{"state":"md","name":"Frederick, Maryland","updated":"2026-10-24","checked":"2026-10-15","bounds":[-77.46611,39.39698,-77.32133,39.546549999999996],"stats":{"reviewed_records":4,"status_confirmed":0,"status_unknown":4,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aligned-iad-06-frederick-md","state":"md","kind":"facility","name":"Aligned Data Centers IAD-06 Frederick","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Frederick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. same-market building-code mismatch. Marylandregionalpage currentnamedsectionisIAD04, not IAD06baseID.5601ManorWoodsRoad/75acrescannotassign toIAD06withoutresolvedbuildingidentity.3MWgeneratorsand2MWUPSnotITtotal. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/maryland-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.4722,"lng":-77.39767,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"same-market building-code mismatch","fields":{},"notes":["Marylandregionalpage currentnamedsectionisIAD04, not IAD06baseID.5601ManorWoodsRoad/75acrescannotassign toIAD06withoutresolvedbuildingidentity.3MWgeneratorsand2MWUPSnotITtotal.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/maryland-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"encore-2026-10-17-batch1","scope":"Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.","fields":{"current_stage_evidence":{"outcome":"unresolved","scope":"Aligned’s current Maryland page explicitly names IAD-04 at Manor Woods Road. It does not independently match inherited IAD-06. IAD-04 power, cooling, incentives and availability are not transferred to a differently numbered building."}},"notes":["Aligned’s current Maryland page explicitly names IAD-04 at Manor Woods Road. It does not independently match inherited IAD-06. IAD-04 power, cooling, incentives and availability are not transferred to a differently numbered building."],"sources":[{"url":"https://aligneddc.com/maryland-data-centers/","host":"aligneddc.com","published":"","date":"","checked":"2026-10-17","label":"Reviewed primary source"}],"checked":"2026-10-17","whole_record_certified":false},{"overlay":"Codex 3 research cohort 50","scope":"The selected current original Maryland page names IAD 04 but does not establish a separate exact IAD 06 service or construction account. Its named facility services and campus design cannot establish IAD 06 current physical stage. Absence of that component from this bounded source is not evidence of closure, cancellation or nonexistence.","fields":{"current_stage_evidence":{"outcome":"selected_iad04_account_not_exact_iad06_stage","scope":"The selected current original Maryland page names IAD 04 but does not establish a separate exact IAD 06 service or construction account. Its named facility services and campus design cannot establish IAD 06 current physical stage. Absence of that component from this bounded source is not evidence of closure, cancellation or nonexistence."}},"notes":["The selected current original Maryland page names IAD 04 but does not establish a separate exact IAD 06 service or construction account. Its named facility services and campus design cannot establish IAD 06 current physical stage. Absence of that component from this bounded source is not evidence of closure, cancellation or nonexistence.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://aligneddc.com/maryland-data-centers/","host":"aligneddc.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Frederick · Frederick · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"24021"}},{"id":"quantum-frederick-campus-md","state":"md","kind":"facility","name":"Quantum Frederick","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Frederick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historic masterplanned land announcement. Land acquisition/masterplan announcement not all campuses operating.2100acres historical overallland, not each tenant. Generic2021state10yearincentive description not current campus award or paid tax saving. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2021-06-28","Maryland Commerce published a Quantum Loophole master campus development account on June 28, 2021. This dates publication of the planned development and reported land purchase, not construction completion, a commissioned building or current operation across the master campus."