{"state":"or","name":"Prineville, Oregon","updated":"2026-10-26","checked":"2026-10-15","bounds":[-120.43835,44.10222,-120.30641,44.21148],"stats":{"reviewed_records":2,"status_confirmed":2,"status_unknown":0,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"apple-prineville-or","state":"or","kind":"facility","name":"Apple Prineville Data Center Campus","group":"operating","status":"Company reported operation","raw_status":"operating","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Crook"],"city":"Prineville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical Oregon multi-program incentive context,primaryMorrowprojectnotboundsite. June2023agenda cover conflicts with2022running header; exact document date held. AppletwoLRZprojects not necessarilytwo physical campuses. MainMorrowCounty proposed2.37Bproject and113Mestimatednetbenefit do not belong to either boundApplePrineville orAmazonUmatillacampus. Historical15yearregime notcurrent2026eligibility; no tax savings allocated perbuilding. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf","host":"oregon.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf","host":"www.apple.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":44.14222,"lng":-120.35641,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"historical Oregon multi-program incentive context,primaryMorrowprojectnotboundsite","fields":{"historical_umatilla_amazon_sip_approval_year":2017,"historical_prineville_apple_lrz_exempt_projects":2,"historical_prineville_apple_lrz_term_years":15,"historical_reporting_period":"2022-2023"},"notes":["June2023agenda cover conflicts with2022running header; exact document date held. AppletwoLRZprojects not necessarilytwo physical campuses. MainMorrowCounty proposed2.37Bproject and113Mestimatednetbenefit do not belong to either boundApplePrineville orAmazonUmatillacampus. Historical15yearregime notcurrent2026eligibility; no tax savings allocated perbuilding.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.oregon.gov/biz/Publications/Boards/Business%20Oregon%20Commission/2023/AmazonSIPAgendaItem.pdf","host":"oregon.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 42","scope":"Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted.","fields":{"current_stage_evidence":{"outcome":"current_named_apple_prineville_operating_account","scope":"Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted."},"source_read_scope":{"text_read":"Page 53 owned and operated site paragraph, page 95 data center context and page 96 Prineville subsection.","visual_pages":[95,96],"whole_report_audited":false,"may_2012_month_not_completed_to_exact_day":true,"other_named_campuses_not_merged":true}},"notes":["Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted.","Identity, organization roles, locations, jurisdictions, quantities and physical opening fields stay unchanged. Source checks and prospective dates never establish an opening."],"sources":[{"url":"https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf","host":"www.apple.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Prineville · Crook · Source context reviewed","status_scope":"Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"41013"}},{"id":"meta-prineville-or","state":"or","kind":"facility","name":"Meta Prineville Data Center Campus","group":"operating","status":"Operator-reported operation","raw_status":"operating","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Crook"],"city":"Prineville","address":"","who":"Meta","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://datacenters.atmeta.com/us-locations/","host":"datacenters.atmeta.com","published":"","date":"","checked":"2026-10-19","label":"Original source for the qualified stage"}],"loc":{"lat":44.17148,"lng":-120.38835,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"direct-pdf-review-round5-2026-10-14.json","scope":"Field or source context only","fields":{"operator_labeled_data_center_investment_usd":2000000000,"investment_is_lower_bound":true,"investment_geographic_label":"Oregon","historic_groundbreaking_year":2010,"peak_construction_workers":1000,"operator_reported_operational_jobs_lower_bound":350,"local_school_nonprofit_direct_funding_usd_lower_bound":5700000,"direct_funding_county_scope":"Crook"},"notes":["Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/","host":"datacenters.atmeta.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"service-status-2026-10-19","scope":"Meta describes the named Prineville center as part of its global infrastructure and reports supported operational jobs in its currently served factsheet.","fields":{"current_stage_evidence":{"outcome":"operator_reported_operation","scope":"Meta describes the named Prineville center as part of its global infrastructure and reports supported operational jobs in its currently served factsheet."}},"notes":["The factsheet is undated and gives no full-campus commissioning date. Its financial, jobs and environmental statements are company claims. Independent certification and current usable capacity remain unverified."],"sources":[{"url":"https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/","host":"datacenters.atmeta.com","published":"","date":"","checked":"2026-10-19","label":"Original source for the qualified stage"},{"url":"https://datacenters.atmeta.com/us-locations/","host":"datacenters.atmeta.com","published":"","date":"","checked":"2026-10-19","label":"Original source for the qualified stage"}],"checked":"2026-10-19","whole_record_certified":false},{"overlay":"Company role source check 07, October 23, 2026","scope":"Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted.","fields":{"company_association":{"name":"Meta","role":"operator","identity_scope":"provider_brand_only","scope":"Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted."