{"state":"va","name":"Prince William County, Virginia","updated":"2026-10-20","checked":"2026-10-15","bounds":[-77.7159,38.5008,-77.2207,38.9427],"stats":{"reviewed_records":6,"status_confirmed":0,"status_unknown":6,"mapped_records":0},"coverage":{"scope":"Counts are Atlas research records associated with this area, not distinct buildings, a complete facility census or verified parcel jurisdictions. Inherited names and mapped points can disagree; each record keeps its source and location limits.","meaning":"Derived subset of published canonical state records; new county source checks do not certify every record or local ordinance."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"amazon-devlin-tech-park-va","state":"va","kind":"facility","name":"Amazon Devlin Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Bristow","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Land price is not total construction spending. Zoning floor allowance is not commissioned space or proof of current operations. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/","host":"virginiabusiness.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Reported Amazon purchase of 188.5 acres in Devlin Technology Park closed November 5 for 700 million USD.","independently_verified_current_operating_status":null},"notes":["Land price is not total construction spending. Zoning floor allowance is not commissioned space or proof of current operations.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/","host":"virginiabusiness.com","date":"2025-11-18","published":"2025-11-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Bristow · Prince William · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"cloudhq-manassas-mcc-va","state":"va","kind":"facility","name":"CloudHQ Manassas MCC Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Manassas","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CloudHQ MCC full-campus and phased development scope. 382MW is full campus marketing total, not each building or energized load. Narrative says over375MW rather than exact382. RFSwithin20months is undated relative interval, not calendar opening. Mid2025construction/Q32026MCC7targets have not been independently observed. Referencepoint not verified parcel centroid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cloudhq.com/campus/mcc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"CloudHQ MCC full-campus and phased development scope","fields":{"campus":"MCC","operator_campus_reference_point":{"lat":38.71955,"lon":-77.49819},"campus_area_sqft":2232875,"headline_total_critical_it_mw":382,"headline_available_critical_load_mw":96,"data_centers":7,"mcc5_status_description":"siteplan approved, ready for development","mcc7_historical_target_service_quarter":"2026-Q3"},"notes":["382MW is full campus marketing total, not each building or energized load. Narrative says over375MW rather than exact382. RFSwithin20months is undated relative interval, not calendar opening. Mid2025construction/Q32026MCC7targets have not been independently observed. Referencepoint not verified parcel centroid.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cloudhq.com/campus/mcc-campus/","host":"cloudhq.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Manassas · Prince William · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"dulles-cloud-south-gainesville-prince-william-va","state":"va","kind":"facility","name":"Dulles Cloud South (Dulles South Innovation Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Planning-stage denial, not an operating-site shutdown. Industrial square footage and traffic forecasts are not commissioned server floor or measured traffic. Later official record still needed. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/","host":"potomaclocal.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"plan-amendment-denied","reported_finding":"Potomac Local reports board denied Dulles South Comprehensive Plan Amendment on July 7, 2026.","report_display_date":"2026-07-08","independently_verified_current_status":null},"notes":["Planning-stage denial, not an operating-site shutdown. Industrial square footage and traffic forecasts are not commissioned server floor or measured traffic. Later official record still needed.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/","host":"potomaclocal.