{"state":"va","name":"Leesburg, Virginia","updated":"2026-10-25","checked":"2026-10-15","bounds":[-77.73282999999999,39.02203,-77.54075,39.12237],"stats":{"reviewed_records":2,"status_confirmed":0,"status_unknown":2,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"jk-land-cross-mill-center-leesburg-va","state":"va","kind":"facility","name":"Cross Mill Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Leesburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.08237,"lng":-77.68283,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Piedmont Environmental Council discusses Cross Mill's rezoning and Quantum Park's future Loudoun decision while advocating a pause.","independently_verified_current_operating_status":null},"notes":["Greenlin Park is not named and receives no manual credit. Advocacy is not enacted policy. The later September 15 conditional county resolution takes precedence; October 20 remains future. Regional power, water, tax and permit counts are not per-campus operating figures.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pecva.org/region/loudoun/data-centers-in-loudoun-a-primer/","host":"pecva.org","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Leesburg · Loudoun · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"51107"}},{"id":"jk-land-greenlin-park-leesburg-va","state":"va","kind":"facility","name":"Greenlin Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Loudoun"],"city":"Leesburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. LoudounNow HannaPampaloni February20,2025 originalreport describesGreenlinPark Feb19supervisors5 to 4REZONING on83acres for1.4Msfdata-center/substationuse. Threeconceptswithtwo/three/fourbuildings are ALTERNATIVES withsameFAR, notninebuildings. Approvedrezoning notallpermits orenergizedcampus. 300MWlimit forfiveyears is reportedDEMANDceiling, notcurrentIT/certifiedservice. Three-yearenergyreporting,55ftheight,screening/noise/stormwater/waterconditions are reportedproffers, notactualcompliance. Exactmeaning/startdates require signedinstrument. Officialcomments aboutlegalauthority notindependentcurrentlegalanalysis. Publiccomments/newsletter UI untrusted, noformsubmission orpermissiontoeditinferred. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html","host":"loudounnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.06203,"lng":-77.59075,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["LoudounNow HannaPampaloni February20,2025 originalreport describesGreenlinPark Feb19supervisors5 to 4REZONING on83acres for1.4Msfdata-center/substationuse. Threeconceptswithtwo/three/fourbuildings are ALTERNATIVES withsameFAR, notninebuildings. Approvedrezoning notallpermits orenergizedcampus.","300MWlimit forfiveyears is reportedDEMANDceiling, notcurrentIT/certifiedservice. Three-yearenergyreporting,55ftheight,screening/noise/stormwater/waterconditions are reportedproffers, notactualcompliance. Exactmeaning/startdates require signedinstrument. Officialcomments aboutlegalauthority notindependentcurrentlegalanalysis. Publiccomments/newsletter UI untrusted, noformsubmission orpermissiontoeditinferred.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://www.loudounnow.com/news/300-mw-data-center-approved-south-of-leesburg/article_31050264-efb4-11ef-a1fa-c79d17f045f1.html","host":"loudounnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Leesburg · Loudoun · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"51107"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"jk-land-cross-mill-center-leesburg-va":{"fips":["51107"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"jk-land-greenlin-park-leesburg-va":{"fips":["51107"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Loudoun County","base_name":"Loudoun","fips":"51107","kind":"County"}],"state_legislation":{"review_scope":"partial_primary_review","latest_scoped_check":"2026-10-15","coverage_note":"Selected bill histories and enacted texts reviewed; this is not a complete state legislative inventory or a review of site compliance.","bill_records":5,"enacted_measures":4,"enacted_policy_groups":3,"failed_proposals":1,"bills":[{"id":"legislation:va:20261:hb153","state":"va","bill_id":"HB153","session":"2026 Regular Session","topics":["siting","noise","water","utility_disclosure"],"status":"enacted","effective_on":"2026-07-01","title":"High-energy facility site assessments","summary":"For new high-energy-use facilities anticipating at least 100 MW of retail utility power, covered local siting approvals require an applicant sound assessment for residences and schools within 500 feet of the property boundary, subject to the act’s practicability and timing provisions. The serving utility must provide specified