},"provider_role":"operator"},"notes":["Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted.","Source dates remain separate from physical milestones and the retained status field."],"sources":[{"url":"https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/","host":"datacenters.atmeta.com","published":"","date":"","checked":"2026-10-23","label":"First party named facility source, PDF first page visually reviewed where supplied"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Prineville · Crook · Source context reviewed","status_scope":"Meta describes the named Prineville center as part of its global infrastructure and reports supported operational jobs in its currently served factsheet.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"41013"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"apple-prineville-or":{"fips":["41013"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"meta-prineville-or":{"fips":["41013"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Crook County","base_name":"Crook","fips":"41013","kind":"County"}],"state_legislation":{"review_scope":"partial_primary_review","latest_scoped_check":"2026-10-23","coverage_note":"Selected bill histories and enacted texts reviewed; this is not a complete state legislative inventory or a review of site compliance.","bill_records":1,"enacted_measures":1,"enacted_policy_groups":1,"failed_proposals":0,"bills":[{"id":"legislation:or:2025r1:hb3546","state":"or","bill_id":"HB3546","session":"2025 Regular Session","topics":["power_rates","utility_contracts","reporting"],"status":"enacted","effective_on":"2025-06-16","title":"Large energy use facility electricity service","summary":"Chapter 323 directs the Public Utility Commission to establish a distinct electricity service class for covered large energy use facilities, allocate serving costs and mitigate risk to other customer classes. Covered service contracts must meet specified conditions and last at least ten years. The definition concerns facilities able to use at least 20 MW and primarily providing the specified data processing service.","applicability":"Approved and effective June 16, 2025. Section 3 temporarily excuses use of the new classification when no company tariff has been approved; that section is repealed January 2, 2028. The even year reporting provision alone is repealed January 2, 2035. These are not a whole act sunset. Exact tariff adoption, report completion, site compliance and every later amendment were not verified.","policy_group_id":"or:2025r1:hb3546","policy_type":"electricity_cost_allocation_and_service_contracts","companion_bill_ids":[],"enacted_on":"2025-06-16","disposition_on":"2025-06-16","reviewed_on":"2026-10-23","chapter":"323","review_scope":"partial_primary_review","bill_url":"https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","text_url":"https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf","report_due_on":"2026-09-01","field_sources":{"state":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"bill_id":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"session":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"topics":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"status":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"effective_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"title":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"summary":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"applicability":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"policy_group_id":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"policy_type":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"companion_bill_ids":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"enacted_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"disposition_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"reviewed_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"chapter":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"review_scope":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"bill_url":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546"],"text_url":["https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"],"report_due_on":["https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3546","https://www.oregonlegislature.gov/bills_laws/lawsstatutes/2025orLaw0323.pdf"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"inference","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}}]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":35,"retained_reviewed_reference":5,"no_site_point":3,"county_display":38},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"or","name":"Prineville","state_name":"Oregon","state_path":"/oregon/","slug":"prineville","path":"/city/oregon/prineville/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261023-c42-apple-prineville-or","subject_id":"site:apple-prineville-or","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"operating","status_label":"Company reported operation","scope":"Apple current 2026 Environmental Progress Report explicitly includes Prineville among the eight data centers that it owns and operates. The Prineville subsection separately reports 2025 electricity use and describes the operating cooling approach. Company reported operation is limited to this named campus account. The Alliance for Water Stewardship abbreviation AWS is not Amazon Web Services. Water certification, energy allocations, offsite generation capacity, every future hall, measured performance and an exact physical opening day are not certified or promoted.