{"state":"wi","name":"Wisconsin Rapids, Wisconsin","updated":"2026-10-25","checked":"2026-10-15","bounds":[-90.10763,44.415350000000004,-89.9915,44.51013],"stats":{"reviewed_records":2,"status_confirmed":0,"status_unknown":2,"mapped_records":0},"coverage":{"scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","meaning":"Exact subset of compiled source records with the retained city label. No citywide review or physical census is inferred."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"dpo-wisconsin-rapids-hpc-wi","state":"wi","kind":"facility","name":"DPO Wisconsin Rapids AI Computing Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wood"],"city":"Wisconsin Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Hydro utility32MWgeneration not site IT. Leaseup-to50years not ownedland; early2025target superseded by later reporting of developer departure. No current construction inferred. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Exact contract-cancellation day and original termination release not retained. PCH is a separate applicant, not proof DPO moved ahead.","date":"","events":[["2025-01-23","DPO issued its January 23, 2025 Wisconsin Rapids development announcement, describing plans and permits still being finalized before groundbreaking. This dates the original publication rather than construction, forecast energization or current computing operation."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/","host":"biztimes.com","date":"2025-01-24","published":"2025-01-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://wiss.fm/news/2026/06/05/data-center-education-in-wisconsin-rapids","host":"wiss.fm","date":"2026-06-05","published":"2026-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html","host":"www.prnewswire.com","published":"2025-01-23","date":"2025-01-23","checked":"2026-10-23","label":"Reviewed operator source"},{"url":"https://www.digitalpoweroptimization.com/news/dpo-launches-200mm-ai-data-center-in-partnership-with-billerud","host":"www.digitalpoweroptimization.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"loc":{"lat":44.45535,"lng":-90.0415,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"BizTimes reproduces DPO WisconsinRapids20MWplanned AI facility with2026energization target.","independently_verified_current_operating_status":null},"notes":["Hydro utility32MWgeneration not site IT. Leaseup-to50years not ownedland; early2025target superseded by later reporting of developer departure. No current construction inferred.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/","host":"biztimes.com","date":"2025-01-24","published":"2025-01-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Civic Media reports DPO cancelled its private contract in2025 and distinguishes later PCH proposal.","original_2026_opening_forecast_superseded":true},"notes":["Exact contract-cancellation day and original termination release not retained. PCH is a separate applicant, not proof DPO moved ahead.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wiss.fm/news/2026/06/05/data-center-education-in-wisconsin-rapids","host":"wiss.fm","date":"2026-06-05","published":"2026-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 59","scope":"The original January 23, 2025 DPO issuer release names Wisconsin Rapids and describes a development still finalizing construction plans and permits before groundbreaking and vertical construction. Its 2026 energization date is a forecast, and energized existing utility infrastructure is not computing service. The company January 24 news item links that original release rather than supplying a new opening. Private later accounts describe a cancellation, but no current original withdrawal instrument or issuer confirmation was independently read in this pass. The historical proposal is retained as context while present physical stage and final legal disposition remain unknown.","fields":{"current_stage_evidence":{"outcome":"historical_named_proposal_later_original_disposition_held","scope":"The original January 23, 2025 DPO issuer release names Wisconsin Rapids and describes a development still finalizing construction plans and permits before groundbreaking and vertical construction. Its 2026 energization date is a forecast, and energized existing utility infrastructure is not computing service. The company January 24 news item links that original release rather than supplying a new opening. Private later accounts describe a cancellation, but no current original withdrawal instrument or issuer confirmation was independently read in this pass. The historical proposal is retained as context while present physical stage and final legal disposition remain unknown."