{"state":"va","name":"Chantilly, Virginia","updated":"2026-10-25","checked":"2026-10-15","bounds":[-77.522586,38.79488,-77.22644,38.949778],"stats":{"reviewed_records":3,"status_confirmed":2,"status_unknown":1,"mapped_records":2},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"penzance-chantilly-premier-fairfax-va","state":"va","kind":"facility","name":"Chantilly Premier","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fairfax"],"city":"Chantilly","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Fully leased according to the developer does not identify tenants or prove current operation. Financing is not actual spending. Earlier maximum zoning allowance differs from the approved site plan's roughly 236,000 square feet; alternate warehouse and DC designs are not additive. Historical statewide study statistics are not current facility counts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2025-11-21","The official November 22, 2025 EDA release caption dates the Chantilly Premier groundbreaking ceremony to November 21. The body says today; the caption supplies the selected ceremony day. This dates a reported ceremony, not the exact first physical work day, current stage or computing operation."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ffxnow.com/2025/10/10/developer-breaks-ground-on-100m-data-center-building-in-chantilly/","host":"ffxnow.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://fairfaxcountyeda.org/fairfax-county-penzance-officials-break-ground-next-generation-digital-infrastructure-project-to-power-the-worlds-deep-tech-future/","host":"fairfaxcountyeda.org","published":"2025-11-22","date":"2025-11-22","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?IsToShowInspection=&Module=Site&TabName=Site&agencyCode=FFX&capID1=REC24&capID2=00000&capID3=029JL","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4151+AUTO+PARK+CIR+CHANTILLY%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-24","label":"Complete literal published street query; calculated range only"},{"url":"https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-77.46798986978281%2C38.89869428853755%2C-77.45529213021719%2C38.908575711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image","host":"imagery.nationalmap.gov","published":"","date":"","checked":"2026-10-24","label":"Actually viewed source street setting; acquisition date unknown"}],"loc":{"lng":-77.461641,"lat":38.903635,"precision":"address","basis":"The original Fairfax County computing source identifies 4151 AUTO PARK CIR CHANTILLY, VA 20151. One complete literal Census street query uniquely supports this calculated street reference inside the unchanged county. The permit work location is distinct from printed stormwater coordinates and partial parcel metadata. A historical BUILT YEAR 1700 field and permit processing dates are not computing construction events. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"FFXnow reports Penzance's Chantilly Premier groundbreaking announcement and 100-million-USD financing, with delivery targeted for first-half 2027 and future users unnamed.","independently_verified_current_operating_status":null},"notes":["Fully leased according to the developer does not identify tenants or prove current operation. Financing is not actual spending. Earlier maximum zoning allowance differs from the approved site plan's roughly 236,000 square feet; alternate warehouse and DC designs are not additive. Historical statewide study statistics are not current facility counts.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ffxnow.com/2025/10/10/developer-breaks-ground-on-100m-data-center-building-in-chantilly/","host":"ffxnow.com","date":"2025-10-10","published":"2025-10-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 49","scope":"The official Economic Development Authority release has a November 22, 2025 publication heading and a photo caption dating the Chantilly Premier groundbreaking ceremony to November 21. Its body uses today without resolving that one day wording difference. It forecasts completion in 2027, and the current PLUS record describes a revised site plan. Ceremony, lease and plan review do not establish exact current physical construction or commissioned computing.","fields":{"current_stage_evidence":{"outcome":"historical_ceremony_and_revised_plan_current_physical_stage_held","scope":"The official Economic Development Authority release has a November 22, 2025 publication heading and a photo caption dating the Chantilly Premier groundbreaking ceremony to November 21. Its body uses today without resolving that one day wording difference. It forecasts completion in 2027, and the current PLUS record describes a revised site plan. Ceremony, lease and plan review do not establish exact current physical construction or commissioned computing."}},"notes":["The official Economic Development Authority release has a November 22, 2025 publication heading and a photo caption dating the Chantilly Premier groundbreaking ceremony to November 21. Its body uses today without resolving that one day wording difference. It forecasts completion in 2027, and the current PLUS record describes a revised site plan. Ceremony, lease and plan review do not establish exact current physical construction or commissioned computing.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://fairfaxcountyeda.org/fairfax-county-penzance-officials-break-ground-next-generation-digital-infrastructure-project-to-power-the-worlds-deep-tech-future/","host":"fairfaxcountyeda.org","published":"2025-11-22","date":"2025-11-22","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?IsToShowInspection=&Module=Site&TabName=Site&agencyCode=FFX&capID1=REC24&capID2=00000&capID3=029JL","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false},{"overlay":"Codex 2 location cohort 72, 2026-10-24","scope":"Exact original named computing source street and one complete literal Census query only. Every original group, role, quantity, name, address, county and source version stays exact. No roof, tenant floor, legal title, actual construction stage, operating event or complete campus is certified.","fields":{"location_review_decision":{"location":{"lng":-77.461641,"lat":38.903635,"precision":"address","basis":"The original Fairfax County computing source identifies 4151 AUTO PARK CIR CHANTILLY, VA 20151. One complete literal Census street query uniquely supports this calculated street reference inside the unchanged county. The permit work location is distinct from printed stormwater coordinates and partial parcel metadata. A historical BUILT YEAR 1700 field and permit processing dates are not computing construction events. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."