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Gainesville · Prince William · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"corscale-gainesville-crossing-va","state":"va","kind":"facility","name":"Gainesville Crossing Digital Campus (GCDC)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. AffiniusCapital original projectpage identifies GainesvilleCrossingGCDC withCorscale.130acres/fivebuildings/326MWFULLBUILDOUTpower have unspecifiedITbasis, not commissionedcriticalIT. Header1,020kRSF is rentable area, not automaticallygrosssitebuildingarea. Developer saysBuilding1stabilized andBuildings1 to 3fullyleased, but lease/stabilization isnot independentmeteredoperation. Buildings2Q22026/3Q32026completion and4 to 5Q22026construction are undated-page targets; datespassingnotobservedcompletion. Introone-on-sitesubstation vs featurestwo-on-sitesubstations is internal scope/versionconflict. LEEDanticipated/WUE-PUEclaims notcertifiedmeasurements; no regiondevoidofnaturaldisastersclaim adopted. GCDC isnotPWCDigitalGateway; unrelatedwithdrawalheadline doesnotcancelthiscampus. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://affiniuscapital.com/projects/gcdc/","host":"affiniuscapital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json","scope":"Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.","fields":{},"notes":["AffiniusCapital original projectpage identifies GainesvilleCrossingGCDC withCorscale.130acres/fivebuildings/326MWFULLBUILDOUTpower have unspecifiedITbasis, not commissionedcriticalIT. Header1,020kRSF is rentable area, not automaticallygrosssitebuildingarea.","Developer saysBuilding1stabilized andBuildings1 to 3fullyleased, but lease/stabilization isnot independentmeteredoperation. Buildings2Q22026/3Q32026completion and4 to 5Q22026construction are undated-page targets; datespassingnotobservedcompletion. Introone-on-sitesubstation vs featurestwo-on-sitesubstations is internal scope/versionconflict. LEEDanticipated/WUE-PUEclaims notcertifiedmeasurements; no regiondevoidofnaturaldisastersclaim adopted. GCDC isnotPWCDigitalGateway; unrelatedwithdrawalheadline doesnotcancelthiscampus.","Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."],"sources":[{"url":"https://affiniuscapital.com/projects/gcdc/","host":"affiniuscapital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Gainesville · Prince William · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"prince-william-digital-gateway-va","state":"va","kind":"facility","name":"Prince William Digital Gateway","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Original court docket and withdrawal instrument not retained. Reported developer termination supported, but no general county ban or cancellation of unrelated Dulles South inferred. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","host":"wtop.com","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"final-developer-appeal-withdrawal-reported","reported_finding":"InsideNoVa reporting via WTOP says QTS withdrew Supreme Court challenge and terminated Digital Gateway project after prior approvals were voided.","report_display_date":"2026-07-02","independently_verified_current_status":null},"notes":["Original court docket and withdrawal instrument not retained. Reported developer termination supported, but no general county ban or cancellation of unrelated Dulles South inferred.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/","host":"wtop.com","date":"2026-07-02","published":"2026-07-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Gainesville · Prince William · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}},{"id":"sharpless-wellington-road-bristow-va","state":"va","kind":"facility","name":"Wellington Road Data Center Campus (Sharpless)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Prince William"],"city":"Bristow","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This is wetlands/streams-related Corps review, not proof of every local building, utility or operating approval. Approved instrument was not obtained by reporter at publication and has not been directly reviewed here. Google affiliation is attributed to DataCenterDynamics, not an independently examined corporate filing. Neighboring Microsoft 124 acres and nearly 4 million square feet concern separate parcels and cannot be assigned to Sharpless. Existing industrial zoning does not waive all remaining permits. Historic cleanup orders and ongoing groundwater treatment are not a blanket environmental clearance. No MW or current operating certification. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html","host":"insidenova.com","date":"2024-03-08","published":"2024-03-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":null,"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"InsideNoVa reports an Army Corps official confirmed approval of Sharpless’s four-building proposal at 6201 Wellington Road on a 181-acre former military-industrial site.","independently_verified_current_operating_status":null,"operator_or_exact_site_identity_needs_crosswalk":true},"notes":["This is wetlands/streams-related Corps review, not proof of every local building, utility or operating approval. Approved instrument was not obtained by reporter at publication and has not been directly reviewed here. Google affiliation is attributed to DataCenterDynamics, not an independently examined corporate filing. Neighboring Microsoft 124 acres and nearly 4 million square feet concern separate parcels and cannot be assigned to Sharpless. Existing industrial zoning does not waive all remaining permits. Historic cleanup orders and ongoing groundwater treatment are not a blanket environmental clearance. No MW or current operating certification.