{"state":"ne","name":"Grand Island, Nebraska","updated":"2026-10-24","checked":"2026-10-15","bounds":[-98.56504,40.808080000000004,-98.45004,40.92438],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"archgreen-grand-island-hall-ne","state":"ne","kind":"facility","name":"ArchGreen Grand Island Data Center","group":"building","status":"Company reported construction","raw_status":"under construction","status_field":"current_status","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hall"],"city":"Grand Island","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Same page says development completed and currently under construction. Actual commissioning and exact build completion remain null. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.arch-green.com/project-1-3","host":"arch-green.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.88438,"lng":-98.51504,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"ArchGreen operator page names modular crypto development west of Grand Island in Hall County.","independently_verified_current_operating_status":null},"notes":["Same page says development completed and currently under construction. Actual commissioning and exact build completion remain null.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.arch-green.com/project-1-3","host":"arch-green.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 73","scope":"The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted.","fields":{"current_stage_evidence":{"outcome":"developer_explicit_named_grandisland_construction","scope":"The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted."},"source_read_scope":{"complete_original_current_developer_project_body_read":true,"completed_development_not_completed_construction":true,"undated_page_not_invented_event_day":true,"separate_doniphan_project_not_merged":true}},"notes":["The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted.","Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."],"sources":[{"url":"https://www.arch-green.com/project-1-3","host":"www.arch-green.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Grand Island · Hall · Source context reviewed","status_scope":"The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"31079"}},{"id":"fortitude-grand-island-ne","state":"ne","kind":"facility","name":"Fortitude Grand Island Nebraska Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hall"],"city":"Grand Island","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. No observed opening or final current status inferred; original lease, rates and acoustic reports not retained. Company/utility water and noise claims are attributed. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-07-28","The original Fortitude investor index dates its Grand Island energization announcement July 28, 2026. This is the index statement date; the linked full release was not read, and actual computing commissioning or the exact first energization day is not independently certified."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.centralnebraskatoday.com/2026/06/26/data-center-nearing-completion-in-east-grand-island/","host":"centralnebraskatoday.com","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://fortitudemining.com/investors/","host":"fortitudemining.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"loc":{"lat":40.84808,"lng":-98.50004,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported Fortitude nearing completion at 380 Museum Drive; July/August opening forecast.","independently_verified_current_operating_status":null},"notes":["No observed opening or final current status inferred; original lease, rates and acoustic reports not retained. Company/utility water and noise claims are attributed.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.centralnebraskatoday.com/2026/06/26/data-center-nearing-completion-in-east-grand-island/","host":"centralnebraskatoday.com","date":"2026-06-26","published":"2026-06-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 73","scope":"The complete original issuer investor index carries a July 28, 2026 energization announcement title for Grand Island. The linked full release host was unavailable at robots, so its body was not read through an alternate copy. Energization and a title do not independently establish commissioned mining, installed computing load or exact present operation. The index publication date is retained as a statement date without recasting it as the exact first physical energization or opening.","fields":{"current_stage_evidence":{"outcome":"issuer_index_energization_headline_computing_operation_held","scope":"The complete original issuer investor index carries a July 28, 2026 energization announcement title for Grand Island. The linked full release host was unavailable at robots, so its body was not read through an alternate copy. Energization and a title do not independently establish commissioned mining, installed computing load or exact present operation. The index publication date is retained as a statement date without recasting it as the exact first physical energization or opening."},"source_read_scope":{"complete_original_issuer_investor_index_read":true,"linked_release_robots_unavailable_body_not_adopted":true,"energization_headline_not_computing_operation":true}},"notes":["The complete original issuer investor index carries a July 28, 2026 energization announcement title for Grand Island. The linked full release host was unavailable at robots, so its body was not read through an alternate copy. Energization and a title do not independently establish commissioned mining, installed computing load or exact present operation. The index publication date is retained as a statement date without recasting it as the exact first physical energization or opening.","Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."],"sources":[{"url":"https://fortitudemining.com/investors/","host":"fortitudemining.