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","host":"business.maryland.gov","date":"2021-06-28","published":"2021-06-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.48908,"lng":-77.41611,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historic masterplanned land announcement","fields":{"historical_development_announcement_date":"2021-06-28","historic_masterplan_site_acres":2100,"published_historic_site":"former Alcoa EastalcoWorks,nearBuckeystown,FrederickCounty,Maryland","reported_acquisition_joint_venture":["QuantumLoophole","TPGRealEstatePartners"]},"notes":["Land acquisition/masterplan announcement not all campuses operating.2100acres historical overallland, not each tenant. Generic2021state10yearincentive description not current campus award or paid tax saving.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","host":"business.maryland.gov","date":"2021-06-28","published":"2021-06-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 50","scope":"The original June 28, 2021 State account announces a planned master campus and a land purchase partnership. It does not establish exact current computing operation across the master development. A named operator service offering at one component cannot be transferred to every component or to the master campus. Land development, incentive eligibility and projected benefits do not establish operating facilities.","fields":{"current_stage_evidence":{"outcome":"historical_master_campus_announcement_not_current_compute_stage","scope":"The original June 28, 2021 State account announces a planned master campus and a land purchase partnership. It does not establish exact current computing operation across the master development. A named operator service offering at one component cannot be transferred to every component or to the master campus. Land development, incentive eligibility and projected benefits do not establish operating facilities."}},"notes":["The original June 28, 2021 State account announces a planned master campus and a land purchase partnership. It does not establish exact current computing operation across the master development. A named operator service offering at one component cannot be transferred to every component or to the master campus. Land development, incentive eligibility and projected benefits do not establish operating facilities.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","host":"business.maryland.gov","published":"2021-06-28","date":"2021-06-28","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Frederick · Frederick · Source context reviewed","event_evidence":[{"date":"2021-06-28","text":"Maryland Commerce published a Quantum Loophole master campus development account on June 28, 2021. This dates publication of the planned development and reported land purchase, not construction completion, a commissioned building or current operation across the master campus.","kind":"announced","sources":[{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","host":"business.maryland.gov","published":"2021-06-28","date":"2021-06-28","checked":"2026-10-23","label":"Reviewed government record"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"24021"}},{"id":"rowan-bauxite-ii-frederick-md","state":"md","kind":"facility","name":"Rowan Digital Infrastructure Bauxite II","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Frederick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rowan Bauxite campus power conflict and phased dates. 600headlineversus630plusnarrativepowerconflict/phaseunresolved;notperBauxiteIIorIII.375accombinednot375each. Substantialcompletionnotclientenergization. Neither exactFrederickparcelnorcriticalITbasisindependentlyconfirmed. Plannednetzerogoalsnotachievedmeasuredenergy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.43698,"lng":-77.39458,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Rowan Bauxite campus power conflict and phased dates","fields":{"developer":"Rowan Digital Infrastructure","campus":"Bauxite I, II and III, Maryland","combined_site_acres":375,"headline_combined_capacity_mw":600,"narrative_combined_capacity_mw_min_exclusive":630,"canonical_campus_current_it_mw":null,"developer_reported_bauxite1_substantial_completion_year":2025,"bauxite2_delivery_target_year":2026,"bauxite3_delivery_target_year":2027},"notes":["600headlineversus630plusnarrativepowerconflict/phaseunresolved;notperBauxiteIIorIII.375accombinednot375each. Substantialcompletionnotclientenergization. Neither exactFrederickparcelnorcriticalITbasisindependentlyconfirmed. Plannednetzerogoalsnotachievedmeasuredenergy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Frederick · Frederick · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"24021"}},{"id":"rowan-bauxite-iii-frederick-md","state":"md","kind":"facility","name":"Rowan Digital Infrastructure Bauxite III","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Frederick"],"city":"Frederick","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Rowan Bauxite campus power conflict and phased dates. 