{"state":"or","name":"Forest Grove, Oregon","updated":"2026-10-26","checked":"2026-10-15","bounds":[-123.16602999999999,45.48756,-123.04610000000001,45.615809999999996],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"crane-pdx01-forest-grove-or","state":"or","kind":"facility","name":"Crane PDX01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Forest Grove","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. First-building8MWinitial up-to47MWcap and approximate100MWwhole-site plan not additive. Air cooling applies first building only. Required road completion before occupancy and later phase uncertainty retained; no current opening inferred. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://forestgrovenewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/","host":"forestgrovenewstimes.com","date":"2025-08-18","published":"2025-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.cranedc.com/data-centers/oregon-data-center","host":"www.cranedc.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":45.57581,"lng":-123.11603,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Forest Grove News-Times reports July2025 Crane groundbreaking with2026first-building completion forecast.","independently_verified_current_operating_status":null},"notes":["First-building8MWinitial up-to47MWcap and approximate100MWwhole-site plan not additive. Air cooling applies first building only. Required road completion before occupancy and later phase uncertainty retained; no current opening inferred.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://forestgrovenewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/","host":"forestgrovenewstimes.com","date":"2025-08-18","published":"2025-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 42","scope":"Crane current original Oregon page labels the campus Active Development and separately describes PDX01 phases and PDX02. Its advertised 2026 third quarter ready for service period has passed, but the page does not explicitly report actual commissioning or completion of the inherited PDX01 phase. Marketing specifications, remote hands terms and a passed target do not establish operation. The separate PDX02 scope, promised capacity and certifications are not merged or promoted.","fields":{"current_stage_evidence":{"outcome":"current_active_development_page_and_past_ready_target_not_completion","scope":"Crane current original Oregon page labels the campus Active Development and separately describes PDX01 phases and PDX02. Its advertised 2026 third quarter ready for service period has passed, but the page does not explicitly report actual commissioning or completion of the inherited PDX01 phase. Marketing specifications, remote hands terms and a passed target do not establish operation. The separate PDX02 scope, promised capacity and certifications are not merged or promoted."}},"notes":["Crane current original Oregon page labels the campus Active Development and separately describes PDX01 phases and PDX02. Its advertised 2026 third quarter ready for service period has passed, but the page does not explicitly report actual commissioning or completion of the inherited PDX01 phase. Marketing specifications, remote hands terms and a passed target do not establish operation. The separate PDX02 scope, promised capacity and certifications are not merged or promoted.","Identity, organization roles, locations, jurisdictions, quantities and physical opening fields stay unchanged. Source checks and prospective dates never establish an opening."],"sources":[{"url":"https://www.cranedc.com/data-centers/oregon-data-center","host":"www.cranedc.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Forest Grove · Washington · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"41067"}},{"id":"crane-pdx02-forest-grove-or","state":"or","kind":"facility","name":"Crane PDX02","group":"proposed","status":"Provider listed proposal","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Washington"],"city":"Forest Grove","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Crane Forest Grove site phases and campus mismatch. NamedPDX02notwholecampus100plus.24+24+48=96doesnotreconcileheadline100plus,phase/scoperoundingheld. PowerbasisnotexplicitcriticalITforcapacities. Q32026targetnotobservedservice. PUEdesignnotmeasuredannualaverage. Incentive/LEEDclaimsnotindependentapprovedaward/certifierinspection. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cranedc.com/data-centers/oregon-data-center","host":"cranedc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.52756,"lng":-123.0961,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Crane Forest Grove site phases and campus mismatch","fields":{"operator":"Crane Data Centers","market":"Forest Grove, Oregon","named_phases":[{"site":"PDX01 phase1","capacity_mw":24,"whitespace_sqft":36000,"adjacent_flex_sqft":6400},{"site":"PDX01 phase2","additional_capacity_mw":24,"additional_whitespace_sqft":36000,"additional_flex_sqft":6400},{"site":"PDX02","capacity_mw_approx":48,"area_sqft_approx":150000}],"campus_headline_capacity_mw_min_exclusive":100,"historical_service_target_quarter":"2026-Q3","design_pue_at_full_it_load":1.3},"notes":["NamedPDX02notwholecampus100plus.24+24+48=96doesnotreconcileheadline100plus,phase/scoperoundingheld. PowerbasisnotexplicitcriticalITforcapacities. Q32026targetnotobservedservice. PUEdesignnotmeasuredannualaverage. Incentive/LEEDclaimsnotindependentapprovedaward/certifierinspection.