},"reference_method":"Census interpolated street address","published_address":"4151 AUTO PARK CIR CHANTILLY, VA 20151","county_fips":["51059"],"operator_coordinates_adopted":false,"corporate_address_adopted":false}},"notes":["Exact original named computing source street and one complete literal Census query only. Every original group, role, quantity, name, address, county and source version stays exact. No roof, tenant floor, legal title, actual construction stage, operating event or complete campus is certified.","The inherited general area coordinate was not independently admitted as a reviewed computing street reference. The original Fairfax County source explicitly identifies 4151 AUTO PARK CIR CHANTILLY, VA 20151 as the named computing location. One complete literal Census query returns a unique calculated street range inside unchanged county 51059. The measured correction is 2839.5 metres. Exact original named computing facility street, not city or publisher mail. Every original group, role, quantity, name, address, county and source version remains unchanged. The source street and calculated Census range do not establish a roof, title, actual construction stage, operating event or complete campus. This is a source reference correction, not physical relocation.","Exact original named computing facility street, not city or publisher mail. Every original group, role, quantity, name, address, county and source version remains unchanged. The source street and calculated Census range do not establish a roof, title, actual construction stage, operating event or complete campus.","The street setting shows a curving road through substantial buildings and parking, with wooded land and water nearby. No stormwater facility coordinate or computing roof is adopted. Imagery acquisition date is unknown and may predate construction."],"sources":[{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?IsToShowInspection=&Module=Site&TabName=Site&agencyCode=FFX&capID1=REC24&capID2=00000&capID3=029JL","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-24","label":"Exact original named computing street, distinct from contacts and technical fields"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4151+AUTO+PARK+CIR+CHANTILLY%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-24","label":"Complete literal published street query; calculated range only"},{"url":"https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-77.46798986978281%2C38.89869428853755%2C-77.45529213021719%2C38.908575711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image","host":"imagery.nationalmap.gov","published":"","date":"","checked":"2026-10-24","label":"Actually viewed source street setting; acquisition date unknown"}],"checked":"2026-10-24","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Calculated street reference, not a roof or tenant floor","summary":"Chantilly · Fairfax · Source context reviewed","event_evidence":[{"date":"2025-11-21","text":"The official November 22, 2025 EDA release caption dates the Chantilly Premier groundbreaking ceremony to November 21. The body says today; the caption supplies the selected ceremony day. This dates a reported ceremony, not the exact first physical work day, current stage or computing operation.","kind":"announced","sources":[{"url":"https://fairfaxcountyeda.org/fairfax-county-penzance-officials-break-ground-next-generation-digital-infrastructure-project-to-power-the-worlds-deep-tech-future/","host":"fairfaxcountyeda.org","published":"2025-11-22","date":"2025-11-22","checked":"2026-10-23","label":"Reviewed government record"}]}]},{"id":"aerospace-corporation-chantilly-va","state":"va","kind":"facility","name":"The Aerospace Corporation","group":"operating","status":"Agency-listed operating","crypto":false,"type":"Data center (agency classification)","counties":["Fairfax"],"city":"Chantilly","address":"14725 Lee Rd, Chantilly, VA, 20151","who":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"DEQ air-registration classification only. No individual permit order, whole-campus operation, current operator/owner, opening day, power/water quantity or verified parcel is established. The source has no row-specific as-of date. Checked October 16, 2026 is a retrieval/review date, not a facility milestone. Postal city is not verified municipal or county jurisdiction. No map point is adopted; the agency coordinates may represent an entrance or centroid and have reference/currency limits.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-16","label":"Virginia DEQ data-center-flagged air-site registry"},{"url":"https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-16","label":"Virginia DEQ air-dataset scope and reference-coordinate limits"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=14725+Lee+Rd%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-23","label":"Unique county match of the exact registered street"}],"loc":{"lat":38.83488,"lng":-77.27644,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":false,"precision_label":"Exact site not published; shown at county level","summary":"Virginia DEQ registration 73977","reviewed_evidence":[{"overlay":"S2-Virginia-DEQ-20261016","scope":"Explicit Virginia DEQ data-center registration research context; no physical-site or operator certification.","fields":{"agency_registration_number":"73977","agency_registered_name":"The Aerospace Corporation","agency_registered_address":"14725 Lee Rd, Chantilly, VA, 20151","agency_source_description":"Admin office and data ctr","agency_principal_product":"Data Center","agency_data_center_flag":"Y","agency_air_operational_status":"Operating","agency_scope_limits":"The dataset is reference information, not a legal location description or a current permit order. Coordinates can represent a facility entrance or centroid; underlying source dates may predate retrieval.","identity_review_scope":"Reviewed all 1869 canonical IDs, the original 2136 inventory names including 36 held Virginia IDs, existing published address fields and all 198 agency registrations. Name leads were manually inspected; broad park/one/initial matching is not identity evidence. No matching record or exact published-street registration was found for this named/addressed registration. Nearby inherited points are leads only. No original commercial-directory facts or geometry are adopted. This admits a registry research context, not a certified distinct physical site."