{"state":"mi","name":"Gaines Township, Michigan","updated":"2026-10-24","checked":"2026-10-15","bounds":[-85.5993,42.99214,-85.47395,43.10521],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"microsoft-gaines-township-mi","state":"mi","kind":"facility","name":"Microsoft Gaines Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Gaines Township","address":"","who":"Microsoft","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. No specific development plans had been provided. The existing Switch Pyramid's water use and history are not Microsoft site facts. Requested rezoning is not an observed approval; historic purchase price is land consideration, not project capex or current power demand. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-04-15","Gaines Charter Township certified minutes record the Planning Commission public hearing on the Microsoft rezoning request on April 15, 2026. The hearing included public concerns and company answers. The certified PDF has an incomplete motion continuation, so this event does not assert a final rezoning decision, current construction or operation."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wgvunews.org/news/2025-12-16/gaines-township-to-consider-rezoning-for-future-microsoft-data-center","host":"wgvunews.org","date":"2025-12-16","published":"2025-12-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070","host":"www.gainestownship.org","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://local.microsoft.com/blog/gaines-charter-township-public-meeting/","host":"local.microsoft.com","published":"2026-03-10","date":"2026-03-10","checked":"2026-10-24","label":"Reviewed operator source"},{"url":"https://local.microsoft.com/communities/americas/michigan/","host":"local.microsoft.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"loc":{"lat":43.03214,"lng":-85.5493,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WGVU reports Microsoft's rezoning request for an additional Gaines Township parcel adjoining its former Steelcase land, with a December 18 public hearing scheduled.","independently_verified_current_operating_status":null},"notes":["No specific development plans had been provided. The existing Switch Pyramid's water use and history are not Microsoft site facts. Requested rezoning is not an observed approval; historic purchase price is land consideration, not project capex or current power demand.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wgvunews.org/news/2025-12-16/gaines-township-to-consider-rezoning-for-future-microsoft-data-center","host":"wgvunews.org","date":"2025-12-16","published":"2025-12-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 14","scope":"The certified April 15, 2026 Gaines Charter Township Planning Commission minutes record the Microsoft rezoning public hearing, public comments, company answers and a tabling motion. The certified PDF omits the motion continuation before its signed certification page; the separate May packet includes a draft continuation. No final township rezoning outcome, a vote count for that motion, present physical construction or operation is inferred from the incomplete certified sequence. Proposed conditions and company assurances remain proposals and attributed statements.","fields":{"current_stage_evidence":{"outcome":"certified_hearing_and_incomplete_motion_sequence_current_stage_held","scope":"The certified April 15, 2026 Gaines Charter Township Planning Commission minutes record the Microsoft rezoning public hearing, public comments, company answers and a tabling motion. The certified PDF omits the motion continuation before its signed certification page; the separate May packet includes a draft continuation. No final township rezoning outcome, a vote count for that motion, present physical construction or operation is inferred from the incomplete certified sequence. Proposed conditions and company assurances remain proposals and attributed statements."