},"source_read_scope":{"original_issuer_date_source_authorship_and_predevelopment_body_read":true,"january24_company_link_not_first_announcement_day":true,"energized_substation_not_compute":true,"later_private_cancellation_not_original_final_action":true,"no_legal_withdrawal_promoted_to_physical_closure":true,"no_quantity_or_role_export":true}},"notes":["The original January 23, 2025 DPO issuer release names Wisconsin Rapids and describes a development still finalizing construction plans and permits before groundbreaking and vertical construction. Its 2026 energization date is a forecast, and energized existing utility infrastructure is not computing service. The company January 24 news item links that original release rather than supplying a new opening. Private later accounts describe a cancellation, but no current original withdrawal instrument or issuer confirmation was independently read in this pass. The historical proposal is retained as context while present physical stage and final legal disposition remain unknown.","Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."],"sources":[{"url":"https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html","host":"www.prnewswire.com","published":"2025-01-23","date":"2025-01-23","checked":"2026-10-23","label":"Reviewed operator source"},{"url":"https://www.digitalpoweroptimization.com/news/dpo-launches-200mm-ai-data-center-in-partnership-with-billerud","host":"www.digitalpoweroptimization.com","published":"","date":"","checked":"2026-10-23","label":"Reviewed operator source"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Wisconsin Rapids · Wood · Source context reviewed","event_evidence":[{"date":"2025-01-23","text":"DPO issued its January 23, 2025 Wisconsin Rapids development announcement, describing plans and permits still being finalized before groundbreaking. This dates the original publication rather than construction, forecast energization or current computing operation.","kind":"announced","sources":[{"url":"https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html","host":"www.prnewswire.com","published":"2025-01-23","date":"2025-01-23","checked":"2026-10-23","label":"Reviewed operator source"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"55141"}},{"id":"pch-wi-holdings-wisconsin-rapids-wood-county-wi","state":"wi","kind":"facility","name":"Wisconsin Rapids Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wood"],"city":"Wisconsin Rapids","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City timeline says October5 council adopted recommendations including12-month development moratorium; signed ordinance/effective scope/exemptions not yet retained. City process says commission recommendation proceeds to council; do not report September16 as final countywide ban or assume October20 outcome. City says it has no legal/financial partnership or NDA with developer. Private land marketing and municipal processing are separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-09-16","The City reports that the Planning Commission held the September 16, 2026 hearing on the DC Rapids application and denied it. The same City process description separates that body recommendation from Council action. The exact later Council outcome is not established by this review."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wirapids.gov/612/Papermill-Redevelopment","host":"wirapids.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.wirapids.gov/DocumentCenter/View/2706/MC-1415-Ordinance-Amendment---Data-Centers-PDF","host":"www.wirapids.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.wirapids.gov/DocumentCenter/View/3124/2026-10-05-Special-Common-Council-Agenda-Packet?bidId=","host":"www.wirapids.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"loc":{"lat":44.47013,"lng":-90.05763,"precision":"county","basis":"Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Field or source context only","fields":{"reported_context":"City timeline names PCH WI Holdings, PNK and DC Rapids LLC as names used for applicant submissions; September16 Planning Commission denied application, with possible Common Council action October20 still ahead.","application_date_reported_by_city":"2026-04-27","planning_commission_denial_date_reported_by_city":"2026-09-16","moratorium_approval_date_reported_by_city":"2026-10-05","common_council_possible_action_date":"2026-10-20","final_cup_outcome_verified":false},"notes":["City timeline says October5 council adopted recommendations including12-month development moratorium; signed ordinance/effective scope/exemptions not yet retained.","City process says commission recommendation proceeds to council; do not report September16 as final countywide ban or assume October20 outcome.","City says it has no legal/financial partnership or NDA with developer. Private land marketing and municipal processing are separate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wirapids.gov/612/Papermill-Redevelopment","host":"wirapids.