},"notes":["DEQ air-registration classification only. No individual permit order, whole-campus operation, current operator/owner, opening day, power/water quantity or verified parcel is established.","The source has no row-specific as-of date. Checked October 16, 2026 is a retrieval/review date, not a facility milestone. Postal city is not verified municipal or county jurisdiction. No map point is adopted; the agency coordinates may represent an entrance or centroid and have reference/currency limits."],"sources":[{"url":"https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-16","label":"Virginia DEQ data-center-flagged air-site registry"},{"url":"https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-16","label":"Virginia DEQ air-dataset scope and reference-coordinate limits"}],"checked":"2026-10-16","whole_record_certified":false},{"overlay":"Codex 2 county context cohort 44, October 23, 2026","scope":"County context review of the exact agency street only. This review adds no site reference. Any separately reviewed site reference retains its own precision and source scope. County evidence does not certify a roof, full campus, legal parcel, municipal boundary, physical stage, party role or quantity.","fields":{"county_context":{"fips":["51059"],"names":["Fairfax"],"point_admission":false}},"notes":["Agency air registry classifications and the data center flag are not physical facility findings. Registered agency coordinates and names do not become a site point or current party role.","The original empty county and jurisdiction wrappers remain in conflicts and source history. Canonical addresses and all native locations stay exact.","Independent Harrisonburg city is selected only by its unique source street county equivalent, without treating every postal city as an incorporated jurisdiction.","One unique Census county equivalent and county polygon agree. The calculated coordinate remains research evidence only, with no public site point or destination."],"sources":[{"url":"https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-23","label":"Exact agency registration and registered street"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=14725+Lee+Rd%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-23","label":"Unique county match of the exact registered street"}],"checked":"2026-10-23","whole_record_certified":false}],"raw_status":"operating","status_field":"current_status","status_scope":"DEQ air-registration classification only. No individual permit order, whole-campus operation, current operator/owner, opening day, power/water quantity or verified parcel is established.","reviewed_area_context":{"checked":"2026-10-23","confidence":"inference","fips":["51059"],"review_id":"location-codex2-context044-aerospace-corporation-chantilly-va","scope":"County context review of the exact agency street only. This review adds no site reference. Any separately reviewed site reference retains its own precision and source scope. County evidence does not certify a roof, full campus, legal parcel, municipal boundary, physical stage, party role or quantity.","source_urls":["https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000","https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=14725+Lee+Rd%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json"]},"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"no_site_point","county_display":"51059"}},{"id":"h5-chantilly-lafayette-campus-va","state":"va","kind":"facility","name":"H5 Virginia colocation campus","group":"operating","status":"Operator-listed campus","crypto":false,"type":"Colocation","counties":["Fairfax County"],"city":"Chantilly","address":"4050 Lafayette Center Dr, Chantilly, VA 20151","who":"H5 Data Centers","mw":null,"power":"","power_note":"The current website reports 23 critical MW and its linked brochure reports 16.4 MW. Technical dates and the commissioned/available share remain unknown. Neither is utility allocation, backup generation or measured demand.","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"The operator markets a Virginia colocation campus at 4030, 4040 and 4050 Lafayette Center Drive and publishes 4050 as its contact location. The map uses a cited 4030 county reference parcel, not the 4050 roof or a surveyed whole-campus footprint. Current HTML says 23 critical MW; its linked brochure and an alternate PDF say 16.4 MW, with no technical as-of dates. These conflicting claims are not added or certified delivered capacity. Issued/Closed electrical workflows and an Approved performance bond do not establish a closed site, complete campus, occupancy or discharge of every condition. The vendor building-count claim is retained without inventing address-to-building extents.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/virginia-colocation.html","host":"h5datacenters.com","published":"","date":"","checked":"2026-10-16","label":"H5 Virginia current colocation page"},{"url":"https://h5datacenters.com/slick_virginia_.pdf","host":"h5datacenters.com","published":"","date":"","checked":"2026-10-16","label":"H5 brochure linked from current Virginia page"},{"url":"https://h5datacenters.com/slick_virginia.pdf","host":"h5datacenters.com","published":"","date":"","checked":"2026-10-16","label":"H5 alternate Virginia brochure"},{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?Module=Building&TabName=Building&agencyCode=FFX&capID1=REC26&capID2=00000&capID3=016EB","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax ELEC-2026-01665 electrical workflow"},{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?Module=Building&TabName=Building&agencyCode=FFX&capID1=REC26&capID2=00000&capID3=00ZPK","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax ELEC-2026-01452 electrical workflow"},{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?Module=Site&TabName=Site&agencyCode=FFX&capID1=REC26&capID2=00000&capID3=01B6N","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax BOND-2026-00021 and related plan reference"},{"url":"https://www.fairfaxcounty.gov/gispub2/rest/services/GIS/Property/MapServer/1?f=pjson","host":"www.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax County Property parcels layer"},{"url":"https://www.fairfaxcounty.gov/gispub2/rest/services/GIS/Property/MapServer/1/query?where=PIN%3D%270332+01++0010D%27&outFields=%2A&outSR=4326&returnGeometry=true&f=json","host":"www.