{"state":"nc","name":"Rockingham, North Carolina","updated":"2026-10-25","checked":"2026-10-15","bounds":[-79.79793,34.796260000000004,-79.686266,35.0458],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":1},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aws-richmond-county-nc","state":"nc","kind":"facility","name":"Amazon Web Services Richmond County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richmond"],"city":"Rockingham","address":"","who":"Amazon","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. June26draft-permit hearing notice not final permit or operating proof as ofOctober14. Engine counts and backup versus bridge power are not campus IT MW and not normally concurrent. Hearing announcement not observed hearing outcome. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.deq.nc.gov/news/press-releases/2026/06/26/deq-announces-joint-public-hearing-amazon-data-center-and-duke-energy-air-quality-permits-richmond","host":"deq.nc.gov","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.deq.nc.gov/news/events/public-hearing-preliminary-determination-air-quality-permit-applications-amazon-data-services-and","host":"www.deq.nc.gov","published":"","date":"","checked":"2026-10-23","label":"Original notice expressly separates Amazon computing and Duke power streets"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=198+Energy+Way%2C+Hamlet%2C+NC+28345&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-23","label":"Complete unique literal 198 Energy Way street response"},{"url":"https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-79.74228547430411%2C34.83131928853755%2C-79.73024652569589%2C34.841200711462456&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image","host":"imagery.nationalmap.gov","published":"","date":"","checked":"2026-10-23","label":"Actually viewed source setting, acquisition date unknown"},{"url":"https://www.aboutamazon.com/news/aws/aws-investment-north-carolina-ai-cloud-infrastructure","host":"www.aboutamazon.com","published":"2025-06-04","date":"2025-06-04","checked":"2026-10-24","label":"Reviewed operator source"}],"loc":{"lng":-79.736266,"lat":34.83626,"precision":"address","basis":"The original North Carolina agency notice explicitly identifies the Amazon computing project at 198 Energy Way, Hamlet, NC 28345, separately from the Duke power facility at 1761 Airport Road. One complete unique literal Census street range gives a calculated reference inside Richmond County. The nearby energy complex is excluded as a computing building. Existing status group unknown remains unchanged. No surveyed roof, legal title or complete campus is selected. Imagery acquisition date is unknown and may predate construction."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"project_name":"Energy Way Tech Campus","published_location":"Airport Road, Hamlet, Richmond County, North Carolina","hearing_scheduled_date":"2026-07-30","hearing_scheduled_local_time":"18:00","comment_deadline":"2026-07-31","proposed_duke_bridge_diesel_engines":57,"proposed_amazon_emergency_diesel_engines":588,"bridge_retirement_requirement_after_operation_years":1},"notes":["June26draft-permit hearing notice not final permit or operating proof as ofOctober14. Engine counts and backup versus bridge power are not campus IT MW and not normally concurrent. Hearing announcement not observed hearing outcome.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.deq.nc.gov/news/press-releases/2026/06/26/deq-announces-joint-public-hearing-amazon-data-center-and-duke-energy-air-quality-permits-richmond","host":"deq.nc.gov","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 2 location cohort 60, 2026-10-24","scope":"Explicit computing source identity and calculated Census street range only. Existing status group unknown remains unchanged. No current computing operation, surveyed roof, legal title, tenant, role, physical milestone, technical quantity or complete campus is certified.","fields":{"location_review_decision":{"location":{"lng":-79.736266,"lat":34.83626,"precision":"address","basis":"The original North Carolina agency notice explicitly identifies the Amazon computing project at 198 Energy Way, Hamlet, NC 28345, separately from the Duke power facility at 1761 Airport Road. One complete unique literal Census street range gives a calculated reference inside Richmond County. The nearby energy complex is excluded as a computing building. Existing status group unknown remains unchanged. No surveyed roof, legal title or complete campus is selected. Imagery acquisition date is unknown and may predate construction."