{"state":"nh","name":"Concord, New Hampshire","updated":"2026-10-25","checked":"2026-10-15","bounds":[-71.75251,43.21493,-71.6266,43.357659999999996],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"locke-road-micro-data-center-concord-nh","state":"nh","kind":"facility","name":"Locke Road Micro Data Center","group":"proposed","status":"Listed proposal","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Merrimack"],"city":"Concord","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Concord microfacility application versus completeness and prior land uses. HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-10-19","The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/","host":"concordmonitor.com","date":"2026-09-14","published":"2026-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C","host":"concordnh.legistar.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://concordnh.legistar.com/Calendar.aspx","host":"concordnh.legistar.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":43.31766,"lng":-71.70251,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Concord microfacility application versus completeness and prior land uses","fields":{"project":"LockeRoad micro data center","address":"52 LockeRoad, Concord, NewHampshire","owner_applicant":"Granite Municipal Manufacturing and Sales LLC","engineer":"Northpoint Engineering LLC","proposed_building_gross_sqft":8160,"proposed_data_center_space_sqft":7220,"parent_site_acres_approx":21,"reported_buildable_acres_approx":9.3,"stage_asofreport":"application completeness/site design consideration, not final approval","scheduled_completeness_meeting":"2026-09-16T19:00:00-04:00"},"notes":["HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/","host":"concordmonitor.com","date":"2026-09-14","published":"2026-09-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 66","scope":"The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.","fields":{"current_stage_evidence":{"outcome":"official_named_locke_road_micro_compute_proposal","scope":"The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day."},"source_read_scope":{"original_current_calendar_selected_oct21_row_read":true,"original_agenda_physical_page9_item7L_complete_text_read":true,"full_agenda_review_not_claimed":true,"october19_is_print_date_not_first_publication":true,"private_november18_account_not_officially_verified":true,"unrelated_private_property_details_excluded":true}},"notes":["The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.","Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."],"sources":[{"url":"https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C","host":"concordnh.legistar.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://concordnh.legistar.com/Calendar.aspx","host":"concordnh.legistar.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Concord · Merrimack · Source context reviewed","status_scope":"The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.","event_evidence":[{"date":"2026-10-19","text":"The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service.","kind":"announced","sources":[{"url":"https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C","host":"concordnh.legistar.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"33013"}},{"id":"nh-doit-hazen-concord-data-center-nh","state":"nh","kind":"facility","name":"New Hampshire DoIT Hazen Drive Data Center","group":"unknown","status":"Status unclear","crypto":false,"type":"Data center research context","counties":["Merrimack"],"city":"Concord","address":"","who":"New Hampshire Department of Information Technology","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.","date":"","events":[["2026-10-25","Added to the atlas. Compilation date only, not opening or construction."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.gc.nh.gov/LBA/budget/FiscalItems/2-1-13%20Agenda%20Items.pdf","host":"www.gc.nh.gov","published":"","date":"","checked":"2026-10-25","label":"Official source retained for premises or county context"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=27+Hazen+Drive+Concord+NH&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-25","label":"Official source retained for premises or county context"}],"loc":{"lat":43.25493,"lng":-71.6766,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":false,"precision_label":"Exact site not published; shown at county level","summary":"Concord sourced data center research context. County level only.","reviewed_evidence":[{"overlay":"Codex 3 inherited discovery review 16","scope":"Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.","fields":{"source_context":{"name":"New Hampshire DoIT Hazen Drive Data Center","operator":"New Hampshire Department of Information Technology","scope":"Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.","address":"","exact_street_unpublished":true},"county_association":{"county":"Merrimack","county_fips":"33013","scope":"Exact retained Census27HazenDriveConcord match gives Merrimack33013, corroborating the legislative premises address."},"atlas_added_event":{"kind":"atlas_added","date":"2026-10-25","scope":"Intended compilation day only. Must equal actual admission day before Native commit; never a physical milestone."}},"notes":["Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.","Historical forecasts, permits, funding and building occupancy do not establish current data center operation."],"sources":[{"url":"https://www.gc.nh.gov/LBA/budget/FiscalItems/2-1-13%20Agenda%20Items.pdf","host":"www.gc.nh.gov","published":"","date":"","checked":"2026-10-25","label":"Official source retained for premises or county context"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=27+Hazen+Drive+Concord+NH&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-25","label":"Official source retained for premises or county context"}],"checked":"2026-10-25","whole_record_certified":false}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"no_site_point","county_display":"33013"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"locke-road-micro-data-center-concord-nh":{"fips":["33013"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"nh-doit-hazen-concord-data-center-nh":{"fips":["33013"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Merrimack