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax parcel 0332 01  0010D"},{"url":"https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-16","label":"Virginia DEQ data-center-flagged air-site registry"},{"url":"https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-16","label":"Virginia DEQ air-dataset scope and reference-coordinate limits"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4030+Lafayette+Center+Drive%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-16","label":"census-h5-4030"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4040+Lafayette+Center+Drive%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-16","label":"census-h5-4040"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4050+Lafayette+Center+Drive%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-16","label":"census-h5-4050"},{"url":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12/query?where=1%3D1&outFields=GEOID%2CSTATE%2CCOUNTY%2CBASENAME%2CNAME%2CLSADC%2CCOUNTYCC%2COBJECTID&returnGeometry=true&outSR=4326&geometryPrecision=4&f=geojson&orderByFields=GEOID","host":"tigerweb.geo.census.gov","published":"","date":"","checked":"2026-10-15","label":"Census county-name and FIPS reference, January 1, 2025 vintage"}],"loc":{"lat":38.909778,"lng":-77.472586,"precision":"approximate","basis":"Approximate campus reference centered on the county Property GIS parcel cited for 4030 Lafayette Center Drive. The operator also publishes 4040 and 4050; this does not certify the whole campus boundary, three building footprints or a 4050 rooftop.","source_url":"https://www.fairfaxcounty.gov/gispub2/rest/services/GIS/Property/MapServer/1/query?where=PIN%3D%270332+01++0010D%27&outFields=%2A&outSR=4326&returnGeometry=true&f=json"},"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":false,"precision_label":"Approximate area, not the exact parcel","summary":"Chantilly colocation research context; source-scoped location","reviewed_evidence":[{"overlay":"Virginia-operator-components-20261016","scope":"Current operator service, named campus/component and official registration review; no certified physical-site census or whole-campus completion.","fields":{"agency_registration_number":"72375","agency_registered_name":"Chantilly Technology Partners, LLC/H5 VA","agency_registered_address":"4030 Lafayette Center Dr Ste A, Chantilly, VA, 20151","agency_air_operational_status":"Operating","identity_review_scope":"Compared the retained 1,877 canonical IDs, all Virginia canonical names/published street fields and the original 2,136-item inventory including 36 held Virginia IDs. Reviewed the surfaced name/street leads and the complete 198-row DEQ cohort. No matching current record or exact original published-street identity was found for these operator-specific service addresses. H5 Ashburn/Herndon and the Chantilly Premier name lead do not establish this Lafayette identity. Held Lumen Ashburn and McLean leads are not merged or admitted; historical provider relationships remain unresolved. Original commercial/inventory information is lead context only, never adopted facts, operator roles or coordinates. This admits a research context, not a certified distinct physical site.","published_component_addresses":["4030 Lafayette Center Drive","4040 Lafayette Center Drive","4050 Lafayette Center Drive"],"operator_reported_building_count":3,"building_identity_scope":"The operator describes three buildings, but the address list is not independently resolved into three surveyed or one-to-one building footprints. Building-to-address relationships and physical footprints remain unresolved.","published_critical_capacity_mw":23,"critical_capacity_source_difference":"Current HTML lists 23 critical MW. Its directly linked brochure and the alternate PDF each list 16.4. PDF modification metadata is January 24, 2024, not a publication or technical as-of day. Capacity available/energized now is unresolved.","county_electrical_workflows":[{"record":"ELEC-2026-01665","classification":"Commercial Electrical","status":"Issued","project_label":"H5 data centers phase 3","location":"4030 Lafayette Center Drive","issued_on":null},{"record":"ELEC-2026-01452","classification":"Commercial Electrical","status":"Closed","project_label":"H5 data centers","location":"4030 Lafayette Center Drive","issued_on":null}],"generator_unit_source_issue":"ELEC-2026-01665 prints 3000kva KW generators. This mixed-unit expression is not normalized or summed as generation MW.","bond_workflow":{"record":"BOND-2026-00021","status":"Approved","related_plan":"PI-2025-00017","plan_name":"LAFAYETTE DATA CENTERS","conditions":[{"condition":"Letter 18 Document","status":"Applied","displayed_date":"2026-06-08"},{"condition":"Conservation Agreement","status":"Met","displayed_date":"2026-06-16"},{"condition":"Development Agreement","status":"Met","displayed_date":"2026-06-16"}],"scope":"Performance-bond workflow and displayed condition dates only; not site-plan approval, legally effective dates, final occupancy or proof every condition is met."},"county_reference_parcel":{"reference":"0332 01  0010D","permit_reference":"0332010010D","scope":"Normalized identifier matches county electrical/bond records. One Property GIS reference parcel; no current title, full marketed campus boundary or surveyed roof claim."},"census_address_checks":[{"address":"4030 Lafayette Center Drive, Chantilly, VA 20151","matches":0},{"address":"4040 Lafayette Center Drive, Chantilly, VA 20151","matches":0},{"address":"4050 Lafayette Center Drive, Chantilly, VA 20151","matches":0}],"location_reference_scope":"Approximate campus reference centered on the county Property GIS parcel cited for 4030 Lafayette Center Drive. The operator also publishes 4040 and 4050; this does not certify the whole campus boundary, three building footprints or a 4050 rooftop."},"notes":["The operator markets a Virginia colocation campus at 4030, 4040 and 4050 Lafayette Center Drive and publishes 4050 as its contact location. The map uses a cited 4030 county reference parcel, not the 4050 roof or a surveyed whole-campus footprint. Current HTML says 23 critical MW; its linked brochure and an alternate PDF say 16.4 MW, with no technical as-of dates. These conflicting claims are not added or certified delivered capacity. Issued/Closed electrical workflows and an Approved performance bond do not establish a closed site, complete campus, occupancy or discharge of every condition. The vendor building-count claim is retained without inventing address-to-building extents."],"sources":[{"url":"https://h5datacenters.com/virginia-colocation.html","host":"h5datacenters.com","published":"","date":"","checked":"2026-10-16","label":"H5 Virginia current colocation page"},{"url":"https://h5datacenters.com/slick_virginia_.pdf","host":"h5datacenters.com","published":"","date":"","checked":"2026-10-16","label":"H5 brochure linked from current Virginia page"},{"url":"https://h5datacenters.com/slick_virginia.pdf","host":"h5datacenters.com","published":"","date":"","checked":"2026-10-16","label":"H5 alternate Virginia brochure"},{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?Module=Building&TabName=Building&agencyCode=FFX&capID1=REC26&capID2=00000&capID3=016EB","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax ELEC-2026-01665 electrical workflow"},{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?Module=Building&TabName=Building&agencyCode=FFX&capID1=REC26&capID2=00000&capID3=00ZPK","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax ELEC-2026-01452 electrical workflow"},{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?Module=Site&TabName=Site&agencyCode=FFX&capID1=REC26&capID2=00000&capID3=01B6N","host":"plus.