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf","publisher":"Apple","source_type":"company_filing","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:7f06aaaf7f7b4ea002853f0a"],"event_type":["source:7f06aaaf7f7b4ea002853f0a"],"occurred_on":["source:7f06aaaf7f7b4ea002853f0a"],"observed_on":["source:7f06aaaf7f7b4ea002853f0a"],"qualifies_status":["source:7f06aaaf7f7b4ea002853f0a"],"status_group":["source:7f06aaaf7f7b4ea002853f0a"],"status_label":["source:7f06aaaf7f7b4ea002853f0a"],"scope":["source:7f06aaaf7f7b4ea002853f0a"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:status:service-status-20261019-q004","subject_id":"site:meta-prineville-or","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-19","qualifies_status":true,"status_group":"operating","status_label":"Operator-reported operation","scope":"Meta describes the named Prineville center as part of its global infrastructure and reports supported operational jobs in its currently served factsheet.","display_category":"source_check","display_date":"2026-10-19","sources":[{"url":"https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/","publisher":"Meta","source_type":"company_page","retrieved_on":"2026-10-19"},{"url":"https://datacenters.atmeta.com/us-locations/","publisher":"Meta","source_type":"company_page","retrieved_on":"2026-10-19"}],"field_sources":{"subject_id":["source:4cd661432ac00bf7858424b5","source:86226411b31faa61473ce917"],"event_type":["source:4cd661432ac00bf7858424b5","source:86226411b31faa61473ce917"],"occurred_on":["source:4cd661432ac00bf7858424b5","source:86226411b31faa61473ce917"],"observed_on":["source:4cd661432ac00bf7858424b5","source:86226411b31faa61473ce917"],"qualifies_status":["source:4cd661432ac00bf7858424b5","source:86226411b31faa61473ce917"],"status_group":["source:4cd661432ac00bf7858424b5","source:86226411b31faa61473ce917"],"status_label":["source:4cd661432ac00bf7858424b5","source:86226411b31faa61473ce917"],"scope":["source:4cd661432ac00bf7858424b5","source:86226411b31faa61473ce917"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/apple/","name":"Apple"},{"path":"/company/meta/","name":"Meta"}],"map_settings":{"bounds":[-120.43835,44.10222,-120.30641,44.21148],"hub":[-120.37237999999999,44.156850000000006],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-123.2113,46.1741],[-123.1182,46.1851],[-122.9046,46.081],[-122.8115,45.9605],[-122.7622,45.6593],[-122.2474,45.5498],[-121.8093,45.7086],[-121.5354,45.725],[-121.2177,45.6703],[-121.1849,45.6045],[-120.6372,45.7469],[-120.5057,45.6976],[-120.21,45.725],[-119.9635,45.8236],[-119.5254,45.9112],[-119.1256,45.9332],[-118.9886,45.9989],[-116.9183,45.9934],[-116.7814,45.8236],[-116.5459,45.7524],[-116.4638,45.6155],[-116.6719,45.3197],[-116.7321,45.1445],[-116.8471,45.024],[-116.8307,44.9309],[-116.9348,44.783],[-117.0388,44.7501],[-117.2415,44.3941],[-117.1703,44.2572],[-116.9786,44.2408],[-116.8964,44.1586],[-117.0279,43.83],[-117.0279,42.0007],[-118.6983,41.9898],[-120.0019,41.9952],[-121.037,41.9952],[-122.3789,42.0117],[-123.2333,42.0062],[-124.2136,42.0007],[-124.356,42.1157],[-124.4327,42.4389],[-124.4163,42.6634],[-124.5532,42.8387],[-124.4546,43.003],[-124.3834,43.2714],[-124.2355,43.5562],[-124.1698,43.8081],[-124.0603,44.657],[-124.0767,44.772],[-123.9781,45.1445],[-123.9398,45.6593],[-123.9946,45.9441],[-123.9453,46.1139],[-123.5454,46.2618],[-123.3702,46.1468],[-123.2113,46.1741]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-123.2113,46.1741],[-123.1182,46.1851],[-122.9046,46.081],[-122.8115,45.9605],[-122.7622,45.6593],[-122.2474,45.5498],[-121.8093,45.7086],[-121.5354,45.725],[-121.2177,45.6703],[-121.1849,45.6045],[-120.6372,45.7469],[-120.5057,45.6976],[-120.21,45.725],[-119.9635,45.8236],[-119.5254,45.9112],[-119.1256,45.9332],[-118.9886,45.9989],[-116.9183,45.9934],[-116.7814,45.8236],[-116.5459,45.7524],[-116.4638,45.6155],[-116.6719,45.3197],[-116.7321,45.1445],[-116.8471,45.024],[-116.8307,44.9309],[-116.9348,44.783],[-117.0388,44.7501],[-117.2415,44.3941],[-117.1703,44.2572],[-116.9786,44.2408],[-116.8964,44.1586],[-117.0279,43.83],[-117.0279,42.0007],[-118.6983,41.9898],[-120.0019,41.9952],[-121.037,41.9952],[-122.3789,42.0117],[-123.2333,42.0062],[-124.2136,42.0007],[-124.356,42.1157],[-124.4327,42.4389],[-124.4163,42.6634],[-124.5532,42.8387],[-124.4546,43.003],[-124.3834,43.2714],[-124.2355,43.5562],[-124.1698,43.8081],[-124.0603,44.657],[-124.0767,44.772],[-123.9781,45.1445],[-123.9398,45.6593],[-123.9946,45.9441],[-123.9453,46.1139],[-123.5454,46.2618],[-123.3702,46.1468],[-123.2113,46.1741]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
