{"updated": "2026-10-26", "scope": "The October 26, 2026 compilation lists 84 research records with the building label. Records can describe buildings, campuses or proposals; this is not a count of distinct operating facilities.", "records": [{"id": "terawulf-hawesville-ky", "kind": "project", "name": "Justified Data Campus", "group": "building", "status": "Site development underway", "raw_status": "under construction", "crypto": false, "type": "data center", "counties": ["Hancock"], "city": "Hawesville", "who": "TeraWulf / Raylan Data", "end_user": "Anthropic", "mw": 401, "power": "Approximately 401 MW contracted critical IT across future phases", "power_note": "Separate non-additive figures: approximately 401 MW contracted critical IT; up to 482 MW approved electric service; up to 480 MW planned gross campus capacity. None establishes current delivered IT or metered demand.", "investment": "approximately 4.0 billion to 4.5 billion in site development and initial data halls, excluding customer computing equipment", "jobs": "", "acres": null, "utility": "Big Rivers Electric / Kenergy; market delivery through MISO", "water": "", "incentives": "Customer bears project-specific power supply, delivery and infrastructure costs under the approved contract. No verified site-specific tax award recorded here.", "note": "PSC power agreement approval; operator describes development at former smelter", "date": "2026-08-21", "events": [["2026-07-06", "TeraWulf announced an Anthropic lease for approximately 401 MW critical IT at Justified. Initial second-half-2027 and full early-2028 delivery are future targets."], ["2026-08-21", "Electric-service agreement approval dated August 21, reported in TeraWulf’s August 24 announcement. Up to 482 MW is service capacity, not IT delivery, building approval or operation."]], "timeline": [], "sources": [{"url": "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus", "host": "investors.terawulf.com", "date": "2026-08-24"}, {"url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack", "host": "investors.terawulf.com", "date": "2026-07-06"}, {"url": "https://www.terawulf.com/our-sites", "host": "www.terawulf.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Current operator site directory"}, {"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/0001083301-26-000166.pdf", "host": "investors.terawulf.com", "published": "2026-08-05", "date": "2026-08-05", "checked": "2026-10-16", "label": "Q2 filing, pages 54–55 reviewed"}, {"url": "https://www.justifieddatacampus.com/faq", "host": "www.justifieddatacampus.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Project FAQ: site development and cooling design"}, {"url": "https://www.justifieddatacampus.com/project-overview", "host": "www.justifieddatacampus.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Project overview and prospective timing"}, {"url": "https://www.justifieddatacampus.com/newsroom/data-center-noise-levels-at-the-justified-data-campus", "host": "www.justifieddatacampus.com", "published": "2026-10-12", "date": "2026-10-12", "checked": "2026-10-16", "label": "Project account of noise modelling"}, {"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0000950142-26-000720/eh260751501_8k.htm", "host": "investors.terawulf.com", "published": "2026-03-16", "date": "2026-03-16", "checked": "2026-10-16", "label": "Raylan / Justified borrower and affiliate roles"}], "loc": {"lat": 37.84153, "lng": -86.77784, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Hancock County · 401 MW · TeraWulf / Raylan Data", "reviewed_evidence": [{"overlay": "Hawesville primary depth October 16", "scope": "Targeted operator/issuer review of Hawesville site development, lease, utility approval and cooling design. Not a physical-site, completed-building, full-order legal, location or whole-state certification.", "fields": {"site_work_scope": "The undated project FAQ says site development is underway. This supports site development, including brownfield work, not a verified start/completion of data-center halls or an operating facility.", "critical_it_contract": {"approximately_mw": 401, "basis": "contracted critical IT", "lease_years": 20, "tenant": "Anthropic", "source_publication": "2026-07-06", "delivered_capacity_established": false}, "electric_service_approval": {"up_to_mw": 482, "measure": "electric service", "order_date_reported_by_operator": "2026-08-21", "announcement_date": "2026-08-24", "building_occupancy_or_operation_established": false}, "gross_campus_plan": {"up_to_mw": 480, "measure": "gross data center capacity", "basis": "future phased plan", "technical_as_of_date": null, "source": "current operator directory"}, "delivery_targets": {"initial": "second half of 2027", "full_401mw": "early 2028", "project_faq": "mid-to-late 2027, subject to site planning and permitting", "exact_opening_day": null}, "development_forecast": "Operator August 24 estimate of approximately $4.0–4.5 billion for site development and initial data halls, excluding customer computing equipment. Forecast range, not spent investment, incentive or contracted revenue.", "land_scope": {"project_property_acres": 790, "buildable_acres": 250, "relationship": "Different operator land measures, not an adopted parcel boundary or exact surveyed acreage; the issuer says more than 250 buildable acres."