},"reference_method":"Census interpolated street address","published_address":"198 Energy Way, Hamlet, NC 28345","county_fips":["37153"],"operator_coordinates_adopted":false,"corporate_address_adopted":false}},"notes":["Original agency notice explicitly orders Amazon computing address 198 Energy Way before the separate Duke 1761 Airport Road power facility. The unique Census street endpoint inside Richmond is a calculated range only. Power plant, hearing venue and agency offices are excluded. No computing roof, current operation, legal title, complete campus or approval event is inferred.","Explicit computing source identity and calculated Census street range only. Existing status group unknown remains unchanged. No current computing operation, surveyed roof, legal title, tenant, role, physical milestone, technical quantity or complete campus is certified.","The actual source frame shows an existing industrial energy complex to the northwest, a road through the center and extensive wooded areas south and east. The literal Census endpoint is a calculated street range only. The nearby power complex is not selected as a computing building, and this image does not establish a current computing campus or construction date.","The inherited general area coordinate was not a reviewed computing property destination. The independently named original government computing street and complete unique literal Census street response support this bounded reference inside the retained county. The measured inherited point offset is 12543.5 metres. All predecessor coordinates and source versions remain in history. This is a reference correction without physical relocation, a new computing event, selected roof, ownership, current operation or whole campus certification."],"sources":[{"url":"https://www.deq.nc.gov/news/events/public-hearing-preliminary-determination-air-quality-permit-applications-amazon-data-services-and","host":"www.deq.nc.gov","published":"","date":"","checked":"2026-10-23","label":"Original notice expressly separates Amazon computing and Duke power streets"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=198+Energy+Way%2C+Hamlet%2C+NC+28345&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-23","label":"Complete unique literal 198 Energy Way street response"},{"url":"https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-79.74228547430411%2C34.83131928853755%2C-79.73024652569589%2C34.841200711462456&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image","host":"imagery.nationalmap.gov","published":"","date":"","checked":"2026-10-23","label":"Actually viewed source setting, acquisition date unknown"}],"checked":"2026-10-24","whole_record_certified":false},{"overlay":"Company role source check69, October24,2026","scope":"The June 4, 2025 Amazon announcement identifies its planned AWS infrastructure investment in Richmond County. Developer per source means the named project proponent, not an identified construction contractor, property title or proof of all planned buildings being complete. Statewide investment, job and energy totals are not allocated to this record. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred.","fields":{"company_association":{"name":"Amazon","role":"developer","identity_scope":"provider_brand_only","scope":"The June 4, 2025 Amazon announcement identifies its planned AWS infrastructure investment in Richmond County. Developer per source means the named project proponent, not an identified construction contractor, property title or proof of all planned buildings being complete. Statewide investment, job and energy totals are not allocated to this record. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."},"provider_role":"developer"},"notes":["The June 4, 2025 Amazon announcement identifies its planned AWS infrastructure investment in Richmond County. Developer per source means the named project proponent, not an identified construction contractor, property title or proof of all planned buildings being complete. Statewide investment, job and energy totals are not allocated to this record. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."],"sources":[{"url":"https://www.aboutamazon.com/news/aws/aws-investment-north-carolina-ai-cloud-infrastructure","host":"www.aboutamazon.com","published":"2025-06-04","date":"2025-06-04","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Calculated street reference, not a roof or complete campus","summary":"Rockingham · Richmond · Source context reviewed"},{"id":"terra-nexus-rockingham-richmond-county-nc","state":"nc","kind":"facility","name":"Terra Nexus Rockingham Data Center (Old Cheraw Highway)","group":"proposed","status":"Listed proposal","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Richmond"],"city":"Rockingham","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Council-hearing chronology is inconsistent: article publishedAugust 13 uses futureTuesday while caption citesAugust 11 packet; do not invent exact hearing/result. Initial 75,000 gallons/day is explicitly superseded by a proposed lower-water cooling design, but revised exact demand is unknown;1000 gallons/daysewer is distinct not additive consumption.48.4 dB is model output, not measurement. Staff claim no air permit needed despite backup generators is not adopted legal conclusion.30 jobs and 9 to 12 monthfirst-phase timing lack an observed start.824.3 million is whole-city existing taxable value, not project investment. No city incentives statement does not exclude all state/federal assistance. Project Blue Marlin/Amazon is separate. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yourdailyjournal.com/news/265529/rockingham-council-to-hold-public-hearing-on-data-center-rezoning","host":"yourdailyjournal.com","date":"2026-08-13","published":"2026-08-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://img1.wsimg.com/blobby/go/b2b3cb0c-2c60-4ad2-90bc-2c01c4adfee4/downloads/84474868-d2c5-42ae-9e19-65736f6b2a31/Terra%20Nexus%20Rockingham%20Operational%20Noise%20Study.pdf?ver=1792020521238","host":"img1.wsimg.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://gorockingham.com/city-council-agendas","host":"gorockingham.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":35.0058,"lng":-79.74793,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Richmond County Daily Journal reports Terra Nexus’s 165-acre conditional-rezoning proposal at 316 OldCherawHighway, with planning recommendation onAugust 4 and a proposed phased 1.2 billion-dollar data center.","independently_verified_current_operating_status":null,"original_water_design_gallons_per_day":75000,"original_water_design_superseded_by_revised_proposal":true,"revised_water_design_gallons_per_day":null},"notes":["Council-hearing chronology is inconsistent: article publishedAugust 13 uses futureTuesday while caption citesAugust 11 packet; do not invent exact hearing/result. Initial 75,000 gallons/day is explicitly superseded by a proposed lower-water cooling design, but revised exact demand is unknown;1000 gallons/daysewer is distinct not additive consumption.48.4 dB is model output, not measurement. Staff claim no air permit needed despite backup generators is not adopted legal conclusion.30 jobs and 9 to 12 monthfirst-phase timing lack an observed start.824.3 million is whole-city existing taxable value, not project investment. No city incentives statement does not exclude all state/federal assistance. Project Blue Marlin/Amazon is separate.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yourdailyjournal.com/news/265529/rockingham-council-to-hold-public-hearing-on-data-center-rezoning","host":"yourdailyjournal.com","date":"2026-08-13","published":"2026-08-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 57","scope":"The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts.","fields":{"current_stage_evidence":{"outcome":"original_named_engineering_proposal_not_operating_noise_measurement","scope":"The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts."},"source_read_scope":{"original_city_index_and_selected_study_text_pages":[1,2,3,4],"full_32_page_study_not_claimed_read":true,"predicted_operational_noise_not_observed_computing":true,"ferc_comparison_not_binding_city_rule":true,"exact_old_cheraw_street_or_parcel_not_newly_certified":true,"city_of_rockingham_in_richmond_county_not_rockingham_county":true,"unread_scanned_agendas_not_final_vote":true,"no_technical_quantity_export":true}},"notes":["The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://img1.wsimg.com/blobby/go/b2b3cb0c-2c60-4ad2-90bc-2c01c4adfee4/downloads/84474868-d2c5-42ae-9e19-65736f6b2a31/Terra%20Nexus%20Rockingham%20Operational%20Noise%20Study.pdf?ver=1792020521238","host":"img1.wsimg.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://gorockingham.com/city-council-agendas","host":"gorockingham.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Rockingham · Richmond · Source context reviewed","status_scope":"The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"37153"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"aws-richmond-county-nc":{"fips":["37153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"terra-nexus-rockingham-richmond-county-nc":{"fips":["37153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Richmond County","base_name":"Richmond","fips":"37153","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":32,"retained_reviewed_reference":10,"no_site_point":2,"county_display":34},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"nc","name":"Rockingham","state_name":"North Carolina","state_path":"/north-carolina/","slug":"rockingham","path":"/city/north-carolina/rockingham/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261023-c57-terra-nexus-rockingham-richmond-county-nc","subject_id":"site:terra-nexus-rockingham-richmond-county-nc","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"proposed","status_label":"Listed