600headlineversus630plusnarrativepowerconflict/phaseunresolved;notperBauxiteIIorIII.375accombinednot375each. Substantialcompletionnotclientenergization. Neither exactFrederickparcelnorcriticalITbasisindependentlyconfirmed. Plannednetzerogoalsnotachievedmeasuredenergy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.50655,"lng":-77.37133,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Rowan Bauxite campus power conflict and phased dates","fields":{"developer":"Rowan Digital Infrastructure","campus":"Bauxite I, II and III, Maryland","combined_site_acres":375,"headline_combined_capacity_mw":600,"narrative_combined_capacity_mw_min_exclusive":630,"canonical_campus_current_it_mw":null,"developer_reported_bauxite1_substantial_completion_year":2025,"bauxite2_delivery_target_year":2026,"bauxite3_delivery_target_year":2027},"notes":["600headlineversus630plusnarrativepowerconflict/phaseunresolved;notperBauxiteIIorIII.375accombinednot375each. Substantialcompletionnotclientenergization. Neither exactFrederickparcelnorcriticalITbasisindependentlyconfirmed. Plannednetzerogoalsnotachievedmeasuredenergy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rowan.digital/portfolio/bauxite-i-ii-iii/","host":"rowan.digital","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Frederick · Frederick · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"24021"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"aligned-iad-06-frederick-md":{"fips":["24021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"quantum-frederick-campus-md":{"fips":["24021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"rowan-bauxite-ii-frederick-md":{"fips":["24021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"rowan-bauxite-iii-frederick-md":{"fips":["24021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Frederick County","base_name":"Frederick","fips":"24021","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[{"id":"local-rule:county-review:20261023:c03:24021","jurisdiction":{"state":"MD","county_fips":"24021","municipality":null},"rule_type":"county_research_review","status":"policy_context_found","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Frederick County","adopted_on":null,"conditions":["Frederick County Executive Order 05 2026 is effective September 14, 2026 and temporarily stops acceptance, consideration, processing and review of applications for Critical Digital Infrastructure facilities and associated electric substations, as determined by County staff. It replaces Order 04 2026 and expires July 1, 2027 unless superseded or terminated earlier.","The signed order exempts applications on property with an approved Adequate Public Facilities Ordinance Letter of Understanding before June 17, 2025. The County page says the pause does not stop existing construction. This bounded review does not classify any parcel as exempt, cancel a project, decide a rejected agreement merits or verify a complete County or state legal corpus."],"scope":"Bounded county area source review, not an enacted legal instrument, complete legal corpus, legal advice or parcel permission. County association does not establish parcel jurisdiction. Check dates are not legal effective dates.","label":"Policy context found","checked_on":"2026-10-23","sources":[{"url":"https://www.frederickcountymd.gov/9310/Data-Centers","publisher":"Frederick County","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-23","archive_sha256":"97edc28f2ef20b8393ca32e3227df168d689c310c9a0a7f138a8683378828a03","capture_format":"raw_response_bytes"},{"url":"https://www.frederickcountymd.gov/ArchiveCenter/ViewFile/Item/17236","publisher":"Frederick County","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-23","archive_sha256":"5f8ee1daad37eccc9240395069ecbbbbe7f878cd5b996c908660691dfd6617b1","capture_format":"raw_response_bytes"}]}],"stage_timelines":{"quantum-frederick-campus-md":{"stages":[{"id":"event:milestone:research-20261023-c50-quantum-frederick-campus-md:0","date":"2021-06-28","stage":"announced","scheduled":false,"basis":"primary source","scope":"Maryland Commerce published a Quantum Loophole master campus development account on June 