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Codex 3 research cohort 25","scope":"The City current papermill page explicitly groups PCH WI Holdings, PNK and DC Rapids submissions for its data center application at 950 Fourth Avenue North. It reports the Planning Commission denied the application at the September 16, 2026 hearing but separately describes that body making a recommendation before Council action. The same page still says Council may act October 20. The later final Council outcome was not captured, so no final denial, approval or physical stage is adopted. Existing paper converting and power activities on the redevelopment site are not data center operation. The City reports October 5 moratorium adoption, but the reviewed agenda packet contains unsigned proposed text with blanks and expressly excludes conditional use applications and earlier submissions. Its draft is not certified as the final ordinance or used to call this application paused. The signed earlier data center amendment was adopted April 14, approved April 21 and published April 24, 2026, with effectiveness conditioned on passage and publication. Its bounded standards are City requirements, not verified individual compliance, all of Wood County law or a complete current code audit.","fields":{"current_stage_evidence":{"outcome":"planning_commission_denial_report_not_final_council_disposition","scope":"The City current papermill page explicitly groups PCH WI Holdings, PNK and DC Rapids submissions for its data center application at 950 Fourth Avenue North. It reports the Planning Commission denied the application at the September 16, 2026 hearing but separately describes that body making a recommendation before Council action. The same page still says Council may act October 20. The later final Council outcome was not captured, so no final denial, approval or physical stage is adopted. Existing paper converting and power activities on the redevelopment site are not data center operation. The City reports October 5 moratorium adoption, but the reviewed agenda packet contains unsigned proposed text with blanks and expressly excludes conditional use applications and earlier submissions. Its draft is not certified as the final ordinance or used to call this application paused. The signed earlier data center amendment was adopted April 14, approved April 21 and published April 24, 2026, with effectiveness conditioned on passage and publication. Its bounded standards are City requirements, not verified individual compliance, all of Wood County law or a complete current code audit."},"local_instrument_scope":{"april_instrument_all_three_signed_pages_visually_read":true,"adopted_on":"2026-04-14","approved_on":"2026-04-21","published_on":"2026-04-24","effectiveness_requires_passage_and_publication":true,"principal_building_residential_separation_feet":400,"liquid_cooling_closed_or_recycled_water_required":true,"generator_testing_weekdays_10_to_16":true,"continuous_generator_use_except_power_outage_prohibited":true,"noise_study_and_utility_verification_requirements_not_compliance_finding":true,"october_packet_pdf_pages_visually_read":[37,40,42],"october_packet_unsigned_blank_instrument_not_final":true,"draft_excludes_conditional_use_and_prior_submissions":true,"final_october20_council_outcome_unknown":true}},"notes":["The City current papermill page explicitly groups PCH WI Holdings, PNK and DC Rapids submissions for its data center application at 950 Fourth Avenue North. It reports the Planning Commission denied the application at the September 16, 2026 hearing but separately describes that body making a recommendation before Council action. The same page still says Council may act October 20. The later final Council outcome was not captured, so no final denial, approval or physical stage is adopted. Existing paper converting and power activities on the redevelopment site are not data center operation. The City reports October 5 moratorium adoption, but the reviewed agenda packet contains unsigned proposed text with blanks and expressly excludes conditional use applications and earlier submissions. Its draft is not certified as the final ordinance or used to call this application paused. The signed earlier data center amendment was adopted April 14, approved April 21 and published April 24, 2026, with effectiveness conditioned on passage and publication. Its bounded standards are City requirements, not verified individual compliance, all of Wood County law or a complete current code audit.","The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."],"sources":[{"url":"https://www.wirapids.gov/612/Papermill-Redevelopment","host":"www.wirapids.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.wirapids.gov/DocumentCenter/View/2706/MC-1415-Ordinance-Amendment---Data-Centers-PDF","host":"www.wirapids.