{"state":"ga","name":"Bartow County, Georgia","updated":"2026-10-19","checked":"2026-10-15","bounds":[-85.047,34.0753,-84.6443,34.413],"stats":{"reviewed_records":7,"status_confirmed":1,"status_unknown":6,"mapped_records":0},"coverage":{"scope":"Counts are Atlas research records associated with this area, not distinct buildings, a complete facility census or verified parcel jurisdictions. Inherited names and mapped points can disagree; each record keeps its source and location limits.","meaning":"Derived subset of published canonical state records; new county source checks do not certify every record or local ordinance."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"atlas-stiles-road-cartersville-ga","state":"ga","kind":"facility","name":"Atlas Development Stiles Road Data Center (Euharlee Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd","host":"change.org","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"Change.org opposition petition names AtlasDevelopment’s proposed 260,000 square-foot use at 208/329 StilesRoad, with aDecember 15,2025 Bartowconditional-permit hearing described.","independently_verified_current_operating_status":null},"notes":["Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd","host":"change.org","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Cartersville · Bartow · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"databank-indo-cartersville-ga","state":"ga","kind":"project","name":"DataBank Project Indo","group":"approved","status":"Zoning approved","raw_status":"approved","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"218 Industrial Park Road, Cartersville, GA","who":"DataBank","end_user":"","mw":null,"power":"","power_note":"Approximate 200 MW +/- critical IT planning envelope described by city staff for Project Indo. Not approved utility supply, a measured load or commissioned capacity; no specific technical as-of day is stated.","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[["2026-09-03","Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation."]],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html","host":"daily-tribune.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","host":"mccmeetings.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"Signed September 3, 2026 council minutes, pages 1-2 and 7"},{"url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf","host":"mccmeetingspublic.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"Z26-05 city case file, zoning synopsis pages 1-3"},{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-47a78684740141a2bd666b0110ac1ed2.pdf","host":"mccmeetings.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"September 17 council minutes, page 1 ratifies September 3 minutes"},{"url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-621d8771b7934c63b3825634b1abf945.pdf","host":"mccmeetingspublic.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"September 3 second-reading staff summary; recommendation, not vote"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Daily Tribune reports DataBank DRI/rezoning application for69-acre218IndustrialParkRoad in Cartersville.","independently_verified_current_operating_status":null},"notes":["Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html","host":"daily-tribune.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Primary-Campus-Holds-20261016","scope":"Targeted primary campus/project stage and identity-scope review. No physical-site census, point/precision upgrade, actual delivery, metered use or legal title finding.","fields":{"city_case_reference":"Z26-05; ordinance reference 44-26","zoning_decision":{"adopted_on":"2026-09-03","zoning_vote":"6-0","variance_vote":"6-0","from":"H-I (Heavy Industrial)","to":"T (Technology)","conditions":["Conditioned on the submitted concept site plan, elevations and project descriptions, including a closed-loop water cooling system.","Principal use limited to data processing, storage, hosting and related services, with associated Technology-district and customary accessory uses.","No certificate of occupancy for a data center until a letter establishes electric power is available; individual buildings and subdivisions may be treated separately."],"effective_on":null},"variance_scope":"Approved concurrent requests reduce off-street parking from 1,313 to 286 spaces and allow the front facade nearest Industrial Park Road to face away from that road. These are site-specific zoning permissions, not building or occupancy permits.","published_project_location":{"address":"218 Industrial Park Road, Cartersville, Georgia","parcel_reference":"C059-0001-001","reported_acres_approx":68.77},"proposed_technical_scope":"City staff describes an approximately 200 MW +/- critical IT data-center proposal and two data-center warehouses. This is a planning envelope, not