}, "cooling_design": "Project FAQ describes a planned sealed closed-loop system with air-to-fluid heat rejection and minimal utility water; no Ohio River supply planned. Design statement only, not measured withdrawal/consumption, zero total water use, permit or water right.", "developer_legal_roles": "TeraWulf is the project developer brand. March 16 filing identifies Raylan Finance LLC as Holdings, Raylan Data LLC as Borrower and Justified DataPower LLC as affiliate/Real Estate Guarantor. Those financing roles do not certify current parcel title or independent physical sites.", "location_hold": "The inherited house point remains county-only and unplotted. Former-smelter context and undated corporate graphics do not establish a verified parcel, roof or address point.", "prospective_conflicts": "Project overview retains an expected first-half-2026 construction start subject to planning/permits, while the FAQ says site development is underway. The quarter filing also described expected 2026 commencement. No exact physical start or occupancy day is inferred.", "noise_model_scope": "The October 12 project post describes predicted sound at two residential locations and a study of three planned buildings. This is an operator account of modelling, not independent review of the full ERM report, measured noise, legal compliance certification or three completed buildings.", "financial_scope": "The July lease revenue forecast is approximately $19 billion over twenty years, not construction investment. The same release’s Abernathy disposition is a separate transaction and campus.", "source_limits": "Company pages have no published technical as-of date. Corporate disclosures are field-specific; the PSC docket and relevant order sections were corroborated through the web tool, without local Python retrieval or raw PDF hash/full-order adoption. No contacts or requests were made."}, "notes": ["Site development underway is limited to the operator FAQ; data-center halls, opening and delivered IT are unconfirmed.", "480 MW gross, 482 MW service and approximately 401 MW IT are different non-additive measures.", "County-only house-point protection and all legacy technical figures/forecast text remain unchanged.", "Noise values are not normalized without the full study; cooling design does not establish zero water use."], "sources": [{"url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack", "host": "investors.terawulf.com", "published": "2026-07-06", "date": "2026-07-06", "checked": "2026-10-16", "label": "Anthropic lease announcement"}, {"url": "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus", "host": "investors.terawulf.com", "published": "2026-08-24", "date": "2026-08-24", "checked": "2026-10-16", "label": "Electric-service approval announcement"}, {"url": "https://www.terawulf.com/our-sites", "host": "www.terawulf.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Current operator site directory"}, {"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/0001083301-26-000166.pdf", "host": "investors.terawulf.com", "published": "2026-08-05", "date": "2026-08-05", "checked": "2026-10-16", "label": "Q2 filing, pages 54–55 reviewed"}, {"url": "https://www.justifieddatacampus.com/faq", "host": "www.justifieddatacampus.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Project FAQ: site development and cooling design"}, {"url": "https://www.justifieddatacampus.com/project-overview", "host": "www.justifieddatacampus.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Project overview and prospective timing"}, {"url": "https://www.justifieddatacampus.com/newsroom/data-center-noise-levels-at-the-justified-data-campus", "host": "www.justifieddatacampus.com", "published": "2026-10-12", "date": "2026-10-12", "checked": "2026-10-16", "label": "Project account of noise modelling"}, {"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0000950142-26-000720/eh260751501_8k.htm", "host": "investors.terawulf.com", "published": "2026-03-16", "date": "2026-03-16", "checked": "2026-10-16", "label": "Raylan / Justified borrower and affiliate roles"}], "checked": "2026-10-16", "whole_record_certified": false}], "status_field": "current_status", "status_scope": "Operator project FAQ, checked October 16, 2026, says site development is underway. The undated statement supports brownfield/site development only; physical data-hall construction, delivered IT, occupancy and operation remain unconfirmed. The older first-half-2026 target is not a proved start date.", "event_evidence": [{"date": "2026-07-06", "text": "TeraWulf announced an Anthropic lease for approximately 401 MW critical IT at Justified. Initial second-half-2027 and full early-2028 delivery are future targets.", "kind": "announced", "sources": [{"url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack", "host": "investors.terawulf.com", "published": "2026-07-06", "date": "2026-07-06", "checked": "2026-10-16", "label": "Anthropic