{"state":"wa","name":"Moses Lake, Washington","updated":"2026-10-24","checked":"2026-10-15","bounds":[-119.53582,47.10141,-119.30094,47.37207],"stats":{"reviewed_records":3,"status_confirmed":1,"status_unknown":2,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"bitfarms-moses-lake-wa","state":"wa","kind":"facility","name":"Moses Lake Facility","group":"proposed","status":"Project listed development","raw_status":"proposed","status_field":"current_status","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grant"],"city":"Moses Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-08-10","Keel published its second quarter update August 10, 2026, reporting the named Moses Lake mining shutdown during April and prospective HPC conversion work. This is the publication day, not an invented exact shutdown date or HPC opening."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results","host":"ir.keelinfra.com","published":"2026-08-10","date":"2026-08-10","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":47.20559,"lng":-119.45182,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Campus-level issuer context, not proof every imported plant/building ID is independently energized.","fields":{"announcement_date":"2026-05-11","quarter_ended":"2026-03-31","company_claim":"Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.","redomiciliation_parent_transaction_date":"2026-04-01"},"notes":["Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","date":"2026-05-11","published":"2026-05-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 35","scope":"The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged.","fields":{"current_stage_evidence":{"outcome":"named_moses_lake_hpc_conversion_separate_from_stopped_legacy_mining","scope":"The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged."}},"notes":["The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged.","The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."],"sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results","host":"ir.keelinfra.com","published":"2026-08-10","date":"2026-08-10","checked":"2026-10-23","label":"Reviewed operator source"},{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","host":"ir.keelinfra.com","published":"2026-05-11","date":"2026-05-11","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Moses Lake · Grant · Source context reviewed","status_scope":"The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged.","event_evidence":[{"date":"2026-08-10","text":"Keel published its second quarter update August 10, 2026, reporting the named Moses Lake mining shutdown during April and prospective HPC conversion work. This is the publication day, not an invented exact shutdown date or HPC opening.","kind":"announced","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results","host":"ir.keelinfra.com","published":"2026-08-10","date":"2026-08-10","checked":"2026-10-23","label":"Reviewed operator source"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"53025"}},{"id":"salcido-wheeler-moses-lake-wa","state":"wa","kind":"facility","name":"Salcido Wheeler Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grant"],"city":"Moses Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Salcido nine named Washington site chronologies. NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.14141,"lng":-119.35094,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Salcido nine named Washington site chronologies","fields":{"operator":"Salcido Enterprises","named_sites":[{"name":"Wheeler","county":"Grant, Washington","power_mw":4.8,"completion_month":"2024-12"},{"name":"Broadway","county":"Grant, Washington","expanded_power_mw":2,"expansion_month":"2023-09"},{"name":"Cashmere","locality":"Cashmere, Washington","completion_year":2014},{"name":"Columbia","locality":"Wenatchee, Washington","conversion":"cold-storage