commissioned, contracted or metered capacity. No new two-building physical census is asserted.","utility_and_delivery_limits":"The case file says MEAG Power was studying power supply needs and transmission routing, with sewer flow and industrial pretreatment information still needed. It forecasts development in 2027 and staged facility delivery from 2028 through 2032, contingent on approval. No actual start, utility allocation, occupancy, opening or consumption is established.","water_condition_scope":"Closed-loop water cooling is a zoning condition. It is not proof of installed equipment, zero water use, a withdrawal permit or measured consumption.","approval_document_scope":"Signed September 3 council minutes record both final motions. September 17 minutes separately approve those minutes. The September 3 agenda and staff recommendation alone are not used as proof the vote passed. No automatic September 3 effective date is inferred.","current_status_basis":"City Council approved Z26-05 rezoning and concurrent variances on September 3, 2026, both 6-0, with three conditions and ordinance reference 44-26. Approval is limited to zoning; final building, air, power-availability, occupancy, construction and operation are not established."},"notes":["Field-specific review only. Original name, approximate location and wrapper, city/county context, opening field, legacy MW, financial and ownership limits remain.","Campus/component and regulatory proposal units are not interchangeable with separate physical sites or complete operational capacity."],"sources":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","host":"mccmeetings.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"Signed September 3, 2026 council minutes, pages 1-2 and 7"},{"url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf","host":"mccmeetingspublic.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"Z26-05 city case file, zoning synopsis pages 1-3"},{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-47a78684740141a2bd666b0110ac1ed2.pdf","host":"mccmeetings.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"September 17 council minutes, page 1 ratifies September 3 minutes"},{"url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-621d8771b7934c63b3825634b1abf945.pdf","host":"mccmeetingspublic.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"September 3 second-reading staff summary; recommendation, not vote"}],"checked":"2026-10-16","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Cartersville · Bartow · Source context reviewed","search_extra":"DataBank Project Indo Z26-05 44-26 218 Industrial Park Road C059-0001-001","status_scope":"City Council approved Z26-05 rezoning and concurrent variances on September 3, 2026, both 6-0, with three conditions and ordinance reference 44-26. Approval is limited to zoning; final building, air, power-availability, occupancy, construction and operation are not established.","event_evidence":[{"date":"2026-09-03","text":"Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation.","kind":"approved","sources":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","host":"mccmeetings.blob.core.usgovcloudapi.net","published":"","date":"","checked":"2026-10-16","label":"Signed September 3, 2026 council minutes, pages 1-2 and 7"}]}],"typed_power_facts":[{"measure":"it_capacity","value":200,"unit":"MW","as_of":null,"as_of_basis":"not_published","observed_on":"2026-10-16","basis":"forecast","scope":"Approximate 200 MW +/- critical IT planning envelope described by city staff for Project Indo. Not approved utility supply, a measured load or commissioned capacity; no specific technical as-of day is stated.","sources":["https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf"]}],"location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"thor-equities-kingston-technology-hub-bartow-ga","state":"ga","kind":"facility","name":"Kingston Technology Hub (Thor Equities)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Kingston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/","host":"newslinelocal.com","date":"2026-09-08","published":"2026-09-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Center Square reporting republished by Newsline Local describes Thor Equities’ proposed Kingston DRI, quoting 350,000 squarefeet,559 acres and 150 MW peak power.","independently_verified_current_operating_status":null},"notes":["DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/","host":"newslinelocal.com","date":"2026-09-08","published":"2026-09-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Kingston · Bartow · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"oakley-brown-farm-road-cartersville-ga","state":"ga","kind":"facility","name":"Oakley Real Estate Partners Brown Farm Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bartow generic agenda without exact-site evidence. Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf","host":"cms2.revize.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Bartow generic agenda without exact-site evidence","fields":{},"notes":["Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf","host":"cms2.revize.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"encore-2026-10-17-batch1","scope":"Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.","fields":{},"notes":["The original September 2026 agenda host disallows automated retrieval. No final commissioner decision is established. Directory and news claims remain leads; access failure does not qualify as a fresh field review."],"sources":[{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf","host":"cms2.revize.com","published":"","date":"","checked":"2026-10-17","label":"Access-check target"}],"checked":"2026-10-17","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Cartersville · Bartow · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"taurus-digital-realty-project-bunkhouse-stilesboro-ga","state":"ga","kind":"facility","name":"Project Bunkhouse (Digital Realty Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Stilesboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bunkhouse filed initial proposal with operator/area holds. Description prints8,675,0000while sizefieldprints8,675,000; scope/typo conflict held, no approved canonical area. Form lists engineering contact as developer, not independentTaurus/DigitalRealty operator confirmation. InitialDRI not rezoning approval, actual build or energized capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Bunkhouse filed initial proposal with operator/area holds","fields":{"dri_id":"4433","project_name":"ProjectBunkhouse","published_location_description":"TaffRoad southofHighway113,BartowCounty,Georgia","published_project_point":{"latitude":34.096532,"longitude":-84.911951,"geo_precision":"applicant-provided project location,not parcel centroid"},"proposed_area_sqft_size_field":8675000,"estimated_completion_year":2035,"printed_property_owner":"GainesFamilyLandLLC"},"notes":["Description prints8,675,0000while sizefieldprints8,675,000; scope/typo conflict held, no approved canonical area. Form lists engineering contact as developer, not independentTaurus/DigitalRealty operator confirmation. InitialDRI not rezoning approval, actual build or energized capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Stilesboro · Bartow · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"atlas-project-springbank-adairsville-ga","state":"ga","kind":"facility","name":"Project Springbank (Atlas Development Bartow County Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Adairsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. filed initial regional-impact proposal. Initial regional-impact information form not rezoning approval, final permit or construction proof. Checkbox selection states not inferred from plain text. Closed-loop description not measured water use or zero wastewater. Mailing address in Carrollton is developer address, not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"filed initial regional-impact proposal","fields":{"dri_id":"4403","project_name":"Project Springbank","submitting_jurisdiction":"Bartow County, Georgia","developer":"Atlas Development LLC","planned_buildings":6,"planned_total_area_sqft":2274000,"published_project_location":{"latitude":34.30926,"longitude":-84.96325,"geo_precision":"applicant-provided project location; not parcel centroid"},"estimated_completion_month":"2031-12"},"notes":["Initial regional-impact information form not rezoning approval, final permit or construction proof. Checkbox selection states not inferred from plain text. Closed-loop description not measured water use or zero wastewater. Mailing address in Carrollton is developer address, not site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Adairsville · Bartow · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"switch-keep-2-atlanta-north-cartersville-ga","state":"ga","kind":"facility","name":"Switch KEEP 2.0 Atlanta North Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Switch phased regional-impact application. 