County","base_name":"Merrimack","fips":"33013","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"stage_timelines":{"locke-road-micro-data-center-concord-nh":{"stages":[{"id":"event:milestone:research-20261024-c66-locke-road-micro-data-center-concord-nh:0","date":"2026-10-19","stage":"announced","scheduled":false,"basis":"primary source","scope":"The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service.","sources":[{"url":"https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C","publisher":"City of Concord original October 21 Planning Board agenda"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":7,"no_site_point":1,"county_display":8},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"nh","name":"Concord","state_name":"New Hampshire","state_path":"/new-hampshire/","slug":"concord","path":"/city/new-hampshire/concord/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","county_rule_reviews":[],"city_timeline":[{"id":"event:atlas-added:discovery-20261025-c3-nh-doit-hazen-concord-data-center-nh","subject_id":"site:nh-doit-hazen-concord-data-center-nh","event_type":"announcement","occurred_on":"2026-10-25","observed_on":"2026-10-25","qualifies_status":false,"status_group":null,"status_label":null,"scope":"Added to the atlas. Compilation date only, not a project announcement, opening or construction milestone.","display_category":"recorded_event","display_date":"2026-10-25","sources":[{"url":"https://www.gc.nh.gov/LBA/budget/FiscalItems/2-1-13%20Agenda%20Items.pdf","publisher":"Official government record","source_type":"government_record","retrieved_on":"2026-10-25"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=27+Hazen+Drive+Concord+NH&benchmark=Public_AR_Current&vintage=Current_Current&format=json","publisher":"U.S. Census Bureau","source_type":"government_record","retrieved_on":"2026-10-25"}],"field_sources":{"subject_id":["source:6157e1e5dfe1185953ce3dba","source:f2e82de4566b6035dfda2388"],"event_type":["source:6157e1e5dfe1185953ce3dba","source:f2e82de4566b6035dfda2388"],"occurred_on":["source:6157e1e5dfe1185953ce3dba","source:f2e82de4566b6035dfda2388"],"observed_on":["source:6157e1e5dfe1185953ce3dba","source:f2e82de4566b6035dfda2388"],"qualifies_status":["source:6157e1e5dfe1185953ce3dba","source:f2e82de4566b6035dfda2388"],"status_group":["source:6157e1e5dfe1185953ce3dba","source:f2e82de4566b6035dfda2388"],"status_label":["source:6157e1e5dfe1185953ce3dba","source:f2e82de4566b6035dfda2388"],"scope":["source:6157e1e5dfe1185953ce3dba","source:f2e82de4566b6035dfda2388"]},"field_confidence":{"subject_id":"inference","event_type":"inference","occurred_on":"inference","observed_on":"inference","qualifies_status":"inference","status_group":"inference","status_label":"inference","scope":"inference"}},{"id":"event:status:research-20261024-c66-locke-road-micro-data-center-concord-nh","subject_id":"site:locke-road-micro-data-center-concord-nh","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-24","qualifies_status":true,"status_group":"proposed","status_label":"Listed proposal","scope":"The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.","display_category":"source_check","display_date":"2026-10-24","sources":[{"url":"https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C","publisher":"City of Concord original October 21 Planning Board agenda","source_type":"government_record","retrieved_on":"2026-10-23"},{"url":"https://concordnh.legistar.com/Calendar.aspx","publisher":"City of Concord original meeting calendar","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:f47cadc3b657a68604e293cf","source:bfc1eb6f6040ae7084da47ec"],"event_type":["source:f47cadc3b657a68604e293cf","source:bfc1eb6f6040ae7084da47ec"],"occurred_on":["source:f47cadc3b657a68604e293cf","source:bfc1eb6f6040ae7084da47ec"],"observed_on":["source:f47cadc3b657a68604e293cf","source:bfc1eb6f6040ae7084da47ec"],"qualifies_status":["source:f47cadc3b657a68604e293cf","source:bfc1eb6f6040ae7084da47ec"],"status_group":["source:f47cadc3b657a68604e293cf","source:bfc1eb6f6040ae7084da47ec"],"status_label":["source:f47cadc3b657a68604e293cf","source:bfc1eb6f6040ae7084da47ec"],"scope":["source:f47cadc3b657a68604e293cf","source:bfc1eb6f6040ae7084da47ec"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261024-c66-locke-road-micro-data-center-concord-nh:0","subject_id":"site:locke-road-micro-data-center-concord-nh","event_type":"announced","occurred_on":"2026-10-19","observed_on":"2026-10-24","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service.","display_category":"recorded_event","display_date":"2026-10-19","sources":[{"url":"https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C","publisher":"City of Concord original October 21 Planning Board agenda","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:f47cadc3b657a68604e293cf"],"event_type":["source:f47cadc3b657a68604e293cf"],"occurred_on":["source:f47cadc3b657a68604e293cf"],"observed_on":["source:f47cadc3b657a68604e293cf"],"qualifies_status":["source:f47cadc3b657a68604e293cf"],"status_group":["source:f47cadc3b657a68604e293cf"],"status_label":["source:f47cadc3b657a68604e293cf"],"scope":["source:f47cadc3b657a68604e293cf"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-71.75251,43.21493,-71.6266,43.357659999999996],"hub":[-71.689555,43.286294999999996],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-71.0818,45.3033],[-71.0325,44.657],[-70.9668,43.3426],[-70.808,43.2275],[-70.8244,43.129],[-70.7039,43.0578],[-70.8189,42.8715],[-70.9175,42.888],[-71.1859,42.7894],[-71.2954,42.6963],[-72.4565,42.7291],[-72.5442,42.8058],[-72.5332,42.9537],[-72.4456,43.0085],[-72.4565,43.1509],[-72.3799,43.5726],[-72.2046,43.7698],[-72.117,43.9943],[-72.0293,44.0765],[-72.0348,44.3229],[-71.7007,44.416],[-71.5364,44.5858],[-71.6295,44.7501],[-71.4926,44.9144],[-71.5036,45.013],[-71.3612,45.2704],[-71.1311,45.2431],[-71.0818,45.3033]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-71.0818,45.3033],[-71.0325,44.657],[-70.9668,43.3426],[-70.808,43.2275],[-70.8244,43.129],[-70.7039,43.0578],[-70.8189,42.8715],[-70.9175,42.888],[-71.1859,42.7894],[-71.2954,42.6963],[-72.4565,42.7291],[-72.5442,42.8058],[-72.5332,42.9537],[-72.4456,43.0085],[-72.4565,43.1509],[-72.3799,43.5726],[-72.2046,43.7698],[-72.117,43.9943],[-72.0293,44.0765],[-72.0348,44.3229],[-71.7007,44.416],[-71.5364,44.5858],[-71.6295,44.7501],[-71.4926,44.9144],[-71.5036,45.013],[-71.3612,45.2704],[-71.1311,45.2431],[-71.0818,45.3033]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