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html","host":"insidenova.com","date":"2024-03-08","published":"2024-03-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Site point withheld pending location review","summary":"Bristow · Prince William · Source context reviewed","location_display":{"policy":"reviewed-map-references-2026-10-20","decision":"withheld_unreviewed_point","scope":"The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history."}}],"county_rules":{},"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."},"geography":{"vintage":"2025-01-01","source":"https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12","source_capture_sha256":"cda691cfd3505bf7a39c1be4e7df197f80f2b53a2b9701cff8a486b004b43abe","scale":"1:5,000,000","meaning":"Generalized 1:5,000,000 display boundaries, not parcel or cadastral geometry","records":{"amazon-devlin-tech-park-va":{"fips":["51153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"cloudhq-manassas-mcc-va":{"fips":["51153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"dulles-cloud-south-gainesville-prince-william-va":{"fips":["51153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"corscale-gainesville-crossing-va":{"fips":["51153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"prince-william-digital-gateway-va":{"fips":["51153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."},"sharpless-wellington-road-bristow-va":{"fips":["51153"],"method":"inherited_area_context","point_context_conflict":false,"legacy_area_unmatched":false,"note":"Area names retain inherited research context; the exact jurisdiction is not independently verified."}}},"geography_areas":[{"name":"Accomack County","base_name":"Accomack","fips":"51001","kind":"County"},{"name":"Albemarle County","base_name":"Albemarle","fips":"51003","kind":"County"},{"name":"Alleghany County","base_name":"Alleghany","fips":"51005","kind":"County"},{"name":"Amelia County","base_name":"Amelia","fips":"51007","kind":"County"},{"name":"Amherst County","base_name":"Amherst","fips":"51009","kind":"County"},{"name":"Appomattox County","base_name":"Appomattox","fips":"51011","kind":"County"},{"name":"Arlington County","base_name":"Arlington","fips":"51013","kind":"County"},{"name":"Augusta County","base_name":"Augusta","fips":"51015","kind":"County"},{"name":"Bath County","base_name":"Bath","fips":"51017","kind":"County"},{"name":"Bedford County","base_name":"Bedford","fips":"51019","kind":"County"},{"name":"Bland County","base_name":"Bland","fips":"51021","kind":"County"},{"name":"Botetourt County","base_name":"Botetourt","fips":"51023","kind":"County"},{"name":"Brunswick County","base_name":"Brunswick","fips":"51025","kind":"County"},{"name":"Buchanan County","base_name":"Buchanan","fips":"51027","kind":"County"},{"name":"Buckingham County","base_name":"Buckingham","fips":"51029","kind":"County"},{"name":"Campbell County","base_name":"Campbell","fips":"51031","kind":"County"},{"name":"Caroline County","base_name":"Caroline","fips":"51033","kind":"County"},{"name":"Carroll County","base_name":"Carroll","fips":"51035","kind":"County"},{"name":"Charles City County","base_name":"Charles City","fips":"51036","kind":"County"},{"name":"Charlotte County","base_name":"Charlotte","fips":"51037","kind":"County"},{"name":"Chesterfield County","base_name":"Chesterfield","fips":"51041","kind":"County"},{"name":"Clarke County","base_name":"Clarke","fips":"51043","kind":"County"},{"name":"Craig County","base_name":"Craig","fips":"51045","kind":"County"},{"name":"Culpeper County","base_name":"Culpeper","fips":"51047","kind":"County"},{"name":"Cumberland County","base_name":"Cumberland","fips":"51049","kind":"County"},{"name":"Dickenson County","base_name":"Dickenson","fips":"51051","kind":"County"},{"name":"Dinwiddie County","base_name":"Dinwiddie","fips":"51053","kind":"County"},{"name":"Essex County","base_name":"Essex","fips":"51057","kind":"County"},{"name":"Fairfax County","base_name":"Fairfax","fips":"51059","kind":"County"},{"name":"Fauquier County","base_name":"Fauquier","fips":"51061","kind":"County"},{"name":"Floyd County","base_name":"Floyd","fips":"51063","kind":"County"},{"name":"Fluvanna County","base_name":"Fluvanna","fips":"51065","kind":"County"},{"name":"Franklin County","base_name":"Franklin","fips":"51067","kind":"County"},{"name":"Frederick County","base_name":"Frederick","fips":"51069","kind":"County"},{"name":"Giles County","base_name":"Giles","fips":"51071","kind":"County"},{"name":"Gloucester