126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Switch phased regional-impact application","fields":{"dri_id":"4061","project_name":"SwitchKEEP2.0AtlantaNorthCampus","initial_phase_site_acres":126,"initial_phase_buildings":1,"initial_phase_completion_target":"2026-Q2","overall_project_completion_target_year":2046,"published_location_description":"south ofOldAlabamaRoad/BatesRoad intersection towardPauldingCountyline,CityofCartersville"},"notes":["126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Cartersville · Bartow · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"atlas-stiles-road-cartersville-ga":{"fips":["13015"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"databank-indo-cartersville-ga":{"fips":["13015"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"thor-equities-kingston-technology-hub-bartow-ga":{"fips":["13015"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"oakley-brown-farm-road-cartersville-ga":{"fips":["13015"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"taurus-digital-realty-project-bunkhouse-stilesboro-ga":{"fips":["13015"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"atlas-project-springbank-adairsville-ga":{"fips":["13015"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"switch-keep-2-atlanta-north-cartersville-ga":{"fips":["13015"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Appling County","base_name":"Appling","fips":"13001","kind":"County"},{"name":"Atkinson County","base_name":"Atkinson","fips":"13003","kind":"County"},{"name":"Bacon County","base_name":"Bacon","fips":"13005","kind":"County"},{"name":"Baker County","base_name":"Baker","fips":"13007","kind":"County"},{"name":"Baldwin County","base_name":"Baldwin","fips":"13009","kind":"County"},{"name":"Banks County","base_name":"Banks","fips":"13011","kind":"County"},{"name":"Barrow County","base_name":"Barrow","fips":"13013","kind":"County"},{"name":"Bartow County","base_name":"Bartow","fips":"13015","kind":"County"},{"name":"Ben Hill County","base_name":"Ben Hill","fips":"13017","kind":"County"},{"name":"Berrien County","base_name":"Berrien","fips":"13019","kind":"County"},{"name":"Bibb County","base_name":"Bibb","fips":"13021","kind":"County"},{"name":"Bleckley County","base_name":"Bleckley","fips":"13023","kind":"County"},{"name":"Brantley County","base_name":"Brantley","fips":"13025","kind":"County"},{"name":"Brooks County","base_name":"Brooks","fips":"13027","kind":"County"},{"name":"Bryan County","base_name":"Bryan","fips":"13029","kind":"County"},{"name":"Bulloch County","base_name":"Bulloch","fips":"13031","kind":"County"},{"name":"Burke County","base_name":"Burke","fips":"13033","kind":"County"},{"name":"Butts County","base_name":"Butts","fips":"13035","kind":"County"},{"name":"Calhoun County","base_name":"Calhoun","fips":"13037","kind":"County"},{"name":"Camden County","base_name":"Camden","fips":"13039","kind":"County"},{"name":"Candler County","base_name":"Candler","fips":"13043","kind":"County"},{"name":"Carroll County","base_name":"Carroll","fips":"13045","kind":"County"},{"name":"Catoosa County","base_name":"Catoosa","fips":"13047","kind":"County"},{"name":"Charlton County","base_name":"Charlton","fips":"13049","kind":"County"},{"name":"Chatham County","base_name":"Chatham","fips":"13051","kind":"County"},{"name":"Chattahoochee County","base_name":"Chattahoochee","fips":"13053","kind":"County"},{"name":"Chattooga County","base_name":"Chattooga","fips":"13055","kind":"County"},{"name":"Cherokee County","base_name":"Cherokee","fips":"13057","kind":"County"},{"name":"Clarke County","base_name":"Clarke","fips":"13059","kind":"County"},{"name":"Clay County","base_name":"Clay","fips":"13061","kind":"County"},{"name":"Clayton County","base_name":"Clayton","fips":"13063","kind":"County"},{"name":"Clinch County","base_name":"Clinch","fips":"13065","kind":"County"},{"name":"Cobb County","base_name":"Cobb","fips":"13067","kind":"County"},{"name":"Coffee County","base_name":"Coffee","fips":"13069","kind":"County"},{"name":"Colquitt County","base_name":"Colquitt","fips":"13071","kind":"County"},{"name":"Columbia County","base_name":"Columbia","fips":"13073","kind":"County"},{"name":"Cook County","base_name":"Cook","fips":"13075","kind":"County"},{"name":"Coweta County","base_name":"Coweta","fips":"13077","kind":"County"},{"name":"Crawford County","base_name":"Crawford","fips":"13079","kind":"County"},{"name":"Crisp County","base_name":"Crisp","fips":"13081","kind":"County"},{"name":"Dade County","base_name":"Dade","fips":"13083","kind":"County"},{"name":"Dawson County","base_name":"Dawson","fips":"13085","kind":"County"},{"name":"Decatur County","base_name":"Decatur","fips":"13087","kind":"County"},{"name":"DeKalb County","base_name":"DeKalb","fips":"13089","kind":"County"},{"name":"Dodge County","base_name":"Dodge","fips":"13091","kind":"County"},{"name":"Dooly County","base_name":"Dooly","fips":"13093","kind":"County"},{"name":"Dougherty County","base_name":"Dougherty","fips":"13095","kind":"County"},{"name":"Douglas County","base_name":"Douglas","fips":"13097","kind":"County"},{"name":"Early County","base_name":"Early","fips":"13099","kind":"County"},{"name":"Echols County","base_name":"Echols","fips":"13101","kind":"County"},{"name":"Effingham County","base_name":"Effingham","fips":"13103","kind":"County"},{"name":"Elbert County","base_name":"Elbert","fips":"13105","kind":"County"},{"name":"Emanuel