{"state":"pa","name":"Salem Township, Pennsylvania","updated":"2026-10-24","checked":"2026-10-15","bounds":[-76.05851,41.13689,-75.91152,41.25295],"stats":{"reviewed_records":3,"status_confirmed":1,"status_unknown":2,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"four-three-glenbrook-salem-township-luzerne-pa","state":"pa","kind":"facility","name":"4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The potential 1.2-billion-USD purchase is neither a closed transaction nor construction spending. Proposed demand is not secured IT. The earlier QTS closing is separate. The buyer is undisclosed and the expected community agreement is not executed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.timesleader.com/news/1745226/1-2-billion-land-deal-for-second-data-center-project-in-salem-township-announced-by-4-3-group","host":"timesleader.com","date":"2026-06-13","published":"2026-06-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv","host":"gis.dep.pa.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv","host":"gis.dep.pa.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":41.19461,"lng":-76.00851,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Times Leader describes prospective Glen Brook land assembly, a 39-building concept and intended zoning applications.","independently_verified_current_operating_status":null},"notes":["The potential 1.2-billion-USD purchase is neither a closed transaction nor construction spending. Proposed demand is not secured IT. The earlier QTS closing is separate. The buyer is undisclosed and the expected community agreement is not executed.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.timesleader.com/news/1745226/1-2-billion-land-deal-for-second-data-center-project-in-salem-township-announced-by-4-3-group","host":"timesleader.com","date":"2026-06-13","published":"2026-06-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 29","scope":"DEP names a Glen Brook Group Salem Township proposal, but the row does not recertify the inherited Salem 3 component or distinguish it from other Glen Brook land assembly phases. The broad company and municipality match remains context. A specific current individual phase is not adopted, and the earlier separate QTS transaction is not transferred. Existing identity, roles, quantities and locations remain unchanged.","fields":{"current_stage_evidence":{"outcome":"broad_company_and_municipality_row_without_accepted_individual_component_crosswalk","scope":"DEP names a Glen Brook Group Salem Township proposal, but the row does not recertify the inherited Salem 3 component or distinguish it from other Glen Brook land assembly phases. The broad company and municipality match remains context. A specific current individual phase is not adopted, and the earlier separate QTS transaction is not transferred. Existing identity, roles, quantities and locations remain unchanged."},"tracker_scope":{"project_id":"10000048","original_project_and_related_permit_csv_read":true,"no_data_center_operation_inferred":true,"no_coordinate_or_role_promotion":true,"individual_component_crosswalk_accepted":false}},"notes":["DEP names a Glen Brook Group Salem Township proposal, but the row does not recertify the inherited Salem 3 component or distinguish it from other Glen Brook land assembly phases. The broad company and municipality match remains context. A specific current individual phase is not adopted, and the earlier separate QTS transaction is not transferred. Existing identity, roles, quantities and locations remain unchanged.","The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."],"sources":[{"url":"https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv","host":"gis.dep.pa.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv","host":"gis.dep.pa.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Salem Township · Luzerne · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"42079"}},{"id":"aws-cumulus-salem-township-pa","state":"pa","kind":"facility","name":"AWS Cumulus Data Center Campus, Salem Township","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Statewide exemption-cost estimates are not a known Amazon award amount. Two-campus commitment is not per-site spending; labor and energy claims remain attributed and dated. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://technical.ly/civics/amazon-data-centers-tax-break/","host":"technical.ly","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv","host":"gis.dep.pa.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv","host":"gis.dep.pa.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":41.17689,"lng":-75.98916,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Spotlight PA reporting via Technical.ly describes Salem Township and Falls Township AWS investments, state sales-tax exemption and workforce support.","independently_verified_current_operating_status":null},"notes":["Statewide exemption-cost estimates are not a known Amazon award amount. Two-campus commitment is not per-site spending; labor and energy claims remain attributed and dated.