proposal","scope":"The current original City agenda index posts a March 2026 Meridian Consultants Operational Noise Study for Terra Nexus at Rockingham. Its executive summary and project description explicitly evaluate a proposed data center development. This supports a named listed proposal within the engineering planning scope, without observed construction, computing service or a verified final City vote. Operational noise in the title refers to modeled future operation. The study says its chosen FERC comparison is a benchmark even though this project is not subject to FERC jurisdiction; it is not a newly enacted City numerical noise standard. Predicted effects, equipment counts, dimensions and suggested operational behavior are not exported as measured facility facts.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://img1.wsimg.com/blobby/go/b2b3cb0c-2c60-4ad2-90bc-2c01c4adfee4/downloads/84474868-d2c5-42ae-9e19-65736f6b2a31/Terra%20Nexus%20Rockingham%20Operational%20Noise%20Study.pdf?ver=1792020521238","publisher":"City of Rockingham posted Meridian Consultants project study","source_type":"government_record","retrieved_on":"2026-10-23"},{"url":"https://gorockingham.com/city-council-agendas","publisher":"City of Rockingham North Carolina","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:f86eca21cf1fd030d4c7c5ca","source:eae6949c895605d49e8b0c78"],"event_type":["source:f86eca21cf1fd030d4c7c5ca","source:eae6949c895605d49e8b0c78"],"occurred_on":["source:f86eca21cf1fd030d4c7c5ca","source:eae6949c895605d49e8b0c78"],"observed_on":["source:f86eca21cf1fd030d4c7c5ca","source:eae6949c895605d49e8b0c78"],"qualifies_status":["source:f86eca21cf1fd030d4c7c5ca","source:eae6949c895605d49e8b0c78"],"status_group":["source:f86eca21cf1fd030d4c7c5ca","source:eae6949c895605d49e8b0c78"],"status_label":["source:f86eca21cf1fd030d4c7c5ca","source:eae6949c895605d49e8b0c78"],"scope":["source:f86eca21cf1fd030d4c7c5ca","source:eae6949c895605d49e8b0c78"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/amazon-web-services/","name":"Amazon Web Services (AWS)"}],"map_settings":{"bounds":[-79.79793,34.796260000000004,-79.686266,35.0458],"hub":[-79.742098,34.92103],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-80.9787,36.5621],[-80.294,36.5457],[-79.5108,36.5402],[-75.8687,36.5512],[-75.7537,36.1513],[-76.033,36.1897],[-76.0713,36.1404],[-76.4109,36.0801],[-76.4602,36.0254],[-76.6847,36.0089],[-76.6738,35.9377],[-76.3999,35.987],[-76.3616,35.9432],[-76.0604,35.9925],[-75.9618,35.8994],[-75.781,35.9377],[-75.7153,35.6968],[-75.7756,35.5817],[-75.8961,35.5708],[-76.148,35.3243],[-76.4821,35.3134],[-76.5369,35.1436],[-76.3945,34.9738],[-76.2794,34.9409],[-76.493,34.6616],[-76.6738,34.6945],[-76.9914,34.6671],[-77.2105,34.6068],[-77.5556,34.4151],[-77.8294,34.1632],[-77.9718,33.8455],[-78.1799,33.9167],[-78.5414,33.851],[-79.6751,34.804],[-80.7979,34.8204],[-80.7815,34.9355],[-80.9348,35.1052],[-81.0389,35.045],[-81.0444,35.1491],[-82.2767,35.1983],[-82.5505,35.16],[-82.7641,35.0669],[-83.1092,35.0012],[-83.6185,34.9847],[-84.3196,34.9902],[-84.2922,35.2257],[-84.095,35.2476],[-84.0184,35.4119],[-83.7719,35.5598],[-83.4981,35.5653],[-83.2516,35.7187],[-82.9942,35.7734],[-82.7751,35.998],[-82.6382,36.0637],[-82.6108,35.9651],[-82.2164,36.1568],[-82.0357,36.1185],[-81.9097,36.3047],[-81.7235,36.354],[-81.6797,36.5895],[-80.9787,36.5621]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-80.9787,36.5621],[-80.294,36.5457],[-79.5108,36.5402],[-75.8687,36.5512],[-75.7537,36.1513],[-76.033,36.1897],[-76.0713,36.1404],[-76.4109,36.0801],[-76.4602,36.0254],[-76.6847,36.0089],[-76.6738,35.9377],[-76.3999,35.987],[-76.3616,35.9432],[-76.0604,35.9925],[-75.9618,35.8994],[-75.781,35.9377],[-75.7153,35.6968],[-75.7756,35.5817],[-75.8961,35.5708],[-76.148,35.3243],[-76.4821,35.3134],[-76.5369,35.1436],[-76.3945,34.9738],[-76.2794,34.9409],[-76.493,34.6616],[-76.6738,34.6945],[-76.9914,34.6671],[-77.2105,34.6068],[-77.5556,34.4151],[-77.8294,34.1632],[-77.9718,33.8455],[-78.1799,33.9167],[-78.5414,33.851],[-79.6751,34.804],[-80.7979,34.8204],[-80.7815,34.9355],[-80.9348,35.1052],[-81.0389,35.045],[-81.0444,35.1491],[-82.2767,35.1983],[-82.5505,35.16],[-82.7641,35.0669],[-83.1092,35.0012],[-83.6185,34.9847],[-84.3196,34.9902],[-84.2922,35.2257],[-84.095,35.2476],[-84.0184,35.4119],[-83.7719,35.5598],[-83.4981,35.5653],[-83.2516,35.7187],[-82.9942,35.7734],[-82.7751,35.998],[-82.6382,36.0637],[-82.6108,35.9651],[-82.2164,36.1568],[-82.0357,36.1185],[-81.9097,36.3047],[-81.7235,36.354],[-81.6797,36.5895],[-80.9787,36.5621]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
