{"state":"mo","name":"New Florence, Missouri","updated":"2026-10-26","checked":"2026-10-15","bounds":[-91.53456,38.90132,-91.42029000000001,38.994389999999996],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aws-green-new-florence-mo","state":"mo","kind":"facility","name":"AWS Project Green Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"New Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Tax projections are scenarios, not receipts; announced county/community payments are not verified disbursement. Do not add 25-year minimum and maximum cases. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/","host":"themissouritimes.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.94132,"lng":-91.47029,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Missouri Times describes Project Green minimum and maximum tax projections and different treatment of real and personal property.","independently_verified_current_operating_status":null},"notes":["Tax projections are scenarios, not receipts; announced county/community payments are not verified disbursement. Do not add 25-year minimum and maximum cases.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/","host":"themissouritimes.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Florence · Montgomery · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"29139"}},{"id":"google-spade-new-florence-mo","state":"mo","kind":"project","name":"Google Project Spade Campus","group":"proposed","status":"Development announced","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"New Florence","address":"","who":"Google","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-05-20","Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","host":"governor.mo.gov","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.datacenters.google/locations/","host":"www.datacenters.google","published":"","date":"","checked":"2026-10-16","label":"Google official location source"}],"loc":{"lat":38.95439,"lng":-91.48456,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Montgomery","city":"New Florence","announced_planned_infrastructure_investment_usd":15000000000,"energy_impact_fund_usd":20000000,"additional_power_generation_support_mw_lower_bound":500},"notes":["State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","host":"governor.mo.gov","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"S4-Google-Pending-20261016","scope":"Scoped Google regional identity and lifecycle review; existing approximate points, jurisdiction, legacy totals and opening fields are retained.","fields":{"record_association_scope":"Explicit association of the existing named Google New Florence, Missouri research context with the primary named location. This does not resolve a parcel, building allocation or distinct physical-site census; inherited project-code aliases are retained rather than independently certified.","announced_investment_scope":"The governor announces a $15 billion New Florence infrastructure investment. Scope includes supporting infrastructure and programs; the amount is not normalized as installed data center value, current spending or a building-specific amount.","planned_cooling_scope":"The governor says the future Montgomery County data center will use air cooling. Future design statement; no measured water total, permit limit or zero total water use is inferred.","regional_generation_not_it_capacity":"The governor’s contracted new generation and additional Ameren capacity are grid-supply context. They are not New Florence IT load or commissioned data center capacity.","current_status_basis":"Missouri’s governor reports Google’s May20,2026 New Florence infrastructure/data-center announcement. The published account describes planned facilities and future jobs; it supports an announced development, not a specific construction permit, completed building or operation. The inherited Spade project-code alias and approximate location remain unverified."},"notes":["Partial record/field review only. No point movement, exact opening day, commissioned IT capacity, or whole-state freshness certification."],"sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","host":"governor.mo.gov","published":"2026-05-20","date":"2026-05-20","checked":"2026-10-16","label":"Office of the Governor of Missouri reviewed primary source"},{"url":"https://www.datacenters.google/locations/","host":"www.datacenters.google","published":"","date":"","checked":"2026-10-16","label":"Google official location source"}],"checked":"2026-10-16","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Florence · Montgomery · Source context reviewed","status_scope":"Missouri’s governor reports Google’s May20,2026 New Florence infrastructure/data-center announcement. The published account describes planned facilities and future jobs; it supports an announced development, not a specific construction permit, completed building or operation. The inherited Spade project-code alias and approximate location remain unverified.","event_evidence":[{"date":"2026-05-20","text":"Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established.","kind":"announced","sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","host":"governor.mo.gov","published":"2026-05-20","date":"2026-05-20","checked":"2026-10-16","label":"Office of the Governor of Missouri reviewed primary source"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"29139"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"aws-green-new-florence-mo":{"fips":["29139"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"google-spade-new-florence-mo":{"fips":["29139"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Montgomery