{"state":"va","name":"Louisa, Virginia","updated":"2026-10-25","checked":"2026-10-15","bounds":[-78.02852,37.939,-77.91292,38.0333],"stats":{"reviewed_records":2,"status_confirmed":1,"status_unknown":1,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aws-lake-anna-technology-campus-louisa-va","state":"va","kind":"facility","name":"Lake Anna Technology Campus (LATC)","group":"building","status":"Reported construction","raw_status":"under construction","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Louisa"],"city":"Louisa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-06-18","The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.louisacounty.gov/m/faq?cat=40","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/Blog.aspx?IID=59","host":"www.louisacounty.gov","published":"2026-06-18","date":"2026-06-18","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":37.979,"lng":-77.96292,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"encore-2026-10-17-batch2","scope":"Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.","fields":{"current_stage_evidence":{"outcome":"unresolved","scope":"Louisa County identifies Lake Anna separately from North Creek. Its June 18, 2026 water update says initial construction WILL temporarily rely on groundwater; that future arrangement does not establish an observed construction start. The June 2025 guide’s general campus wording is not a current individual phase report. Reservoir delivery forecast for early 2027 is prospective, and reservoir safe yield is not AWS consumption. Current stage remains unresolved."}},"notes":["Louisa County identifies Lake Anna separately from North Creek. Its June 18, 2026 water update says initial construction WILL temporarily rely on groundwater; that future arrangement does not establish an observed construction start. The June 2025 guide’s general campus wording is not a current individual phase report. Reservoir delivery forecast for early 2027 is prospective, and reservoir safe yield is not AWS consumption. Current stage remains unresolved."],"sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/m/faq?cat=40","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/Blog.aspx?IID=59","host":"www.louisacounty.gov","published":"2026-06-18","date":"2026-06-18","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"}],"checked":"2026-10-17","whole_record_certified":false},{"overlay":"Codex 3 research cohort 49","scope":"The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.","fields":{"current_stage_evidence":{"outcome":"county_reported_vertical_construction","scope":"The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified."},"source_read_scope":{"budget_selected_pdf_pages":[1,88],"annual_selected_text_pages":[10,28],"entire_financial_reports_not_reviewed":true}},"notes":["The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.louisacounty.gov/Blog.aspx?IID=59","host":"www.louisacounty.gov","published":"2026-06-18","date":"2026-06-18","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Louisa · Louisa · Source context reviewed","typed_water_facts":[{"measure":"supply_source","value":"Future initial-phase groundwater, followed by planned reservoir supply","unit":null,"basis":"operator_reported_statement","as_of":"2026-06-18","as_of_basis":"source_dated","observed_on":"2026-10-17","scope":"County-reported FUTURE initial-construction water arrangement and early-2027 reservoir forecast. It does not establish an observed construction start, delivered reservoir water, a withdrawal quantity or actual consumption.","sources":["https://www.louisacounty.gov/Blog.aspx?IID=59"]}],"status_scope":"The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.","event_evidence":[{"date":"2026-06-18","text":"The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation.","kind":"announced","sources":[{"url":"https://www.louisacounty.gov/Blog.aspx?IID=59","host":"www.louisacounty.gov","published":"2026-06-18","date":"2026-06-18","checked":"2026-10-23","label":"Reviewed government record"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"51109"}},{"id":"aws-north-creek-technology-campus-louisa-va","state":"va","kind":"facility","name":"North Creek Technology Campus (NCTC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Louisa"],"city":"Louisa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.louisacounty.gov/m/faq?cat=40","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":37.9933,"lng":-77.97852,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.louisacounty.gov/3258/Data-Centers","host":"louisacounty.