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"},{"url":"https://www.wirapids.gov/DocumentCenter/View/3124/2026-10-05-Special-Common-Council-Agenda-Packet?bidId=","host":"www.wirapids.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}],"checked":"2026-10-23","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Exact site not published; shown at county level","summary":"Wisconsin Rapids · Wood · Source context reviewed","event_evidence":[{"date":"2026-09-16","text":"The City reports that the Planning Commission held the September 16, 2026 hearing on the DC Rapids application and denied it. The same City process description separates that body recommendation from Council action. The exact later Council outcome is not established by this review.","kind":"hearing","sources":[{"url":"https://www.wirapids.gov/612/Papermill-Redevelopment","host":"www.wirapids.gov","published":"","date":"","checked":"2026-10-23","label":"Reviewed government record"}]}],"location_display":{"policy":"reviewed-map-references-2026-10-23","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.","county_display":"55141"}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"dpo-wisconsin-rapids-hpc-wi":{"fips":["55141"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"pch-wi-holdings-wisconsin-rapids-wood-county-wi":{"fips":["55141"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Wood County","base_name":"Wood","fips":"55141","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{"dpo-wisconsin-rapids-hpc-wi":{"stages":[{"id":"event:milestone:research-20261023-c59-dpo-wisconsin-rapids-hpc-wi:0","date":"2025-01-23","stage":"announced","scheduled":false,"basis":"primary source","scope":"DPO issued its January 23, 2025 Wisconsin Rapids development announcement, describing plans and permits still being finalized before groundbreaking. This dates the original publication rather than construction, forecast energization or current computing operation.","sources":[{"url":"https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html","publisher":"Digital Power Optimization Inc. original issuer release via PR Newswire"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"},"pch-wi-holdings-wisconsin-rapids-wood-county-wi":{"stages":[{"id":"event:milestone:research-20261023-c25-pch-wi-holdings-wisconsin-rapids-wood-county-wi:0","date":"2026-09-16","stage":"hearing","scheduled":false,"basis":"primary source","scope":"The City reports that the Planning Commission held the September 16, 2026 hearing on the DC Rapids application and denied it. The same City process description separates that body recommendation from Council action. The exact later Council outcome is not established by this review.","sources":[{"url":"https://www.wirapids.gov/612/Papermill-Redevelopment","publisher":"City of Wisconsin Rapids"}]}],"scheduled_dates":[],"next_scheduled":null,"as_of":"2026-10-24"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-23","counts":{"withheld_unreviewed_point":30,"retained_reviewed_reference":3,"no_site_point":1,"county_display":31},"scope":"Reviewed location references are mapped as site dots. Records without a reviewed point are shown at county level only, never as a site. Admission does not certify a parcel, property ownership or current operating status."},"city":{"state":"wi","name":"Wisconsin Rapids","state_name":"Wisconsin","state_path":"/wisconsin/","slug":"wisconsin-rapids","path":"/city/wisconsin/wisconsin-rapids/"},"city_scope":"Records retain this city or place label in the Atlas sources. The map keeps each record's own location limits. A shared city label does not establish a municipal boundary, parcel jurisdiction or a complete list of operating buildings.","page_created_on":"2026-10-23","city_timeline":[{"id":"event:milestone:research-20261023-c25-pch-wi-holdings-wisconsin-rapids-wood-county-wi:0","subject_id":"site:pch-wi-holdings-wisconsin-rapids-wood-county-wi","event_type":"hearing","occurred_on":"2026-09-16","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"The City reports that the Planning Commission held the September 16, 2026 hearing on the DC Rapids application and denied it. The same City process description separates that body recommendation from Council action. The exact later Council outcome is not established by this review.","display_category":"recorded_event","display_date":"2026-09-16","sources":[{"url":"https://www.wirapids.gov/612/Papermill-Redevelopment","publisher":"City of Wisconsin