5ad8"],"scope":["source:ac317455d25e24dd9dea5ad8"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261024-c77-stack-caddo-parish-la:0","subject_id":"site:stack-caddo-parish-la","event_type":"announced","occurred_on":"2026-02-23","observed_on":"2026-10-24","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.","display_category":"recorded_event","display_date":"2026-02-23","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","publisher":"Louisiana Economic Development original Amazon and STACK campus announcement","source_type":"government_record","retrieved_on":"2026-10-24"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","publisher":"STACK original Louisiana campus announcement","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"event_type":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"occurred_on":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"observed_on":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"qualifies_status":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"status_group":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"status_label":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"scope":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261024-c77-aws-blanchard-caddo-parish-la:0","subject_id":"site:aws-blanchard-caddo-parish-la","event_type":"announced","occurred_on":"2026-02-23","observed_on":"2026-10-24","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.","display_category":"recorded_event","display_date":"2026-02-23","sources":[{"url":"https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion","publisher":"Louisiana Economic Development original Amazon and STACK campus announcement","source_type":"government_record","retrieved_on":"2026-10-24"},{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/","publisher":"STACK original Louisiana campus announcement","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"event_type":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"occurred_on":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"observed_on":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"qualifies_status":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"status_group":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"status_label":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"],"scope":["source:594c32b0d46d73121cfbfa36","source:1f5b8671ab48dc47ac48cb26"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/amazon-web-services/","name":"Amazon Web Services (AWS)"}],"map_settings":{"bounds":[-93.95396,32.54038,-93.83281000000001,32.63975],"hub":[-93.893385,32.590064999999996],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-93.6085,33.0185],[-91.1658,33.0021],[-91.0727,32.8871],[-91.1439,32.8433],[-91.1548,32.6406],[-91.0069,32.5146],[-90.985,32.2189],[-91.1055,31.9889],[-91.341,31.8465],[-91.4013,31.6219],[-91.4999,31.6438],[-91.5163,31.2769],[-91.6368,31.2659],[-91.5656,31.0687],[-91.6368,30.9975],[-89.7472,30.9975],[-89.8458,30.6689],[-89.6815,30.4498],[-89.6432,30.2855],[-89.5227,30.1815],[-89.8184,30.0445],[-89.8404,29.946],[-89.5994,29.8802],[-89.4953,30.0391],[-89.2872,29.8802],[-89.3036,29.7543],[-89.4241,29.6995],[-89.6487,29.7488],[-89.6213,29.6557],[-89.698,29.5133],[-89.5063,29.3873],[-89.1995,29.349],[-89.09,29.2011],[-89.0024,29.1792],[-89.1612,29.0094],[-89.3365,29.0423],[-89.4843,29.2175],[-89.8513,29.3106],[-89.8513,29.4804],[-90.032,29.4257],[-90.0211,29.2833],[-90.1032,29.1518],[-90.2347,29.1299],[-90.3333,29.2778],[-90.5633,29.2833],[-90.6455,29.1299],[-90.7988,29.0861],[-90.9631,29.1792],[-91.0946,29.1901],[-91.2205,29.4366],[-91.4451,29.5461],[-91.5327,29.5297],[-91.6204,29.7378],[-91.8832,29.7105],[-91.8887,29.8364],[-92.1461,29.7159],[-92.1133,29.6228],[-92.3105,29.5352],[-92.6172,29.579],[-92.9732,29.7159],[-93.2251,29.7762],[-93.7673,29.7269],[-93.8385,29.6885],[-93.9261,29.7871],[-93.6906,30.1431],[-93.7673,30.3348],[-93.6961,30.4389],[-93.729,30.5758],[-93.6304,30.6799],[-93.5263,30.9373],[-93.5428,31.1509],[-93.8166,31.5562],[-93.8221,31.7753],[-94.0412,31.9943],[-94.0412,33.0185],[-93.6085,33.0185]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-93.6085,33.0185],[-91.1658,33.0021],[-91.0727,32.8871],[-91.1439,32.8433],[-91.1548,32.6406],[-91.0069,32.5146],[-90.985,32.2189],[-91.1055,31.9889],[-91.341,31.8465],[-91.4013,31.6219],[-91.4999,31.6438],[-91.5163,31.2769],[-91.6368,31.2659],[-91.5656,31.0687],[-91.6368,30.9975],[-89.7472,30.9975],[-89.8458,30.6689],[-89.6815,30.4498],[-89.6432,30.2855],[-89.5227,30.1815],[-89.8184,30.0445],[-89.8404,29.946],[-89.5994,29.8802],[-89.4953,30.0391],[-89.2872,29.8802],[-89.3036,29.7543],[-89.4241,29.6995],[-89.6487,29.7488],[-89.6213,29.6557],[-89.698,29.5133],[-89.5063,29.3873],[-89.1995,29.349],[-89.09,29.2011],[-89.0024,29.1792],[-89.1612,29.0094],[-89.3365,29.0423],[-89.4843,29.2175],[-89.8513,29.3106],[-89.8513,29.4804],[-90.032,29.4257],[-90.0211,29.2833],[-90.1032,29.1518],[-90.2347,29.1299],[-90.3333,29.2778],[-90.5633,29.2833],[-90.6455,29.1299],[-90.7988,29.0861],[-90.9631,29.1792],[-91.0946,29.1901],[-91.2205,29.4366],[-91.4451,29.5461],[-91.5327,29.5297],[-91.6204,29.7378],[-91.8832,29.7105],[-91.8887,29.8364],[-92.1461,29.7159],[-92.1133,29.6228],[-92.3105,29.5352],[-92.6172,29.579],[-92.9732,29.7159],[-93.2251,29.7762],[-93.7673,29.7269],[-93.8385,29.6885],[-93.9261,29.7871],[-93.6906,30.1431],[-93.7673,30.3348],[-93.6961,30.4389],[-93.729,30.5758],[-93.6304,30.6799],[-93.5263,30.9373],[-93.5428,31.1509],[-93.8166,31.5562],[-93.8221,31.7753],[-94.0412,31.9943],[-94.0412,33.0185],[-93.6085,33.0185]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