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax BOND-2026-00021 and related plan reference"},{"url":"https://www.fairfaxcounty.gov/gispub2/rest/services/GIS/Property/MapServer/1?f=pjson","host":"www.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax County Property parcels layer"},{"url":"https://www.fairfaxcounty.gov/gispub2/rest/services/GIS/Property/MapServer/1/query?where=PIN%3D%270332+01++0010D%27&outFields=%2A&outSR=4326&returnGeometry=true&f=json","host":"www.fairfaxcounty.gov","published":"","date":"","checked":"2026-10-16","label":"Fairfax parcel 0332 01  0010D"},{"url":"https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-16","label":"Virginia DEQ data-center-flagged air-site registry"},{"url":"https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf","host":"gisdata.deq.virginia.gov","published":"","date":"","checked":"2026-10-16","label":"Virginia DEQ air-dataset scope and reference-coordinate limits"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4030+Lafayette+Center+Drive%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-16","label":"census-h5-4030"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4040+Lafayette+Center+Drive%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-16","label":"census-h5-4040"},{"url":"https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4050+Lafayette+Center+Drive%2C+Chantilly%2C+VA+20151&benchmark=Public_AR_Current&vintage=Current_Current&format=json","host":"geocoding.geo.census.gov","published":"","date":"","checked":"2026-10-16","label":"census-h5-4050"},{"url":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12/query?where=1%3D1&outFields=GEOID%2CSTATE%2CCOUNTY%2CBASENAME%2CNAME%2CLSADC%2CCOUNTYCC%2COBJECTID&returnGeometry=true&outSR=4326&geometryPrecision=4&f=geojson&orderByFields=GEOID","host":"tigerweb.geo.census.gov","published":"","date":"","checked":"2026-10-15","label":"Census county-name and FIPS reference, January 1, 2025 vintage"}],"checked":"2026-10-16","whole_record_certified":false},{"overlay":"Company role source check56, October24,2026","scope":"H5 Data Centers identifies this named Virginia site or retained campus in the main body of its own location page. The relationship records the H5 Data Centers provider brand only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised capacity, utility availability, prices, renewable supply, certification, performance, security and environmental marketing are not independently verified measurements, legal title or environmental outcomes. Public cloud connectivity does not identify every tenant or a different operator. Customer testimonials and their names are not retained as research claims. The source publication date is unknown. The main body identifies a campus at4030,4040and4050LafayetteCenterDrive, while the contact block uses4050. The existing combined campus stays combined, without new building records, exact outlines or a site status change. Generator runtime advertising is not permitted emissions or actual running history.","fields":{"company_association":{"name":"H5 Data Centers","role":"operator","identity_scope":"provider_brand_only","scope":"H5 Data Centers identifies this named Virginia site or retained campus in the main body of its own location page. The relationship records the H5 Data Centers provider brand only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised capacity, utility availability, prices, renewable supply, certification, performance, security and environmental marketing are not independently verified measurements, legal title or environmental outcomes. Public cloud connectivity does not identify every tenant or a different operator. Customer testimonials and their names are not retained as research claims. The source publication date is unknown. The main body identifies a campus at4030,4040and4050LafayetteCenterDrive, while the contact block uses4050. The existing combined campus stays combined, without new building records, exact outlines or a site status change. Generator runtime advertising is not permitted emissions or actual running history."},"provider_role":"operator"},"notes":["H5 Data Centers identifies this named Virginia site or retained campus in the main body of its own location page. The relationship records the H5 Data Centers provider brand only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised capacity, utility availability, prices, renewable supply, certification, performance, security and environmental marketing are not independently verified measurements, legal title or environmental outcomes. Public cloud connectivity does not identify every tenant or a different operator. Customer testimonials and their names are not retained as research claims. The source publication date is unknown. The main body identifies a campus at4030,4040and4050LafayetteCenterDrive, while the contact block uses4050. The existing combined campus stays combined, without new building records, exact outlines or a site status change. Generator runtime advertising is not permitted emissions or actual running history."],"sources":[{"url":"https://h5datacenters.com/virginia-colocation.html","host":"h5datacenters.com","published":"","date":"","checked":"2026-10-24","label":"Reviewed operator source"}],"checked":"2026-10-24","whole_record_certified":false}],"search_extra":"H5 Virginia Chantilly Lafayette 4030 4040 4050 Lafayette Center Drive DEQ 72375 ELEC-2026-01665 ELEC-2026-01452 BOND-2026-00021 PI-2025-00017","raw_status":"partly operating","status_field":"current_status","status_scope":"Current operator-marketed colocation service on the Lafayette campus; individual building operation, phase 3 completion, full buildout, occupancy and available/delivered capacity are not established.","typed_power_facts":[{"measure":"it_capacity","value":23,"unit":"MW","as_of":null,"basis":"operator_reported_capacity","scope":"Website-listed campus critical capacity. Both currently accessible brochures say 16.4 MW without a technical as-of day. The discrepancy is unresolved; these alternatives are not additive, metered use or certified available/delivered capacity.","observed_on":"2026-10-16","as_of_basis":"not_published","sources":["https://h5datacenters.com/virginia-colocation.html"]}]}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"penzance-chantilly-premier-fairfax-va":{"fips":["51059"],"method":"point_disambiguation","point_context_conflict":false,"legacy_area_unmatched":false,"note":"County and independent-city names overlap. The mapped point provides area context only; the exact jurisdiction still needs source review."