},"source_read_scope":{"certified_minutes_pages_text_read":[1,2,3,4,5,6,7,8,9,10,11],"certified_pages_visually_read":[4,8,11,12],"certification_signature_dated":"2026-05-28","certified_sequence_missing_motion_continuation":true,"draft_may_packet_not_final_vote_proof":true,"kent_county_gaines_distinct_from_genesee_county_gaines":true}},"notes":["The certified April 15, 2026 Gaines Charter Township Planning Commission minutes record the Microsoft rezoning public hearing, public comments, company answers and a tabling motion. The certified PDF omits the motion continuation before its signed certification page; the separate May packet includes a draft continuation. No final township rezoning outcome, a vote count for that motion, present physical construction or operation is inferred from the incomplete certified sequence. Proposed conditions and company assurances remain proposals and attributed statements.","The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."],"sources":[{"url":"https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070","host":"www.gainestownship.org","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false},{"overlay":"Company role source check69, October24,2026","scope":"The named Microsoft recap identifies datacenter project concepts discussed in Gaines Charter Township. Its March 3, 2026 meeting and March 10, 2026 publisher metadata remain distinct. Developer per source is a prospective project association, not an approved final design, land title or current construction finding. Regional water and utility price pledges do not establish measured site outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred.","fields":{"company_association":{"name":"Microsoft","role":"developer","identity_scope":"provider_brand_only","scope":"The named Microsoft recap identifies datacenter project concepts discussed in Gaines Charter Township. Its March 3, 2026 meeting and March 10, 2026 publisher metadata remain distinct. Developer per source is a prospective project association, not an approved final design, land title or current construction finding. Regional water and utility price pledges do not establish measured site outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."},"provider_role":"developer"},"notes":["The named Microsoft recap identifies datacenter project concepts discussed in Gaines Charter Township. Its March 3, 2026 meeting and March 10, 2026 publisher metadata remain distinct. Developer per source is a prospective project association, not an approved final design, land title or current construction finding. Regional water and utility price pledges do not establish measured site outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."],"sources":[{"url":"https://local.microsoft.com/blog/gaines-charter-township-public-meeting/","host":"local.microsoft.com","published":"2026-03-10","date":"2026-03-10","checked":"2026-10-24","label":"Reviewed operator source"},{"url":"https://local.microsoft.com/communities/americas/michigan/","host":"local.microsoft.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Gaines Township · Kent · Source context reviewed","event_evidence":[{"date":"2026-04-15","text":"Gaines Charter Township certified minutes record the Planning Commission public hearing on the Microsoft rezoning request on April 15, 2026. The hearing included public concerns and company answers. The certified PDF has an incomplete motion continuation, so this event does not assert a final rezoning decision, current construction or operation.","kind":"hearing","sources":[{"url":"https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070","host":"www.gainestownship.org","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"26081"}},{"id":"switch-pyramid-campus-grand-rapids-mi","state":"mi","kind":"facility","name":"Switch Pyramid Campus","group":"operating","status":"Reported service","raw_status":"operating","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Kent"],"city":"Gaines Township","address":"","who":"Switch","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Publicationdate from article:published_time, not2024modifieddate. Firstphaseopen does not energize full320MWdesign. Power basis not explicitlyIT. Later2017grandopeningceremony is not first operatingdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. 2017proposal does not establish current tariff approval, measured renewable supply or campusMW.1.8Marea describes planned campus, not completed firstphase.