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://technical.ly/civics/amazon-data-centers-tax-break/","host":"technical.ly","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 28","scope":"DEP original project CSV separately lists Salem Amazon Phase 1 as DEP Review Complete and Phase 2 as under review. Related Phase 1 permit rows still include pending amendments and a not yet submitted item, so the aggregate title is not every approval complete. Amazon current investment announcement describes future campuses and is not itself commissioning of the exact inherited Cumulus component. A water system operations approval is not data center operation. Existing power supply, a broader campus investment, individual permitted infrastructure and future expansion remain distinct. Exact current computing operation and the inherited component crosswalk remain unclear.","fields":{"current_stage_evidence":{"outcome":"salem_phase_and_individual_permit_scopes_not_exact_cumulus_operation","scope":"DEP original project CSV separately lists Salem Amazon Phase 1 as DEP Review Complete and Phase 2 as under review. Related Phase 1 permit rows still include pending amendments and a not yet submitted item, so the aggregate title is not every approval complete. Amazon current investment announcement describes future campuses and is not itself commissioning of the exact inherited Cumulus component. A water system operations approval is not data center operation. Existing power supply, a broader campus investment, individual permitted infrastructure and future expansion remain distinct. Exact current computing operation and the inherited component crosswalk remain unclear."},"tracker_scope":{"project_ids":["10000002","10000066"],"phase1_aggregate_and_related_pending_rows_differ":true,"water_system_operations_not_data_center_operations":true,"no_site_or_jurisdiction_change":true}},"notes":["DEP original project CSV separately lists Salem Amazon Phase 1 as DEP Review Complete and Phase 2 as under review. Related Phase 1 permit rows still include pending amendments and a not yet submitted item, so the aggregate title is not every approval complete. Amazon current investment announcement describes future campuses and is not itself commissioning of the exact inherited Cumulus component. A water system operations approval is not data center operation. Existing power supply, a broader campus investment, individual permitted infrastructure and future expansion remain distinct. Exact current computing operation and the inherited component crosswalk remain unclear.","The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."],"sources":[{"url":"https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv","host":"gis.dep.pa.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv","host":"gis.dep.pa.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation","host":"www.aboutamazon.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Salem Township · Luzerne · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"42079"}},{"id":"qts-salem-township-luzerne-pa","state":"pa","kind":"facility","name":"QTS Salem Township Data Center Campus (Salem 2)","group":"proposed","status":"Developer-listed development","raw_status":"proposed","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Luzerne"],"city":"Salem Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. The reported more-than500-million-USD Salem2land proceeds are not full construction cost or Salem3spending. Salem3land-value descriptions differ at1.2/1.4billion; retain conflict. Developer survey results are self-reported from78respondents, not an independent regional economic-impact study. Generic pay ranges and statewide forecasts are not actual site jobs. Later hearing outcomes, critical IT and contractual nuclear supply are not independently verified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","host":"timesleader.com","date":"2026-08-22","published":"2026-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://q.com/data-centers/salem-township/","host":"q.com","published":"","date":"","checked":"2026-10-22","label":"Reviewed operator source"}],"loc":{"lat":41.21295,"lng":-75.96152,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"The Times Leader separates Salem's AWS campus, QTS/4-3Salem2land transaction and proposed4-3GlennbrookSalem3campus, with the latter awaiting an overlay decision.","independently_verified_current_operating_status":null},"notes":["The reported more-than500-million-USD Salem2land proceeds are not full construction cost or Salem3spending. Salem3land-value descriptions differ at1.2/1.4billion; retain conflict. Developer survey results are self-reported from78respondents, not an independent regional economic-impact study. Generic pay ranges and statewide forecasts are not actual site jobs. Later hearing outcomes, critical IT and contractual nuclear supply are not independently verified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project","host":"timesleader.com","date":"2026-08-22","published":"2026-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 5","scope":"QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs.","fields":{"current_stage_evidence":{"outcome":"operator_listed_proposal","scope":"QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs."}},"notes":["QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs.","An agency decision or a source publication date does not certify an opening, a physical site count or a technical quantity."],"sources":[{"url":"https://q.com/data-centers/salem-township/","host":"q.com","published":"","date":"","checked":"2026-10-22","label":"Reviewed operator source"}],"checked":"2026-10-22","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Salem Township · Luzerne · Source context reviewed","status_scope":"QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs.","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"42079"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"four-three-glenbrook-salem-township-luzerne-pa":{"fips":["42079"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"aws-cumulus-salem-township-pa":{"fips":["42079"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"qts-salem-township-luzerne-pa":{"fips":["42079"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Luzerne County","base_name":"Luzerne","fips":"42079","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":52,"retained_reviewed_reference":10,"no_site_point":1,"county_display":53},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"pa","name":"Salem Township","state_name":"Pennsylvania","state_path":"/pennsylvania/","slug":"salem-township","path":"/city/pennsylvania/salem-township/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261022-c05-qts-salem-township-luzerne-pa","subject_id":"site:qts-salem-township-luzerne-pa","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-22","qualifies_status":true,"status_group":"proposed","status_label":"Developer-listed development","scope":"QTS describes its named Salem Township campus as proposed and in early planning. This is the QTS proposal only, separate from the AWS campus and the 4 3 Glenbrook proposal. It does not establish final permitting, a construction start, operation or the fulfillment of forecast investment and jobs.","display_category":"source_check","display_date":"2026-10-22","sources":[{"url":"https://q.com/data-centers/salem-township/","publisher":"QTS","source_type":"company_page","retrieved_on":"2026-10-22"}],"field_sources":{"subject_id":["source:c7b231553eed113e88218f09"],"event_type":["source:c7b231553eed113e88218f09"],"occurred_on":["source:c7b231553eed113e88218f09"],"observed_on":["source:c7b231553eed113e88218f09"],"qualifies_status":["source:c7b231553eed113e88218f09"],"status_group":["source:c7b231553eed113e88218f09"],"status_label":["source:c7b231553eed113e88218f09"],"scope":["source:c7b231553eed113e88218f09"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/amazon-web-services/","name":"Amazon Web Services (AWS)"},{"path":"/company/qts/","name":"QTS"}],"map_settings":{"bounds":[-76.05851,41.13689,-75.91152,41.25295],"hub":[-75.985015,41.194919999999996],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-79.7628,42.2526],[-79.7628,42.0007],[-75.3593,42.0007],[-75.2498,41.8638],[-75.1731,41.8693],[-75.0526,41.7542],[-75.0745,41.6064],[-74.8938,41.4366],[-74.7404,41.4311],[-74.6966,41.3599],[-74.8281,41.2887],[-74.8828,41.1792],[-75.1348,40.971],[-75.0526,40.867],[-75.206,40.6917],[-75.195,40.5767],[-75.069,40.5438],[-75.0581,40.4179],[-74.7733,40.2152],[-74.8226,40.1276],[-75.1293,39.9633],[-75.1457,39.8866],[-75.4141,39.8045],[-75.6167,39.8318],[-75.7865,39.7223],[-79.478,39.7223],[-80.5186,39.7223],[-80.5186,40.637],[-80.5186,41.9788],[-80.5186,41.9788],[-80.3324,42.0336],[-79.7628,42.2691],[-79.7628,42.2526]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-79.7628,42.2526],[-79.7628,42.0007],[-75.3593,42.0007],[-75.2498,41.8638],[-75.1731,41.8693],[-75.0526,41.7542],[-75.0745,41.6064],[-74.8938,41.4366],[-74.7404,41.4311],[-74.6966,41.3599],[-74.8281,41.2887],[-74.8828,41.1792],[-75.1348,40.971],[-75.0526,40.867],[-75.206,40.6917],[-75.195,40.5767],[-75.069,40.5438],[-75.0581,40.4179],[-74.7733,40.2152],[-74.8226,40.1276],[-75.1293,39.9633],[-75.1457,39.8866],[-75.4141,39.8045],[-75.6167,39.8318],[-75.7865,39.7223],[-79.478,39.7223],[-80.5186,39.7223],[-80.5186,40.637],[-80.5186,41.9788],[-80.5186,41.9788],[-80.3324,42.0336],[-79.7628,42.2691],[-79.7628,42.2526]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