},"aerospace-corporation-chantilly-va":{"fips":["51059"],"method":"reviewed_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"County context review of the exact agency street only. This review adds no site reference. Any separately reviewed site reference retains its own precision and source scope. County evidence does not certify a roof, full campus, legal parcel, municipal boundary, physical stage, party role or quantity. This retains reviewed county context only; it does not admit a site point, parcel or current operating status."},"h5-chantilly-lafayette-campus-va":{"fips":["51059"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Fairfax County","base_name":"Fairfax","fips":"51059","kind":"County"}],"state_legislation":{"review_scope":"partial_primary_review","latest_scoped_check":"2026-10-15","coverage_note":"Selected bill histories and enacted texts reviewed; this is not a complete state legislative inventory or a review of site compliance.","bill_records":5,"enacted_measures":4,"enacted_policy_groups":3,"failed_proposals":1,"bills":[{"id":"legislation:va:20261:hb153","state":"va","bill_id":"HB153","session":"2026 Regular Session","topics":["siting","noise","water","utility_disclosure"],"status":"enacted","effective_on":"2026-07-01","title":"High-energy facility site assessments","summary":"For new high-energy-use facilities anticipating at least 100 MW of retail utility power, covered local siting approvals require an applicant sound assessment for residences and schools within 500 feet of the property boundary, subject to the act’s practicability and timing provisions. The serving utility must provide specified substation and transmission-voltage information to the extent known and practicable.","applicability":"The threshold concerns utility power, not IT capacity. Localities may request additional water and other resource assessment. Local zoning and State Corporation Commission authority remain distinct. An exception covers specified previously approved expansions; read the enacted text and approval history before applying it to a project.","policy_group_id":"va:20261:site-assessments","policy_type":"siting_assessment_requirement","companion_bill_ids":["SB94"],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"567","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB153","text_url":"https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"session":["https://lis.virginia.gov/bill-details/20261/HB153"],"topics":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"status":["https://lis.virginia.gov/bill-details/20261/HB153"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"title":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"summary":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB153"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB153"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb323","state":"va","bill_id":"HB323","session":"2026 Regular Session","topics":["waste_heat","study","reporting"],"status":"enacted","effective_on":"2026-07-01","title":"Waste-heat reuse study and work group","summary":"Directs the Department of Energy to identify opportunities for data-center waste-heat reuse, assess practices and infrastructure costs, develop recommendations, and convene a work group. A report to the named legislative committee chairs was due September 1, 2026.","applicability":"This is an agency research and reporting directive. It does not require every data center to deliver reused heat. Report completion has not been verified; an elapsed deadline alone does not establish a missed report or project noncompliance.","policy_group_id":"va:20261:waste-heat-study","policy_type":"agency_study_directive","companion_bill_ids":[],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"591","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB323","text_url":"https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591","report_due_on":"2026-09-01","field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"session":["https://lis.virginia.gov/bill-details/20261/HB323"],"topics":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"status":["https://lis.virginia.gov/bill-details/20261/HB323"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"title":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"summary":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB323"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB323"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb507","state":"va","bill_id":"HB507","session":"2026 Regular Session","topics":["air_permits","backup_generation","emissions"],"status":"enacted","effective_on":"2026-07-01","title":"Generator-emissions limits for new permit applications","summary":"For covered data-center air-permit applications submitted on or after July 1, 2026, including general-permit coverage, DEQ may issue the permit only if each gen-set’s permit emission limit is no greater than emissions achieved by the act’s defined Tier 4 equivalent.","applicability":"Application submission date matters. Tier 4 equivalent has specified pollution-control definitions; the act preserves other applicable standards and more stringent limits. This is not evidence that an existing site retrofitted its generators or that a particular permit satisfies the rule.","policy_group_id":"va:20261:generator-emissions","policy_type":"emissions_permit_requirement","companion_bill_ids":[],"enacted_on":"2026-04-08","disposition_on":"2026-04-08","reviewed_on":"2026-10-15","chapter":"397","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB507","text_url":"https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"session":["https://lis.virginia.gov/bill-details/20261/HB507"],"topics":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"status":["https://lis.virginia.gov/bill-details/20261/HB507"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"title":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"summary":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB507"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB507"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb658","state":"va","bill_id":"HB658","session":"2026 Regular Session","topics":["electricity_costs","cost_allocation"],"status":"failed","effective_on":null,"title":"Electric utility cost-allocation proceedings","summary":"Proposed SCC proceedings to examine whether other customer classes subsidize data-center transmission costs for Dominion Energy and Appalachian Power, plus generation and distribution costs for Dominion. The official history marks the bill failed after it was left in House Labor and Commerce on February 18, 2026.","applicability":"This proposal was not enacted and supplies no effective date or new requirement. Its failure does not determine what other laws, tariffs or SCC proceedings