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"encore-2026-10-17-batch2","scope":"Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.","fields":{"current_stage_evidence":{"outcome":"unresolved","scope":"Louisa County identifies North Creek, formerly JCM, separately from Lake Anna, formerly REB. The guide’s June 2025 campus context, plural references to contractor work and older FAQ forecasts do not establish North Creek’s current building phase. Shared future water service is not evidence of construction or commissioning. No exact day is invented for the guide’s month-only date. Current stage remains unresolved."}},"notes":["Louisa County identifies North Creek, formerly JCM, separately from Lake Anna, formerly REB. The guide’s June 2025 campus context, plural references to contractor work and older FAQ forecasts do not establish North Creek’s current building phase. Shared future water service is not evidence of construction or commissioning. No exact day is invented for the guide’s month-only date. Current stage remains unresolved."],"sources":[{"url":"https://www.louisacounty.gov/m/faq?cat=40","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"},{"url":"https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-17","label":"Reviewed source context"}],"checked":"2026-10-17","whole_record_certified":false},{"overlay":"Codex 3 research cohort 49","scope":"The County FY2027 budget and earlier December 12, 2025 transmittal report describe North Creek site preparation starting in spring 2025. Neither selected passage establishes exact current vertical construction, all phase readiness or computing operation. Lake Anna vertical construction is a separate named campus and is not transferred to North Creek. A season is not converted to an invented exact start date.","fields":{"current_stage_evidence":{"outcome":"reported_site_preparation_not_current_vertical_building_stage","scope":"The County FY2027 budget and earlier December 12, 2025 transmittal report describe North Creek site preparation starting in spring 2025. Neither selected passage establishes exact current vertical construction, all phase readiness or computing operation. Lake Anna vertical construction is a separate named campus and is not transferred to North Creek. A season is not converted to an invented exact start date."},"source_read_scope":{"budget_selected_pdf_pages":[1,88],"annual_selected_text_pages":[10,28],"entire_financial_reports_not_reviewed":true}},"notes":["The County FY2027 budget and earlier December 12, 2025 transmittal report describe North Creek site preparation starting in spring 2025. Neither selected passage establishes exact current vertical construction, all phase readiness or computing operation. Lake Anna vertical construction is a separate named campus and is not transferred to North Creek. A season is not converted to an invented exact start date.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101","host":"www.louisacounty.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Louisa · Louisa · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"51109"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"aws-lake-anna-technology-campus-louisa-va":{"fips":["51109"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"aws-north-creek-technology-campus-louisa-va":{"fips":["51109"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Louisa County","base_name":"Louisa","fips":"51109","kind":"County"}],"state_legislation":{"review_scope":"partial_primary_review","latest_scoped_check":"2026-10-15","coverage_note":"Selected bill histories and enacted texts reviewed; this is not a complete state legislative inventory or a review of site compliance.","bill_records":5,"enacted_measures":4,"enacted_policy_groups":3,"failed_proposals":1,"bills":[{"id":"legislation:va:20261:hb153","state":"va","bill_id":"HB153","session":"2026 Regular Session","topics":["siting","noise","water","utility_disclosure"],"status":"enacted","effective_on":"2026-07-01","title":"High-energy facility site assessments","summary":"For new high-energy-use facilities anticipating at least 100 MW of retail utility power, covered local siting approvals require an applicant sound assessment for residences and schools within 500 feet of the property boundary, subject to the act’s practicability and timing provisions. The serving utility must provide specified substation and transmission-voltage information to the extent known and practicable.","applicability":"The threshold concerns utility power, not IT capacity. Localities may request additional water and other resource assessment. Local zoning and State Corporation Commission authority remain distinct. An exception covers specified previously approved expansions; read the enacted text and approval history before applying it to a