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cranedc.com/data-centers/oregon-data-center","host":"cranedc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 69","scope":"The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02.","fields":{"current_stage_evidence":{"outcome":"provider_listed_specific_pdx02_proposal","scope":"The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02."},"source_read_scope":{"complete_original_oregon_campus_body_read":true,"pdx01_phases_and_pdx02_separate":true,"passed_ready_for_service_forecast_not_completion":true,"no_measured_capacity_or_first_opening_export":true}},"notes":["The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02.","Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."],"sources":[{"url":"https://www.cranedc.com/data-centers/oregon-data-center","host":"www.cranedc.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Forest Grove · Washington · Source context reviewed","status_scope":"The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"41067"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"crane-pdx01-forest-grove-or":{"fips":["41067"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"crane-pdx02-forest-grove-or":{"fips":["41067"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Washington County","base_name":"Washington","fips":"41067","kind":"County"}],"state_legislation":{"review_scope":"partial_primary_review","latest_scoped_check":"2026-10-23","coverage_note":"Selected bill histories and enacted texts reviewed; this is not a complete state legislative inventory or a review of site compliance.","bill_records":1,"enacted_measures":1,"enacted_policy_groups":1,"failed_proposals":0,"bills":[{"id":"legislation:or:2025r1:hb3546","state":"or","bill_id":"HB3546","session":"2025 Regular Session","topics":["power_rates","utility_contracts","reporting"],"status":"enacted","effective_on":"2025-06-16","title":"Large energy use facility electricity service","summary":"Chapter 323 directs the Public Utility Commission to establish a distinct electricity service class for covered large energy use facilities, allocate serving costs and mitigate risk to other customer classes. Covered service contracts must meet specified conditions and last at least ten years. The definition concerns facilities able to use at least 20 MW and primarily providing the specified data processing service.","applicability":"Approved and effective June 16, 2025. Section 3 temporarily excuses use of the new classification when no company tariff has been approved; that section is repealed January 2, 2028. The even year reporting provision alone is repealed January 2, 2035. These are not a whole act sunset. Exact tariff adoption, report completion, site compliance and every later amendment were not verified.","policy_group_id":"or:2025r1:hb3546","policy_type":"electricity_cost_allocation_and_service_contracts","companion_bill_ids":[],"enacted_on":"2025-06-16","disposition_on":"2025-06-16","reviewed_on":"2026-10-23","chapter":"323","review_scope":"partial_primary_review","bill_url":"https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","text_url":"https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf","report_due_on":"2026-09-01","field_sources":{"state":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"bill_id":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"session":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"topics":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"status":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"effective_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"title":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"summary":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"applicability":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"policy_group_id":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"policy_type":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"companion_bill_ids":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"enacted_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"disposition_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"reviewed_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"chapter":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"review_scope":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"bill_url":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546"],"text_url":["https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"report_due_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"inference","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}}]},"county_rule_reviews":[{"id":"local-rule:county-review:20261017:41067","jurisdiction":{"state":"OR","county_fips":"41067","municipality":null},"rule_type":"county_research_review","status":"policy_context_found","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Washington County","adopted_on":null,"conditions":["The county Community Development Code assessment identifies data-center