lease announcement"}]}, {"date": "2026-08-21", "text": "Electric-service agreement approval dated August 21, reported in TeraWulf’s August 24 announcement. Up to 482 MW is service capacity, not IT delivery, building approval or operation.", "kind": "approved", "sources": [{"url": "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus", "host": "investors.terawulf.com", "published": "2026-08-24", "date": "2026-08-24", "checked": "2026-10-16", "label": "Electric-service approval announcement"}]}], "typed_power_facts": [{"measure": "it_capacity", "value": 401, "unit": "MW", "basis": "contracted", "as_of": "2026-07-06", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Approximately 401 MW leased critical IT across future phases, not delivered or metered load; initial second-half-2027 and full early-2028 targets. Not additive with service or gross capacity.", "sources": ["https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack"]}, {"measure": "approved_service", "value": 482, "unit": "MW", "basis": "approved", "as_of": "2026-08-21", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Up to 482 MW electric-service agreement approved August 21, according to the August 24 operator announcement. Not IT load, actual demand, building approval or completed service delivery.", "sources": ["https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus"]}, {"measure": "site_gross_capacity", "value": 480, "unit": "MW", "basis": "forecast", "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "scope": "Up to 480 MW future gross data-center capacity in the current undated operator directory; phased plan starting in 2027. Not delivered IT or measured draw.", "sources": ["https://www.terawulf.com/our-sites"]}], "typed_water_facts": [{"measure": "cooling_type", "value": "Planned sealed closed-loop cooling with air-to-fluid heat rejection and minimal utility water.", "unit": null, "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "basis": "operator_reported_statement", "scope": "Prospective operator cooling-design statement; Ohio River supply is not planned. Not measured withdrawal or consumption, zero total water use, a permit or a water right.", "sources": ["https://www.justifieddatacampus.com/faq"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "county_context_only", "county_display": "21091"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "powerhouse-louisville-ky", "kind": "project", "name": "PowerHouse Data Centers - Louisville (Camp Ground Road)", "group": "building", "status": "Under construction", "raw_status": "under construction", "crypto": false, "type": "data center", "counties": ["Jefferson"], "city": "Louisville", "who": "PowerHouse Data Centers / Poe Companies", "end_user": "", "mw": 400, "power": "Up to 525 MW maximum utility power in the current operator plan", "power_note": "Different non-additive source scopes: current up-to-525 MW utility maximum; January 2025 reported 335 MW access, up-to-402 MW expansion and 130 MW October 2026 availability forecast. The older 400 MW campus headline remains unclassified and legacy numeric MW stays 400. No approved service, delivered IT, metered use or accomplished opening is established.", "investment": "", "jobs": "", "acres": "153", "utility": "LG&E", "water": "Louisville Water", "incentives": "", "note": "Developer and planning approval reporting; forecast opening is not proof of operation", "date": "2026-03-05", "events": [["2025-01-16", "PowerHouse, Poe and LG&E announced the Louisville development and utility-access forecasts. The date is an announcement, not a proved construction start, power delivery or opening."]], "timeline": [], "sources": [{"url": "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus", "host": "powerhousedata.com", "date": "2025-01-16"}, {"url": "https://www.lpm.org/news/2026-03-05/west-louisville-data-center-approved-despite-opposition", "host": "lpm.org", "date": "2026-03-05"}, {"url": "https://www.powerhousedata.com/data-center/ph-louisville", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Current Louisville project specifications"}, {"url": "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer", "host": "lge-ku.com", "published": "2025-01-16", "date": "2025-01-16", "checked": "2026-10-16", "label": "Original utility announcement"}, {"url": "https://www.poecompanies.com/poe-properties/camp-ground-industrial/", "host": "www.poecompanies.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Developer project page"}], "loc": {"lat": 38.21342, "lng": -85.6393, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "state": "KY", "precision_label": "Exact site not published; shown at county level", "summary": "Kentucky · Jefferson County · 400 MW · PowerHouse Data Centers / Poe Companies", "reviewed_evidence": [{"overlay": "PowerHouse utility and water-source depth October 16", "scope": "Targeted primary developer/utility power and planned water-source review only. Not current construction, legal approval, precise location, physical-site identity or whole-state certification.", "fields": {"utility_maximum": {"maximum_utility_power_mw": 525, "technical_as_of": null, "scope": "Advertised maximum utility power for a development; not approved service, IT load or metered demand."