warehouse"},{"name":"Eller","county":"Douglas, Washington","power_mw":4,"renovation_completion_month":"2018-09"},{"name":"Entiat","county":"Chelan, Washington","power_mw":2,"deployment_month":"2023-07"},{"name":"Fortress","county":"Grant, Washington","power_mw":4.6,"deployment_month":"2023-03"},{"name":"Horizon","power_mw":4,"online_quarter":"2019-Q1"},{"name":"Pangborn","county":"Douglas, Washington","power_mw":10,"buildings":4,"completion_month":"2018-05"}],"power_basis":"operator high-density electrical/data-space or mining/AI service capacity, not explicit critical IT"},"notes":["NamedsitehistorynotindependentcurrentoccupancyorAItenantverification. Pangbornfourbuildingsnotfouradditionalcampuses. Cashmere/ColumbiagenericmultimegawattnotinventednumericMW. Tier0operatorlabelnotUptimeInstituteTiercertification. Wenatchee615NorthWenatcheefootercontactnotallninefacilityaddresses. No exactparcelpointsnewlycertified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.salcidoenterprises.tech/data-centers","host":"salcidoenterprises.tech","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Moses Lake · Grant · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"53025"}},{"id":"serverfarm-titan-moses-lake-wa","state":"wa","kind":"facility","name":"TiTAN (Serverfarm Moses Lake)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Grant"],"city":"Moses Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Serverfarm TiTAN area, utility-unit and tariff-copy conflicts. 34MVAapparentpowernotautomatically34MWactive;tableandnarrativeunitsdiffer.22MWITseparate.163000/250000buildingareasand136000narrativerepresentunresolvedphase/scope;donotsumcurrentarea. Published0.026perKWpricehasenergyuniterror,donotrewriteperKWhorshowcurrentrate. Hydroelectric/embodiedcarbonmodeledclaimnotindependentmeasuredcert. SeattlemarketcopydoesnotrelocateMosesLakesite. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.serverfarmllc.com/moses-lake-data-center/","host":"serverfarmllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.33207,"lng":-119.48582,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Serverfarm TiTAN area, utility-unit and tariff-copy conflicts","fields":{"operator":"Serverfarm","site_name":"TiTAN","locality":"Moses Lake, Washington","critical_it_mw":22,"utility_capacity_table_mva":34,"narrative_utility_power_mw":34,"published_building1_sqft":163000,"published_building2_sqft":250000,"narrative_facility_sqft":136000,"narrative_site_acres":10,"canonical_current_area_sqft":null},"notes":["34MVAapparentpowernotautomatically34MWactive;tableandnarrativeunitsdiffer.22MWITseparate.163000/250000buildingareasand136000narrativerepresentunresolvedphase/scope;donotsumcurrentarea. Published0.026perKWpricehasenergyuniterror,donotrewriteperKWhorshowcurrentrate. Hydroelectric/embodiedcarbonmodeledclaimnotindependentmeasuredcert. SeattlemarketcopydoesnotrelocateMosesLakesite.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.serverfarmllc.com/moses-lake-data-center/","host":"serverfarmllc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Moses Lake · Grant · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"53025"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"bitfarms-moses-lake-wa":{"fips":["53025"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"salcido-wheeler-moses-lake-wa":{"fips":["53025"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"serverfarm-titan-moses-lake-wa":{"fips":["53025"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Grant County","base_name":"Grant","fips":"53025","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[{"id":"local-rule:county-review:20261017:53025","jurisdiction":{"state":"WA","county_fips":"53025","municipality":null},"rule_type":"county_research_review","status":"none_found_in_checked_sources","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Grant County","adopted_on":null,"conditions":["The retained zoning-district and performance/use-specific chapters carry December 2024 amendment footers. A normalized text search found none of the checked data-center, data-processing, telecommunications-hotel or server-farm terms.","This is a bounded search of two posted chapters, not proof that general categories do not apply or that no later amendment exists. Quincy, Moses