28, 2021. This dates publication of the planned development and reported land purchase, not construction completion, a commissioned building or current operation across the master campus.","sources":[{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","publisher":"Maryland Department of Commerce"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":15,"retained_reviewed_reference":6,"county_display":15},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"md","name":"Frederick","state_name":"Maryland","state_path":"/maryland/","slug":"frederick","path":"/city/maryland/frederick/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:milestone:research-20261023-c50-quantum-frederick-campus-md:0","subject_id":"site:quantum-frederick-campus-md","event_type":"announced","occurred_on":"2021-06-28","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"Maryland Commerce published a Quantum Loophole master campus development account on June 28, 2021. This dates publication of the planned development and reported land purchase, not construction completion, a commissioned building or current operation across the master campus.","display_category":"recorded_event","display_date":"2021-06-28","sources":[{"url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/","publisher":"Maryland Department of Commerce","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:211d7cb18028a1efbc1c9a42"],"event_type":["source:211d7cb18028a1efbc1c9a42"],"occurred_on":["source:211d7cb18028a1efbc1c9a42"],"observed_on":["source:211d7cb18028a1efbc1c9a42"],"qualifies_status":["source:211d7cb18028a1efbc1c9a42"],"status_group":["source:211d7cb18028a1efbc1c9a42"],"status_label":["source:211d7cb18028a1efbc1c9a42"],"scope":["source:211d7cb18028a1efbc1c9a42"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/aligned-data-centers/","name":"Aligned Data Centers"}],"map_settings":{"bounds":[-77.46611,39.39698,-77.32133,39.546549999999996],"hub":[-77.39372,39.471765],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-75.9946,37.9532],[-76.0166,37.9532],[-76.0439,37.9532],[-75.9946,37.9532]],[[-79.478,39.7223],[-75.7865,39.7223],[-75.6934,38.4626],[-75.0471,38.4517],[-75.2443,38.0299],[-75.3977,38.0135],[-75.6715,37.9532],[-75.8851,37.9094],[-75.8796,38.0737],[-75.9618,38.1395],[-75.8468,38.2107],[-76.0001,38.375],[-76.0494,38.3038],[-76.2575,38.3202],[-76.3287,38.5009],[-76.263,38.5009],[-76.2575,38.7365],[-76.1918,38.8296],[-76.2794,39.1472],[-76.1699,39.3334],[-76.0001,39.3663],[-75.9727,39.558],[-76.0987,39.5361],[-76.1042,39.4375],[-76.3671,39.3115],[-76.4438,39.1965],[-76.4602,38.9062],[-76.5588,38.7693],[-76.515,38.5393],[-76.3835,38.3805],[-76.3999,38.26],[-76.3178,38.1395],[-76.3616,38.0573],[-76.5916,38.2161],[-76.9202,38.2928],[-77.0188,38.4462],[-77.205,38.3585],[-77.2762,38.479],[-77.1284,38.6324],[-77.0407,38.7912],[-76.9093,38.8953],[-77.0353,38.9939],[-77.1174,38.9336],[-77.2489,39.0267],[-77.457,39.076],[-77.457,39.2239],[-77.5665,39.3061],[-77.7199,39.3225],[-77.8349,39.6018],[-78.0047,39.6018],[-78.1745,39.6949],[-78.2676,39.6182],[-78.4319,39.6237],[-78.4702,39.5142],[-78.766,39.5854],[-78.9631,39.4375],[-79.0946,39.4704],[-79.2918,39.3006],[-79.4889,39.2075],[-79.478,39.7223]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-75.9946,37.9532],[-76.0166,37.9532],[-76.0439,37.9532],[-75.9946,37.9532]],[[-79.478,39.7223],[-75.7865,39.7223],[-75.6934,38.4626],[-75.0471,38.4517],[-75.2443,38.0299],[-75.3977,38.0135],[-75.6715,37.9532],[-75.8851,37.9094],[-75.8796,38.0737],[-75.9618,38.1395],[-75.8468,38.2107],[-76.0001,38.375],[-76.0494,38.3038],[-76.2575,38.3202],[-76.3287,38.5009],[-76.263,38.5009],[-76.2575,38.7365],[-76.1918,38.8296],[-76.2794,39.1472],[-76.1699,39.3334],[-76.0001,39.3663],[-75.9727,39.558],[-76.0987,39.5361],[-76.1042,39.4375],[-76.3671,39.3115],[-76.4438,39.1965],[-76.4602,38.9062],[-76.5588,38.7693],[-76.515,38.5393],[-76.3835,38.3805],[-76.3999,38.26],[-76.3178,38.1395],[-76.3616,38.0573],[-76.5916,38.2161],[-76.9202,38.2928],[-77.0188,38.4462],[-77.205,38.3585],[-77.2762,38.479],[-77.1284,38.6324],[-77.0407,38.7912],[-76.9093,38.8953],[-77.0353,38.9939],[-77.1174,38.9336],[-77.2489,39.0267],[-77.457,39.076],[-77.457,39.2239],[-77.5665,39.3061],[-77.7199,39.3225],[-77.8349,39.6018],[-78.0047,39.6018],[-78.1745,39.6949],[-78.2676,39.6182],[-78.4319,39.6237],[-78.4702,39.5142],[-78.766,39.5854],[-78.9631,39.4375],[-79.0946,39.4704],[-79.2918,39.3006],[-79.4889,39.2075],[-79.478,39.7223]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