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/","host":"switch.com","date":"2017-03-09","published":"2017-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.switch.com/switch-leads-consumers-energys-program-bring-100-renewable-energy-michigan-businesses/","host":"switch.com","date":"2017-05-15","published":"2017-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.switch.com/grand-rapids/","host":"www.switch.com","published":"","date":"","checked":"2026-10-23","label":"First party exact campus text, scoped provider relationship reviewed"},{"url":"https://www.switch.com/schneider-electric-and-switch-expand-partnership-with-1-9-billion-supply-capacity-agreement-to-power-ai-factories/","host":"www.switch.com","published":"2025-11-19","date":"2025-11-19","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":43.06521,"lng":-85.52395,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"first_phase_opening_announcement_date":"2017-03-09","full_campus_design_area_sqft_max":1800000,"full_campus_design_power_mw_max":320,"first_phase_design_area_sqft_min_exclusive":225000,"subsequent_grand_rapids1_planned_area_sqft":471248},"notes":["Publicationdate from article:published_time, not2024modifieddate. Firstphaseopen does not energize full320MWdesign. Power basis not explicitlyIT. Later2017grandopeningceremony is not first operatingdate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/","host":"switch.com","date":"2017-03-09","published":"2017-03-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_reported_opening_month":"2017-03","historical_renewable_program_stage":"proposed to Michigan PSC"},"notes":["2017proposal does not establish current tariff approval, measured renewable supply or campusMW.1.8Marea describes planned campus, not completed firstphase.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/switch-leads-consumers-energys-program-bring-100-renewable-energy-michigan-businesses/","host":"switch.com","date":"2017-05-15","published":"2017-05-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Company role source check 14, October 23, 2026","scope":"Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The current page explicitly names Pyramid. The older first phase opening story is not used as a current whole campus operating or completion finding.","fields":{"company_association":{"name":"Switch","role":"operator","identity_scope":"provider_brand_only","scope":"Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The current page explicitly names Pyramid. The older first phase opening story is not used as a current whole campus operating or completion finding."},"provider_role":"operator"},"notes":["Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The current page explicitly names Pyramid. The older first phase opening story is not used as a current whole campus operating or completion finding.","Source publication and retrieval dates remain separate from physical milestones."],"sources":[{"url":"https://www.switch.com/grand-rapids/","host":"www.switch.com","published":"","date":"","checked":"2026-10-23","label":"First party exact campus text, scoped provider relationship reviewed"}],"checked":"2026-10-23","whole_record_certified":false},{"overlay":"Codex 3 research cohort 52","scope":"The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented.","fields":{"current_stage_evidence":{"outcome":"current_named_campus_service","scope":"The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented."},"source_read_scope":{"selected_sections":["Current Grand Rapids campus account","November 2025 release operating campus paragraph","Historical first phase opening and later planned buildings"],"all_future_phases_not_operating":true,"technical_quantities_not_exported":true}},"notes":["The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.switch.com/grand-rapids/","host":"www.switch.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"},{"url":"https://www.switch.com/schneider-electric-and-switch-expand-partnership-with-1-9-billion-supply-capacity-agreement-to-power-ai-factories/","host":"www.switch.com","published":"2025-11-19","date":"2025-11-19","checked":"2026-10-23","label":"Reviewed operator source"},{"url":"https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/","host":"www.switch.