{"state":"oh","name":"New Albany, Ohio","updated":"2026-10-24","checked":"2026-10-15","bounds":[-83.156294,39.90866,-82.306566,40.18909],"stats":{"reviewed_records":13,"status_confirmed":5,"status_unknown":8,"mapped_records":1},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aws-2550-beech-road-new-albany-oh","state":"oh","kind":"facility","name":"AWS New Albany (2550 Beech Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Assessed improvements/abatements are property records, not investment or incentive payments. Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111744-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":40.10383,"lng":-82.49647,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"parcel":"095-111744-00.000","parcel_owner":"VADATA INC","parcel_site_address":"2550 BEECH RD NW","tax_acres":67.27,"county":"Licking"},"notes":["Assessed improvements/abatements are property records, not investment or incentive payments.","Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111744-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 54","scope":"The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.","fields":{"current_stage_evidence":{"outcome":"broader_new_albany_market_not_exact_component_stage","scope":"The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed."},"source_read_scope":{"selected_section":"August 7, 2025 AWS data centers in New Albany","current_rolling_source_not_all_articles_read":true,"regional_service_not_transferred_to_every_building":true,"no_site_event_from_broader_market_publication":true}},"notes":["The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"aws-3180-beech-road-new-albany-oh","state":"oh","kind":"facility","name":"AWS New Albany (3180 Beech Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Assessed improvements/abatements are property records, not investment or incentive payments. 3180 street number is not present in this queried parcel. Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111618-04.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":40.06593,"lng":-82.48081,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"parcel":"095-111618-04.000","parcel_owner":"AMAZON DATA SERVICES INC","parcel_site_address":"BEECH RD NW","tax_acres":106.41,"county":"Licking"},"notes":["Assessed improvements/abatements are property records, not investment or incentive payments.","3180 street number is not present in this queried parcel.","Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111618-04.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 54","scope":"The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.","fields":{"current_stage_evidence":{"outcome":"broader_new_albany_market_not_exact_component_stage","scope":"The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed."},"source_read_scope":{"selected_section":"August 7, 2025 AWS data centers in New Albany","current_rolling_source_not_all_articles_read":true,"regional_service_not_transferred_to_every_building":true,"no_site_event_from_broader_market_publication":true}},"notes":["The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"aws-beech-road-new-albany-oh","state":"oh","kind":"facility","name":"AWS New Albany (Beech/Miller Road Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25AMAZON%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":40.11654,"lng":-82.4639,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":8,"cadastral_error":null,"parcel_assertions":[{"PID":93672,"Parcel":"093-106422-00.004","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"2575 NEWTON CT ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":1.64},{"PID":96925,"Parcel":"095-111408-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"BEECH RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":199.81},{"PID":93874,"Parcel":"095-111618-04.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"BEECH RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":106.41},{"PID":96928,"Parcel":"095-111648-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"MILLER RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":67.68},{"PID":96932,"Parcel":"095-111870-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"BEECH RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":0.27},{"PID":90304,"Parcel":"095-112074-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"2575 NEWTON CT ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":92.69},{"PID":96936,"Parcel":"095-112248-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"13757 MILLER RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":12.9},{"PID":96941,"Parcel":"095-112248-00.001","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"BEECH RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":71.3}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25AMAZON%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 54","scope":"The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.","fields":{"current_stage_evidence":{"outcome":"broader_new_albany_market_not_exact_component_stage","scope":"The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed."},"source_read_scope":{"selected_section":"August 7, 2025 AWS data centers in New Albany","current_rolling_source_not_all_articles_read":true,"regional_service_not_transferred_to_every_building":true,"no_site_event_from_broader_market_publication":true}},"notes":["The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"aws-newton-court-new-albany-oh","state":"oh","kind":"facility","name":"AWS New Albany (Newton Court)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-112074-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":40.08521,"lng":-82.51888,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":90304,"Parcel":"095-112074-00.000","OwnerName":"AMAZON DATA SERVICES INC","SiteAddress":"2575 NEWTON CT ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":92.69}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-112074-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 54","scope":"The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.","fields":{"current_stage_evidence":{"outcome":"broader_new_albany_market_not_exact_component_stage","scope":"The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed."},"source_read_scope":{"selected_section":"August 7, 2025 AWS data centers in New Albany","current_rolling_source_not_all_articles_read":true,"regional_service_not_transferred_to_every_building":true,"no_site_event_from_broader_market_publication":true}},"notes":["The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"edgeconnex-mcn-new-albany-licking-county-oh","state":"oh","kind":"facility","name":"EdgeConneX MCN New Albany (South Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25EDGECONNEX%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.04885,"lng":-82.50524,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":17,"cadastral_error":null,"parcel_assertions":[{"PID":37146,"Parcel":"052-173658-00.000","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":35.2},{"PID":37147,"Parcel":"052-173658-00.002","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":4.0},{"PID":37148,"Parcel":"052-173658-00.003","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"13490 GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":2.53},{"PID":37149,"Parcel":"052-173658-00.004","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":2.53},{"PID":37150,"Parcel":"052-173658-00.005","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":2.53},{"PID":37151,"Parcel":"052-173658-00.006","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.33},{"PID":37152,"Parcel":"052-173664-00.000","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"13151 JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":79.86},{"PID":37357,"Parcel":"052-174306-00.000","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"13399 JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":0.75},{"PID":37649,"Parcel":"052-176184-00.000","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"13399 JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.0},{"PID":37650,"Parcel":"052-176184-00.001","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.33},{"PID":37651,"Parcel":"052-176184-00.002","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"GREEN CHAPEL RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":1.33},{"PID":37652,"Parcel":"052-176184-00.004","OwnerName":"EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC","SiteAddress":"JOHNSTOWN-UTICA RD ","SitePostalCity":"JOHNSTOWN","Jurisdiction":"Monroe Twp.","Municipality":null,"Township":"Monroe","TaxAcres":3.99},{"PID":95774,"Parcel":"093-107490-00.002","OwnerName":"EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC","SiteAddress":"INNOVATION CAMPUS WAY ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":14.78},{"PID":96257,"Parcel":"095-111720-00.000","OwnerName":"EDGECONNEX MCN NEW ALBANY NORTH PROPCO 1 LLC","SiteAddress":"3356 CLOVER VALLEY RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":170.29},{"PID":96920,"Parcel":"095-112056-00.006","OwnerName":"EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC","SiteAddress":"12525 JUG STREET RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":9.28},{"PID":91103,"Parcel":"095-112080-02.001","OwnerName":"EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC","SiteAddress":"9850 INNOVATION CAMPUS WAY ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":33.86},{"PID":95687,"Parcel":"095-112188-00.000","OwnerName":"EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC","SiteAddress":"2465 CLOVER VALLEY RD NW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":39.61}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25EDGECONNEX%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"edged-columbus-new-albany-oh","state":"oh","kind":"facility","name":"Edged Columbus","group":"operating","status":"Operator-announced opening","raw_status":"operating","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"New Albany","address":"","who":"Edged","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. ReleaseSeptember11saysopeningyesterday. Criticalcapacityspecificationnotmeasuredload.92Mgallonswatersavingscomparedtoconventionaldesignnotactualwaterwithdrawal;1.15PUEportfolioaverage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://edged.us/news/columbus-grand-opening","host":"edged.us","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://edged.us/columbus","host":"edged.us","published":"","date":"","checked":"2026-10-23","label":"First party named campus and scoped operator relationship"}],"loc":{"lat":39.99348,"lng":-82.99121,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"opening_event_date":"2025-09-10","critical_capacity_mw":24,"published_city":"New Albany, Ohio"},"notes":["ReleaseSeptember11saysopeningyesterday. Criticalcapacityspecificationnotmeasuredload.92Mgallonswatersavingscomparedtoconventionaldesignnotactualwaterwithdrawal;1.15PUEportfolioaverage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://edged.us/news/columbus-grand-opening","host":"edged.us","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"orchestra-status-2026-10-19","scope":"Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","fields":{"current_stage_evidence":{"outcome":"operator_announced_opening","scope":"Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","reported_stage_date":{"date":"2025-09-10","basis":"operator_reported_opening","status_label":"Operator-announced opening","source_scope":"September 11 release explicitly describes the opening celebration as yesterday; independent commissioning and all halls are not certified."}}},"notes":["Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified."],"sources":[{"url":"https://edged.us/news/columbus-grand-opening","host":"edged.us","published":"2025-09-11","date":"2025-09-11","checked":"2026-10-19","label":"Operator source for the qualified stage"}],"checked":"2026-10-19","whole_record_certified":false},{"overlay":"Company role source check25, October23,2026","scope":"Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Columbus and explicitly names New Albany. The marketing city does not replace current city or county fields.","fields":{"company_association":{"name":"Edged","role":"operator","identity_scope":"provider_brand_only","scope":"Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Columbus and explicitly names New Albany. The marketing city does not replace current city or county fields."},"provider_role":"operator"},"notes":["Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Columbus and explicitly names New Albany. The marketing city does not replace current city or county fields."],"sources":[{"url":"https://edged.us/columbus","host":"edged.us","published":"","date":"","checked":"2026-10-23","label":"First party named campus and scoped operator relationship"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Franklin · Source context reviewed","status_scope":"Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39049"}},{"id":"google-new-albany-oh","state":"oh","kind":"facility","name":"Google New Albany Data Center","group":"operating","status":"Operating phase","raw_status":"partly operating","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"New Albany","address":"","who":"Google","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"Calendar-year 2025 operator-reported location totals. Withdrawal, discharge and consumption are separate quantities; methodology permits estimates and does not establish today’s use.","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Montauk Innovations LLC affiliation with Google is not established by this cadastral response. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Ohio statewide page. 20B+state total cannot be copied to Lancaster and NewAlbany independently. Cloud region opening is a service region, not exact physical building commissioning. Google 2026 quarterly performance table; named regional campus scope. Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'222-004984'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://datacenters.google/efficiency/","host":"datacenters.google","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.datacenters.google/locations/ohio/","host":"www.datacenters.google","published":"","date":"","checked":"2026-10-16","label":"Google official location source"},{"url":"https://www.datacenters.google/locations/","host":"www.datacenters.google","published":"","date":"","checked":"2026-10-16","label":"Google official location source"},{"url":"https://sustainability.google/files/google-2026-environmental-report.pdf","host":"sustainability.google","published":"","date":"","checked":"2026-10-16","label":"Google 2026 Environmental Report"},{"url":"https://treapropsearch.franklincountyohio.gov/Details.aspx?district=222&ext=00&parcel=004984","host":"treapropsearch.franklincountyohio.gov","published":"","date":"","checked":"2026-10-23","label":"Matching tax reference identifier and location address, not billing address"},{"url":"https://newalbanyohio.org/wp-content/uploads/2016/04/Council-Minutes-12-10-18-Regular-Meeting.pdf","host":"newalbanyohio.org","published":"","date":"","checked":"2026-10-23","label":"Historical council minutes identify the Montauk Innovations and Google data center alias only"},{"url":"https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-82.77868882243699%2C40.05248097736256%2C-82.76343117756302%2C40.06415902263744&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image","host":"basemap.nationalmap.gov","published":"","date":"","checked":"2026-10-23","label":"Viewed parcel area setting, acquisition date unknown"}],"loc":{"lng":-82.77106,"lat":40.05832,"precision":"approximate","basis":"Approximate mathematical center of Franklin County tax reference parcel 222-004984 at 5266 Babbitt Road, New Albany, Ohio. County situs and tax records agree, with historical city corroboration of the Google and Montauk data center alias. One reference parcel only, not a surveyed roof, legal title or complete Google campus."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PARCELID":"222-004984","ACRES":221.89582397,"SITEADDRESS":"5266 BABBITT RD","OWNERNME1":"MONTAUK INNOVATIONS LLC","BLDGAREA":811338}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Montauk Innovations LLC affiliation with Google is not established by this cadastral response.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'222-004984'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Ohio statewide page","fields":{"new_albany_construction_start_year":2019,"regional_investment_usd_min_exclusive":20000000000,"investment_scope":"Ohio statewide; New Albany, Lancaster and Columbus"},"notes":["20B+state total cannot be copied to Lancaster and NewAlbany independently. Cloud region opening is a service region, not exact physical building commissioning.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Atlas targeted primary-source follow-up","scope":"Google 2026 quarterly performance table; named regional campus scope","fields":{"operator_reported_pue_period":"2026-Q2","operator_reported_campus_pue":[{"source_campus_label":"Central Ohio (New Albany), Ohio","quarterly_pue":1.08,"trailing_twelve_month_pue":1.07}]},"notes":["Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown."],"sources":[{"url":"https://datacenters.google/efficiency/","host":"datacenters.google","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"checked":"2026-10-15","capture_sha256":"398f42d55ca9e2ebecd3b24e2dede307ad2d9d3b653469d1efebd135488f9c17","events":[],"whole_record_certified":false},{"overlay":"S4-Google-Locations-20261016","scope":"Named Google location research context; regional campus and individual building identity remain separate.","fields":{"operator_location_scope":"New Albany, Ohio is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.","record_association_scope":"The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.","annual_water_reporting":{"source_location":"New Albany, OH","report_year":2026,"reporting_year":2025,"source_page":97,"unit":"Million gallons","withdrawal":1008.1,"discharge":172.4,"consumption":835.7},"water_method_scope":"Annual calendar-year 2025 figures for the reported location, not instantaneous use, a daily rate, an approved limit or one building. Google uses metered or invoiced values when available and can estimate missing data; the table does not identify each row’s metering completeness. Consumption is calculated as withdrawal minus discharge; values are rounded. Seawater and brackish water over 1,000 mg/L total dissolved solids are excluded. Unless otherwise specified, withdrawals are potable; Douglas County includes reclaimed wastewater. No litres or daily averages are calculated.","water_location_association":"New Albany, OH is associated with this regional campus research context only; no allocation to separate expansion/street-address records or individual buildings.","current_status_basis":"An operating component is supported at Google’s named New Albany, Ohio location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection."},"notes":["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."],"sources":[{"url":"https://www.datacenters.google/locations/ohio/","host":"www.datacenters.google","published":"","date":"","checked":"2026-10-16","label":"Google official location source"},{"url":"https://www.datacenters.google/locations/","host":"www.datacenters.google","published":"","date":"","checked":"2026-10-16","label":"Google official location source"},{"url":"https://sustainability.google/files/google-2026-environmental-report.pdf","host":"sustainability.google","published":"","date":"","checked":"2026-10-16","label":"Google 2026 Environmental Report"}],"checked":"2026-10-16","whole_record_certified":false},{"overlay":"Codex 2 location cohort 23, October 23, 2026","scope":"One approximate Franklin County reference parcel only. Existing native status remains operating. No roof, legal title or complete campus certification.","fields":{"location_review_decision":{"location":{"lng":-82.77106,"lat":40.05832,"precision":"approximate","basis":"Approximate mathematical center of Franklin County tax reference parcel 222-004984 at 5266 Babbitt Road, New Albany, Ohio. County situs and tax records agree, with historical city corroboration of the Google and Montauk data center alias. One reference parcel only, not a surveyed roof, legal title or complete Google campus."