{"state":"az","name":"Pinal County, Arizona","updated":"2026-10-19","checked":"2026-10-15","bounds":[-112.2036,32.5013,-110.4485,33.466],"stats":{"reviewed_records":7,"status_confirmed":0,"status_unknown":7,"mapped_records":0},"coverage":{"scope":"Counts are Atlas research records associated with this area, not distinct buildings, a complete facility census or verified parcel jurisdictions. Inherited names and mapped points can disagree; each record keeps its source and location limits.","meaning":"Derived subset of published canonical state records; new county source checks do not certify every record or local ordinance."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"zinke-arizona-independent-technology-campus-pinal-az","state":"az","kind":"facility","name":"Arizona Independent Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 956 acresnewland-use amendment plus 561 previouslydesignatedEmploymentacres yields 1517 plannedrezoningarea, which includes manufacturing/warehousing/energy and is NOT all DCfootprint. Land-use amendment still needed approval before rezoning; no DCbuilding authorization, ESA or current operation. CityofMaricopageneralplaninterest does not place site in city jurisdiction. Supervisor’s reference to earlier 500 acres does not by itself crosswalk this concept to another W-Holdings record; parcel/project identities require originalcase comparison before counting distinct campuses. NoMW/capex/waterquantity/RFSverified. Automated comment extraction corrected from retained public main body. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/data-center-south-of-maricopa-tech-campus-2026-september-worksession/","host":"pinalpost.com","date":"2026-09-05","published":"2026-09-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"PinalPost reports Zinke’sPZ-PA-015-26 conceptual ArizonaIndependentTechnologyCampus request was discussed atAugust 20 andSeptember 2 work sessions, with NO VOTE at either.","independently_verified_current_operating_status":null,"reported_work_sessions":["2026-08-20","2026-09-02"],"source_says_no_vote_at_either":true,"amendment_acres":956,"previous_employment_designation_acres":561,"combined_potential_rezoning_acres":1517,"all_1517_acres_are_dc_footprint":false},"notes":["956 acresnewland-use amendment plus 561 previouslydesignatedEmploymentacres yields 1517 plannedrezoningarea, which includes manufacturing/warehousing/energy and is NOT all DCfootprint. Land-use amendment still needed approval before rezoning; no DCbuilding authorization, ESA or current operation. CityofMaricopageneralplaninterest does not place site in city jurisdiction. Supervisor’s reference to earlier 500 acres does not by itself crosswalk this concept to another W-Holdings record; parcel/project identities require originalcase comparison before counting distinct campuses. NoMW/capex/waterquantity/RFSverified. Automated comment extraction corrected from retained public main body.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/data-center-south-of-maricopa-tech-campus-2026-september-worksession/","host":"pinalpost.com","date":"2026-09-05","published":"2026-09-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"edgecore-dobson-farms-east-florence-az","state":"az","kind":"facility","name":"Dobson Farms East","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Pinal Post reports October 7, 2025 Florence land-use amendments for three Dobson Farms areas totaling 1,619 acres.","independently_verified_current_operating_status":null},"notes":["Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Florence · Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"w-holdings-energy-generation-technology-campus-maricopa-az","state":"az","kind":"facility","name":"Energy Generation and Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Maricopa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Land-use amendment is not all DC/gas-plant/storage permits or current operation.10 billion-dollarvalue covers integrated construction/equipment plans, not solely DCcapex or actual spending.1000 regionalpermanentjobs and quoted 500 direct example have different scopes; no single current employment total certified. Campus abuts Ak-Chin community, not proved to occupy tribal land; cultural-resource concerns are attributed and no final mitigation/consultation finding reviewed. Other two county projects approved thatday are separate. No MW or executed utility agreement verified. Article wasNov 24 local/Nov 25 UTC, not theJuly 2026 commentdate. Automated comment-only extraction corrected from retained main body. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://inmaricopa.com/data-center-okd/","host":"inmaricopa.com","date":"2025-11-24","published":"2025-11-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"InMaricopa reports Pinal supervisors unanimously approved a land-use amendment for W Holdings’ proposed 500-acre EnergyGenerationandTechnologyCampus south of Maricopa.","independently_verified_current_operating_status":null},"notes":["Land-use amendment is not all DC/gas-plant/storage permits or current operation.10 billion-dollarvalue covers integrated construction/equipment plans, not solely DCcapex or actual spending.1000 regionalpermanentjobs and quoted 500 direct example have different scopes; no single current employment total certified. Campus abuts Ak-Chin community, not proved to occupy tribal land; cultural-resource concerns are attributed and no final mitigation/consultation finding reviewed. Other two county projects approved thatday are separate. No MW or executed utility agreement verified. Article wasNov 24 local/Nov 25 UTC, not theJuly 2026 commentdate. Automated comment-only extraction corrected from retained main body.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://inmaricopa.com/data-center-okd/","host":"inmaricopa.com","date":"2025-11-24","published":"2025-11-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Maricopa · Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"ryan-companies-florence-tech-park-az","state":"az","kind":"facility","name":"Florence Tech Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Pinal Post reports October 7, 2025 Florence land-use amendments for three Dobson Farms areas totaling 1,619 acres.","independently_verified_current_operating_status":null},"notes":["Ryan's 780-acre park, EdgeCore's 239-acre East parcel and the 600-acre West area are separate. Combined benefits do not apply in full to each. Conceptual power demand is not delivered IT; detailed plans remained pending.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","host":"pinalpost.com","date":"2025-10-09","published":"2025-10-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Florence · Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"vermaland-la-osa-eloy-az","state":"az","kind":"facility","name":"La Osa Data Center Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Eloy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. URL datedAugust 26 but body says updatedSeptember 29; preserve update provenance and distinguish new denial section from older future-hearing paragraph still on page. Reported denial is not independently examined original resolution, appeal judgment or permanent prohibition. Same update says Pima adopted 120 daypauseSeptember 22 andTucsonnewrulesAugust 5; those are different jurisdictions and require original scope/exception review. This later-dated Pima claim differs from round 32 Sept 24 story’s future-meeting wording; exact signed county instrument remains a follow-up, not a calendar-inferred resolution. No La Osa MW/approved water/operation inferred. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sonorandesert.org/2026/08/26/data-centers-update/","host":"sonorandesert.org","date":"2026-09-29","published":"2026-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Coalition for Sonoran Desert Protection’s update explicitly reports Pinal supervisors denied La Osa rezoning onAugust 26,2026, after conservation-group opposition.","independently_verified_current_operating_status":null,"advocacy_reported_rezoning_denial_date":"2026-08-26","original_decision_verified":false},"notes":["URL datedAugust 26 but body says updatedSeptember 29; preserve update provenance and distinguish new denial section from older future-hearing paragraph still on page. Reported denial is not independently examined original resolution, appeal judgment or permanent prohibition. Same update says Pima adopted 120 daypauseSeptember 22 andTucsonnewrulesAugust 5; those are different jurisdictions and require original scope/exception review. This later-dated Pima claim differs from round 32 Sept 24 story’s future-meeting wording; exact signed county instrument remains a follow-up, not a calendar-inferred resolution. No La Osa MW/approved water/operation inferred.