}, "historical_power_scopes": {"announcement_date": "2025-01-16", "campus_headline_mw": 400, "initial_power_access_reported_mw": 335, "near_term_expansion_up_to_mw": 402, "first_availability_forecast_mw": 130, "scope": "The 400 MW headline has no explicit IT or gross measure, so it stays unclassified. The other figures describe utility access or forecasts. No quantities are added."}, "delivery_targets": {"first_130_mw_availability_target": "2026-10", "original_first_building_target": "Q4 2026", "current_delivery_target": "Q4 2026", "current_power_delivery_target": "Q4 2026", "actual_delivery_day": null, "scope": "Published targets only; October availability, switch-station completion and first-building operation have not been verified as accomplished."}, "timeline_headings": {"site_development_timeline": "Q1 2025 to Q2 2027", "entitlements_design": "Q4 2024 to Q1 2025", "construction_delivery": "Q4 2026", "power_delivery": "Q4 2026", "scope": "Literal heading/value pairs from the current project page, not actual construction or opening dates."}, "developer_role": "PowerHouse and Poe describe a development joint venture. Poe labels the property In Development. This identifies developers, not a current end-user operator, legal parcel owner or corporate parent.", "water_supply_plan": "The developer and utility name Louisville Water Company infrastructure for the future campus. No facility withdrawal or consumption quantity, water right, cooling type or permit is established. The Ohio River flow statistic is not facility water use.", "land_and_building_scope": {"current_operator_acres": 154, "current_developable_square_feet": 1800000, "current_operator_buildings_up_to": 6, "inherited_acres_text": "153", "scope": "Current advertised plan, not surveyed acreage, constructed floor area or six completed buildings. The prior 153-acre display is retained pending plan/parcel review."}, "location_hold": "The existing county context remains unplotted. Operator/developer pages and renderings do not establish a reviewed parcel or precise campus point; the Poe footer office is not the project address.", "construction_status_scope": "This power/water review does not reverify physical construction or change the inherited Under construction label. Prospective construction, utility targets and architectural renderings cannot certify a completed milestone or operation.", "visual_source_scope": "Three architectural renderings on the project page were visually read through the public browser. They are design illustrations, not dated construction photography, cadastral geometry or an aerial inspection.", "source_date_scope": "January 16, 2025 is the original announcement date. Current operator/developer pages do not publish technical as-of dates. The October 16, 2026 retrieval date is a field check, not publication, approval or delivery."}, "notes": ["Keep 525 MW utility maximum separate from the older unclassified 400 MW campus headline, 335 MW access statement, up-to-402 MW expansion and 130 MW availability forecast.", "Q4 2026 and October 2026 are targets, not completed service, construction or operation. Current technical dates remain unknown.", "Planning, later court attachments and contractor-permit/address/building-count conflicts remain separate research. No agency or legal claim from those unadopted leads is made here.", "Retain the rejected house-point hold and all old non-power display values. No numeric legacy MW, acreage, address, site stage, permit, incentive or building identity is changed."], "sources": [{"url": "https://www.powerhousedata.com/data-center/ph-louisville", "host": "www.powerhousedata.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Current Louisville project specifications"}, {"url": "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus", "host": "www.powerhousedata.com", "published": "2025-01-16", "date": "2025-01-16", "checked": "2026-10-16", "label": "Original campus announcement"}, {"url": "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer", "host": "lge-ku.com", "published": "2025-01-16", "date": "2025-01-16", "checked": "2026-10-16", "label": "Original utility announcement"}, {"url": "https://www.poecompanies.com/poe-properties/camp-ground-industrial/", "host": "www.poecompanies.