},"reference_method":"Approximate county reference parcel center","reference_parcel":{"identifier":"222-004984","objectid":366477,"source_system":"Franklin County public tax reference parcel","agency_site_address":"5266 BABBITT RD","postal_code":"43054","agency_tax_name":"MONTAUK INNOVATIONS LLC","not_survey_quality":true,"legal_title_verified":false,"independent_building_identity":false,"full_campus_certified":false},"operator_coordinates_adopted":false,"census_range_adopted":false}},"notes":["One exact county tax reference identifier binds the source geometry and situs to the existing Google New Albany research record. The county treasurer repeats 5266 Babbitt Road and the Montauk Innovations tax name. Its Scottsdale billing address is excluded.","Actually viewed December 10, 2018 city council minutes page 3 identify Montauk Innovations as a Google subsidiary in the data center project. That historical alias corroboration does not certify present title, legal ownership, property area, incentive terms, quantity, operation or a complete campus boundary.","The mathematical area center is inside the reference parcel and the retained Franklin County. It remains approximate. No house roof is selected, raw polygon is not exported, and no surveyed building or complete Google campus is certified. All native status, physical date, quantity, role, identity, jurisdiction and canonical address wrappers remain exact."],"sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'222-004984'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.franklincountyohio.gov","published":"","date":"","checked":"2026-10-23","label":"Exact public tax reference parcel 222-004984 geometry and situs"},{"url":"https://treapropsearch.franklincountyohio.gov/Details.aspx?district=222&ext=00&parcel=004984","host":"treapropsearch.franklincountyohio.gov","published":"","date":"","checked":"2026-10-23","label":"Matching tax reference identifier and location address, not billing address"},{"url":"https://newalbanyohio.org/wp-content/uploads/2016/04/Council-Minutes-12-10-18-Regular-Meeting.pdf","host":"newalbanyohio.org","published":"","date":"","checked":"2026-10-23","label":"Historical council minutes identify the Montauk Innovations and Google data center alias only"},{"url":"https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-82.77868882243699%2C40.05248097736256%2C-82.76343117756302%2C40.06415902263744&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image","host":"basemap.nationalmap.gov","published":"","date":"","checked":"2026-10-23","label":"Viewed parcel area setting, acquisition date unknown"},{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","published":"","date":"","checked":"2026-10-23","label":"Current Ohio locations name New Albany, no numeric address inferred"}],"checked":"2026-10-23","whole_record_certified":false},{"overlay":"Company role source check57, October24,2026","scope":"Google identifies the named New Albany data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Ohio page separately identifies New Albany and its2019construction context. That milestone is not a new exact opening date or the date every phase began operating.","fields":{"company_association":{"name":"Google","role":"operator","identity_scope":"provider_brand_only","scope":"Google identifies the named New Albany data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Ohio page separately identifies New Albany and its2019construction context. That milestone is not a new exact opening date or the date every phase began operating."},"provider_role":"operator"},"notes":["Google identifies the named New Albany data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Ohio page separately identifies New Albany and its2019construction context. That milestone is not a new exact opening date or the date every phase began operating."],"sources":[{"url":"https://datacenters.google/locations/ohio/","host":"datacenters.google","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate county reference parcel, not a surveyed site or full campus","summary":"New Albany · Franklin · Source context reviewed","status_scope":"An operating component is supported at Google’s named New Albany, Ohio location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.","typed_water_facts":[{"measure":"withdrawal","value":1008.1,"unit":"million gallons","as_of":null,"as_of_basis":"reporting_period","reporting_period":{"label":"2025","start":"2025-01-01","end":"2025-12-31"},"observed_on":"2026-10-16","basis":"operator_reported_total","scope":"Google 2026 Environmental Report p.97: New Albany, OH, calendar year 2025 withdrawal; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.","sources":["https://sustainability.google/files/google-2026-environmental-report.pdf"]},{"measure":"discharge","value":172.4,"unit":"million gallons","as_of":null,"as_of_basis":"reporting_period","reporting_period":{"label":"2025","start":"2025-01-01","end":"2025-12-31"},"observed_on":"2026-10-16","basis":"operator_reported_total","scope":"Google 2026 Environmental Report p.97: New Albany, OH, calendar year 2025 discharge; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.","sources":["https://sustainability.google/files/google-2026-environmental-report.pdf"]},{"measure":"consumption","value":835.7,"unit":"million gallons","as_of":null,"as_of_basis":"reporting_period","reporting_period":{"label":"2025","start":"2025-01-01","end":"2025-12-31"},"observed_on":"2026-10-16","basis":"operator_reported_total","scope":"Google 2026 Environmental Report p.97: New Albany, OH, calendar year 2025 consumption; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.","sources":["https://sustainability.google/files/google-2026-environmental-report.pdf"]}]},{"id":"meta-prometheus-new-albany-oh","state":"oh","kind":"facility","name":"Meta Prometheus","group":"proposed","status":"AI expansion planned","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The