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Grand Island · Hall · Source context reviewed","event_evidence":[{"date":"2026-07-28","text":"The original Fortitude investor index dates its Grand Island energization announcement July 28, 2026. This is the index statement date; the linked full release was not read, and actual computing commissioning or the exact first energization day is not independently certified.","kind":"announced","sources":[{"url":"https://fortitudemining.com/investors/","host":"fortitudemining.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"31079"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"archgreen-grand-island-hall-ne":{"fips":["31079"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"fortitude-grand-island-ne":{"fips":["31079"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Hall County","base_name":"Hall","fips":"31079","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{"fortitude-grand-island-ne":{"stages":[{"id":"event:milestone:research-20261024-c73-fortitude-grand-island-ne:0","date":"2026-07-28","stage":"announced","scheduled":false,"basis":"primary source","scope":"The original Fortitude investor index dates its Grand Island energization announcement July 28, 2026. This is the index statement date; the linked full release was not read, and actual computing commissioning or the exact first energization day is not independently certified.","sources":[{"url":"https://fortitudemining.com/investors/","publisher":"Fortitude original current investor release index"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":22,"retained_reviewed_reference":7,"county_display":22},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"ne","name":"Grand Island","state_name":"Nebraska","state_path":"/nebraska/","slug":"grand-island","path":"/city/nebraska/grand-island/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261024-c73-archgreen-grand-island-hall-ne","subject_id":"site:archgreen-grand-island-hall-ne","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-24","qualifies_status":true,"status_group":"building","status_label":"Company reported construction","scope":"The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted.","display_category":"source_check","display_date":"2026-10-24","sources":[{"url":"https://www.arch-green.com/project-1-3","publisher":"ArchGreen original Grand Island project account","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:0ee7b82cbeafe20c0ef512e9"],"event_type":["source:0ee7b82cbeafe20c0ef512e9"],"occurred_on":["source:0ee7b82cbeafe20c0ef512e9"],"observed_on":["source:0ee7b82cbeafe20c0ef512e9"],"qualifies_status":["source:0ee7b82cbeafe20c0ef512e9"],"status_group":["source:0ee7b82cbeafe20c0ef512e9"],"status_label":["source:0ee7b82cbeafe20c0ef512e9"],"scope":["source:0ee7b82cbeafe20c0ef512e9"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261024-c73-fortitude-grand-island-ne:0","subject_id":"site:fortitude-grand-island-ne","event_type":"announced","occurred_on":"2026-07-28","observed_on":"2026-10-24","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The original Fortitude investor index dates its Grand Island energization announcement July 28, 2026. This is the index statement date; the linked full release was not read, and actual computing commissioning or the exact first energization day is not independently certified.","display_category":"recorded_event","display_date":"2026-07-28","sources":[{"url":"https://fortitudemining.com/investors/","publisher":"Fortitude original current investor release index","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:77fd438e2e3cbb98ee94996c"],"event_type":["source:77fd438e2e3cbb98ee94996c"],"occurred_on":["source:77fd438e2e3cbb98ee94996c"],"observed_on":["source:77fd438e2e3cbb98ee94996c"],"qualifies_status":["source:77fd438e2e3cbb98ee94996c"],"status_group":["source:77fd438e2e3cbb98ee94996c"],"status_label":["source:77fd438e2e3cbb98ee94996c"],"scope":["source:77fd438e2e3cbb98ee94996c"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-98.56504,40.808080000000004,-98.45004,40.92438],"hub":[-98.50754,40.86623],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-103.3246,43.003],[-101.6267,42.9975],[-98.4994,42.9975],[-98.4665,42.9482],[-97.9517,42.7675],[-97.8312,42.8661],[-97.6888,42.8442],[-97.2178,42.8442],[-96.692,42.6579],[-96.6263,42.5155],[-96.4455,42.4882],[-96.2648,42.039],[-96.1279,41.9733],[-96.0622,41.7981],[-96.1224,41.6776],[-96.095,41.5406],[-95.9198,41.453],[-95.9252,41.2011],[-95.8266,40.9765],[-95.8814,40.7191],[-95.7664,40.5877],[-95.5528,40.2645],[-95.3063,40.0016],[-101.906,40.0016],[-102.0539,40.0016],[-102.0539,41.0039],[-104.053,41.0039],[-104.053,43.003],[-103.3246,43.003]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-103.3246,43.003],[-101.6267,42.9975],[-98.4994,42.9975],[-98.4665,42.9482],[-97.9517,42.7675],[-97.8312,42.8661],[-97.6888,42.8442],[-97.2178,42.8442],[-96.692,42.6579],[-96.6263,42.5155],[-96.4455,42.4882],[-96.2648,42.039],[-96.1279,41.9733],[-96.0622,41.7981],[-96.1224,41.6776],[-96.095,41.5406],[-95.9198,41.453],[-95.9252,41.2011],[-95.8266,40.9765],[-95.8814,40.7191],[-95.7664,40.5877],[-95.5528,40.2645],[-95.3063,40.0016],[-101.906,40.0016],[-102.0539,40.0016],[-102.0539,41.0039],[-104.053,41.0039],[-104.053,43.003],[-103.3246,43.003]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