County","base_name":"Gloucester","fips":"51073","kind":"County"},{"name":"Goochland County","base_name":"Goochland","fips":"51075","kind":"County"},{"name":"Grayson County","base_name":"Grayson","fips":"51077","kind":"County"},{"name":"Greene County","base_name":"Greene","fips":"51079","kind":"County"},{"name":"Greensville County","base_name":"Greensville","fips":"51081","kind":"County"},{"name":"Halifax County","base_name":"Halifax","fips":"51083","kind":"County"},{"name":"Hanover County","base_name":"Hanover","fips":"51085","kind":"County"},{"name":"Henrico County","base_name":"Henrico","fips":"51087","kind":"County"},{"name":"Henry County","base_name":"Henry","fips":"51089","kind":"County"},{"name":"Highland County","base_name":"Highland","fips":"51091","kind":"County"},{"name":"Isle of Wight County","base_name":"Isle of Wight","fips":"51093","kind":"County"},{"name":"James City County","base_name":"James City","fips":"51095","kind":"County"},{"name":"King and Queen County","base_name":"King and Queen","fips":"51097","kind":"County"},{"name":"King George County","base_name":"King George","fips":"51099","kind":"County"},{"name":"King William County","base_name":"King William","fips":"51101","kind":"County"},{"name":"Lancaster County","base_name":"Lancaster","fips":"51103","kind":"County"},{"name":"Lee County","base_name":"Lee","fips":"51105","kind":"County"},{"name":"Loudoun County","base_name":"Loudoun","fips":"51107","kind":"County"},{"name":"Louisa County","base_name":"Louisa","fips":"51109","kind":"County"},{"name":"Lunenburg County","base_name":"Lunenburg","fips":"51111","kind":"County"},{"name":"Madison County","base_name":"Madison","fips":"51113","kind":"County"},{"name":"Mathews County","base_name":"Mathews","fips":"51115","kind":"County"},{"name":"Mecklenburg County","base_name":"Mecklenburg","fips":"51117","kind":"County"},{"name":"Middlesex County","base_name":"Middlesex","fips":"51119","kind":"County"},{"name":"Montgomery County","base_name":"Montgomery","fips":"51121","kind":"County"},{"name":"Nelson County","base_name":"Nelson","fips":"51125","kind":"County"},{"name":"New Kent County","base_name":"New Kent","fips":"51127","kind":"County"},{"name":"Northampton County","base_name":"Northampton","fips":"51131","kind":"County"},{"name":"Northumberland County","base_name":"Northumberland","fips":"51133","kind":"County"},{"name":"Nottoway County","base_name":"Nottoway","fips":"51135","kind":"County"},{"name":"Orange County","base_name":"Orange","fips":"51137","kind":"County"},{"name":"Page County","base_name":"Page","fips":"51139","kind":"County"},{"name":"Patrick County","base_name":"Patrick","fips":"51141","kind":"County"},{"name":"Pittsylvania County","base_name":"Pittsylvania","fips":"51143","kind":"County"},{"name":"Powhatan County","base_name":"Powhatan","fips":"51145","kind":"County"},{"name":"Prince Edward County","base_name":"Prince Edward","fips":"51147","kind":"County"},{"name":"Prince George County","base_name":"Prince George","fips":"51149","kind":"County"},{"name":"Prince William County","base_name":"Prince William","fips":"51153","kind":"County"},{"name":"Pulaski County","base_name":"Pulaski","fips":"51155","kind":"County"},{"name":"Rappahannock County","base_name":"Rappahannock","fips":"51157","kind":"County"},{"name":"Richmond County","base_name":"Richmond","fips":"51159","kind":"County"},{"name":"Roanoke County","base_name":"Roanoke","fips":"51161","kind":"County"},{"name":"Rockbridge County","base_name":"Rockbridge","fips":"51163","kind":"County"},{"name":"Rockingham County","base_name":"Rockingham","fips":"51165","kind":"County"},{"name":"Russell County","base_name":"Russell","fips":"51167","kind":"County"},{"name":"Scott County","base_name":"Scott","fips":"51169","kind":"County"},{"name":"Shenandoah County","base_name":"Shenandoah","fips":"51171","kind":"County"},{"name":"Smyth County","base_name":"Smyth","fips":"51173","kind":"County"},{"name":"Southampton County","base_name":"Southampton","fips":"51175","kind":"County"},{"name":"Spotsylvania County","base_name":"Spotsylvania","fips":"51177","kind":"County"},{"name":"Stafford County","base_name":"Stafford","fips":"51179","kind":"County"},{"name":"Surry County","base_name":"Surry","fips":"51181","kind":"County"},{"name":"Sussex County","base_name":"Sussex","fips":"51183","kind":"County"},{"name":"Tazewell County","base_name":"Tazewell","fips":"51185","kind":"County"},{"name":"Warren County","base_name":"Warren","fips":"51187","kind":"County"},{"name":"Washington County","base_name":"Washington","fips":"51191","kind":"County"},{"name":"Westmoreland County","base_name":"Westmoreland","fips":"51193","kind":"County"},{"name":"Wise County","base_name":"Wise","fips":"51195","kind":"County"},{"name":"Wythe County","base_name":"Wythe","fips":"51197","kind":"County"},{"name":"York County","base_name":"York","fips":"51199","kind":"County"},{"name":"Alexandria