Lake and other municipal codes are separate and were not comprehensively reviewed."],"scope":"Bounded source review, not an enacted legal instrument. County association does not establish the governing parcel jurisdiction. This review has no legal effective or expiry date; dates of underlying actions are described separately.","label":"None found in checked sources","checked_on":"2026-10-17","sources":[{"url":"https://www.grantcountywa.gov/DocumentCenter/View/596/Chapter-2304-Zoning-Districts-PDF","publisher":"Grant County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"861122f24783d1413ed0dcd03ba1b64537e3965d152de7b068035dc664cc1546","capture_format":"raw_response_bytes"},{"url":"https://www.grantcountywa.gov/DocumentCenter/View/595/Chapter-2308-Performance-and-Use-Specific-Standards-PDF","publisher":"Grant County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"ce5955b1055e295e95f25fb7c57756802bdd1766fe2dd5529443175c5c31a608","capture_format":"raw_response_bytes"}]}],"stage_timelines":{"bitfarms-moses-lake-wa":{"stages":[{"id":"event:milestone:research-20261023-c35-bitfarms-moses-lake-wa:0","date":"2026-08-10","stage":"announced","scheduled":false,"basis":"primary source","scope":"Keel published its second quarter update August 10, 2026, reporting the named Moses Lake mining shutdown during April and prospective HPC conversion work. This is the publication day, not an invented exact shutdown date or HPC opening.","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results","publisher":"Keel Infrastructure"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":39,"retained_reviewed_reference":11,"no_site_point":1,"county_display":40},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"wa","name":"Moses Lake","state_name":"Washington","state_path":"/washington/","slug":"moses-lake","path":"/city/washington/moses-lake/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:status:research-20261023-c35-bitfarms-moses-lake-wa","subject_id":"site:bitfarms-moses-lake-wa","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-23","qualifies_status":true,"status_group":"proposed","status_label":"Project listed development","scope":"The August 10, 2026 company update expressly reports shutdown of Moses Lake cryptocurrency mining during April 2026 and describes prospective HPC development and delivered modules at the named site. Project listed development applies to the proposed HPC conversion. Module delivery, permitting progress, commercial negotiation and a future service year do not establish completed HPC construction or operation. The historic mining phase is not described as continuing, and the whole property is not declared permanently closed. The source provides a month for mining shutdown, so no exact cessation day is invented. Existing identity, crypto flag and roles remain unchanged.","display_category":"source_check","display_date":"2026-10-23","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results","publisher":"Keel Infrastructure","source_type":"company_page","retrieved_on":"2026-10-23"},{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results","publisher":"Keel Infrastructure","source_type":"company_page","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:77610ab5e497c8176c189922","source:eb3de0e5a79b76347dbd1ca4"],"event_type":["source:77610ab5e497c8176c189922","source:eb3de0e5a79b76347dbd1ca4"],"occurred_on":["source:77610ab5e497c8176c189922","source:eb3de0e5a79b76347dbd1ca4"],"observed_on":["source:77610ab5e497c8176c189922","source:eb3de0e5a79b76347dbd1ca4"],"qualifies_status":["source:77610ab5e497c8176c189922","source:eb3de0e5a79b76347dbd1ca4"],"status_group":["source:77610ab5e497c8176c189922","source:eb3de0e5a79b76347dbd1ca4"],"status_label":["source:77610ab5e497c8176c189922","source:eb3de0e5a79b76347dbd1ca4"],"scope":["source:77610ab5e497c8176c189922","source:eb3de0e5a79b76347dbd1ca4"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261023-c35-bitfarms-moses-lake-wa:0","subject_id":"site:bitfarms-moses-lake-wa","event_type":"announced","occurred_on":"2026-08-10","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"Keel