project.","policy_group_id":"va:20261:site-assessments","policy_type":"siting_assessment_requirement","companion_bill_ids":["SB94"],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"567","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB153","text_url":"https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"session":["https://lis.virginia.gov/bill-details/20261/HB153"],"topics":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"status":["https://lis.virginia.gov/bill-details/20261/HB153"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"title":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"summary":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB153"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB153"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb323","state":"va","bill_id":"HB323","session":"2026 Regular Session","topics":["waste_heat","study","reporting"],"status":"enacted","effective_on":"2026-07-01","title":"Waste-heat reuse study and work group","summary":"Directs the Department of Energy to identify opportunities for data-center waste-heat reuse, assess practices and infrastructure costs, develop recommendations, and convene a work group. A report to the named legislative committee chairs was due September 1, 2026.","applicability":"This is an agency research and reporting directive. It does not require every data center to deliver reused heat. Report completion has not been verified; an elapsed deadline alone does not establish a missed report or project noncompliance.","policy_group_id":"va:20261:waste-heat-study","policy_type":"agency_study_directive","companion_bill_ids":[],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"591","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB323","text_url":"https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591","report_due_on":"2026-09-01","field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"session":["https://lis.virginia.gov/bill-details/20261/HB323"],"topics":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"status":["https://lis.virginia.gov/bill-details/20261/HB323"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"title":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"summary":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB323"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB323"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb507","state":"va","bill_id":"HB507","session":"2026 Regular Session","topics":["air_permits","backup_generation","emissions"],"status":"enacted","effective_on":"2026-07-01","title":"Generator-emissions limits for new permit applications","summary":"For covered data-center air-permit applications submitted on or after July 1, 2026, including general-permit coverage, DEQ may issue the permit only if each gen-set’s permit emission limit is no greater than emissions achieved by the act’s defined Tier 4 equivalent.","applicability":"Application submission date matters. Tier 4 equivalent has specified pollution-control definitions; the act preserves other applicable standards and more stringent limits. This is not evidence that an existing site retrofitted its generators or that a particular permit satisfies the rule.","policy_group_id":"va:20261:generator-emissions","policy_type":"emissions_permit_requirement","companion_bill_ids":[],"enacted_on":"2026-04-08","disposition_on":"2026-04-08","reviewed_on":"2026-10-15","chapter":"397","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB507","text_url":"https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"session":["https://lis.virginia.gov/bill-details/20261/HB507"],"topics":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"status":["https://lis.virginia.gov/bill-details/20261/HB507"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"title":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"summary":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB507"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB507"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb658","state":"va","bill_id":"HB658","session":"2026 Regular Session","topics":["electricity_costs","cost_allocation"],"status":"failed","effective_on":null,"title":"Electric utility cost-allocation proceedings","summary":"Proposed SCC proceedings to examine whether other customer classes subsidize data-center transmission costs for Dominion Energy and Appalachian Power, plus generation and distribution costs for Dominion. The official history marks the bill failed after it was left in House Labor and Commerce on February 18, 2026.","applicability":"This proposal was not enacted and supplies no effective date or new requirement. Its failure does not determine what other laws, tariffs or SCC proceedings