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sonorandesert.org/2026/08/26/data-centers-update/","host":"sonorandesert.org","date":"2026-09-29","published":"2026-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Eloy · Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"lpi-group-project-midway-casa-grande-az","state":"az","kind":"facility","name":"Project Midway Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Casa Grande","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Postponement is not approval. The 500 MW modeled primary and 400 MW backup generation are not additive IT; 298 MVA cannot be converted to MW without power factor. Proposed stipulations are not adopted conditions. Average 14,500 and maximum 35,200 gallons per day are alternatives, not additive use; an older 11,507 figure was superseded. Modeled noise is not operating measurement. Future water line, fire support and generation arrangements are not executed commitments. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pinalpost.com/data-center-hearing-project-midway-rezoning-set-for-july-16/","host":"pinalpost.com","date":"2026-07-15","published":"2026-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Pinal Post's July 20 update says both Project Midway planning cases scheduled for July 16 were postponed. The underlying concept covers five planned buildings and about 400 MW demand, with power technology still undecided.","independently_verified_current_operating_status":null},"notes":["Postponement is not approval. The 500 MW modeled primary and 400 MW backup generation are not additive IT; 298 MVA cannot be converted to MW without power factor. Proposed stipulations are not adopted conditions. Average 14,500 and maximum 35,200 gallons per day are alternatives, not additive use; an older 11,507 figure was superseded. Modeled noise is not operating measurement. Future water line, fire support and generation arrangements are not executed commitments.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pinalpost.com/data-center-hearing-project-midway-rezoning-set-for-july-16/","host":"pinalpost.com","date":"2026-07-15","published":"2026-07-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Casa Grande · Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"ryan-companies-southwest-crossing-data-park-eloy-az","state":"az","kind":"facility","name":"Southwest Crossing Data Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Pinal"],"city":"Eloy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Commission recommendation is not council adoption or construction. Three buildings exceeding 855,000 square feet differ from the economic study ceiling of 1.25 million square feet; do not merge both as final built area. 400 MW has no stated critical-IT basis. $687.5 million construction cost, more than $5.6 million annual direct tax and 4,800 direct construction jobs are consultant forecasts, not spending, collections or permanent jobs. Proposed 219,600 gallons/day average cap has a city-engineer exception and is not measured consumption or a claim of zero water use. End user is explicitly unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/","host":"azbex.com","date":"2025-01-21","published":"2025-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"AZBEX reports Ryan Companies pivoted the Eloy industrial proposal to Southwest Crossing Data Park, with planning commission recommending the rezoning on January 15.","independently_verified_current_operating_status":null,"reported_water_design_average_gallons_per_day":219600,"water_figure_scope":"Proposed