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Gaines Township · Kent · Source context reviewed","status_scope":"The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"26081"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"microsoft-gaines-township-mi":{"fips":["26081"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"switch-pyramid-campus-grand-rapids-mi":{"fips":["26081"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Kent County","base_name":"Kent","fips":"26081","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[{"id":"local-rule:county-review:20261023:c03:26081","jurisdiction":{"state":"MI","county_fips":"26081","municipality":null},"rule_type":"county_research_review","status":"source_access_limited","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Kent County","adopted_on":null,"conditions":["The October 23 source attempt stopped at a robots response of HTTP 403. The target government document was not requested. No government policy content was reviewed from the selected target.","No restriction, permission, legal outcome or absence of law is established by this access only review. Other retained project packets have separate scopes and do not replace the inaccessible current code. No alternate identity or access bypass was used."],"scope":"Bounded county area source review, not an enacted legal instrument, complete legal corpus, legal advice or parcel permission. County association does not establish parcel jurisdiction. Check dates are not legal effective dates.","label":"Source access limited","checked_on":"2026-10-23","sources":[{"url":"https://www.kentcountymi.gov/DocumentCenter/View/10142/2025-Kent-County-Fair-Housing-Analysis-and-Fair-Housing-Equity-Plan-PDF","publisher":"Data Centers Atlas access check; government policy content not captured","source_type":"unclassified","published_on":null,"retrieved_on":"2026-10-23","archive_sha256":null,"capture_format":null}]}],"stage_timelines":{"microsoft-gaines-township-mi":{"stages":[{"id":"event:milestone:research-20261023-c14-microsoft-gaines-township-mi:0","date":"2026-04-15","stage":"hearing","scheduled":false,"basis":"primary source","scope":"Gaines Charter Township certified minutes record the Planning Commission public hearing on the Microsoft rezoning request on April 15, 2026. The hearing included public concerns and company answers. The certified PDF has an incomplete motion continuation, so this event does not assert a final rezoning decision, current construction or operation.","sources":[{"url":"https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070","publisher":"Gaines Charter Township"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":48,"retained_reviewed_reference":14,"county_display":48},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"mi","name":"Gaines Township","state_name":"Michigan","state_path":"/michigan/","slug":"gaines-township","path":"/city/michigan/gaines-township/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261023-c52-switch-pyramid-campus-grand-rapids-mi","subject_id":"site:switch-pyramid-campus-grand-rapids-mi","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"operating","status_label":"Reported service","scope":"The current original provider page offers Grand Rapids Pyramid Campus colocation and connectivity, while the November 19, 2025 provider release explicitly includes Grand Rapids among its operating campuses. The original opening account concerns the first adaptive reuse phase of the Pyramid, with surrounding campus buildings still planned. Reported campus service does not make all planned phases operating, establish current load or certify an exact opening day. The selected opening body has no exact day independently verified in this bounded review, so no opening event is invented.