city","base_name":"Alexandria","fips":"51510","kind":"Independent city"},{"name":"Bristol city","base_name":"Bristol","fips":"51520","kind":"Independent city"},{"name":"Buena Vista city","base_name":"Buena Vista","fips":"51530","kind":"Independent city"},{"name":"Charlottesville city","base_name":"Charlottesville","fips":"51540","kind":"Independent city"},{"name":"Chesapeake city","base_name":"Chesapeake","fips":"51550","kind":"Independent city"},{"name":"Colonial Heights city","base_name":"Colonial Heights","fips":"51570","kind":"Independent city"},{"name":"Covington city","base_name":"Covington","fips":"51580","kind":"Independent city"},{"name":"Danville city","base_name":"Danville","fips":"51590","kind":"Independent city"},{"name":"Emporia city","base_name":"Emporia","fips":"51595","kind":"Independent city"},{"name":"Fairfax city","base_name":"Fairfax","fips":"51600","kind":"Independent city"},{"name":"Falls Church city","base_name":"Falls Church","fips":"51610","kind":"Independent city"},{"name":"Franklin city","base_name":"Franklin","fips":"51620","kind":"Independent city"},{"name":"Fredericksburg city","base_name":"Fredericksburg","fips":"51630","kind":"Independent city"},{"name":"Galax city","base_name":"Galax","fips":"51640","kind":"Independent city"},{"name":"Hampton city","base_name":"Hampton","fips":"51650","kind":"Independent city"},{"name":"Harrisonburg city","base_name":"Harrisonburg","fips":"51660","kind":"Independent city"},{"name":"Hopewell city","base_name":"Hopewell","fips":"51670","kind":"Independent city"},{"name":"Lexington city","base_name":"Lexington","fips":"51678","kind":"Independent city"},{"name":"Lynchburg city","base_name":"Lynchburg","fips":"51680","kind":"Independent city"},{"name":"Manassas city","base_name":"Manassas","fips":"51683","kind":"Independent city"},{"name":"Manassas Park city","base_name":"Manassas Park","fips":"51685","kind":"Independent city"},{"name":"Martinsville city","base_name":"Martinsville","fips":"51690","kind":"Independent city"},{"name":"Newport News city","base_name":"Newport News","fips":"51700","kind":"Independent city"},{"name":"Norfolk city","base_name":"Norfolk","fips":"51710","kind":"Independent city"},{"name":"Norton city","base_name":"Norton","fips":"51720","kind":"Independent city"},{"name":"Petersburg city","base_name":"Petersburg","fips":"51730","kind":"Independent city"},{"name":"Poquoson city","base_name":"Poquoson","fips":"51735","kind":"Independent city"},{"name":"Portsmouth city","base_name":"Portsmouth","fips":"51740","kind":"Independent city"},{"name":"Radford city","base_name":"Radford","fips":"51750","kind":"Independent city"},{"name":"Richmond city","base_name":"Richmond","fips":"51760","kind":"Independent city"},{"name":"Roanoke city","base_name":"Roanoke","fips":"51770","kind":"Independent city"},{"name":"Salem city","base_name":"Salem","fips":"51775","kind":"Independent city"},{"name":"Staunton city","base_name":"Staunton","fips":"51790","kind":"Independent city"},{"name":"Suffolk city","base_name":"Suffolk","fips":"51800","kind":"Independent city"},{"name":"Virginia Beach city","base_name":"Virginia Beach","fips":"51810","kind":"Independent city"},{"name":"Waynesboro city","base_name":"Waynesboro","fips":"51820","kind":"Independent city"},{"name":"Williamsburg city","base_name":"Williamsburg","fips":"51830","kind":"Independent city"},{"name":"Winchester city","base_name":"Winchester","fips":"51840","kind":"Independent city"}],"state_legislation":{"review_scope":"partial_primary_review","latest_scoped_check":"2026-10-15","coverage_note":"Selected bill histories and enacted texts reviewed; this is not a complete state legislative inventory or a review of site compliance.","bill_records":5,"enacted_measures":4,"enacted_policy_groups":3,"failed_proposals":1,"bills":[{"id":"legislation:va:20261:hb153","state":"va","bill_id":"HB153","session":"2026 Regular Session","topics":["siting","noise","water","utility_disclosure"],"status":"enacted","effective_on":"2026-07-01","title":"High-energy facility site assessments","summary":"For new high-energy-use facilities anticipating at least 100 MW of retail utility power, covered local siting approvals require an applicant sound assessment for residences and schools within 500 feet of the property boundary, subject to the act’s practicability and timing provisions. The serving utility must provide specified substation and transmission-voltage information to the extent known and practicable.","applicability":"The threshold concerns utility power, not IT capacity. Localities may request additional water and other resource assessment. Local zoning and State Corporation Commission authority remain distinct. An exception covers specified previously approved expansions; read the enacted text and approval history before applying it to a