{"state":"mn","name":"Monticello, Minnesota","updated":"2026-10-24","checked":"2026-10-15","bounds":[-94.02931,45.13397,-93.91288,45.22902],"stats":{"reviewed_records":2,"status_confirmed":0,"status_unknown":2,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"monticello-tech-park-frattalone-mn","state":"mn","kind":"facility","name":"Monticello Tech Park (Monticello Tech LLC / Frattalone)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wright"],"city":"Monticello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.monticellomn.gov/753/Monticello-Tech","host":"www.monticellomn.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":45.17397,"lng":-93.96288,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Monticello Times separates Frattalone/Monticello Tech's 550-acre concept from Scannell's roughly 106-acre concept near Bertram park, explicitly saying neither project was approved or had building permits.","independently_verified_current_operating_status":null},"notes":["Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 58","scope":"The current original City Monticello Tech page identifies a proposed Monticello Tech LLC development and complete land use applications, with an October 6, 2026 Planning Commission hearing and advisory recommendation by four votes to one. It says Council consideration is not yet scheduled. The selected body does not independently establish whether this inherited company labeled inventory point is a separate physical project or a partner reference to the same named proposal. No duplicate campus, provider role, exact parcel or status is promoted while that crosswalk is held. A statutory decision deadline and environmental review are not computing operation or final approval.","fields":{"current_stage_evidence":{"outcome":"named_city_proposal_inherited_company_crosswalk_and_distinctness_held","scope":"The current original City Monticello Tech page identifies a proposed Monticello Tech LLC development and complete land use applications, with an October 6, 2026 Planning Commission hearing and advisory recommendation by four votes to one. It says Council consideration is not yet scheduled. The selected body does not independently establish whether this inherited company labeled inventory point is a separate physical project or a partner reference to the same named proposal. No duplicate campus, provider role, exact parcel or status is promoted while that crosswalk is held. A statutory decision deadline and environmental review are not computing operation or final approval."},"source_read_scope":{"original_city_current_status_and_selected_review_chronology_read":true,"planning_recommendation_not_final_council_approval":true,"company_labeled_inventory_not_independent_separate_campus":true,"no_project_merge_or_new_identity":true,"december8_decision_deadline_not_compute_schedule":true}},"notes":["The current original City Monticello Tech page identifies a proposed Monticello Tech LLC development and complete land use applications, with an October 6, 2026 Planning Commission hearing and advisory recommendation by four votes to one. It says Council consideration is not yet scheduled. The selected body does not independently establish whether this inherited company labeled inventory point is a separate physical project or a partner reference to the same named proposal. No duplicate campus, provider role, exact parcel or status is promoted while that crosswalk is held. A statutory decision deadline and environmental review are not computing operation or final approval.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.monticellomn.gov/753/Monticello-Tech","host":"www.monticellomn.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Monticello · Wright · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"27171"}},{"id":"scannell-monticello-tech-park-mn","state":"mn","kind":"facility","name":"Scannell Properties Monticello Tech Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wright"],"city":"Monticello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.monticellomn.gov/753/Monticello-Tech","host":"www.monticellomn.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":45.18902,"lng":-93.97931,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Monticello Times separates Frattalone/Monticello Tech's 550-acre concept from Scannell's roughly 106-acre concept near Bertram park, explicitly saying neither project was approved or had building permits.","independently_verified_current_operating_status":null},"notes":["Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 58","scope":"The current original City Monticello Tech page identifies a proposed Monticello Tech LLC development and complete land use applications, with an October 6, 2026 Planning Commission hearing and advisory recommendation by four votes to one. It says Council consideration is not yet scheduled. The selected body does not independently establish whether this inherited company labeled inventory point is a separate physical project or a partner reference to the same named proposal. No duplicate campus, provider role, exact parcel or status is promoted while that crosswalk is held. A statutory decision deadline and environmental review are not computing operation or final approval.","fields":{"current_stage_evidence":{"outcome":"named_city_proposal_inherited_company_crosswalk_and_distinctness_held","scope":"The current original City Monticello Tech page identifies a proposed Monticello Tech LLC development and complete land use applications, with an October 6, 2026 Planning Commission hearing and advisory recommendation by four votes to one. It says Council consideration is not yet scheduled. The selected body does not independently establish whether this inherited company labeled inventory point is a separate physical project or a partner reference to the same named proposal. No duplicate campus, provider role, exact parcel or status is promoted while that crosswalk is held. A statutory decision deadline and environmental review are not computing operation or final approval."