substation and transmission-voltage information to the extent known and practicable.","applicability":"The threshold concerns utility power, not IT capacity. Localities may request additional water and other resource assessment. Local zoning and State Corporation Commission authority remain distinct. An exception covers specified previously approved expansions; read the enacted text and approval history before applying it to a project.","policy_group_id":"va:20261:site-assessments","policy_type":"siting_assessment_requirement","companion_bill_ids":["SB94"],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"567","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB153","text_url":"https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"session":["https://lis.virginia.gov/bill-details/20261/HB153"],"topics":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"status":["https://lis.virginia.gov/bill-details/20261/HB153"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"title":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"summary":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB153"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB153"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb323","state":"va","bill_id":"HB323","session":"2026 Regular Session","topics":["waste_heat","study","reporting"],"status":"enacted","effective_on":"2026-07-01","title":"Waste-heat reuse study and work group","summary":"Directs the Department of Energy to identify opportunities for data-center waste-heat reuse, assess practices and infrastructure costs, develop recommendations, and convene a work group. A report to the named legislative committee chairs was due September 1, 2026.","applicability":"This is an agency research and reporting directive. It does not require every data center to deliver reused heat. Report completion has not been verified; an elapsed deadline alone does not establish a missed report or project noncompliance.","policy_group_id":"va:20261:waste-heat-study","policy_type":"agency_study_directive","companion_bill_ids":[],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"591","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB323","text_url":"https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591","report_due_on":"2026-09-01","field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"session":["https://lis.virginia.gov/bill-details/20261/HB323"],"topics":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"status":["https://lis.virginia.gov/bill-details/20261/HB323"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"title":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"summary":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB323"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB323"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb507","state":"va","bill_id":"HB507","session":"2026 Regular Session","topics":["air_permits","backup_generation","emissions"],"status":"enacted","effective_on":"2026-07-01","title":"Generator-emissions limits for new permit applications","summary":"For covered data-center air-permit applications submitted on or after July 1, 2026, including general-permit coverage, DEQ may issue the permit only if each gen-set’s permit emission limit is no greater than emissions achieved by the act’s defined Tier 4 equivalent.","applicability":"Application submission date matters. Tier 4 equivalent has specified pollution-control definitions; the act preserves other applicable standards and more stringent limits. This is not evidence that an existing site retrofitted its generators or that a particular permit satisfies the rule.","policy_group_id":"va:20261:generator-emissions","policy_type":"emissions_permit_requirement","companion_bill_ids":[],"enacted_on":"2026-04-08","disposition_on":"2026-04-08","reviewed_on":"2026-10-15","chapter":"397","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB507","text_url":"https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"session":["https://lis.virginia.gov/bill-details/20261/HB507"],"topics":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"status":["https://lis.virginia.gov/bill-details/20261/HB507"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"title":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"summary":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB507"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB507"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb658","state":"va","bill_id":"HB658","session":"2026 Regular Session","topics":["electricity_costs","cost_allocation"],"status":"failed","effective_on":null,"title":"Electric utility cost-allocation proceedings","summary":"Proposed