project.","policy_group_id":"va:20261:site-assessments","policy_type":"siting_assessment_requirement","companion_bill_ids":["SB94"],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"567","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB153","text_url":"https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"session":["https://lis.virginia.gov/bill-details/20261/HB153"],"topics":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"status":["https://lis.virginia.gov/bill-details/20261/HB153"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"title":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"summary":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB153"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB153"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB153"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB153/text/CHAP0567"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb323","state":"va","bill_id":"HB323","session":"2026 Regular Session","topics":["waste_heat","study","reporting"],"status":"enacted","effective_on":"2026-07-01","title":"Waste-heat reuse study and work group","summary":"Directs the Department of Energy to identify opportunities for data-center waste-heat reuse, assess practices and infrastructure costs, develop recommendations, and convene a work group. A report to the named legislative committee chairs was due September 1, 2026.","applicability":"This is an agency research and reporting directive. It does not require every data center to deliver reused heat. Report completion has not been verified; an elapsed deadline alone does not establish a missed report or project noncompliance.","policy_group_id":"va:20261:waste-heat-study","policy_type":"agency_study_directive","companion_bill_ids":[],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"591","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB323","text_url":"https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591","report_due_on":"2026-09-01","field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"session":["https://lis.virginia.gov/bill-details/20261/HB323"],"topics":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"status":["https://lis.virginia.gov/bill-details/20261/HB323"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"title":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"summary":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB323"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB323"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB323"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB323/text/CHAP0591"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb507","state":"va","bill_id":"HB507","session":"2026 Regular Session","topics":["air_permits","backup_generation","emissions"],"status":"enacted","effective_on":"2026-07-01","title":"Generator-emissions limits for new permit applications","summary":"For covered data-center air-permit applications submitted on or after July 1, 2026, including general-permit coverage, DEQ may issue the permit only if each gen-set’s permit emission limit is no greater than emissions achieved by the act’s defined Tier 4 equivalent.","applicability":"Application submission date matters. Tier 4 equivalent has specified pollution-control definitions; the act preserves other applicable standards and more stringent limits. This is not evidence that an existing site retrofitted its generators or that a particular permit satisfies the rule.","policy_group_id":"va:20261:generator-emissions","policy_type":"emissions_permit_requirement","companion_bill_ids":[],"enacted_on":"2026-04-08","disposition_on":"2026-04-08","reviewed_on":"2026-10-15","chapter":"397","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB507","text_url":"https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"session":["https://lis.virginia.gov/bill-details/20261/HB507"],"topics":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"status":["https://lis.virginia.gov/bill-details/20261/HB507"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"title":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"summary":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB507"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB507"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB507"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB507/text/CHAP0397"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:hb658","state":"va","bill_id":"HB658","session":"2026 Regular Session","topics":["electricity_costs","cost_allocation"],"status":"failed","effective_on":null,"title":"Electric utility cost-allocation proceedings","summary":"Proposed SCC proceedings to examine whether other customer classes subsidize data-center transmission costs for Dominion Energy and Appalachian Power, plus generation and distribution costs for