published its second quarter update August 10, 2026, reporting the named Moses Lake mining shutdown during April and prospective HPC conversion work. This is the publication day, not an invented exact shutdown date or HPC opening.","display_category":"recorded_event","display_date":"2026-08-10","sources":[{"url":"https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results","publisher":"Keel Infrastructure","source_type":"company_page","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:77610ab5e497c8176c189922"],"event_type":["source:77610ab5e497c8176c189922"],"occurred_on":["source:77610ab5e497c8176c189922"],"observed_on":["source:77610ab5e497c8176c189922"],"qualifies_status":["source:77610ab5e497c8176c189922"],"status_group":["source:77610ab5e497c8176c189922"],"status_label":["source:77610ab5e497c8176c189922"],"scope":["source:77610ab5e497c8176c189922"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-119.53582,47.10141,-119.30094,47.37207],"hub":[-119.41838,47.23674],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-117.0334,49.0002],[-117.0443,47.7625],[-117.0388,46.4261],[-117.0553,46.3439],[-116.9238,46.1687],[-116.9183,45.9934],[-118.9886,45.9989],[-119.1256,45.9332],[-119.5254,45.9112],[-119.9635,45.8236],[-120.21,45.725],[-120.5057,45.6976],[-120.6372,45.7469],[-121.1849,45.6045],[-121.2177,45.6703],[-121.5354,45.725],[-121.8093,45.7086],[-122.2474,45.5498],[-122.7622,45.6593],[-122.8115,45.9605],[-122.9046,46.081],[-123.1182,46.1851],[-123.2113,46.1741],[-123.3702,46.1468],[-123.5454,46.2618],[-123.7262,46.3001],[-123.8741,46.2399],[-124.0658,46.3275],[-124.0274,46.4644],[-123.896,46.5356],[-124.0986,46.7437],[-124.2355,47.286],[-124.3177,47.3572],[-124.4272,47.7405],[-124.6244,47.8884],[-124.7066,48.1842],[-124.597,48.3813],[-124.3944,48.2882],[-123.9836,48.1623],[-123.7043,48.1677],[-123.4249,48.1185],[-123.1621,48.1677],[-123.0361,48.0801],[-122.8006,48.0856],[-122.6363,47.8665],[-122.5158,47.8829],[-122.4939,47.5872],[-122.4227,47.3188],[-122.3241,47.3462],[-122.4227,47.5762],[-122.3953,47.8008],[-122.231,48.0308],[-122.3624,48.1239],[-122.3734,48.2882],[-122.472,48.469],[-122.4227,48.6004],[-122.4884,48.7538],[-122.6472,48.7757],[-122.7951,48.8907],[-122.7568,49.0002],[-117.0334,49.0002]],[[-122.7184,48.3101],[-122.587,48.354],[-122.6089,48.1513],[-122.7677,48.228],[-122.7184,48.3101]],[[-123.0251,48.584],[-122.9156,48.7154],[-122.7677,48.5566],[-122.8115,48.4197],[-123.0416,48.458],[-123.0251,48.584]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-117.0334,49.0002],[-117.0443,47.7625],[-117.0388,46.4261],[-117.0553,46.3439],[-116.9238,46.1687],[-116.9183,45.9934],[-118.9886,45.9989],[-119.1256,45.9332],[-119.5254,45.9112],[-119.9635,45.8236],[-120.21,45.725],[-120.5057,45.6976],[-120.6372,45.7469],[-121.1849,45.6045],[-121.2177,45.6703],[-121.5354,45.725],[-121.8093,45.7086],[-122.2474,45.5498],[-122.7622,45.6593],[-122.8115,45.9605],[-122.9046,46.081],[-123.1182,46.1851],[-123.2113,46.1741],[-123.3702,46.1468],[-123.5454,46.2618],[-123.7262,46.3001],[-123.8741,46.2399],[-124.0658,46.3275],[-124.0274,46.4644],[-123.896,46.5356],[-124.0986,46.7437],[-124.2355,47.286],[-124.3177,47.3572],[-124.4272,47.7405],[-124.6244,47.8884],[-124.7066,48.1842],[-124.597,48.3813],[-124.3944,48.2882],[-123.9836,48.1623],[-123.7043,48.1677],[-123.4249,48.1185],[-123.1621,48.1677],[-123.0361,48.0801],[-122.8006,48.0856],[-122.6363,47.8665],[-122.5158,47.8829],[-122.4939,47.5872],[-122.4227,47.3188],[-122.3241,47.3462],[-122.4227,47.5762],[-122.3953,47.8008],[-122.231,48.0308],[-122.3624,48.1239],[-122.3734,48.2882],[-122.472,48.469],[-122.4227,48.6004],[-122.4884,48.7538],[-122.6472,48.7757],[-122.7951,48.8907],[-122.7568,49.0002],[-117.0334,49.0002]],[[-122.7184,48.3101],[-122.587,48.354],[-122.6089,48.1513],[-122.7677,48.228],[-122.7184,48.3101]],[[-123.0251,48.584],[-122.9156,48.7154],[-122.7677,48.5566],[-122.8115,48.4197],[-123.0416,48.458],[-123.0251,48.584]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