SCC proceedings to examine whether other customer classes subsidize data-center transmission costs for Dominion Energy and Appalachian Power, plus generation and distribution costs for Dominion. The official history marks the bill failed after it was left in House Labor and Commerce on February 18, 2026.","applicability":"This proposal was not enacted and supplies no effective date or new requirement. Its failure does not determine what other laws, tariffs or SCC proceedings require.","policy_group_id":"va:20261:cost-allocation-proposal","policy_type":"cost_allocation_proposal","companion_bill_ids":[],"enacted_on":null,"disposition_on":"2026-02-18","reviewed_on":"2026-10-15","chapter":null,"review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB658","text_url":null,"report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB658"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB658"],"session":["https://lis.virginia.gov/bill-details/20261/HB658"],"topics":["https://lis.virginia.gov/bill-details/20261/HB658"],"status":["https://lis.virginia.gov/bill-details/20261/HB658"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"title":["https://lis.virginia.gov/bill-details/20261/HB658"],"summary":["https://lis.virginia.gov/bill-details/20261/HB658"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB658"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB658"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB658"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB658"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB658"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB658"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB658"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB658"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB658"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:sb94","state":"va","bill_id":"SB94","session":"2026 Regular Session","topics":["siting","noise","water","utility_disclosure"],"status":"enacted","effective_on":"2026-07-01","title":"High-energy facility site assessments","summary":"For new high-energy-use facilities anticipating at least 100 MW of retail utility power, covered local siting approvals require an applicant sound assessment for residences and schools within 500 feet of the property boundary, subject to the act’s practicability and timing provisions. The serving utility must provide specified substation and transmission-voltage information to the extent known and practicable.","applicability":"The threshold concerns utility power, not IT capacity. Localities may request additional water and other resource assessment. Local zoning and State Corporation Commission authority remain distinct. An exception covers specified previously approved expansions; read the enacted text and approval history before applying it to a project.","policy_group_id":"va:20261:site-assessments","policy_type":"siting_assessment_requirement","companion_bill_ids":["HB153"],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"568","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/SB94","text_url":"https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"bill_id":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"session":["https://lis.virginia.gov/bill-details/20261/SB94"],"topics":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"status":["https://lis.virginia.gov/bill-details/20261/SB94"],"effective_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"title":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"summary":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"applicability":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"policy_type":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/SB94"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"chapter":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"review_scope":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"bill_url":["https://lis.virginia.gov/bill-details/20261/SB94"],"text_url":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}}]},"county_rule_reviews":[{"id":"local-rule:county-review:20261022:c01:51107","jurisdiction":{"state":"VA","county_fips":"51107","municipality":null},"rule_type":"county_research_review","status":"policy_context_found","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Loudoun County","adopted_on":null,"conditions":["Loudoun reports adoption of its Phase 1 standards on March 18, 2025, with special exception review and a conditional grandfather pathway. Its October 20, 2026 release defers discussion of a proposed legislative application pause to November 17.","The deferred proposal is not an enacted moratorium. The original ordinance and