visible publication date is November 17, not the November 13 URL. Gigawatt-scale, world-first, no-grid-use and no-rate-impact statements are plans or attributed claims, not verified operating metrics or guarantees. Temporary construction jobs are not permanent jobs; no completed generation or power agreement is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-","host":"spectrumnews1.com","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","host":"datacenters.atmeta.com","published":"","date":"","checked":"2026-10-16","label":"Reviewed current operator evidence"}],"loc":{"lat":40.10919,"lng":-82.43475,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Spectrum News reports ongoing Prometheus construction and officials' plans for on-site gas generation at Meta's New Albany campus.","independently_verified_current_operating_status":null},"notes":["The visible publication date is November 17, not the November 13 URL. Gigawatt-scale, world-first, no-grid-use and no-rate-impact statements are plans or attributed claims, not verified operating metrics or guarantees. Temporary construction jobs are not permanent jobs; no completed generation or power agreement is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-","host":"spectrumnews1.com","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"overnight-status-2026-10-16","scope":"Named project and operator-service status review; phase and source limits retained.","fields":{"current_stage_evidence":{"outcome":"supported_label","label":"AI expansion planned","basis":"The current New Albany factsheet specifically names Prometheus and describes its AI role and delivery in future terms.","checked_on":"2026-10-16"},"stage_review_limits":"Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted."},"notes":["Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted.","Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."],"sources":[{"url":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","host":"datacenters.atmeta.com","published":"","date":"","checked":"2026-10-16","label":"Reviewed current operator evidence"}],"checked":"2026-10-16","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","status_scope":"Primary source review checked 2026-10-16. The current New Albany factsheet specifically names Prometheus and describes its AI role and delivery in future terms. Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"qts-new-albany-1-franklin-county-oh","state":"oh","kind":"facility","name":"QTS New Albany 1","group":"proposed","status":"Operator-listed development","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. No exact MW, opening event or site capital value adopted. Three-million-dollar electricity-assistance commitment is across Ohio over three years, not this individual campus. County conflict remains in the separate cadastral review.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://q.com/data-centers/new-albany-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://q.com/data-centers/","host":"q.com","published":"","date":"","checked":"2026-10-19","label":"Operator source for the qualified stage"}],"loc":{"lat":40.14909,"lng":-82.46501,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":98685,"Parcel":"094-106404-00.011","OwnerName":"QTS NEW ALBANY I DC1 LLC","SiteAddress":"1235 BEECH RD SW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":18.1}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_named_listing":"New Albany1"},"notes":["No exact MW, opening event or site capital value adopted. Three-million-dollar electricity-assistance commitment is across Ohio over three years, not this individual campus. County conflict remains in the separate cadastral review.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/new-albany-1/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"orchestra-status-2026-10-19","scope":"QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","fields":{"current_stage_evidence":{"outcome":"operator_listed_development","scope":"QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}},"notes":["QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review."],"sources":[{"url":"https://q.com/data-centers/","host":"q.com","published":"","date":"","checked":"2026-10-19","label":"Operator source for the qualified stage"}],"checked":"2026-10-19","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","status_scope":"QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"qts-new-albany-2-franklin-county-oh","state":"oh","kind":"facility","name":"QTS New Albany 2","group":"proposed","status":"Operator-listed development","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. No exact MW, opening event or site capital value adopted. Shared statewide assistance commitment cannot be counted again for this campus. County conflict remains unresolved.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://q.com/data-centers/new-albany-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://q.com/data-centers/","host":"q.com","published":"","date":"","checked":"2026-10-19","label":"Operator source for the qualified stage"}],"loc":{"lat":40.05996,"lng":-82.53757,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":96153,"Parcel":"094-107502-00.003","OwnerName":"QTS NEW ALBANY II DC1 LLC","SiteAddress":"BEECH RD SW","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":18.85}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"direct-operators-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_named_listing":"New Albany2"},"notes":["No exact MW, opening event or site capital value adopted. Shared statewide assistance commitment cannot be counted again for this campus. County conflict remains unresolved.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/new-albany-2/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"orchestra-status-2026-10-19","scope":"QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","fields":{"current_stage_evidence":{"outcome":"operator_listed_development","scope":"QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}},"notes":["QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review."],"sources":[{"url":"https://q.com/data-centers/","host":"q.com","published":"","date":"","checked":"2026-10-19","label":"Operator source for the qualified stage"}],"checked":"2026-10-19","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","status_scope":"QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"qts-new-albany-3-franklin-county-oh","state":"oh","kind":"facility","name":"QTS New Albany III","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=UPPER(OWNERNME1)+LIKE+'%25QTS%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.96349,"lng":-83.04383,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PARCELID":"222-005361","ACRES":78.24176124,"SITEADDRESS":"5760 - 5780 BABBITT RD","OWNERNME1":"QTS NEW ALBANY III LLC","BLDGAREA":null}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=UPPER(OWNERNME1)+LIKE+'%25QTS%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.franklincountyohio.