County","base_name":"Montgomery","fips":"29139","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{"google-spade-new-florence-mo":{"stages":[{"id":"event:milestone:google-followup-20261016-google-spade-new-florence-mo:0","date":"2026-05-20","stage":"announced","scheduled":false,"basis":"primary source","scope":"Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established.","sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","publisher":"Office of the Governor of Missouri"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":23,"retained_reviewed_reference":6,"no_site_point":1,"county_display":24},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"mo","name":"New Florence","state_name":"Missouri","state_path":"/missouri/","slug":"new-florence","path":"/city/missouri/new-florence/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:google-followup-20261016-google-spade-new-florence-mo","subject_id":"site:google-spade-new-florence-mo","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-16","qualifies_status":true,"status_group":"proposed","status_label":"Development announced","scope":"Missouri’s governor reports Google’s May20,2026 New Florence infrastructure/data-center announcement. The published account describes planned facilities and future jobs; it supports an announced development, not a specific construction permit, completed building or operation. The inherited Spade project-code alias and approximate location remain unverified.","display_category":"source_check","display_date":"2026-10-16","sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","publisher":"Office of the Governor of Missouri","source_type":"government_record","retrieved_on":"2026-10-16"}],"field_sources":{"subject_id":["source:a6cb943327d1f5c369c94080"],"event_type":["source:a6cb943327d1f5c369c94080"],"occurred_on":["source:a6cb943327d1f5c369c94080"],"observed_on":["source:a6cb943327d1f5c369c94080"],"qualifies_status":["source:a6cb943327d1f5c369c94080"],"status_group":["source:a6cb943327d1f5c369c94080"],"status_label":["source:a6cb943327d1f5c369c94080"],"scope":["source:a6cb943327d1f5c369c94080"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:google-followup-20261016-google-spade-new-florence-mo:0","subject_id":"site:google-spade-new-florence-mo","event_type":"announced","occurred_on":"2026-05-20","observed_on":"2026-10-16","qualifies_status":false,"status_group":null,"status_label":null,"scope":"Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established.","display_category":"recorded_event","display_date":"2026-05-20","sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","publisher":"Office of the Governor of Missouri","source_type":"government_record","retrieved_on":"2026-10-16"}],"field_sources":{"subject_id":["source:a6cb943327d1f5c369c94080"],"event_type":["source:a6cb943327d1f5c369c94080"],"occurred_on":["source:a6cb943327d1f5c369c94080"],"observed_on":["source:a6cb943327d1f5c369c94080"],"qualifies_status":["source:a6cb943327d1f5c369c94080"],"status_group":["source:a6cb943327d1f5c369c94080"],"status_label":["source:a6cb943327d1f5c369c94080"],"scope":["source:a6cb943327d1f5c369c94080"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/amazon-web-services/","name":"Amazon Web Services (AWS)"},{"path":"/company/google/","name":"Google"}],"map_settings":{"bounds":[-91.53456,38.90132,-91.42029000000001,38.994389999999996],"hub":[-91.47742500000001,38.947855],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-91.834,40.6096],[-91.7299,40.615],[-91.5272,40.4124],[-91.4177,40.3795],[-91.5053,40.2371],[-91.4944,40.0345],[-91.3684,39.7278],[-91.0617,39.4704],[-90.7276,39.2568],[-90.6619,38.9281],[-90.5852,38.8679],[-90.4702,38.961],[-90.2511,38.9172],[-90.1087,38.846],[-90.2073,38.7255],[-90.1799,38.6324],[-90.3497,38.375],[-90.3552,38.2161],[-90.0594,38.0135],[-89.9499,37.882],[-89.8404,37.904],[-89.5172,37.6904],[-89.5172,37.537],[-89.4351,37.3453],[-89.5172,37.2796],[-89.2927,36.9948],[-89.1338,36.9838],[-89.216,36.5785],[-89.3639,36.6224],[-89.4186,36.4964],[-89.4843,36.4964],[-89.5391,36.4964],[-89.5336,36.2499],[-89.7308,35.998],[-90.3771,35.998],[-90.2183,36.1842],[-90.0649,36.3047],[-90.1525,36.4964],[-94.4738,36.5019],[-94.6162,36.5019],[-94.6162,37.0003],[-94.6108,39.1582],[-94.8244,39.2075],[-94.9832,39.443],[-95.1092,39.5416],[-94.8846,39.8318],[-95.2078,39.9085],[-95.3063,40.0016],[-95.5528,40.2645],[-95.7664,40.5877],[-94.6327,40.5712],[-93.258,40.5822],[-91.834,40.6096]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-91.834,40.6096],[-91.7299,40.615],[-91.5272,40.4124],[-91.4177,40.3795],[-91.5053,40.2371],[-91.4944,40.0345],[-91.3684,39.7278],[-91.0617,39.4704],[-90.7276,39.2568],[-90.6619,38.9281],[-90.5852,38.8679],[-90.4702,38.961],[-90.2511,38.9172],[-90.1087,38.846],[-90.2073,38.7255],[-90.1799,38.6324],[-90.3497,38.375],[-90.3552,38.2161],[-90.0594,38.0135],[-89.9499,37.882],[-89.8404,37.904],[-89.5172,37.6904],[-89.5172,37.537],[-89.4351,37.3453],[-89.5172,37.2796],[-89.2927,36.9948],[-89.1338,36.9838],[-89.216,36.5785],[-89.3639,36.6224],[-89.4186,36.4964],[-89.4843,36.4964],[-89.5391,36.4964],[-89.5336,36.2499],[-89.7308,35.998],[-90.3771,35.998],[-90.2183,36.1842],[-90.0649,36.3047],[-90.1525,36.4964],[-94.4738,36.5019],[-94.6162,36.5019],[-94.6162,37.0003],[-94.6108,39.1582],[-94.8244,39.2075],[-94.9832,39.443],[-95.1092,39.5416],[-94.8846,39.8318],[-95.2078,39.9085],[-95.3063,40.0016],[-95.5528,40.2645],[-95.7664,40.5877],[-94.6327,40.5712],[-93.258,40.5822],[-91.834,40.6096]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