require.","policy_group_id":"va:20261:cost-allocation-proposal","policy_type":"cost_allocation_proposal","companion_bill_ids":[],"enacted_on":null,"disposition_on":"2026-02-18","reviewed_on":"2026-10-15","chapter":null,"review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB658","text_url":null,"report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB658"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB658"],"session":["https://lis.virginia.gov/bill-details/20261/HB658"],"topics":["https://lis.virginia.gov/bill-details/20261/HB658"],"status":["https://lis.virginia.gov/bill-details/20261/HB658"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"title":["https://lis.virginia.gov/bill-details/20261/HB658"],"summary":["https://lis.virginia.gov/bill-details/20261/HB658"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB658"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB658"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB658"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB658"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB658"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB658"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB658"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB658"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB658"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:sb94","state":"va","bill_id":"SB94","session":"2026 Regular Session","topics":["siting","noise","water","utility_disclosure"],"status":"enacted","effective_on":"2026-07-01","title":"High-energy facility site assessments","summary":"For new high-energy-use facilities anticipating at least 100 MW of retail utility power, covered local siting approvals require an applicant sound assessment for residences and schools within 500 feet of the property boundary, subject to the act’s practicability and timing provisions. The serving utility must provide specified substation and transmission-voltage information to the extent known and practicable.","applicability":"The threshold concerns utility power, not IT capacity. Localities may request additional water and other resource assessment. Local zoning and State Corporation Commission authority remain distinct. An exception covers specified previously approved expansions; read the enacted text and approval history before applying it to a project.","policy_group_id":"va:20261:site-assessments","policy_type":"siting_assessment_requirement","companion_bill_ids":["HB153"],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"568","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/SB94","text_url":"https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"bill_id":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"session":["https://lis.virginia.gov/bill-details/20261/SB94"],"topics":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"status":["https://lis.virginia.gov/bill-details/20261/SB94"],"effective_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"title":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"summary":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"applicability":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"policy_type":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/SB94"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"chapter":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"review_scope":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"bill_url":["https://lis.virginia.gov/bill-details/20261/SB94"],"text_url":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}}]},"county_rule_reviews":[],"stage_timelines":{"aws-lake-anna-technology-campus-louisa-va":{"stages":[{"id":"event:milestone:research-20261023-c49-aws-lake-anna-technology-campus-louisa-va:0","date":"2026-06-18","stage":"announced","scheduled":false,"basis":"primary source","scope":"The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation.","sources":[{"url":"https://www.louisacounty.gov/Blog.aspx?IID=59","publisher":"Louisa County"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":77,"retained_reviewed_reference":39,"no_site_point":6,"county_display":83},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"va","name":"Louisa","state_name":"Virginia","state_path":"/virginia/","slug":"louisa","path":"/city/virginia/louisa/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261023-c49-aws-lake-anna-technology-campus-louisa-va","subject_id":"site:aws-lake-anna-technology-campus-louisa-va","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"building","status_label":"Reported construction","scope":"The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=","publisher":"Louisa County","source_type":"government_record","retrieved_on":"2026-10-23"},{"url":"https://www.louisacounty.gov/Blog.aspx?IID=59","publisher":"Louisa