application limit with city-engineer exception; not measured consumption","executed_utility_agreement_verified":false},"notes":["Commission recommendation is not council adoption or construction. Three buildings exceeding 855,000 square feet differ from the economic study ceiling of 1.25 million square feet; do not merge both as final built area. 400 MW has no stated critical-IT basis. $687.5 million construction cost, more than $5.6 million annual direct tax and 4,800 direct construction jobs are consultant forecasts, not spending, collections or permanent jobs. Proposed 219,600 gallons/day average cap has a city-engineer exception and is not measured consumption or a claim of zero water use. End user is explicitly unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/","host":"azbex.com","date":"2025-01-21","published":"2025-01-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Eloy · Pinal · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"zinke-arizona-independent-technology-campus-pinal-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"edgecore-dobson-farms-east-florence-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"w-holdings-energy-generation-technology-campus-maricopa-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"ryan-companies-florence-tech-park-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"vermaland-la-osa-eloy-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"lpi-group-project-midway-casa-grande-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"ryan-companies-southwest-crossing-data-park-eloy-az":{"fips":["04021"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Apache County","base_name":"Apache","fips":"04001","kind":"County"},{"name":"Cochise County","base_name":"Cochise","fips":"04003","kind":"County"},{"name":"Coconino County","base_name":"Coconino","fips":"04005","kind":"County"},{"name":"Gila County","base_name":"Gila","fips":"04007","kind":"County"},{"name":"Graham County","base_name":"Graham","fips":"04009","kind":"County"},{"name":"Greenlee County","base_name":"Greenlee","fips":"04011","kind":"County"},{"name":"La Paz County","base_name":"La Paz","fips":"04012","kind":"County"},{"name":"Maricopa County","base_name":"Maricopa","fips":"04013","kind":"County"},{"name":"Mohave County","base_name":"Mohave","fips":"04015","kind":"County"},{"name":"Navajo County","base_name":"Navajo","fips":"04017","kind":"County"},{"name":"Pima County","base_name":"Pima","fips":"04019","kind":"County"},{"name":"Pinal County","base_name":"Pinal","fips":"04021","kind":"County"},{"name":"Santa Cruz County","base_name":"Santa Cruz","fips":"04023","kind":"County"},{"name":"Yavapai County","base_name":"Yavapai","fips":"04025","kind":"County"},{"name":"Yuma County","base_name":"Yuma","fips":"04027","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-20","counts":{"withheld_unreviewed_point":44,"retained_reviewed_reference":2},"scope":"Only admitted existing location references are mapped. Records without a supported point stay searchable. Admission does not certify a parcel, property ownership or current operating status."},"county":{"fips":"04021","name":"Pinal County","base_name":"Pinal","kind":"County","state":"az","state_name":"Arizona","state_path":"/arizona/","path":"/county/arizona/pinal/"},"county_scope":"Counts are Atlas research records associated with this area, not distinct buildings, a complete facility census or verified parcel jurisdictions. Inherited names and mapped points can disagree; each record keeps its source and location limits.","page_created_on":"2026-10-20","county_policy_review_recorded":false,"checked_scope":"Inherited state source-context checkpoint only. Record and county-policy checks keep their separate dates; this is not a whole-county review.","map_settings":{"bounds":[-112.2036,32.5013,-110.4485,33.466],"hub":[-111.32605,32.98365],"hub_basis":"Illustrative county bounds midpoint. Lines do not depict actual power or fiber connections."