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Franklin · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39049"}},{"id":"qts-new-albany-4-licking-county-oh","state":"oh","kind":"facility","name":"QTS New Albany IV","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Licking"],"city":"New Albany","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25QTS+NEW+ALBANY+IV%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.07747,"lng":-82.41903,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"cadastral_response_features":1,"cadastral_error":null,"parcel_assertions":[{"PID":97052,"Parcel":"095-111570-01.000","OwnerName":"QTS NEW ALBANY IV LLC","SiteAddress":"13335 MILLER RD ","SitePostalCity":"NEW ALBANY","Jurisdiction":"New Albany City","Municipality":"New Albany","Township":"Jersey","TaxAcres":161.26}]},"notes":["Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25QTS+NEW+ALBANY+IV%25'&outFields=*&returnCentroid=true&outSR=4326&f=json","host":"gis.lickingcounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Licking · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39089"}},{"id":"stack-nal01-new-albany-oh","state":"oh","kind":"facility","name":"STACK Infrastructure NAL01 (New Albany)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"New Albany","address":"","who":"STACK Infrastructure","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Regional page names NAL01. Do not claim contracted/energized capacity from scalability language. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/new-albany/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.stackinfra.com/locations/americas/new-albany/nal01/","host":"www.stackinfra.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":39.94866,"lng":-82.97672,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"advertised_campus_power_mw":60,"power_basis":"scalable campus offering, not measured load","campus_acres":40,"campuses":1},"notes":["Regional page names NAL01. Do not claim contracted/energized capacity from scalability language.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/new-albany/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Company role source check 17, October 23, 2026","scope":"STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The New Albany market page explicitly lists NAL01. The provider brand offers scalable campus infrastructure; market safety, tax and land availability claims do not establish commissioning, permits or eligibility.","fields":{"company_association":{"name":"STACK Infrastructure","role":"operator","identity_scope":"provider_brand_only","scope":"STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The New Albany market page explicitly lists NAL01. The provider brand offers scalable campus infrastructure; market safety, tax and land availability claims do not establish commissioning, permits or eligibility."},"provider_role":"operator"},"notes":["STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. The New Albany market page explicitly lists NAL01. The provider brand offers scalable campus infrastructure; market safety, tax and land availability claims do not establish commissioning, permits or eligibility.","Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/new-albany/","host":"www.stackinfra.com","published":"","date":"","checked":"2026-10-23","label":"First party exact code or campus text, scoped provider relationship reviewed"}],"checked":"2026-10-23","whole_record_certified":false},{"overlay":"Codex 3 research cohort 33","scope":"STACK current named NAL01 page presents separate A and B buildings, secured utility power and marketed critical capacity. It does not explicitly establish completed current customer compute service or the exact phase of every component in the inherited combined campus record. Available power, a tour invitation, a virtual experience and campus capacity are not commissioning. No individual building phases, inconsistent advertised totals, exact locations or roles are merged or promoted.","fields":{"current_stage_evidence":{"outcome":"named_nal01_building_marketing_and_power_without_exact_combined_service_phase","scope":"STACK current named NAL01 page presents separate A and B buildings, secured utility power and marketed critical capacity. It does not explicitly establish completed current customer compute service or the exact phase of every component in the inherited combined campus record. Available power, a tour invitation, a virtual experience and campus capacity are not commissioning. No individual building phases, inconsistent advertised totals, exact locations or roles are merged or promoted."}},"notes":["STACK current named NAL01 page presents separate A and B buildings, secured utility power and marketed critical capacity. It does not explicitly establish completed current customer compute service or the exact phase of every component in the inherited combined campus record. Available power, a tour invitation, a virtual experience and campus capacity are not commissioning. No individual building phases, inconsistent advertised totals, exact locations or roles are merged or promoted.","The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/new-albany/","host":"www.stackinfra.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"},{"url":"https://www.stackinfra.com/locations/americas/new-albany/nal01/","host":"www.stackinfra.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"New Albany · Franklin · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"39049"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"aws-2550-beech-road-new-albany-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"aws-3180-beech-road-new-albany-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"aws-beech-road-new-albany-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"aws-newton-court-new-albany-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"edgeconnex-mcn-new-albany-licking-county-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"edged-columbus-new-albany-oh":{"fips":["39049"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"google-new-albany-oh":{"fips":["39049"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"meta-prometheus-new-albany-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":true,"legacy_area_unmatched":false,"note":"The inherited area context and mapped point differ. The exact jurisdiction still needs source review."