Dominion. The official history marks the bill failed after it was left in House Labor and Commerce on February 18, 2026.","applicability":"This proposal was not enacted and supplies no effective date or new requirement. Its failure does not determine what other laws, tariffs or SCC proceedings require.","policy_group_id":"va:20261:cost-allocation-proposal","policy_type":"cost_allocation_proposal","companion_bill_ids":[],"enacted_on":null,"disposition_on":"2026-02-18","reviewed_on":"2026-10-15","chapter":null,"review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/HB658","text_url":null,"report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/HB658"],"bill_id":["https://lis.virginia.gov/bill-details/20261/HB658"],"session":["https://lis.virginia.gov/bill-details/20261/HB658"],"topics":["https://lis.virginia.gov/bill-details/20261/HB658"],"status":["https://lis.virginia.gov/bill-details/20261/HB658"],"effective_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"title":["https://lis.virginia.gov/bill-details/20261/HB658"],"summary":["https://lis.virginia.gov/bill-details/20261/HB658"],"applicability":["https://lis.virginia.gov/bill-details/20261/HB658"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/HB658"],"policy_type":["https://lis.virginia.gov/bill-details/20261/HB658"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/HB658"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/HB658"],"chapter":["https://lis.virginia.gov/bill-details/20261/HB658"],"review_scope":["https://lis.virginia.gov/bill-details/20261/HB658"],"bill_url":["https://lis.virginia.gov/bill-details/20261/HB658"],"text_url":["https://lis.virginia.gov/bill-details/20261/HB658"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/HB658"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}},{"id":"legislation:va:20261:sb94","state":"va","bill_id":"SB94","session":"2026 Regular Session","topics":["siting","noise","water","utility_disclosure"],"status":"enacted","effective_on":"2026-07-01","title":"High-energy facility site assessments","summary":"For new high-energy-use facilities anticipating at least 100 MW of retail utility power, covered local siting approvals require an applicant sound assessment for residences and schools within 500 feet of the property boundary, subject to the act’s practicability and timing provisions. The serving utility must provide specified substation and transmission-voltage information to the extent known and practicable.","applicability":"The threshold concerns utility power, not IT capacity. Localities may request additional water and other resource assessment. Local zoning and State Corporation Commission authority remain distinct. An exception covers specified previously approved expansions; read the enacted text and approval history before applying it to a project.","policy_group_id":"va:20261:site-assessments","policy_type":"siting_assessment_requirement","companion_bill_ids":["HB153"],"enacted_on":"2026-04-13","disposition_on":"2026-04-13","reviewed_on":"2026-10-15","chapter":"568","review_scope":"partial_primary_review","bill_url":"https://lis.virginia.gov/bill-details/20261/SB94","text_url":"https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568","report_due_on":null,"field_sources":{"state":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"bill_id":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"session":["https://lis.virginia.gov/bill-details/20261/SB94"],"topics":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"status":["https://lis.virginia.gov/bill-details/20261/SB94"],"effective_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"title":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"summary":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"applicability":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"policy_group_id":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"policy_type":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"companion_bill_ids":["https://lis.virginia.gov/bill-details/20261/SB94"],"enacted_on":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"disposition_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"reviewed_on":["https://lis.virginia.gov/bill-details/20261/SB94"],"chapter":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"review_scope":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"bill_url":["https://lis.virginia.gov/bill-details/20261/SB94"],"text_url":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"],"report_due_on":["https://lis.virginia.gov/bill-details/20261/SB94/text/CHAP0568"]},"field_confidence":{"state":"primary_record","bill_id":"primary_record","session":"primary_record","topics":"inference","status":"primary_record","effective_on":"primary_record","title":"primary_record","summary":"primary_record","applicability":"inference","policy_group_id":"inference","policy_type":"inference","companion_bill_ids":"primary_record","enacted_on":"primary_record","disposition_on":"primary_record","reviewed_on":"primary_record","chapter":"primary_record","review_scope":"inference","bill_url":"primary_record","text_url":"primary_record","report_due_on":"primary_record"}}]},"county_rule_reviews":[],"stage_timelines":{},"location_display_policy":{"id":"reviewed-map-references-2026-10-20","counts":{"withheld_unreviewed_point":104,"retained_reviewed_reference":6,"no_site_point":11},"scope":"Only admitted existing location references are mapped. Records without a supported point stay searchable. Admission does not certify a parcel, property ownership or current operating status."