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://www.switch.com/grand-rapids/","publisher":"Switch","source_type":"company_page","retrieved_on":"2026-10-23"},{"url":"https://www.switch.com/schneider-electric-and-switch-expand-partnership-with-1-9-billion-supply-capacity-agreement-to-power-ai-factories/","publisher":"Switch","source_type":"company_page","retrieved_on":"2026-10-23"},{"url":"https://www.switch.com/switch-grand-rapids-now-open-largest-advanced-data-center-campus-eastern-u-s/","publisher":"Switch","source_type":"company_page","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:363bd99139785e3f5596eb9b","source:4d24cc6c4fab9c48498e4c60","source:d7dab0d1ce8219b00382eb0f"],"event_type":["source:363bd99139785e3f5596eb9b","source:4d24cc6c4fab9c48498e4c60","source:d7dab0d1ce8219b00382eb0f"],"occurred_on":["source:363bd99139785e3f5596eb9b","source:4d24cc6c4fab9c48498e4c60","source:d7dab0d1ce8219b00382eb0f"],"observed_on":["source:363bd99139785e3f5596eb9b","source:4d24cc6c4fab9c48498e4c60","source:d7dab0d1ce8219b00382eb0f"],"qualifies_status":["source:363bd99139785e3f5596eb9b","source:4d24cc6c4fab9c48498e4c60","source:d7dab0d1ce8219b00382eb0f"],"status_group":["source:363bd99139785e3f5596eb9b","source:4d24cc6c4fab9c48498e4c60","source:d7dab0d1ce8219b00382eb0f"],"status_label":["source:363bd99139785e3f5596eb9b","source:4d24cc6c4fab9c48498e4c60","source:d7dab0d1ce8219b00382eb0f"],"scope":["source:363bd99139785e3f5596eb9b","source:4d24cc6c4fab9c48498e4c60","source:d7dab0d1ce8219b00382eb0f"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261023-c14-microsoft-gaines-township-mi:0","subject_id":"site:microsoft-gaines-township-mi","event_type":"hearing","occurred_on":"2026-04-15","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"Gaines Charter Township certified minutes record the Planning Commission public hearing on the Microsoft rezoning request on April 15, 2026. The hearing included public concerns and company answers. The certified PDF has an incomplete motion continuation, so this event does not assert a final rezoning decision, current construction or operation.","display_category":"recorded_event","display_date":"2026-04-15","sources":[{"url":"https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070","publisher":"Gaines Charter Township","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:0cb63c07195d932e7b3ac166"],"event_type":["source:0cb63c07195d932e7b3ac166"],"occurred_on":["source:0cb63c07195d932e7b3ac166"],"observed_on":["source:0cb63c07195d932e7b3ac166"],"qualifies_status":["source:0cb63c07195d932e7b3ac166"],"status_group":["source:0cb63c07195d932e7b3ac166"],"status_label":["source:0cb63c07195d932e7b3ac166"],"scope":["source:0cb63c07195d932e7b3ac166"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/microsoft/","name":"Microsoft"},{"path":"/company/switch/","name":"Switch"}],"map_settings":{"bounds":[-85.5993,42.99214,-85.47395,43.10521],"hub":[-85.536625,43.048675],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-83.4542,41.7323],[-84.807,41.694],[-84.807,41.7597],[-85.9901,41.7597],[-86.8226,41.7597],[-86.6199,41.8912],[-86.483,42.1157],[-86.357,42.2526],[-86.2639,42.4443],[-86.2091,42.7182],[-86.231,43.0139],[-86.5268,43.5945],[-86.4337,43.8136],[-86.4994,44.0765],[-86.2694,44.3448],[-86.2201,44.5694],[-86.253,44.6899],[-86.0886,44.7392],[-86.0667,44.9035],[-85.8093,44.9473],[-85.6122,45.128],[-85.6286,44.7666],[-85.5245,44.7501],[-85.3931,44.9309],[-85.3876,45.2376],[-85.3054,45.3143],[-85.0316,45.3636],[-85.1192,45.5772],[-84.9385,45.7579],[-84.7139,45.7688],[-84.462,45.6538],[-84.2155,45.6374],[-84.095,45.495],[-83.9088,45.484],[-83.5966,45.3526],[-83.4871,45.3581],[-83.3173,45.1445],[-83.4542,45.0295],[-83.3228,44.8816],[-83.2735,44.7118],[-83.3337,44.3394],[-83.5364,44.2463],[-83.5857,44.0546],[-83.8267,43.9888],[-83.9581,43.7588],[-83.9088,43.6712],[-83.6678,43.589],[-83.4816,43.715],[-83.2625,43.9724],[-82.9175,44.071],[-82.7477,43.9943],[-82.6437,43.8519],[-82.5396,43.4357],[-82.5232,43.2275],[-82.4136,42.9756],[-82.5177,42.6141],[-82.682,42.5594],[-82.6875,42.6908],[-82.797,42.6525],[-82.923,42.3512],[-83.1256,42.2362],[-83.1859,42.0062],[-83.4378,41.8145],[-83.4542,41.7323]],[[-85.5081,45.7305],[-85.4917,45.61],[-85.6231,45.5881],[-85.5683,45.7579],[-85.5081,45.7305]],[[-87.5893,45.0952],[-87.7427,45.1992],[-87.6496,45.3416],[-87.8851,45.3636],[-87.792,45.5005],[-87.781,45.6757],[-87.9891,45.7962],[-88.1042,45.9222],[-88.5314,46.0208],[-88.6628,45.9879],[-89.09,46.1358],[-90.1197,46.3384],[-90.2292,46.5082],[-90.4154,46.5685],[-90.0266,46.6725