County","base_name":"Emanuel","fips":"13107","kind":"County"},{"name":"Evans County","base_name":"Evans","fips":"13109","kind":"County"},{"name":"Fannin County","base_name":"Fannin","fips":"13111","kind":"County"},{"name":"Fayette County","base_name":"Fayette","fips":"13113","kind":"County"},{"name":"Floyd County","base_name":"Floyd","fips":"13115","kind":"County"},{"name":"Forsyth County","base_name":"Forsyth","fips":"13117","kind":"County"},{"name":"Franklin County","base_name":"Franklin","fips":"13119","kind":"County"},{"name":"Fulton County","base_name":"Fulton","fips":"13121","kind":"County"},{"name":"Gilmer County","base_name":"Gilmer","fips":"13123","kind":"County"},{"name":"Glascock County","base_name":"Glascock","fips":"13125","kind":"County"},{"name":"Glynn County","base_name":"Glynn","fips":"13127","kind":"County"},{"name":"Gordon County","base_name":"Gordon","fips":"13129","kind":"County"},{"name":"Grady County","base_name":"Grady","fips":"13131","kind":"County"},{"name":"Greene County","base_name":"Greene","fips":"13133","kind":"County"},{"name":"Gwinnett County","base_name":"Gwinnett","fips":"13135","kind":"County"},{"name":"Habersham County","base_name":"Habersham","fips":"13137","kind":"County"},{"name":"Hall County","base_name":"Hall","fips":"13139","kind":"County"},{"name":"Hancock County","base_name":"Hancock","fips":"13141","kind":"County"},{"name":"Haralson County","base_name":"Haralson","fips":"13143","kind":"County"},{"name":"Harris County","base_name":"Harris","fips":"13145","kind":"County"},{"name":"Hart County","base_name":"Hart","fips":"13147","kind":"County"},{"name":"Heard County","base_name":"Heard","fips":"13149","kind":"County"},{"name":"Henry County","base_name":"Henry","fips":"13151","kind":"County"},{"name":"Houston County","base_name":"Houston","fips":"13153","kind":"County"},{"name":"Irwin County","base_name":"Irwin","fips":"13155","kind":"County"},{"name":"Jackson County","base_name":"Jackson","fips":"13157","kind":"County"},{"name":"Jasper County","base_name":"Jasper","fips":"13159","kind":"County"},{"name":"Jeff Davis County","base_name":"Jeff Davis","fips":"13161","kind":"County"},{"name":"Jefferson County","base_name":"Jefferson","fips":"13163","kind":"County"},{"name":"Jenkins County","base_name":"Jenkins","fips":"13165","kind":"County"},{"name":"Johnson County","base_name":"Johnson","fips":"13167","kind":"County"},{"name":"Jones County","base_name":"Jones","fips":"13169","kind":"County"},{"name":"Lamar County","base_name":"Lamar","fips":"13171","kind":"County"},{"name":"Lanier County","base_name":"Lanier","fips":"13173","kind":"County"},{"name":"Laurens County","base_name":"Laurens","fips":"13175","kind":"County"},{"name":"Lee County","base_name":"Lee","fips":"13177","kind":"County"},{"name":"Liberty County","base_name":"Liberty","fips":"13179","kind":"County"},{"name":"Lincoln County","base_name":"Lincoln","fips":"13181","kind":"County"},{"name":"Long County","base_name":"Long","fips":"13183","kind":"County"},{"name":"Lowndes County","base_name":"Lowndes","fips":"13185","kind":"County"},{"name":"Lumpkin County","base_name":"Lumpkin","fips":"13187","kind":"County"},{"name":"McDuffie County","base_name":"McDuffie","fips":"13189","kind":"County"},{"name":"McIntosh County","base_name":"McIntosh","fips":"13191","kind":"County"},{"name":"Macon County","base_name":"Macon","fips":"13193","kind":"County"},{"name":"Madison County","base_name":"Madison","fips":"13195","kind":"County"},{"name":"Marion County","base_name":"Marion","fips":"13197","kind":"County"},{"name":"Meriwether County","base_name":"Meriwether","fips":"13199","kind":"County"},{"name":"Miller County","base_name":"Miller","fips":"13201","kind":"County"},{"name":"Mitchell County","base_name":"Mitchell","fips":"13205","kind":"County"},{"name":"Monroe County","base_name":"Monroe","fips":"13207","kind":"County"},{"name":"Montgomery County","base_name":"Montgomery","fips":"13209","kind":"County"},{"name":"Morgan County","base_name":"Morgan","fips":"13211","kind":"County"},{"name":"Murray County","base_name":"Murray","fips":"13213","kind":"County"},{"name":"Muscogee County","base_name":"Muscogee","fips":"13215","kind":"County"},{"name":"Newton County","base_name":"Newton","fips":"13217","kind":"County"},{"name":"Oconee County","base_name":"Oconee","fips":"13219","kind":"County"},{"name":"Oglethorpe County","base_name":"Oglethorpe","fips":"13221","kind":"County"},{"name":"Paulding County","base_name":"Paulding","fips":"13223","kind":"County"},{"name":"Peach County","base_name":"Peach","fips":"13225","kind":"County"},{"name":"Pickens County","base_name":"Pickens","fips":"13227","kind":"County"},{"name":"Pierce County","base_name":"Pierce","fips":"13229","kind":"County"},{"name":"Pike County","base_name":"Pike","fips":"13231","kind":"County"},{"name":"Polk County","base_name":"Polk","fips":"13233","kind":"County"},{"name":"Pulaski