County","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:300b8f091e11719a21528af0","source:9e49d546c1d6e92bcc69cbe0"],"event_type":["source:300b8f091e11719a21528af0","source:9e49d546c1d6e92bcc69cbe0"],"occurred_on":["source:300b8f091e11719a21528af0","source:9e49d546c1d6e92bcc69cbe0"],"observed_on":["source:300b8f091e11719a21528af0","source:9e49d546c1d6e92bcc69cbe0"],"qualifies_status":["source:300b8f091e11719a21528af0","source:9e49d546c1d6e92bcc69cbe0"],"status_group":["source:300b8f091e11719a21528af0","source:9e49d546c1d6e92bcc69cbe0"],"status_label":["source:300b8f091e11719a21528af0","source:9e49d546c1d6e92bcc69cbe0"],"scope":["source:300b8f091e11719a21528af0","source:9e49d546c1d6e92bcc69cbe0"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261023-c49-aws-lake-anna-technology-campus-louisa-va:0","subject_id":"site:aws-lake-anna-technology-campus-louisa-va","event_type":"announced","occurred_on":"2026-06-18","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation.","display_category":"recorded_event","display_date":"2026-06-18","sources":[{"url":"https://www.louisacounty.gov/Blog.aspx?IID=59","publisher":"Louisa County","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:9e49d546c1d6e92bcc69cbe0"],"event_type":["source:9e49d546c1d6e92bcc69cbe0"],"occurred_on":["source:9e49d546c1d6e92bcc69cbe0"],"observed_on":["source:9e49d546c1d6e92bcc69cbe0"],"qualifies_status":["source:9e49d546c1d6e92bcc69cbe0"],"status_group":["source:9e49d546c1d6e92bcc69cbe0"],"status_label":["source:9e49d546c1d6e92bcc69cbe0"],"scope":["source:9e49d546c1d6e92bcc69cbe0"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-78.02852,37.939,-77.91292,38.0333],"hub":[-77.97072,37.986149999999995],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-75.3977,38.0135],[-75.2443,38.0299],[-75.3758,37.8601],[-75.5127,37.7999],[-75.5948,37.5699],[-75.803,37.1974],[-75.9727,37.1208],[-76.0275,37.2577],[-75.9399,37.5644],[-75.6715,37.9532],[-75.3977,38.0135]],[[-76.0166,37.9532],[-75.9946,37.9532],[-76.0439,37.9532],[-76.0166,37.9532]],[[-78.3497,39.4649],[-77.8294,39.1308],[-77.7199,39.3225],[-77.5665,39.3061],[-77.457,39.2239],[-77.457,39.076],[-77.2489,39.0267],[-77.1174,38.9336],[-77.0407,38.7912],[-77.1284,38.6324],[-77.2489,38.5886],[-77.3255,38.4462],[-77.2817,38.3421],[-77.0134,38.375],[-76.9641,38.2161],[-76.6135,38.1504],[-76.515,38.0245],[-76.2356,37.8875],[-76.3616,37.6082],[-76.2466,37.3891],[-76.3835,37.2851],[-76.3999,37.1591],[-76.274,37.0824],[-76.4109,36.9619],[-76.619,37.1208],[-76.6683,37.066],[-76.4876,36.951],[-75.9946,36.9236],[-75.8687,36.5512],[-79.5108,36.5402],[-80.294,36.5457],[-80.9787,36.5621],[-81.6797,36.5895],[-83.6733,36.6004],[-83.1366,36.7428],[-83.0709,36.8524],[-82.8792,36.8907],[-82.8682,36.9784],[-82.7203,37.0441],[-82.7203,37.1208],[-82.3534,37.2686],[-81.97,37.537],[-81.9864,37.4548],[-81.8495,37.2851],[-81.6797,37.2029],[-81.5537,37.2084],[-81.362,37.3398],[-81.2251,37.2358],[-80.9677,37.2905],[-80.5131,37.4822],[-80.4748,37.422],[-80.2995,37.5096],[-80.294,37.6904],[-80.1845,37.8492],[-79.9983,37.9971],[-79.9216,38.1778],[-79.7244,38.364],[-79.6478,38.5941],[-79.478,38.4571],[-79.3137,38.4133],[-79.2096,38.4955],[-78.996,38.8515],[-78.87,38.7638],[-78.4045,39.1691],[-78.3497,39.4649]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-75.3977,38.0135],[-75.2443,38.0299],[-75.3758,37.8601],[-75.5127,37.7999],[-75.5948,37.5699],[-75.803,37.1974],[-75.9727,37.1208],[-76.0275,37.2577],[-75.9399,37.5644],[-75.6715,37.9532],[-75.3977,38.0135]],[[-76.0166,37.9532],[-75.9946,37.9532],[-76.0439,37.9532],[-76.0166,37.9532]],[[-78.3497,39.4649],[-77.8294,39.1308],[-77.7199,39.3225],[-77.5665,39.3061],[-77.457,39.2239],[-77.457,39.076],[-77.2489,39.0267],[-77.1174,38.9336],[-77.0407,38.7912],[-77.1284,38.6324],[-77.2489,38.5886],[-77.3255,38.4462],[-77.2817,38.3421],[-77.0134,38.375],[-76.9641,38.2161],[-76.6135,38.1504],[-76.515,38.0245],[-76.2356,37.8875],[-76.3616,37.6082],[-76.2466,37.3891],[-76.3835,37.2851],[-76.3999,37.1591],[-76.274,37.0824],[-76.4109,36.9619],[-76.619,37.1208],[-76.6683,37.066],[-76.4876,36.951],[-75.9946,36.9236],[-75.8687,36.5512],[-79.5108,36.5402],[-80.294,36.5457],[-80.9787,36.5621],[-81.6797,36.5895],[-83.6733,36.6004],[-83.1366,36.7428],[-83.0709,36.8524],[-82.8792,36.8907],[-82.8682,36.9784],[-82.7203,37.0441],[-82.7203,37.1208],[-82.3534,37.2686],[-81.97,37.537],[-81.9864,37.4548],[-81.8495,37.2851],[-81.6797,37.2029],[-81.5537,37.2084],[-81.362,37.3398],[-81.2251,37.2358],[-80.9677,37.2905],[-80.5131,37.4822],[-80.4748,37.422],[-80.2995,37.5096],[-80.294,37.6904],[-80.1845,37.8492],[-79.9983,37.9971],[-79.9216,38.1778],[-79.7244,38.364],[-79.6478,38.5941],[-79.478,38.4571],[-79.3137,38.4133],[-79.2096,38.4955],[-78.996,38.8515],[-78.87,38.7638],[-78.4045,39.1691],[-78.3497,39.4649]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