],[-89.8513,46.793],[-89.4131,46.8423],[-89.1283,46.9902],[-88.9969,46.9957],[-88.8874,47.0997],[-88.5752,47.2476],[-88.4163,47.3736],[-88.1808,47.4557],[-87.9563,47.3845],[-88.3506,47.0778],[-88.4437,46.9738],[-88.4383,46.7876],[-88.2466,46.93],[-87.9015,46.908],[-87.6331,46.8095],[-87.3922,46.5356],[-87.2607,46.4863],[-87.0088,46.5301],[-86.9485,46.4699],[-86.6966,46.437],[-86.1598,46.6671],[-85.8805,46.689],[-85.5081,46.678],[-85.2562,46.7547],[-85.0645,46.7602],[-85.0261,46.4808],[-84.829,46.4425],[-84.6318,46.4863],[-84.5496,46.4206],[-84.4182,46.5028],[-84.1279,46.5301],[-84.1224,46.1796],[-83.991,46.0317],[-83.7938,45.9934],[-83.7719,46.092],[-83.5802,46.092],[-83.4761,45.9879],[-83.5638,45.9112],[-84.1115,45.977],[-84.3744,45.9332],[-84.6592,46.0536],[-84.7413,45.9441],[-84.703,45.851],[-84.829,45.8729],[-85.0152,46.0098],[-85.3383,46.092],[-85.5026,46.0975],[-85.6614,45.966],[-85.9243,45.9332],[-86.2091,45.9605],[-86.3242,45.9058],[-86.3515,45.7962],[-86.6637,45.7031],[-86.6473,45.8346],[-86.7842,45.862],[-86.839,45.725],[-87.069,45.7196],[-87.1731,45.6593],[-87.3264,45.4238],[-87.6112,45.1226],[-87.5893,45.0952]],[[-88.8052,47.9761],[-89.0571,47.8501],[-89.1886,47.8337],[-89.1776,47.9377],[-88.5478,48.1732],[-88.6683,48.0089],[-88.8052,47.9761]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-83.4542,41.7323],[-84.807,41.694],[-84.807,41.7597],[-85.9901,41.7597],[-86.8226,41.7597],[-86.6199,41.8912],[-86.483,42.1157],[-86.357,42.2526],[-86.2639,42.4443],[-86.2091,42.7182],[-86.231,43.0139],[-86.5268,43.5945],[-86.4337,43.8136],[-86.4994,44.0765],[-86.2694,44.3448],[-86.2201,44.5694],[-86.253,44.6899],[-86.0886,44.7392],[-86.0667,44.9035],[-85.8093,44.9473],[-85.6122,45.128],[-85.6286,44.7666],[-85.5245,44.7501],[-85.3931,44.9309],[-85.3876,45.2376],[-85.3054,45.3143],[-85.0316,45.3636],[-85.1192,45.5772],[-84.9385,45.7579],[-84.7139,45.7688],[-84.462,45.6538],[-84.2155,45.6374],[-84.095,45.495],[-83.9088,45.484],[-83.5966,45.3526],[-83.4871,45.3581],[-83.3173,45.1445],[-83.4542,45.0295],[-83.3228,44.8816],[-83.2735,44.7118],[-83.3337,44.3394],[-83.5364,44.2463],[-83.5857,44.0546],[-83.8267,43.9888],[-83.9581,43.7588],[-83.9088,43.6712],[-83.6678,43.589],[-83.4816,43.715],[-83.2625,43.9724],[-82.9175,44.071],[-82.7477,43.9943],[-82.6437,43.8519],[-82.5396,43.4357],[-82.5232,43.2275],[-82.4136,42.9756],[-82.5177,42.6141],[-82.682,42.5594],[-82.6875,42.6908],[-82.797,42.6525],[-82.923,42.3512],[-83.1256,42.2362],[-83.1859,42.0062],[-83.4378,41.8145],[-83.4542,41.7323]],[[-85.5081,45.7305],[-85.4917,45.61],[-85.6231,45.5881],[-85.5683,45.7579],[-85.5081,45.7305]],[[-87.5893,45.0952],[-87.7427,45.1992],[-87.6496,45.3416],[-87.8851,45.3636],[-87.792,45.5005],[-87.781,45.6757],[-87.9891,45.7962],[-88.1042,45.9222],[-88.5314,46.0208],[-88.6628,45.9879],[-89.09,46.1358],[-90.1197,46.3384],[-90.2292,46.5082],[-90.4154,46.5685],[-90.0266,46.6725],[-89.8513,46.793],[-89.4131,46.8423],[-89.1283,46.9902],[-88.9969,46.9957],[-88.8874,47.0997],[-88.5752,47.2476],[-88.4163,47.3736],[-88.1808,47.4557],[-87.9563,47.3845],[-88.3506,47.0778],[-88.4437,46.9738],[-88.4383,46.7876],[-88.2466,46.93],[-87.9015,46.908],[-87.6331,46.8095],[-87.3922,46.5356],[-87.2607,46.4863],[-87.0088,46.5301],[-86.9485,46.4699],[-86.6966,46.437],[-86.1598,46.6671],[-85.8805,46.689],[-85.5081,46.678],[-85.2562,46.7547],[-85.0645,46.7602],[-85.0261,46.4808],[-84.829,46.4425],[-84.6318,46.4863],[-84.5496,46.4206],[-84.4182,46.5028],[-84.1279,46.5301],[-84.1224,46.1796],[-83.991,46.0317],[-83.7938,45.9934],[-83.7719,46.092],[-83.5802,46.092],[-83.4761,45.9879],[-83.5638,45.9112],[-84.1115,45.977],[-84.3744,45.9332],[-84.6592,46.0536],[-84.7413,45.9441],[-84.703,45.851],[-84.829,45.8729],[-85.0152,46.0098],[-85.3383,46.092],[-85.5026,46.0975],[-85.6614,45.966],[-85.9243,45.9332],[-86.2091,45.9605],[-86.3242,45.9058],[-86.3515,45.7962],[-86.6637,45.7031],[-86.6473,45.8346],[-86.7842,45.862],[-86.839,45.725],[-87.069,45.7196],[-87.1731,45.6593],[-87.3264,45.4238],[-87.6112,45.1226],[-87.5893,45.0952]],[[-88.8052,47.9761],[-89.0571,47.8501],[-89.1886,47.8337],[-89.1776,47.9377],[-88.5478,48.1732],[-88.6683,48.0089],[-88.8052,47.9761]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