require.","policy_group_id":"va:20261:cost-allocation-proposal","policy_type":"cost_allocation_proposal","companion_bill_ids":[],"enacted_on":null,"disposition_on":"2026-02-18","reviewed_on":"2026-10-15","chapter":null,"review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB658","text_url":null,"report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB658"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB658"],"session":["https://lis.virginia.gov/bill-details/20261/HB658"],"topics":["https://lis.virginia.gov/bill-details/20261/HB658"],"status":["https://lis.virginia.gov/bill-details/20261/HB658"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"title":["https://lis.virginia.gov/bill-details/20261/HB658"],"summary":["https://lis.virginia.gov/bill-details/20261/HB658"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB658"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB658"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB658"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB658"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB658"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB658"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB658"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB658"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB658"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:sb94","state":"va","bill_id":"SB94","session":"2026 Regular Session","topics":["siting","noise","water","utility_disclosure"],"status":"enacted","effective_on":"2026-07-01","title":"High-energy facility site assessments","summary":"For new high-energy-use facilities anticipating at least 100 MW of retail utility power, covered local siting approvals require an applicant sound assessment for residences and schools within 500 feet of the property boundary, subject to the act’s practicability and timing provisions. The serving utility must provide specified substation and transmission-voltage information to the extent known and practicable.","applicability":"The threshold concerns utility power, not IT capacity. Localities may request additional water and other resource assessment. Local zoning and State Corporation Commission authority remain distinct. An exception covers specified previously approved expansions; read the enacted text and approval history before applying it to a project.","policy_group_id":"va:20261:site-assessments","policy_type":"siting_assessment_requirement","companion_bill_ids":["HB153"],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"568","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/SB94","text_url":"https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"bill_id":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"session":["https://lis.virginia.gov/bill-details/20261/SB94"],"topics":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"status":["https://lis.virginia.gov/bill-details/20261/SB94"],"effective_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"title":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"summary":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"applicability":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"policy_type":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/SB94"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"chapter":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"review_scope":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"bill_url":["https://lis.virginia.gov/bill-details/20261/SB94"],"text_url":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}}]},"county_rule_reviews":[{"id":"local-rule:county-review:20261017:51059","jurisdiction":{"state":"VA","county_fips":"51059","municipality":null},"rule_type":"county_research_review","status":"policy_context_found","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Fairfax County","adopted_on":null,"conditions":["The county reports adoption of its data-center zoning amendment on September 10, 2024. Its overview describes noise, screening, design and setback standards, with by-right use in I-5 and I-6 only when the applicable standards are met, and special-exception review in other cases.","Fairfax County is separate from the independent City of Fairfax. General overviews do not establish a particular parcel permission or compliance. Later substation standards are a separate subject. Conflicting state bill numbers on the overview are not adopted as state legislation here."],"scope":"Bounded source review, not an enacted legal instrument. County association does not establish the governing parcel jurisdiction. This review has no legal effective or expiry date; dates of underlying actions are described separately.","label":"Policy context found","checked_on":"2026-10-17","sources":[{"url":"https://www.fairfaxcounty.gov/topics/data-centers","publisher":"Fairfax County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"044f9e4e23f8c71ab7942d28cff168e10669fd6b043ce1a1d519ef824710f474","capture_format":"raw_response_bytes"},{"url":"https://www.fairfaxcounty.gov/board-supervisors-approves-new-data-center-zoning-ordinance-amendment","publisher":"Fairfax County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"bd619e8ba4b85b5dedab62234183297142fc7732b0831e5262698e55a0f71654","capture_format":"raw_response_bytes"},{"url":"https://www.fairfaxcounty.gov/planning-development/data-centers","publisher":"Fairfax County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"b47b8ce35ce63a25d797cd6f7d100d207f11e06174684bfb5f0d0a124b43574b","capture_format":"raw_response_bytes"}]}],"stage_timelines":{"penzance-chantilly-premier-fairfax-va":{"stages":[{"id":"event:milestone:research-20261023-c49-penzance-chantilly-premier-fairfax-va:0","date":"2025-11-21","stage":"announced","scheduled":false,"basis":"primary source","scope":"The official November 22, 2025 EDA release caption dates the Chantilly Premier groundbreaking ceremony to November 21. The body says today; the caption supplies the selected ceremony day. This dates a reported ceremony, not the exact first physical work day, current stage or computing operation.","sources":[{"url":"https://fairfaxcountyeda.org/fairfax-county-penzance-officials-break-ground-next-generation-digital-infrastructure-project-to-power-the-worlds-deep-tech-future/","publisher":"Fairfax County Economic Development Authority"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":77,"retained_reviewed_reference":39,"no_site_point":6,"county_display":83},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"va","name":"Chantilly","state_name":"Virginia","state_path":"/virginia/","slug":"chantilly","path":"/city/virginia/chantilly/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:va-operator-depth-20261016-72375","subject_id":"site:h5-chantilly-lafayette-campus-va","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-16","qualifies_status":true,"status_group":"operating","status_label":"Operator-listed