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Developer project page"}], "checked": "2026-10-16", "whole_record_certified": false}], "event_evidence": [{"date": "2025-01-16", "text": "PowerHouse, Poe and LG&E announced the Louisville development and utility-access forecasts. The date is an announcement, not a proved construction start, power delivery or opening.", "kind": "announced", "sources": [{"url": "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus", "host": "www.powerhousedata.com", "published": "2025-01-16", "date": "2025-01-16", "checked": "2026-10-16", "label": "Original campus announcement"}, {"url": "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer", "host": "lge-ku.com", "published": "2025-01-16", "date": "2025-01-16", "checked": "2026-10-16", "label": "Original utility announcement"}]}], "typed_power_facts": [{"measure": "utility_capacity", "value": 525, "unit": "MW", "basis": "forecast", "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "scope": "Current undated operator plan: up to 525 MW maximum utility power. Not approved service, critical IT, energized capacity or metered consumption. Not additive with historical access/expansion/availability statements.", "sources": ["https://www.powerhousedata.com/data-center/ph-louisville"]}, {"measure": "utility_capacity", "value": 335, "unit": "MW", "basis": "operator_reported_capacity", "as_of": "2025-01-16", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Historical developer/utility announcement reports access secured to an initial 335 MW. This is the reported access scope, not an independently read service approval/contract or confirmation of delivered power.", "sources": ["https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus", "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer"]}, {"measure": "utility_capacity", "value": 402, "unit": "MW", "basis": "forecast", "as_of": "2025-01-16", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Historical near-term expansion up to 402 MW; a future utility-access envelope, not extra capacity to add to 335 or 525 MW. Actual delivery and approved service are unverified.", "sources": ["https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus", "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer"]}, {"measure": "utility_capacity", "value": 130, "unit": "MW", "basis": "forecast", "as_of": "2025-01-16", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Historical first 130 MW utility availability forecast for October 2026, not an IT load or proved energized first phase. Actual delivery day is unknown.", "sources": ["https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus", "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer"]}], "typed_water_facts": [{"measure": "supply_source", "value": "Planned campus access to Louisville Water Company infrastructure.", "unit": null, "as_of": "2025-01-16", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "basis": "operator_reported_statement", "scope": "Prospective named-supplier statement in the original developer/utility announcement and undated developer page. Not measured withdrawal or consumption, a water right, cooling type or a permit. The Ohio River flow statistic is not facility water use.", "sources": ["https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus", "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer", "https://www.poecompanies.com/poe-properties/camp-ground-industrial/"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "county_context_only", "county_display": "21111"}, "state_name": "Kentucky", "state_path": "/kentucky/"}, {"id": "applied-digital-delta-forge-2-brookwood-al", "state": "AL", "kind": "facility", "name": "Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Tuscaloosa"], "city": "Brookwood", "address": "", "who": "Applied Digital", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer announcement republished by telecom newswire, with planned quantities.. Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed. Company report of lease, not original confidential instrument.. Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Reporter account of operator presentation, not observed water use or signed permit.. Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified. Public index and short banner used for discovery, not independent site verification.. Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record. Issuer Form10Q Business Update, printed page 42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/", "host": "tuscaloosathread.com", "date": "2026-09-24", "published": "2026-09-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/", "host": "newswire.telecomramblings.com", "date": "2026-09-24", "published": "2026-09-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2", "host": "ir.applieddigital.com", "date": "2026-06-08", "published": "2026-06-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results", "host": "ir.applieddigital.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://tuscaloosathread.com/applied-digital-brookwood-town-hall/", "host": "tuscaloosathread.com", "date": "2026-10-02", "published": "2026-10-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/news-events/press-releases", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.applieddigital.com/insights/july-site-update", "host": "applieddigital.