County","base_name":"Pulaski","fips":"13235","kind":"County"},{"name":"Putnam County","base_name":"Putnam","fips":"13237","kind":"County"},{"name":"Quitman County","base_name":"Quitman","fips":"13239","kind":"County"},{"name":"Rabun County","base_name":"Rabun","fips":"13241","kind":"County"},{"name":"Randolph County","base_name":"Randolph","fips":"13243","kind":"County"},{"name":"Richmond County","base_name":"Richmond","fips":"13245","kind":"County"},{"name":"Rockdale County","base_name":"Rockdale","fips":"13247","kind":"County"},{"name":"Schley County","base_name":"Schley","fips":"13249","kind":"County"},{"name":"Screven County","base_name":"Screven","fips":"13251","kind":"County"},{"name":"Seminole County","base_name":"Seminole","fips":"13253","kind":"County"},{"name":"Spalding County","base_name":"Spalding","fips":"13255","kind":"County"},{"name":"Stephens County","base_name":"Stephens","fips":"13257","kind":"County"},{"name":"Stewart County","base_name":"Stewart","fips":"13259","kind":"County"},{"name":"Sumter County","base_name":"Sumter","fips":"13261","kind":"County"},{"name":"Talbot County","base_name":"Talbot","fips":"13263","kind":"County"},{"name":"Taliaferro County","base_name":"Taliaferro","fips":"13265","kind":"County"},{"name":"Tattnall County","base_name":"Tattnall","fips":"13267","kind":"County"},{"name":"Taylor County","base_name":"Taylor","fips":"13269","kind":"County"},{"name":"Telfair County","base_name":"Telfair","fips":"13271","kind":"County"},{"name":"Terrell County","base_name":"Terrell","fips":"13273","kind":"County"},{"name":"Thomas County","base_name":"Thomas","fips":"13275","kind":"County"},{"name":"Tift County","base_name":"Tift","fips":"13277","kind":"County"},{"name":"Toombs County","base_name":"Toombs","fips":"13279","kind":"County"},{"name":"Towns County","base_name":"Towns","fips":"13281","kind":"County"},{"name":"Treutlen County","base_name":"Treutlen","fips":"13283","kind":"County"},{"name":"Troup County","base_name":"Troup","fips":"13285","kind":"County"},{"name":"Turner County","base_name":"Turner","fips":"13287","kind":"County"},{"name":"Twiggs County","base_name":"Twiggs","fips":"13289","kind":"County"},{"name":"Union County","base_name":"Union","fips":"13291","kind":"County"},{"name":"Upson County","base_name":"Upson","fips":"13293","kind":"County"},{"name":"Walker County","base_name":"Walker","fips":"13295","kind":"County"},{"name":"Walton County","base_name":"Walton","fips":"13297","kind":"County"},{"name":"Ware County","base_name":"Ware","fips":"13299","kind":"County"},{"name":"Warren County","base_name":"Warren","fips":"13301","kind":"County"},{"name":"Washington County","base_name":"Washington","fips":"13303","kind":"County"},{"name":"Wayne County","base_name":"Wayne","fips":"13305","kind":"County"},{"name":"Webster County","base_name":"Webster","fips":"13307","kind":"County"},{"name":"Wheeler County","base_name":"Wheeler","fips":"13309","kind":"County"},{"name":"White County","base_name":"White","fips":"13311","kind":"County"},{"name":"Whitfield County","base_name":"Whitfield","fips":"13313","kind":"County"},{"name":"Wilcox County","base_name":"Wilcox","fips":"13315","kind":"County"},{"name":"Wilkes County","base_name":"Wilkes","fips":"13317","kind":"County"},{"name":"Wilkinson County","base_name":"Wilkinson","fips":"13319","kind":"County"},{"name":"Worth County","base_name":"Worth","fips":"13321","kind":"County"}],"state_legislation":{"review_scope":"not_reviewed","latest_scoped_check":null,"coverage_note":"State legislation has not been reviewed for this atlas. No listed bill does not mean no law or proposal exists.","bill_records":0,"enacted_measures":0,"enacted_policy_groups":0,"failed_proposals":0,"bills":[]},"site_specific_rules":[{"id":"local-rule:cartersville:indo:44-26","jurisdiction":{"state":"GA","county_fips":"13015","municipality":"Cartersville"},"rule_type":"site_specific_zoning_conditions","status":"adopted","effective_on":null,"expires_on":null,"legacy_rule":null,"subject_id":"site:databank-indo-cartersville-ga","rule_reference":"Z26-05; ordinance reference 44-26","adopted_on":"2026-09-03","conditions":["Conditioned on the submitted concept site plan, elevations and project descriptions, including a closed-loop water cooling system.","Principal use limited to data processing, storage, hosting and related services, with associated Technology-district and customary accessory uses.","No certificate of occupancy for a data center until a letter establishes electric power is available; individual buildings and subdivisions may be treated separately."],"scope":"Conditions attached to this specific rezoning and variance approval. Not a citywide/countywide data-center ordinance, a county rules sweep, or proof conditions have been