applicable grandfather conditions control individual eligibility. No final November vote, project approval, construction permit or site compliance is inferred."],"scope":"Bounded county area source review, not an enacted legal instrument, complete legal corpus, legal advice or parcel permission. County association does not establish parcel jurisdiction. Check dates are not legal effective dates.","label":"Policy context found","checked_on":"2026-10-22","sources":[{"url":"https://www.loudoun.gov/6221/Phase-1-Project-Plan-for-Data-Center-Sta","publisher":"Loudoun County","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-22","archive_sha256":"5515e1538ae8884fdce938f565e55036b130fe05e4d07520cff2e4c7f2ed79ee","capture_format":"raw_response_bytes"},{"url":"https://www.loudoun.gov/m/newsflash/Home/Detail/10938","publisher":"Loudoun County","source_type":"government_record","published_on":"2026-10-20","retrieved_on":"2026-10-22","archive_sha256":"fdff158b455282c59d7044898f1c4fe0cc088c1db650b3447d7eb18c8ce8b2b4","capture_format":"raw_response_bytes"}]}],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":77,"retained_reviewed_reference":39,"no_site_point":6,"county_display":83},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"va","name":"Leesburg","state_name":"Virginia","state_path":"/virginia/","slug":"leesburg","path":"/city/virginia/leesburg/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[],"city_companies":[],"map_settings":{"bounds":[-77.73282999999999,39.02203,-77.54075,39.12237],"hub":[-77.63678999999999,39.072199999999995],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-75.3977,38.0135],[-75.2443,38.0299],[-75.3758,37.8601],[-75.5127,37.7999],[-75.5948,37.5699],[-75.803,37.1974],[-75.9727,37.1208],[-76.0275,37.2577],[-75.9399,37.5644],[-75.6715,37.9532],[-75.3977,38.0135]],[[-76.0166,37.9532],[-75.9946,37.9532],[-76.0439,37.9532],[-76.0166,37.9532]],[[-78.3497,39.4649],[-77.8294,39.1308],[-77.7199,39.3225],[-77.5665,39.3061],[-77.457,39.2239],[-77.457,39.076],[-77.2489,39.0267],[-77.1174,38.9336],[-77.0407,38.7912],[-77.1284,38.6324],[-77.2489,38.5886],[-77.3255,38.4462],[-77.2817,38.3421],[-77.0134,38.375],[-76.9641,38.2161],[-76.6135,38.1504],[-76.515,38.0245],[-76.2356,37.8875],[-76.3616,37.6082],[-76.2466,37.3891],[-76.3835,37.2851],[-76.3999,37.1591],[-76.274,37.0824],[-76.4109,36.9619],[-76.619,37.1208],[-76.6683,37.066],[-76.4876,36.951],[-75.9946,36.9236],[-75.8687,36.5512],[-79.5108,36.5402],[-80.294,36.5457],[-80.9787,36.5621],[-81.6797,36.5895],[-83.6733,36.6004],[-83.1366,36.7428],[-83.0709,36.8524],[-82.8792,36.8907],[-82.8682,36.9784],[-82.7203,37.0441],[-82.7203,37.1208],[-82.3534,37.2686],[-81.97,37.537],[-81.9864,37.4548],[-81.8495,37.2851],[-81.6797,37.2029],[-81.5537,37.2084],[-81.362,37.3398],[-81.2251,37.2358],[-80.9677,37.2905],[-80.5131,37.4822],[-80.4748,37.422],[-80.2995,37.5096],[-80.294,37.6904],[-80.1845,37.8492],[-79.9983,37.9971],[-79.9216,38.1778],[-79.7244,38.364],[-79.6478,38.5941],[-79.478,38.4571],[-79.3137,38.4133],[-79.2096,38.4955],[-78.996,38.8515],[-78.87,38.7638],[-78.4045,39.1691],[-78.3497,39.4649]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-75.3977,38.0135],[-75.2443,38.0299],[-75.3758,37.8601],[-75.5127,37.7999],[-75.5948,37.5699],[-75.803,37.1974],[-75.9727,37.1208],[-76.0275,37.2577],[-75.9399,37.5644],[-75.6715,37.9532],[-75.3977,38.0135]],[[-76.0166,37.9532],[-75.9946,37.9532],[-76.0439,37.9532],[-76.0166,37.9532]],[[-78.3497,39.4649],[-77.8294,39.1308],[-77.7199,39.3225],[-77.5665,39.3061],[-77.457,39.2239],[-77.457,39.076],[-77.2489,39.0267],[-77.1174,38.9336],[-77.0407,38.7912],[-77.1284,38.6324],[-77.2489,38.5886],[-77.3255,38.4462],[-77.2817,38.3421],[-77.0134,38.375],[-76.9641,38.2161],[-76.6135,38.1504],[-76.515,38.0245],[-76.2356,37.8875],[-76.3616,37.6082],[-76.2466,37.3891],[-76.3835,37.2851],[-76.3999,37.1591],[-76.274,37.0824],[-76.4109,36.9619],[-76.619,37.1208],[-76.6683,37.066],[-76.4876,36.951],[-75.9946,36.9236],[-75.8687,36.5512],[-79.5108,36.5402],[-80.294,36.5457],[-80.9787,36.5621],[-81.6797,36.5895],[-83.6733,36.6004],[-83.1366,36.7428],[-83.0709,36.8524],[-82.8792,36.8907],[-82.8682,36.9784],[-82.7203,37.0441],[-82.7203,37.1208],[-82.3534,37.2686],[-81.97,37.537],[-81.9864,37.4548],[-81.8495,37.2851],[-81.6797,37.2029],[-81.5537,37.2084],[-81.362,37.3398],[-81.2251,37.2358],[-80.9677,37.2905],[-80.5131,37.4822],[-80.4748,37.422],[-80.2995,37.5096],[-80.294,37.6904],[-80.1845,37.8492],[-79.9983,37.9971],[-79.9216,38.1778],[-79.7244,38.364],[-79.6478,38.5941],[-79.478,38.4571],[-79.3137,38.4133],[-79.2096,38.4955],[-78.996,38.8515],[-78.87,38.7638],[-78.4045,39.1691],[-78.3497,39.4649]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