Rapids","source_type":"government_record","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:6db55f1269533f33f9ad9e04"],"event_type":["source:6db55f1269533f33f9ad9e04"],"occurred_on":["source:6db55f1269533f33f9ad9e04"],"observed_on":["source:6db55f1269533f33f9ad9e04"],"qualifies_status":["source:6db55f1269533f33f9ad9e04"],"status_group":["source:6db55f1269533f33f9ad9e04"],"status_label":["source:6db55f1269533f33f9ad9e04"],"scope":["source:6db55f1269533f33f9ad9e04"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:research-20261023-c59-dpo-wisconsin-rapids-hpc-wi:0","subject_id":"site:dpo-wisconsin-rapids-hpc-wi","event_type":"announced","occurred_on":"2025-01-23","observed_on":"2026-10-23","qualifies_status":false,"status_group":null,"status_label":null,"scope":"DPO issued its January 23, 2025 Wisconsin Rapids development announcement, describing plans and permits still being finalized before groundbreaking. This dates the original publication rather than construction, forecast energization or current computing operation.","display_category":"recorded_event","display_date":"2025-01-23","sources":[{"url":"https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html","publisher":"Digital Power Optimization Inc. original issuer release via PR Newswire","source_type":"company_page","retrieved_on":"2026-10-23"}],"field_sources":{"subject_id":["source:e9e04058171b7524a382c3a3"],"event_type":["source:e9e04058171b7524a382c3a3"],"occurred_on":["source:e9e04058171b7524a382c3a3"],"observed_on":["source:e9e04058171b7524a382c3a3"],"qualifies_status":["source:e9e04058171b7524a382c3a3"],"status_group":["source:e9e04058171b7524a382c3a3"],"status_label":["source:e9e04058171b7524a382c3a3"],"scope":["source:e9e04058171b7524a382c3a3"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}],"city_companies":[],"map_settings":{"bounds":[-90.10763,44.415350000000004,-89.9915,44.51013],"hub":[-90.049565,44.46274],"hub_basis":"Illustrative view midpoint. Lines do not depict actual power or fiber connections.","bounds_basis":"Display extent of the retained references, including county level context. Not a municipal boundary."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-90.4154,46.5685],[-90.2292,46.5082],[-90.1197,46.3384],[-89.09,46.1358],[-88.6628,45.9879],[-88.5314,46.0208],[-88.1042,45.9222],[-87.9891,45.7962],[-87.781,45.6757],[-87.792,45.5005],[-87.8851,45.3636],[-87.6496,45.3416],[-87.7427,45.1992],[-87.5893,45.0952],[-87.6277,44.9747],[-87.8194,44.9528],[-87.9837,44.7227],[-88.0439,44.5639],[-87.9289,44.5365],[-87.7755,44.6406],[-87.6112,44.8378],[-87.4031,44.9144],[-87.2388,45.1664],[-87.0307,45.2212],[-87.0471,45.0897],[-87.1895,44.9692],[-87.4688,44.553],[-87.5455,44.3229],[-87.54,44.1586],[-87.6441,44.1039],[-87.7372,43.8793],[-87.7043,43.6876],[-87.792,43.5616],[-87.9125,43.2495],[-87.8851,43.003],[-87.7646,42.7839],[-87.8029,42.4936],[-88.7888,42.4936],[-90.64,42.5101],[-90.7112,42.636],[-91.0672,42.751],[-91.1439,42.9099],[-91.1767,43.1344],[-91.0562,43.2549],[-91.2041,43.3535],[-91.2151,43.5014],[-91.2698,43.6164],[-91.2424,43.7752],[-91.4341,43.9943],[-91.593,44.0327],[-91.8778,44.2024],[-91.9271,44.3339],[-92.2338,44.4434],[-92.3378,44.553],[-92.546,44.5694],[-92.8089,44.7501],[-92.7377,45.1171],[-92.7596,45.2869],[-92.6445,45.4402],[-92.7705,45.5662],[-92.8855,45.5772],[-92.8691,45.7196],[-92.6391,45.9332],[-92.3543,46.0153],[-92.294,46.0756],[-92.294,46.6671],[-92.0914,46.7492],[-92.0147,46.7054],[-91.7901,46.6944],[-91.0946,46.8642],[-90.8372,46.9573],[-90.7495,46.8861],[-90.8864,46.7547],[-90.5578,46.5849],[-90.4154,46.5685]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-90.4154,46.5685],[-90.2292,46.5082],[-90.1197,46.3384],[-89.09,46.1358],[-88.6628,45.9879],[-88.5314,46.0208],[-88.1042,45.9222],[-87.9891,45.7962],[-87.781,45.6757],[-87.792,45.5005],[-87.8851,45.3636],[-87.6496,45.3416],[-87.7427,45.1992],[-87.5893,45.0952],[-87.6277,44.9747],[-87.8194,44.9528],[-87.9837,44.7227],[-88.0439,44.5639],[-87.9289,44.5365],[-87.7755,44.6406],[-87.6112,44.8378],[-87.4031,44.9144],[-87.2388,45.1664],[-87.0307,45.2212],[-87.0471,45.0897],[-87.1895,44.9692],[-87.4688,44.553],[-87.5455,44.3229],[-87.54,44.1586],[-87.6441,44.1039],[-87.7372,43.8793],[-87.7043,43.6876],[-87.792,43.5616],[-87.9125,43.2495],[-87.8851,43.003],[-87.7646,42.7839],[-87.8029,42.4936],[-88.7888,42.4936],[-90.64,42.5101],[-90.7112,42.636],[-91.0672,42.751],[-91.1439,42.9099],[-91.1767,43.1344],[-91.0562,43.2549],[-91.2041,43.3535],[-91.2151,43.5014],[-91.2698,43.6164],[-91.2424,43.7752],[-91.4341,43.9943],[-91.593,44.0327],[-91.8778,44.2024],[-91.9271,44.3339],[-92.2338,44.4434],[-92.3378,44.553],[-92.546,44.5694],[-92.8089,44.7501],[-92.7377,45.1171],[-92.7596,45.2869],[-92.6445,45.4402],[-92.7705,45.5662],[-92.8855,45.5772],[-92.8691,45.7196],[-92.6391,45.9332],[-92.3543,46.0153],[-92.294,46.0756],[-92.294,46.6671],[-92.0914,46.7492],[-92.0147,46.7054],[-91.7901,46.6944],[-91.0946,46.8642],[-90.8372,46.9573],[-90.7495,46.8861],[-90.8864,46.7547],[-90.5578,46.5849],[-90.4154,46.5685]]]}}]},"checked_scope":"Each record and field retains its original source date and review scope. This is a city label subset, not a whole city source review."}