campus","scope":"Current operator-marketed colocation service on the Lafayette campus; individual building operation, phase 3 completion, full buildout, occupancy and available/delivered capacity are not established.","display_category":"source_check","display_date":"2026-10-16","sources":[{"url":"https://h5datacenters.com/virginia-colocation.html","publisher":"H5 Data Centers","source_type":"company_page","retrieved_on":"2026-10-16"}],"field_sources":{"subject_id":["source:122b2a87f31b503f87a7117e"],"event_type":["source:122b2a87f31b503f87a7117e"],"occurred_on":["source:122b2a87f31b503f87a7117e"],"observed_on":["source:122b2a87f31b503f87a7117e"],"qualifies_status":["source:122b2a87f31b503f87a7117e"],"status_group":["source:122b2a87f31b503f87a7117e"],"status_label":["source:122b2a87f31b503f87a7117e"],"scope":["source:122b2a87f31b503f87a7117e"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:status:va-followup-20261016-73977","subject_id":"site:aerospace-corporation-chantilly-va","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-16","qualifies_status":true,"status_group":"operating","status_label":"Agency-listed operating","scope":"DEQ air-registration classification only. No individual permit order, whole-campus operation, current operator/owner, opening day, power/water quantity or verified parcel is established.","display_category":"source_check","display_date":"2026-10-16","sources":[{"url":"https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000","publisher":"Virginia Department of Environmental Quality","source_type":"government_record","retrieved_on":"2026-10-16"}],"field_sources":{"subject_id":["source:ccc9ca1f03e816eca833fd70"],"event_type":["source:ccc9ca1f03e816eca833fd70"],"occurred_on":["source:ccc9ca1f03e816eca833fd70"],"observed_on":["source:ccc9ca1f03e816eca833fd70"],"qualifies_status":["source:ccc9ca1f03e816eca833fd70"],"status_group":["source:ccc9ca1f03e816eca833fd70"],"status_label":["source:ccc9ca1f03e816eca833fd70"],"scope":["source:ccc9ca1f03e816eca833fd70"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261023-c49-penzance-chantilly-premier-fairfax-va:0","subject_id":"site:penzance-chantilly-premier-fairfax-va","event_type":"announced","occurred_on":"2025-11-21","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The official November 22, 2025 EDA release caption dates the Chantilly Premier groundbreaking ceremony to November 21. The body says today; the caption supplies the selected ceremony day. This dates a reported ceremony, not the exact first physical work day, current stage or computing operation.","display_category":"recorded_event","display_date":"2025-11-21","sources":[{"url":"https://fairfaxcountyeda.org/fairfax-county-penzance-officials-break-ground-next-generation-digital-infrastructure-project-to-power-the-worlds-deep-tech-future/","publisher":"Fairfax County Economic Development Authority","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:7b0d07f9e0e2233401813b89"],"event_type":["source:7b0d07f9e0e2233401813b89"],"occurred_on":["source:7b0d07f9e0e2233401813b89"],"observed_on":["source:7b0d07f9e0e2233401813b89"],"qualifies_status":["source:7b0d07f9e0e2233401813b89"],"status_group":["source:7b0d07f9e0e2233401813b89"],"status_label":["source:7b0d07f9e0e2233401813b89"],"scope":["source:7b0d07f9e0e2233401813b89"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[{"path":"/company/h5-data-centers/","name":"H5 Data Centers"}],"map_settings":{"bounds":[-77.522586,38.79488,-77.22644,38.949778],"hub":[-77.37451300000001,38.872329],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-75.3977,38.0135],[-75.2443,38.0299],[-75.3758,37.8601],[-75.5127,37.7999],[-75.5948,37.5699],[-75.803,37.1974],[-75.9727,37.1208],[-76.0275,37.2577],[-75.9399,37.5644],[-75.6715,37.9532],[-75.3977,38.0135]],[[-76.0166,37.9532],[-75.9946,37.9532],[-76.0439,37.9532],[-76.0166,37.9532]],[[-78.3497,39.4649],[-77.8294,39.1308],[-77.7199,39.3225],[-77.5665,39.3061],[-77.457,39.2239],[-77.457,39.076],[-77.2489,39.0267],[-77.1174,38.9336],[-77.0407,38.7912],[-77.1284,38.6324],[-77.2489,38.5886],[-77.3255,38.4462],[-77.2817,38.3421],[-77.0134,38.375],[-76.9641,38.2161],[-76.6135,38.1504],[-76.515,38.0245],[-76.2356,37.8875],[-76.3616,37.6082],[-76.2466,37.3891],[-76.3835,37.2851],[-76.3999,37.1591],[-76.274,37.0824],[-76.4109,36.9619],[-76.619,37.1208],[-76.6683,37.066],[-76.4876,36.951],[-75.9946,36.9236],[-75.8687,36.5512],[-79.5108,36.5402],[-80.294,36.5457],[-80.9787,36.5621],[-81.6797,36.5895],[-83.6733,36.6004],[-83.1366,36.7428],[-83.0709,36.8524],[-82.8792,36.8907],[-82.8682,36.9784],[-82.7203,37.0441],[-82.7203,37.1208],[-82.3534,37.2686],[-81.97,37.537],[-81.9864,37.4548],[-81.8495,37.2851],[-81.6797,37.2029],[-81.5537,37.2084],[-81.362,37.3398],[-81.2251,37.2358],[-80.9677,37.2905],[-80.5131,37.4822],[-80.4748,37.422],[-80.2995,37.5096],[-80.294,37.6904],[-80.1845,37.8492],[-79.9983,37.9971],[-79.9216,38.1778],[-79.7244,38.364],[-79.6478,38.5941],[-79.478,38.4571],[-79.3137,38.4133],[-79.2096,38.4955],[-78.996,38.8515],[-78.87,38.7638],[-78.4045,39.1691],[-78.3497,39.4649]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-75.3977,38.0135],[-75.2443,38.0299],[-75.3758,37.8601],[-75.5127,37.7999],[-75.5948,37.5699],[-75.803,37.1974],[-75.9727,37.1208],[-76.0275,37.2577],[-75.9399,37.5644],[-75.6715,37.9532],[-75.3977,38.0135]],[[-76.0166,37.9532],[-75.9946,37.9532],[-76.0439,37.9532],[-76.0166,37.9532]],[[-78.3497,39.4649],[-77.8294,39.1308],[-77.7199,39.3225],[-77.5665,39.3061],[-77.457,39.2239],[-77.457,39.076],[-77.2489,39.0267],[-77.1174,38.9336],[-77.0407,38.7912],[-77.1284,38.6324],[-77.2489,38.5886],[-77.3255,38.4462],[-77.2817,38.3421],[-77.0134,38.375],[-76.9641,38.2161],[-76.6135,38.1504],[-76.515,38.0245],[-76.2356,37.8875],[-76.3616,37.6082],[-76.2466,37.3891],[-76.3835,37.2851],[-76.3999,37.1591],[-76.274,37.0824],[-76.4109,36.9619],[-76.619,37.1208],[-76.6683,37.066],[-76.4876,36.951],[-75.9946,36.9236],[-75.8687,36.5512],[-79.5108,36.5402],[-80.294,36.5457],[-80.9787,36.5621],[-81.6797,36.5895],[-83.6733,36.6004],[-83.1366,36.7428],[-83.0709,36.8524],[-82.8792,36.8907],[-82.8682,36.9784],[-82.7203,37.0441],[-82.7203,37.1208],[-82.3534,37.2686],[-81.97,37.537],[-81.9864,37.4548],[-81.8495,37.2851],[-81.6797,37.2029],[-81.5537,37.2084],[-81.362,37.3398],[-81.2251,37.2358],[-80.9677,37.2905],[-80.5131,37.4822],[-80.4748,37.422],[-80.2995,37.5096],[-80.294,37.6904],[-80.1845,37.8492],[-79.9983,37.9971],[-79.9216,38.1778],[-79.7244,38.364],[-79.6478,38.5941],[-79.478,38.4571],[-79.3137,38.4133],[-79.2096,38.4955],[-78.996,38.8515],[-78.87,38.7638],[-78.4045,39.1691],[-78.3497,39.4649]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