},"qts-new-albany-1-franklin-county-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"qts-new-albany-2-franklin-county-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"qts-new-albany-3-franklin-county-oh":{"fips":["39049"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"qts-new-albany-4-licking-county-oh":{"fips":["39089"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"stack-nal01-new-albany-oh":{"fips":["39049"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Franklin County","base_name":"Franklin","fips":"39049","kind":"County"},{"name":"Licking County","base_name":"Licking","fips":"39089","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[{"id":"local-rule:county-review:20261017:39049","jurisdiction":{"state":"OH","county_fips":"39049","municipality":null},"rule_type":"county_research_review","status":"none_found_in_checked_sources","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Franklin County","adopted_on":null,"conditions":["The checked county zoning resolution is labeled amended January 20, 2026; the official landing page gives February 20, 2026 as its effective date. A normalized text search of the 298-page resolution found none of the checked data-center, data-processing, telecommunications-hotel or server-farm terms.","This search is bounded to the retained county text, not proof that general use categories do not apply. Several townships administer their own zoning, and incorporated cities have separate codes. Adoption and effective dates are distinct; local IT procurement is not a siting rule."],"scope":"Bounded source review, not an enacted legal instrument. County association does not establish the governing parcel jurisdiction. This review has no legal effective or expiry date; dates of underlying actions are described separately.","label":"None found in checked sources","checked_on":"2026-10-17","sources":[{"url":"https://www.franklincountyohio.gov/Business-Development/Development-Planning/Planning-Zoning/Zoning","publisher":"Franklin County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"5b732d5bd4b396e79b89f6294ad47fa3bec7c5856a3e58e49ab4015858f9f314","capture_format":"raw_response_bytes"},{"url":"https://www.franklincountyohio.gov/files/assets/public/v/1/edp/documents/zoning-resolution/zoning-resolution-2026.pdf","publisher":"Franklin County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"e28ed05f80720e8a7602f09047327b16b5690d80773442c0d1cfa7190920c89c","capture_format":"raw_response_bytes"}]},{"id":"local-rule:county-review:20261017:39089","jurisdiction":{"state":"OH","county_fips":"39089","municipality":null},"rule_type":"county_research_review","status":"none_found_in_checked_sources","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Licking County","adopted_on":null,"conditions":["No countywide data-center-specific rule was identified in the checked planning and zoning-routing pages. The county explains that township zoning ordinances are prepared, implemented and enforced by the townships.","The county warns that linked township material may not be current. Individual township and city codes have not all been reviewed. This routing check cannot establish a countywide ban, permission or absence of local restrictions."],"scope":"Bounded source review, not an enacted legal instrument. County association does not establish the governing parcel jurisdiction. This review has no legal effective or expiry date; dates of underlying actions are described separately.","label":"None found in checked sources","checked_on":"2026-10-17","sources":[{"url":"https://lickingcounty.gov/depts/planning/zoninginfo/","publisher":"Licking County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"8739a348ea0e7afcc9c9a95dfbe259e400730f764d704e8d85b4bd322b392d63","capture_format":"raw_response_bytes"},{"url":"https://lickingcounty.gov/depts/planning/","publisher":"Licking County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"dafa37262e50ec7de847acac975eda7a719e9d6cf1f8276428abb5ab822df444","capture_format":"raw_response_bytes"}]}],"stage_timelines":{"edged-columbus-new-albany-oh":{"stages":[{"id":"observation:orchestra-status-20261019-q021:current_stage_evidence","date":"2025-09-10","stage":"operating","scheduled":false,"basis":"operator reported opening","scope":"September 11 release explicitly describes the opening celebration as yesterday; independent commissioning and all halls are not certified.","sources":[{"url":"https://edged.us/news/columbus-grand-opening","publisher":"Edged US"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":71,"retained_reviewed_reference":15,"county_display":71},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"oh","name":"New Albany","state_name":"Ohio","state_path":"/ohio/","slug":"new-albany","path":"/city/ohio/new-albany/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:orchestra-status-20261019-q025","subject_id":"site:qts-new-albany-2-franklin-county-oh","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-19","qualifies_status":true,"status_group":"proposed","status_label":"Operator-listed development","scope":"QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","display_category":"source_check","display_date":"2026-10-19","sources":[{"url":"https://q.com/data-centers/","publisher":"QTS","source_type":"company_page","retrieved_on":"2026-10-19"}],"field_sources":{"subject_id":["source:514274cc4fa6fcf40121a229"],"event_type":["source:514274cc4fa6fcf40121a229"],"occurred_on":["source:514274cc4fa6fcf40121a229"],"observed_on":["source:514274cc4fa6fcf40121a229"],"qualifies_status":["source:514274cc4fa6fcf40121a229"],"status_group":["source:514274cc4fa6fcf40121a229"],"status_label":["source:514274cc4fa6fcf40121a229"],"scope":["source:514274cc4fa6fcf40121a229"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:status:orchestra-status-20261019-q024","subject_id":"site:qts-new-albany-1-franklin-county-oh","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-19","qualifies_status":true,"status_group":"proposed","status_label":"Operator-listed