concerns among the issues raised. The published assessment and priorities process provides recommendations, rather than automatically enacting code amendments.","This checked project page does not establish an adopted data-center restriction. County code applies in its jurisdiction; Hillsboro, Beaverton and other municipal laws are separate. The complete code and later ordinance actions were not exhaustively reviewed."],"scope":"Bounded source review, not an enacted legal instrument. County association does not establish the governing parcel jurisdiction. This review has no legal effective or expiry date; dates of underlying actions are described separately.","label":"Policy context found","checked_on":"2026-10-17","sources":[{"url":"https://www.washingtoncountyor.gov/lut/planning/cdc-assessment","publisher":"Washington County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"e140d9cd3df528ee703059ac081c3b429e68329c16ff71a80b4255622ada5bb2","capture_format":"raw_response_bytes"}]}],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":35,"retained_reviewed_reference":5,"no_site_point":3,"county_display":38},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"or","name":"Forest Grove","state_name":"Oregon","state_path":"/oregon/","slug":"forest-grove","path":"/city/oregon/forest-grove/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261024-c69-crane-pdx02-forest-grove-or","subject_id":"site:crane-pdx02-forest-grove-or","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-24","qualifies_status":true,"status_group":"proposed","status_label":"Provider listed proposal","scope":"The complete original provider page labels its Forest Grove campus active development and specifically lists PDX02 separately from PDX01 phases. This supports a provider listed proposal for the named component. The displayed third quarter of 2026 ready for service forecast does not independently establish accomplished commissioning, actual construction completion or existing computing service. No PDX01 phase or technical design quantity is transferred to PDX02.","display_category":"source_check","display_date":"2026-10-24","sources":[{"url":"https://www.cranedc.com/data-centers/oregon-data-center","publisher":"Crane original Oregon campus account","source_type":"company_page","retrieved_on":"2026-10-24"}],"field_sources":{"subject_id":["source:d5c7ebeec1b68c558bb02bce"],"event_type":["source:d5c7ebeec1b68c558bb02bce"],"occurred_on":["source:d5c7ebeec1b68c558bb02bce"],"observed_on":["source:d5c7ebeec1b68c558bb02bce"],"qualifies_status":["source:d5c7ebeec1b68c558bb02bce"],"status_group":["source:d5c7ebeec1b68c558bb02bce"],"status_label":["source:d5c7ebeec1b68c558bb02bce"],"scope":["source:d5c7ebeec1b68c558bb02bce"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-123.16602999999999,45.48756,-123.04610000000001,45.615809999999996],"hub":[-123.106065,45.551685],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-123.2113,46.1741],[-123.1182,46.1851],[-122.9046,46.081],[-122.8115,45.9605],[-122.7622,45.6593],[-122.2474,45.5498],[-121.8093,45.7086],[-121.5354,45.725],[-121.2177,45.6703],[-121.1849,45.6045],[-120.6372,45.7469],[-120.5057,45.6976],[-120.21,45.725],[-119.9635,45.8236],[-119.5254,45.9112],[-119.1256,45.9332],[-118.9886,45.9989],[-116.9183,45.9934],[-116.7814,45.8236],[-116.5459,45.7524],[-116.4638,45.6155],[-116.6719,45.3197],[-116.7321,45.1445],[-116.8471,45.024],[-116.8307,44.9309],[-116.9348,44.783],[-117.0388,44.7501],[-117.2415,44.3941],[-117.1703,44.2572],[-116.9786,44.2408],[-116.8964,44.1586],[-117.0279,43.83],[-117.0279,42.0007],[-118.6983,41.9898],[-120.0019,41.9952],[-121.037,41.9952],[-122.3789,42.0117],[-123.2333,42.0062],[-124.2136,42.0007],[-124.356,42.1157],[-124.4327,42.4389],[-124.4163,42.6634],[-124.5532,42.8387],[-124.4546,43.003],[-124.3834,43.2714],[-124.2355,43.5562],[-124.1698,43.8081],[-124.0603,44.657],[-124.0767,44.772],[-123.9781,45.1445],[-123.9398,45.6593],[-123.9946,45.9441],[-123.9453,46.1139],[-123.5454,46.2618],[-123.3702,46.1468],[-123.2113,46.1741]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-123.2113,46.1741],[-123.1182,46.1851],[-122.9046,46.081],[-122.8115,45.9605],[-122.7622,45.6593],[-122.2474,45.5498],[-121.8093,45.7086],[-121.5354,45.725],[-121.2177,45.6703],[-121.1849,45.6045],[-120.6372,45.7469],[-120.5057,45.6976],[-120.21,45.725],[-119.9635,45.8236],[-119.5254,45.9112],[-119.1256,45.9332],[-118.9886,45.9989],[-116.9183,45.9934],[-116.7814,45.8236],[-116.5459,45.7524],[-116.4638,45.6155],[-116.6719,45.3197],[-116.7321,45.1445],[-116.8471,45.024],[-116.8307,44.9309],[-116.9348,44.783],[-117.0388,44.7501],[-117.2415,44.3941],[-117.1703,44.2572],[-116.9786,44.2408],[-116.8964,44.1586],[-117.0279,43.83],[-117.0279,42.0007],[-118.6983,41.9898],[-120.0019,41.9952],[-121.037,41.9952],[-122.3789,42.0117],[-123.2333,42.0062],[-124.2136,42.0007],[-124.356,42.1157],[-124.4327,42.4389],[-124.4163,42.6634],[-124.5532,42.8387],[-124.4546,43.003],[-124.3834,43.2714],[-124.2355,43.5562],[-124.1698,43.8081],[-124.0603,44.657],[-124.0767,44.772],[-123.9781,45.1445],[-123.9398,45.6593],[-123.9946,45.9441],[-123.9453,46.1139],[-123.5454,46.2618],[-123.3702,46.1468],[-123.2113,46.1741]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