discharged.","field_sources":{"jurisdiction":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"rule_type":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"status":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"effective_on":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"expires_on":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"legacy_rule":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"subject_id":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"rule_reference":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"adopted_on":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"conditions":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}],"scope":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}]},"field_confidence":{"jurisdiction":"inference","rule_type":"primary_record","status":"primary_record","effective_on":"inference","expires_on":"inference","legacy_rule":"inference","subject_id":"primary_record","rule_reference":"primary_record","adopted_on":"primary_record","conditions":"primary_record","scope":"primary_record"},"field_checked_on":{"jurisdiction":"2026-10-16","rule_type":"2026-10-16","status":"2026-10-16","effective_on":"2026-10-16","expires_on":"2026-10-16","legacy_rule":"2026-10-16","subject_id":"2026-10-16","rule_reference":"2026-10-16","adopted_on":"2026-10-16","conditions":"2026-10-16","scope":"2026-10-16"}}],"county_rule_reviews":[{"id":"local-rule:county-review:20261017:13015","jurisdiction":{"state":"GA","county_fips":"13015","municipality":null},"rule_type":"county_research_review","status":"policy_context_found","effective_on":null,"expires_on":null,"legacy_rule":null,"rule_reference":"Bartow County","adopted_on":null,"conditions":["The signed county ordinance was adopted July 1, 2026 and states immediate effectiveness. Section 9.9 allows data centers in I-1, I-2 and BPD districts and conditionally in A-1, subject to development standards. It requires closed-loop cooling or a functionally equivalent technology, with buffers, setbacks, screening and noise requirements.","The ordinance is not a blanket permission for every parcel or proof any project complies. Accessory generation has its own limits and permitting requirements; its 300 MW firm-load limit is not data-center IT capacity. Cartersville city approvals are separate, including the existing site-specific INDO conditions. Later amendments and each parcel remain subject to review."],"scope":"Bounded source review, not an enacted legal instrument. County association does not establish the governing parcel jurisdiction. This review has no legal effective or expiry date; dates of underlying actions are described separately.","label":"Policy context found","checked_on":"2026-10-17","sources":[{"url":"https://www.bartowcountyga.gov/community_links/data_centers_/index.php","publisher":"Bartow County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"911849a777ea01425a24a6c11aaa0cf578572bb9e9f91526723708b151b0aad3","capture_format":"raw_response_bytes"},{"url":"https://www.bartowcountyga.gov/CommissionerOffice/ZONING-ORDINANCE-AMENDMENTS_DATA%20CENTERS_7-1-2026.pdf?t=202608031207570","publisher":"Bartow County government","source_type":"government_record","published_on":null,"retrieved_on":"2026-10-17","archive_sha256":"8b7f551dea1a3927f9c41cd93a4bb8f3bd6a0f761741bed65430b58643ab3648","capture_format":"raw_response_bytes"}]}],"stage_timelines":{"databank-indo-cartersville-ga":{"stages":[{"id":"event:milestone:campus-holds-20261016-indo:0","date":"2026-09-03","stage":"approved","scheduled":false,"basis":"primary source","scope":"Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation.","sources":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville"}]}],"next_scheduled":null,"as_of":"2026-10-21"}},"location_display_policy":{"id":"reviewed-map-references-2026-10-20","counts":{"withheld_unreviewed_point":72,"retained_reviewed_reference":1,"no_site_point":2},"scope":"Only admitted existing location references are mapped. Records without a supported point stay searchable. Admission does not certify a parcel, property ownership or current operating status."},"county":{"fips":"13015","name":"Bartow County","base_name":"Bartow","kind":"County","state":"ga","state_name":"Georgia","state_path":"/georgia/","path":"/county/georgia/bartow/"},"county_scope":"Counts are Atlas research records associated with this area, not distinct buildings, a complete facility census or verified parcel jurisdictions. Inherited names and mapped points can disagree; each record keeps its source and location limits.","page_created_on":"2026-10-20","county_policy_review_recorded":true,"checked_scope":"Inherited state source-context checkpoint only. Record and county-policy checks keep their separate dates; this is not a whole-county review.","map_settings":{"bounds":[-85.047,34.0753,-84.6443,34.413],"hub":[-84.84565,34.24415],"hub_basis":"Illustrative county bounds midpoint. Lines do not depict actual power or fiber connections."