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-112.2036,32.6378],[-112.2036,32.5067],[-111.7946,32.5066],[-111.7925,32.5066],[-111.5693,32.5068],[-111.5693,32.5014],[-111.4657,32.5013],[-111.3516,32.5014],[-111.2669,32.5016],[-111.2664,32.5016],[-111.1576,32.5016],[-111.1575,32.5113],[-111.0472,32.5114],[-110.9793,32.5113],[-110.9284,32.5112],[-110.9257,32.5112],[-110.9257,32.5114],[-110.8864,32.5115],[-110.8715,32.5114],[-110.8451,32.5139],[-110.7857,32.5138],[-110.6841,32.5138],[-110.6529,32.5138],[-110.4515,32.514],[-110.449,32.5179],[-110.4485,32.5284],[-110.4485,32.7712],[-110.4494,32.9874],[-110.4494,32.9882],[-110.449,33.1945],[-110.4633,33.1833],[-110.5047,33.1862],[-110.5343,33.1677],[-110.546,33.1688],[-110.5497,33.1531],[-110.5794,33.1471],[-110.5935,33.1339],[-110.6113,33.1431],[-110.6325,33.1428],[-110.6554,33.1163],[-110.6779,33.1114],[-110.6833,33.0881],[-110.6932,33.077],[-110.7062,33.0837],[-110.7256,33.0699],[-110.7166,33.0408],[-110.7466,33.0108],[-110.7651,33.0029],[-110.7696,32.985],[-110.7832,32.9848],[-110.9447,33.2473],[-110.9747,33.3421],[-110.9812,33.3546],[-111.04,33.466],[-111.4768,33.4659],[-111.4801,33.4659],[-111.5806,33.4658],[-111.5807,33.4368],[-111.5807,33.4223],[-111.5807,33.4151],[-111.5807,33.4078],[-111.5807,33.3933],[-111.5807,33.3867],[-111.5807,33.3787],[-111.5843,33.3788],[-111.5841,33.3618],[-111.5839,33.3498],[-111.5837,33.3366],[-111.5836,33.3209],[-111.5832,33.2774],[-111.583,33.263],[-111.5829,33.249],[-111.5827,33.2189],[-111.5827,33.2185],[-111.5826,33.2054],[-111.6344,33.2051],[-111.6859,33.2046],[-111.7032,33.2046],[-111.717,33.2047],[-111.7523,33.2048],[-111.7554,33.2048],[-111.7726,33.2047],[-111.7892,33.2047],[-111.8064,33.2047],[-111.8237,33.2042],[-111.8411,33.204],[-111.8411,33.204],[-111.8584,33.2038],[-111.8757,33.2035],[-111.8931,33.2047],[-111.9954,33.2047],[-112.0835,33.2046],[-112.0958,33.2304],[-112.1137,33.2275],[-112.1491,33.2538],[-112.1918,33.265],[-112.1975,33.2784],[-112.1937,33.2989],[-112.2032,33.3105],[-112.2021,33.2469],[-112.2021,33.087],[-112.2021,33.0292],[-112.203,33.0093],[-112.203,32.9928],[-112.2035,32.8365],[-112.2036,32.6378]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-112.2036,32.6378],[-112.2036,32.5067],[-111.7946,32.5066],[-111.7925,32.5066],[-111.5693,32.5068],[-111.5693,32.5014],[-111.4657,32.5013],[-111.3516,32.5014],[-111.2669,32.5016],[-111.2664,32.5016],[-111.1576,32.5016],[-111.1575,32.5113],[-111.0472,32.5114],[-110.9793,32.5113],[-110.9284,32.5112],[-110.9257,32.5112],[-110.9257,32.5114],[-110.8864,32.5115],[-110.8715,32.5114],[-110.8451,32.5139],[-110.7857,32.5138],[-110.6841,32.5138],[-110.6529,32.5138],[-110.4515,32.514],[-110.449,32.5179],[-110.4485,32.5284],[-110.4485,32.7712],[-110.4494,32.9874],[-110.4494,32.9882],[-110.449,33.1945],[-110.4633,33.1833],[-110.5047,33.1862],[-110.5343,33.1677],[-110.546,33.1688],[-110.5497,33.1531],[-110.5794,33.1471],[-110.5935,33.1339],[-110.6113,33.1431],[-110.6325,33.1428],[-110.6554,33.1163],[-110.6779,33.1114],[-110.6833,33.0881],[-110.6932,33.077],[-110.7062,33.0837],[-110.7256,33.0699],[-110.7166,33.0408],[-110.7466,33.0108],[-110.7651,33.0029],[-110.7696,32.985],[-110.7832,32.9848],[-110.9447,33.2473],[-110.9747,33.3421],[-110.9812,33.3546],[-111.04,33.466],[-111.4768,33.4659],[-111.4801,33.4659],[-111.5806,33.4658],[-111.5807,33.4368],[-111.5807,33.4223],[-111.5807,33.4151],[-111.5807,33.4078],[-111.5807,33.3933],[-111.5807,33.3867],[-111.5807,33.3787],[-111.5843,33.3788],[-111.5841,33.3618],[-111.5839,33.3498],[-111.5837,33.3366],[-111.5836,33.3209],[-111.5832,33.2774],[-111.583,33.263],[-111.5829,33.249],[-111.5827,33.2189],[-111.5827,33.2185],[-111.5826,33.2054],[-111.6344,33.2051],[-111.6859,33.2046],[-111.7032,33.2046],[-111.717,33.2047],[-111.7523,33.2048],[-111.7554,33.2048],[-111.7726,33.2047],[-111.7892,33.2047],[-111.8064,33.2047],[-111.8237,33.2042],[-111.8411,33.204],[-111.8411,33.204],[-111.8584,33.2038],[-111.8757,33.2035],[-111.8931,33.2047],[-111.9954,33.2047],[-112.0835,33.2046],[-112.0958,33.2304],[-112.1137,33.2275],[-112.1491,33.2538],[-112.1918,33.265],[-112.1975,33.2784],[-112.1937,33.2989],[-112.2032,33.3105],[-112.2021,33.2469],[-112.2021,33.087],[-112.2021,33.0292],[-112.203,33.0093],[-112.203,32.9928],[-112.2035,32.8365],[-112.2036,32.6378]]]}}]},"county_timeline":[]}