development","scope":"QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","display_category":"source_check","display_date":"2026-10-19","sources":[{"url":"https://q.com/data-centers/","publisher":"QTS","source_type":"company_page","retrieved_on":"2026-10-19"}],"field_sources":{"subject_id":["source:514274cc4fa6fcf40121a229"],"event_type":["source:514274cc4fa6fcf40121a229"],"occurred_on":["source:514274cc4fa6fcf40121a229"],"observed_on":["source:514274cc4fa6fcf40121a229"],"qualifies_status":["source:514274cc4fa6fcf40121a229"],"status_group":["source:514274cc4fa6fcf40121a229"],"status_label":["source:514274cc4fa6fcf40121a229"],"scope":["source:514274cc4fa6fcf40121a229"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:status:orchestra-status-20261019-q021","subject_id":"site:edged-columbus-new-albany-oh","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-19","qualifies_status":true,"status_group":"operating","status_label":"Operator-announced opening","scope":"Edged announced the opening of its New Albany facility in a September 11, 2025 release describing the previous day as the opening celebration. The opening is operator-reported; advertised load, water savings, measured use and all halls being energized are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.","display_category":"source_check","display_date":"2026-10-19","sources":[{"url":"https://edged.us/news/columbus-grand-opening","publisher":"Edged US","source_type":"company_page","retrieved_on":"2026-10-19"}],"field_sources":{"subject_id":["source:0b56d9bc01f3069dcacd41ad"],"event_type":["source:0b56d9bc01f3069dcacd41ad"],"occurred_on":["source:0b56d9bc01f3069dcacd41ad"],"observed_on":["source:0b56d9bc01f3069dcacd41ad"],"qualifies_status":["source:0b56d9bc01f3069dcacd41ad"],"status_group":["source:0b56d9bc01f3069dcacd41ad"],"status_label":["source:0b56d9bc01f3069dcacd41ad"],"scope":["source:0b56d9bc01f3069dcacd41ad"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:status:overnight-status-20261016-25","subject_id":"site:meta-prometheus-new-albany-oh","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-16","qualifies_status":true,"status_group":"proposed","status_label":"AI expansion planned","scope":"Primary source review checked 2026-10-16. The current New Albany factsheet specifically names Prometheus and describes its AI role and delivery in future terms. Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted.","display_category":"source_check","display_date":"2026-10-16","sources":[{"url":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","publisher":"Meta","source_type":"company_page","retrieved_on":"2026-10-16"}],"field_sources":{"subject_id":["source:6873e4e3aa2a3eef0aa658e1"],"event_type":["source:6873e4e3aa2a3eef0aa658e1"],"occurred_on":["source:6873e4e3aa2a3eef0aa658e1"],"observed_on":["source:6873e4e3aa2a3eef0aa658e1"],"qualifies_status":["source:6873e4e3aa2a3eef0aa658e1"],"status_group":["source:6873e4e3aa2a3eef0aa658e1"],"status_label":["source:6873e4e3aa2a3eef0aa658e1"],"scope":["source:6873e4e3aa2a3eef0aa658e1"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:status:google-locations-20261016-google-new-albany-oh","subject_id":"site:google-new-albany-oh","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-16","qualifies_status":true,"status_group":"operating","status_label":"Operating phase","scope":"An operating component is supported at Google’s named New Albany, Ohio location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.","display_category":"source_check","display_date":"2026-10-16","sources":[{"url":"https://www.datacenters.google/locations/ohio/","publisher":"Google","source_type":"company_page","retrieved_on":"2026-10-16"},{"url":"https://sustainability.google/files/google-2026-environmental-report.pdf","publisher":"Google","source_type":"company_page","retrieved_on":"2026-10-16"}],"field_sources":{"subject_id":["source:f55c693a60f147a7bd4236e4","source:99d274c769377c8cc515b8c3"],"event_type":["source:f55c693a60f147a7bd4236e4","source:99d274c769377c8cc515b8c3"],"occurred_on":["source:f55c693a60f147a7bd4236e4","source:99d274c769377c8cc515b8c3"],"observed_on":["source:f55c693a60f147a7bd4236e4","source:99d274c769377c8cc515b8c3"],"qualifies_status":["source:f55c693a60f147a7bd4236e4","source:99d274c769377c8cc515b8c3"],"status_group":["source:f55c693a60f147a7bd4236e4","source:99d274c769377c8cc515b8c3"],"status_label":["source:f55c693a60f147a7bd4236e4","source:99d274c769377c8cc515b8c3"],"scope":["source:f55c693a60f147a7bd4236e4","source:99d274c769377c8cc515b8c3"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/amazon-web-services/","name":"Amazon Web Services (AWS)"},{"path":"/company/edgeconnex/","name":"EdgeConneX"},{"path":"/company/edged/","name":"Edged"},{"path":"/company/google/","name":"Google"},{"path":"/company/meta/","name":"Meta"},{"path":"/company/qts/","name":"QTS"},{"path":"/company/stack-infrastructure/","name":"STACK Infrastructure"}],"map_settings":{"bounds":[-83.156294,39.90866,-82.306566,40.18909],"hub":[-82.73143,40.048874999999995],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-80.5186,41.9788],[-80.5186,40.637],[-80.6665,40.5822],[-80.5953,40.4726],[-80.6008,40.3193],[-80.7377,40.0783],[-80.8308,39.7113],[-81.2196,39.3882],[-81.3456,39.3444],[-81.4552,39.4101],[-81.5702,39.2677],[-81.6852,39.2732],[-81.8112,39.0815],[-81.7838,38.9665],[-81.8878,38.8734],[-82.0357,39.0267],[-82.2219,38.7857],[-82.1726,38.6324],[-82.2931,38.5776],[-82.3315,38.4462],[-82.5944,38.4243],[-82.7313,38.5612],[-82.8463,38.5886],[-82.8901,38.7584],[-83.0325,38.7255],[-83.1421,38.6269],[-83.52,38.7036],[-83.6788,38.6324],[-83.9033,38.7693],[-84.2155,38.8077],[-84.232,38.8953],[-84.4346,39.1034],[-84.818,39.1034],[-84.8016,40.5],[-84.807,41.694],[-83.4542,41.7323],[-83.0654,41.5954],[-82.9339,41.5133],[-82.8353,41.5899],[-82.6163,41.4311],[-82.4793,41.3818],[-82.0138,41.5133],[-81.74,41.4859],[-81.4442,41.6721],[-81.0115,41.8528],[-80.5186,41.9788],[-80.5186,41.9788]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-80.5186,41.9788],[-80.5186,40.637],[-80.6665,40.5822],[-80.5953,40.4726],[-80.6008,40.3193],[-80.7377,40.0783],[-80.8308,39.7113],[-81.2196,39.3882],[-81.3456,39.3444],[-81.4552,39.4101],[-81.5702,39.2677],[-81.6852,39.2732],[-81.8112,39.0815],[-81.7838,38.9665],[-81.8878,38.8734],[-82.0357,39.0267],[-82.2219,38.7857],[-82.1726,38.6324],[-82.2931,38.5776],[-82.3315,38.4462],[-82.5944,38.4243],[-82.7313,38.5612],[-82.8463,38.5886],[-82.8901,38.7584],[-83.0325,38.7255],[-83.1421,38.6269],[-83.52,38.7036],[-83.6788,38.6324],[-83.9033,38.7693],[-84.2155,38.8077],[-84.232,38.8953],[-84.4346,39.1034],[-84.818,39.1034],[-84.8016,40.5],[-84.807,41.694],[-83.4542,41.7323],[-83.0654,41.5954],[-82.9339,41.5133],[-82.8353,41.5899],[-82.6163,41.4311],[-82.4793,41.3818],[-82.0138,41.5133],[-81.74,41.4859],[-81.4442,41.6721],[-81.0115,41.8528],[-80.5186,41.9788],[-80.5186,41.9788]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