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-85.0469,34.0964],[-85.047,34.0829],[-84.9227,34.0825],[-84.9144,34.0753],[-84.8803,34.0826],[-84.8394,34.0825],[-84.7407,34.0824],[-84.7378,34.0794],[-84.7294,34.0791],[-84.6929,34.0787],[-84.6905,34.0786],[-84.6764,34.0785],[-84.6592,34.0782],[-84.6579,34.1425],[-84.6577,34.2027],[-84.6559,34.2139],[-84.6537,34.2275],[-84.654,34.3469],[-84.6461,34.3468],[-84.6443,34.3552],[-84.654,34.3552],[-84.6532,34.4126],[-84.7339,34.413],[-84.7341,34.3965],[-84.8259,34.3976],[-84.8372,34.3977],[-84.8629,34.3966],[-84.8963,34.3963],[-84.9194,34.3987],[-84.9348,34.3987],[-84.9539,34.3842],[-84.9888,34.3846],[-85.0058,34.3924],[-85.0052,34.3471],[-85.0231,34.3471],[-85.0233,34.3169],[-85.0232,34.3053],[-85.0235,34.2755],[-85.0156,34.2511],[-85.0241,34.2462],[-85.0238,34.2134],[-85.0449,34.2073],[-85.0452,34.1838],[-85.0464,34.1179],[-85.0469,34.0964]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-85.0469,34.0964],[-85.047,34.0829],[-84.9227,34.0825],[-84.9144,34.0753],[-84.8803,34.0826],[-84.8394,34.0825],[-84.7407,34.0824],[-84.7378,34.0794],[-84.7294,34.0791],[-84.6929,34.0787],[-84.6905,34.0786],[-84.6764,34.0785],[-84.6592,34.0782],[-84.6579,34.1425],[-84.6577,34.2027],[-84.6559,34.2139],[-84.6537,34.2275],[-84.654,34.3469],[-84.6461,34.3468],[-84.6443,34.3552],[-84.654,34.3552],[-84.6532,34.4126],[-84.7339,34.413],[-84.7341,34.3965],[-84.8259,34.3976],[-84.8372,34.3977],[-84.8629,34.3966],[-84.8963,34.3963],[-84.9194,34.3987],[-84.9348,34.3987],[-84.9539,34.3842],[-84.9888,34.3846],[-85.0058,34.3924],[-85.0052,34.3471],[-85.0231,34.3471],[-85.0233,34.3169],[-85.0232,34.3053],[-85.0235,34.2755],[-85.0156,34.2511],[-85.0241,34.2462],[-85.0238,34.2134],[-85.0449,34.2073],[-85.0452,34.1838],[-85.0464,34.1179],[-85.0469,34.0964]]]}}]},"county_timeline":[{"id":"event:status:campus-holds-20261016-indo","subject_id":"site:databank-indo-cartersville-ga","event_type":"status_observation","occurred_on":null,"observed_on":"2026-10-16","qualifies_status":true,"status_group":"approved","status_label":"Zoning approved","scope":"City Council approved Z26-05 rezoning and concurrent variances on September 3, 2026, both 6-0, with three conditions and ordinance reference 44-26. Approval is limited to zoning; final building, air, power-availability, occupancy, construction and operation are not established.","display_category":"source_check","display_date":"2026-10-16","sources":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville","source_type":"government_record","retrieved_on":"2026-10-16"},{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-47a78684740141a2bd666b0110ac1ed2.pdf","publisher":"City of Cartersville","source_type":"government_record","retrieved_on":"2026-10-16"}],"field_sources":{"subject_id":["source:2d72e344cd3457feb02c58c6","source:fd52ab0cb8d9dad3b53ff6e1"],"event_type":["source:2d72e344cd3457feb02c58c6","source:fd52ab0cb8d9dad3b53ff6e1"],"occurred_on":["source:2d72e344cd3457feb02c58c6","source:fd52ab0cb8d9dad3b53ff6e1"],"observed_on":["source:2d72e344cd3457feb02c58c6","source:fd52ab0cb8d9dad3b53ff6e1"],"qualifies_status":["source:2d72e344cd3457feb02c58c6","source:fd52ab0cb8d9dad3b53ff6e1"],"status_group":["source:2d72e344cd3457feb02c58c6","source:fd52ab0cb8d9dad3b53ff6e1"],"status_label":["source:2d72e344cd3457feb02c58c6","source:fd52ab0cb8d9dad3b53ff6e1"],"scope":["source:2d72e344cd3457feb02c58c6","source:fd52ab0cb8d9dad3b53ff6e1"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}},{"id":"event:milestone:campus-holds-20261016-indo:0","subject_id":"site:databank-indo-cartersville-ga","event_type":"approved","occurred_on":"2026-09-03","observed_on":"2026-10-16","qualifies_status":false,"status_group":null,"status_label":null,"scope":"Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation.","display_category":"recorded_event","display_date":"2026-09-03","sources":[{"url":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf","publisher":"City of Cartersville","source_type":"government_record","retrieved_on":"2026-10-16"}],"field_sources":{"subject_id":["source:2d72e344cd3457feb02c58c6"],"event_type":["source:2d72e344cd3457feb02c58c6"],"occurred_on":["source:2d72e344cd3457feb02c58c6"],"observed_on":["source:2d72e344cd3457feb02c58c6"],"qualifies_status":["source:2d72e344cd3457feb02c58c6"],"status_group":["source:2d72e344cd3457feb02c58c6"],"status_label":["source:2d72e344cd3457feb02c58c6"],"scope":["source:2d72e344cd3457feb02c58c6"]},"field_confidence":{"subject_id":"primary_record","event_type":"primary_record","occurred_on":"primary_record","observed_on":"primary_record","qualifies_status":"primary_record","status_group":"primary_record","status_label":"primary_record","scope":"primary_record"}}]}