},"county":{"fips":"51153","name":"Prince William County","base_name":"Prince William","kind":"County","state":"va","state_name":"Virginia","state_path":"/virginia/","path":"/county/virginia/prince-william/"},"county_scope":"Counts are Atlas research records associated with this area, not distinct buildings, a complete facility census or verified parcel jurisdictions. Inherited names and mapped points can disagree; each record keeps its source and location limits.","page_created_on":"2026-10-20","county_policy_review_recorded":false,"checked_scope":"Inherited state source-context checkpoint only. Record and county-policy checks keep their separate dates; this is not a whole-county review.","map_settings":{"bounds":[-77.7159,38.5008,-77.2207,38.9427],"hub":[-77.4683,38.72175],"hub_basis":"Illustrative county bounds midpoint. Lines do not depict actual power or fiber connections."},"map_mask":{"type":"FeatureCollection","features":[{"type":"Feature","properties":{"role":"mask"},"geometry":{"type":"Polygon","coordinates":[[[-179,-80],[179,-80],[179,84],[-179,84],[-179,-80]],[[-77.7159,38.8416],[-77.71,38.8238],[-77.6799,38.7786],[-77.6797,38.7784],[-77.6697,38.7634],[-77.625,38.6962],[-77.6133,38.6785],[-77.5795,38.6277],[-77.576,38.6223],[-77.5618,38.601],[-77.5355,38.5612],[-77.5313,38.5565],[-77.4818,38.5923],[-77.464,38.5787],[-77.4488,38.5813],[-77.3969,38.5472],[-77.372,38.5212],[-77.3344,38.5141],[-77.3088,38.5008],[-77.3019,38.5045],[-77.2997,38.5071],[-77.2838,38.5265],[-77.2825,38.5291],[-77.277,38.541],[-77.2771,38.5485],[-77.2586,38.5613],[-77.2581,38.5616],[-77.2529,38.5757],[-77.2464,38.5934],[-77.238,38.5983],[-77.2273,38.6045],[-77.2301,38.6251],[-77.2207,38.6474],[-77.2395,38.6665],[-77.2406,38.6677],[-77.2454,38.6721],[-77.2458,38.6723],[-77.2579,38.6847],[-77.2661,38.6878],[-77.2764,38.6946],[-77.2811,38.6958],[-77.2988,38.7043],[-77.3086,38.7067],[-77.3172,38.7012],[-77.3269,38.7041],[-77.3202,38.7108],[-77.3323,38.7165],[-77.3555,38.7252],[-77.3591,38.7238],[-77.3608,38.7217],[-77.3695,38.7103],[-77.3805,38.7225],[-77.3885,38.7491],[-77.4113,38.7447],[-77.4135,38.7727],[-77.4294,38.7809],[-77.4327,38.7798],[-77.4431,38.8037],[-77.4489,38.8032],[-77.4577,38.7973],[-77.4691,38.7959],[-77.4937,38.7981],[-77.4903,38.8103],[-77.5051,38.8162],[-77.5039,38.824],[-77.5088,38.8411],[-77.5296,38.837],[-77.536,38.8474],[-77.5488,38.8466],[-77.5522,38.8866],[-77.5803,38.891],[-77.625,38.9318],[-77.6373,38.9417],[-77.6552,38.9427],[-77.6804,38.8932],[-77.6926,38.887],[-77.7049,38.8432],[-77.7159,38.8416]]]}},{"type":"Feature","properties":{"role":"outline"},"geometry":{"type":"MultiLineString","coordinates":[[[-77.7159,38.8416],[-77.71,38.8238],[-77.6799,38.7786],[-77.6797,38.7784],[-77.6697,38.7634],[-77.625,38.6962],[-77.6133,38.6785],[-77.5795,38.6277],[-77.576,38.6223],[-77.5618,38.601],[-77.5355,38.5612],[-77.5313,38.5565],[-77.4818,38.5923],[-77.464,38.5787],[-77.4488,38.5813],[-77.3969,38.5472],[-77.372,38.5212],[-77.3344,38.5141],[-77.3088,38.5008],[-77.3019,38.5045],[-77.2997,38.5071],[-77.2838,38.5265],[-77.2825,38.5291],[-77.277,38.541],[-77.2771,38.5485],[-77.2586,38.5613],[-77.2581,38.5616],[-77.2529,38.5757],[-77.2464,38.5934],[-77.238,38.5983],[-77.2273,38.6045],[-77.2301,38.6251],[-77.2207,38.6474],[-77.2395,38.6665],[-77.2406,38.6677],[-77.2454,38.6721],[-77.2458,38.6723],[-77.2579,38.6847],[-77.2661,38.6878],[-77.2764,38.6946],[-77.2811,38.6958],[-77.2988,38.7043],[-77.3086,38.7067],[-77.3172,38.7012],[-77.3269,38.7041],[-77.3202,38.7108],[-77.3323,38.7165],[-77.3555,38.7252],[-77.3591,38.7238],[-77.3608,38.7217],[-77.3695,38.7103],[-77.3805,38.7225],[-77.3885,38.7491],[-77.4113,38.7447],[-77.4135,38.7727],[-77.4294,38.7809],[-77.4327,38.7798],[-77.4431,38.8037],[-77.4489,38.8032],[-77.4577,38.7973],[-77.4691,38.7959],[-77.4937,38.7981],[-77.4903,38.8103],[-77.5051,38.8162],[-77.5039,38.824],[-77.5088,38.8411],[-77.5296,38.837],[-77.536,38.8474],[-77.5488,38.8466],[-77.5522,38.8866],[-77.5803,38.891],[-77.625,38.9318],[-77.6373,38.9417],[-77.6552,38.9427],[-77.6804,38.8932],[-77.6926,38.887],[-77.7049,38.8432],[-77.7159,38.8416]]]}}]},"county_timeline":[]}