},"source_read_scope":{"original_city_current_status_and_selected_review_chronology_read":true,"planning_recommendation_not_final_council_approval":true,"company_labeled_inventory_not_independent_separate_campus":true,"no_project_merge_or_new_identity":true,"december8_decision_deadline_not_compute_schedule":true}},"notes":["The current original City Monticello Tech page identifies a proposed Monticello Tech LLC development and complete land use applications, with an October 6, 2026 Planning Commission hearing and advisory recommendation by four votes to one. It says Council consideration is not yet scheduled. The selected body does not independently establish whether this inherited company labeled inventory point is a separate physical project or a partner reference to the same named proposal. No duplicate campus, provider role, exact parcel or status is promoted while that crosswalk is held. A statutory decision deadline and environmental review are not computing operation or final approval.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.monticellomn.gov/753/Monticello-Tech","host":"www.monticellomn.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Monticello · Wright · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"27171"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"monticello-tech-park-frattalone-mn":{"fips":["27171"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"scannell-monticello-tech-park-mn":{"fips":["27171"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Wright County","base_name":"Wright","fips":"27171","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":26,"retained_reviewed_reference":13,"no_site_point":6,"county_display":32},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"mn","name":"Monticello","state_name":"Minnesota","state_path":"/minnesota/","slug":"monticello","path":"/city/minnesota/monticello/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[],"city_companies":[],"map_settings":{"bounds":[-94.02931,45.13397,-93.91288,45.22902],"hub":[-93.97109499999999,45.181495],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-92.0147,46.7054],[-92.0914,46.7492],[-92.294,46.6671],[-92.294,46.0756],[-92.3543,46.0153],[-92.6391,45.9332],[-92.8691,45.7196],[-92.8855,45.5772],[-92.7705,45.5662],[-92.6445,45.4402],[-92.7596,45.2869],[-92.7377,45.1171],[-92.8089,44.7501],[-92.546,44.5694],[-92.3378,44.553],[-92.2338,44.4434],[-91.9271,44.3339],[-91.8778,44.2024],[-91.593,44.0327],[-91.4341,43.9943],[-91.2424,43.7752],[-91.2698,43.6164],[-91.2151,43.5014],[-91.3684,43.5014],[-96.451,43.5014],[-96.451,45.2978],[-96.681,45.4128],[-96.8563,45.6045],[-96.5825,45.8181],[-96.5606,45.9332],[-96.5989,46.333],[-96.7194,46.437],[-96.8015,46.6561],[-96.7851,46.9245],[-96.8234,46.9683],[-96.8563,47.6091],[-97.0535,47.9487],[-97.1302,48.1404],[-97.163,48.5457],[-97.0973,48.6826],[-97.2287,49.0002],[-95.153,49.0002],[-95.153,49.3836],[-94.9558,49.3727],[-94.8244,49.296],[-94.6929,48.7757],[-94.5889,48.7154],[-94.2602,48.699],[-94.2219,48.6497],[-93.8385,48.6278],[-93.7947,48.5183],[-93.4661,48.5457],[-93.4661,48.5895],[-93.2087,48.6442],[-92.9841,48.6223],[-92.7267,48.5402],[-92.6555,48.4361],[-92.5076,48.4471],[-92.3707,48.2225],[-92.305,48.3156],[-92.053,48.3594],[-92.0092,48.2663],[-91.7135,48.2006],[-91.7135,48.113],[-91.5656,48.0418],[-91.2644,48.0801],[-91.0836,48.1787],[-90.8372,48.2389],[-90.7495,48.0911],[-90.5797,48.1239],[-90.3771,48.0911],[-90.1416,48.113],[-89.8732,47.987],[-89.6158,48.0089],[-89.6377,47.9541],[-89.9718,47.8282],[-90.4373,47.7296],[-90.7386,47.6255],[-91.1712,47.3681],[-91.3575,47.2093],[-91.6423,47.0285],[-92.0914,46.7876],[-92.0147,46.7054]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-92.0147,46.7054],[-92.0914,46.7492],[-92.294,46.6671],[-92.294,46.0756],[-92.3543,46.0153],[-92.6391,45.9332],[-92.8691,45.7196],[-92.8855,45.5772],[-92.7705,45.5662],[-92.6445,45.4402],[-92.7596,45.2869],[-92.7377,45.1171],[-92.8089,44.7501],[-92.546,44.5694],[-92.3378,44.553],[-92.2338,44.4434],[-91.9271,44.3339],[-91.8778,44.2024],[-91.593,44.0327],[-91.4341,43.9943],[-91.2424,43.7752],[-91.2698,43.6164],[-91.2151,43.5014],[-91.3684,43.5014],[-96.451,43.5014],[-96.451,45.2978],[-96.681,45.4128],[-96.8563,45.6045],[-96.5825,45.8181],[-96.5606,45.9332],[-96.5989,46.333],[-96.7194,46.437],[-96.8015,46.6561],[-96.7851,46.9245],[-96.8234,46.9683],[-96.8563,47.6091],[-97.0535,47.9487],[-97.1302,48.1404],[-97.163,48.5457],[-97.0973,48.6826],[-97.2287,49.0002],[-95.153,49.0002],[-95.153,49.3836],[-94.9558,49.3727],[-94.8244,49.296],[-94.6929,48.7757],[-94.5889,48.7154],[-94.2602,48.699],[-94.2219,48.6497],[-93.8385,48.6278],[-93.7947,48.5183],[-93.4661,48.5457],[-93.4661,48.5895],[-93.2087,48.6442],[-92.9841,48.6223],[-92.7267,48.5402],[-92.6555,48.4361],[-92.5076,48.4471],[-92.3707,48.2225],[-92.305,48.3156],[-92.053,48.3594],[-92.0092,48.2663],[-91.7135,48.2006],[-91.7135,48.113],[-91.5656,48.0418],[-91.2644,48.0801],[-91.0836,48.1787],[-90.8372,48.2389],[-90.7495,48.0911],[-90.5797,48.1239],[-90.3771,48.0911],[-90.1416,48.113],[-89.8732,47.987],[-89.6158,48.0089],[-89.6377,47.9541],[-89.9718,47.8282],[-90.4373,47.7296],[-90.7386,47.6255],[-91.1712,47.3681],[-91.3575,47.2093],[-91.6423,47.0285],[-92.0914,46.7876],[-92.0147,46.7054]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