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Applied Digital reviewed source"}], "loc": {"lat": 33.28943, "lng": -87.52539, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.", "fields": {"reported_context": "Reported TCEDA incentive vote for Brookwood Delta Forge 2, including projected abatements and community benefit commitments.", "independently_verified_current_operating_status": null}, "notes": ["Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct.", "Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/", "host": "tuscaloosathread.com", "date": "2026-09-24", "published": "2026-09-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Issuer announcement republished by telecom newswire, with planned quantities.", "fields": {"announcement_date": "2026-09-24", "location": "Brookwood, Tuscaloosa County, Alabama", "planned_combined_developer_tenant_investment_usd_more_than": 3200000000, "leased_critical_it_load_mw": 210, "anticipated_operations_year": 2028, "community_benefit_commitment_usd": 270000000, "community_benefit_term_years": 20}, "notes": ["Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/", "host": "newswire.telecomramblings.com", "date": "2026-09-24", "published": "2026-09-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Company report of lease, not original confidential instrument.", "fields": {"announcement_date": "2026-06-08", "company_reported_signed_critical_it_load_mw": 210, "base_lease_years": 15, "expected_base_lease_revenue_usd_approx": 5200000000, "all_options_total_lease_years": 30, "all_options_lease_revenue_usd_approx": 12700000000, "initial_operations_forecast": "2028-Q1"}, "notes": ["Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2", "host": "ir.applieddigital.com", "date": "2026-06-08", "published": "2026-06-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Issuer reports; readiness is not metered grid demand.", "fields": {"announcement_date": "2026-10-07", "fiscal_quarter_ended": "2026-08-31", "polaris_forge_1_reported_ready_for_service_date": "2026-10-01", "polaris_forge_1_reported_operational_critical_it_mw": 250, "other_named_ai_campuses_reported_stage": "Various construction stages", "jamestown_crypto_facility_mw_as_of_quarter_end": 106, "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180, "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300, "potential_base_electron_generation_mw": 1200}, "notes": ["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results", "host": "ir.applieddigital.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Reporter account of operator presentation, not observed water use or signed permit.", "fields": {"report_date": "2026-10-02", "developer_initial_water_fill_gallons_approx": 1400000, "fill_components_gallons": {"fire_tank": 500000, "cooling_loop": 900000}, "developer_ongoing_annual_water_gallons_approx": 750000, "reported_permit_stage": "Packages submitted to city, under review."}, "notes": ["Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://tuscaloosathread.com/applied-digital-brookwood-town-hall/", "host": "tuscaloosathread.com", "date": "2026-10-02", "published": "2026-10-02", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Public index and short banner used for discovery, not independent site verification.", "fields": {}, "notes": ["Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ir.applieddigital.com/news-events/press-releases", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.applieddigital.com/insights/july-site-update", "host": "applieddigital.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Issuer Form10Q Business Update, printed page 42; named-campus construction statement", "fields": {"current_status": "under construction", "status_basis": "Delta Forge 2 is explicitly described as under construction.", "status_as_of": "2026-10-07", "report_period_ended": "2026-08-31"}, "notes": ["Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40", "events": [], "whole_record_certified": false}, {"overlay": "overnight-discovery-2026-10-17", "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.", "fields": {"issuer_annual_property_context": {"issuer": "Applied Digital", "reporting_period": "2026-05-31", "source_name": "Delta Forge 2", "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."}}, "notes": ["No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Applied Digital reviewed source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Company role source check 30, October 23, 2026", "scope": "Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.", "fields": {"company_association": {"name": "Applied Digital", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."}, "provider_role": "developer"}, "notes": ["Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Alabama · Brookwood · Tuscaloosa · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "01125"}, "state_name": "Alabama", "state_path": "/alabama/"}, {"id": "aligned-phx13-glendale-az", "state": "AZ", "kind": "facility", "name": "Aligned PHX-13", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Maricopa"], "city": "Glendale", "address": "", "who": "Aligned Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. Glendale Star May12,2025, updatedJune10, reproduces city-submitted PHX13 groundbreaking context.72MW is this planned facility, one of four on100acre campus; no explicit criticalITbasis and no72times4 inference.230kV is transmission voltage. This is groundbreaking, not energization.73%water reduction against formerrosefarm, renewablepower andclosedloop statements are promoter claims, not audited annual usage. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.glendalestar.com/news/aligned-data-centers-breaks-ground/article_4c7a2620-ccc3-4821-a236-dbfedb40ae85.html", "host": "glendalestar.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://aligneddc.com/video-resources/how-precast-powers-speed-ami-in-action-at-phx-13/", "host": "aligneddc.com", "published": "2025-07-02", "date": "2025-07-02", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.glendaleaz.gov/Business/Economic-Development/Economic-Development-News/2025/Aligned-Data-Centers-Breaks-Ground-on-Phx-13-Facility", "host": "www.glendaleaz.gov", "published": "2025-04-15", "date": "2025-04-15", "checked": "2026-10-17", "label": "Reviewed source context"}], "loc": {"lat": 33.40119, "lng": -112.54831, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json", "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.", "fields": {}, "notes": ["Glendale Star May12,2025, updatedJune10, reproduces city-submitted PHX13 groundbreaking context.72MW is this planned facility, one of four on100acre campus; no explicit criticalITbasis and no72times4 inference.230kV is transmission voltage. This is groundbreaking, not energization.73%water reduction against formerrosefarm, renewablepower andclosedloop statements are promoter claims, not audited annual usage.", "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."], "sources": [{"url": "https://www.glendalestar.com/news/aligned-data-centers-breaks-ground/article_4c7a2620-ccc3-4821-a236-dbfedb40ae85.html", "host": "glendalestar.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "operator-reported_construction", "scope": "Aligned’s PHX-13 description reports precast construction at the Glendale facility. Its publication date is July 2, 2025; the October 15, 2025 modification date is separate. Glendale’s April 15, 2025 groundbreaking account corroborates project identity. These are construction reports, not proof of energization or completion. Reported design and water-saving claims are not metered use; the unavailable water PDF supplies no facts."}}, "notes": ["Aligned’s PHX-13 description reports precast construction at the Glendale facility. Its publication date is July 2, 2025; the October 15, 2025 modification date is separate. Glendale’s April 15, 2025 groundbreaking account corroborates project identity. These are construction reports, not proof of energization or completion. Reported design and water-saving claims are not metered use; the unavailable water PDF supplies no facts."], "sources": [{"url": "https://aligneddc.com/video-resources/how-precast-powers-speed-ami-in-action-at-phx-13/", "host": "aligneddc.com", "published": "2025-07-02", "date": "2025-07-02", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.glendaleaz.gov/Business/Economic-Development/Economic-Development-News/2025/Aligned-Data-Centers-Breaks-Ground-on-Phx-13-Facility", "host": "www.glendaleaz.gov", "published": "2025-04-15", "date": "2025-04-15", "checked": "2026-10-17", "label": "Reviewed source context"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Company role source check 13, October 23, 2026", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The video page text identifies the PHX-13 build and the company construction management role. Only that written relationship is used; no video inspection or installed work is certified.", "fields": {"company_association": {"name": "Aligned Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The video page text identifies the PHX-13 build and the company construction management role. Only that written relationship is used; no video inspection or installed work is certified."}, "provider_role": "developer"}, "notes": ["Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The video page text identifies the PHX-13 build and the company construction management role. Only that written relationship is used; no video inspection or installed work is certified.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://aligneddc.com/video-resources/how-precast-powers-speed-ami-in-action-at-phx-13/", "host": "aligneddc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party exact named code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arizona · Glendale · Maricopa · Source context reviewed", "status_scope": "Aligned’s PHX-13 description reports precast construction at the Glendale facility. Its publication date is July 2, 2025; the October 15, 2025 modification date is separate. Glendale’s April 15, 2025 groundbreaking account corroborates project identity. These are construction reports, not proof of energization or completion. Reported design and water-saving claims are not metered use; the unavailable water PDF supplies no facts.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "04013"}, "state_name": "Arizona", "state_path": "/arizona/"}, {"id": "avaio-digital-leo-little-rock-ar", "state": "AR", "kind": "facility", "name": "AVAIO Digital Leo Campus", "group": "building", "status": "Site work underway", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Pulaski"], "city": "", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AVAIO Leo development and planned energy components. 1070=570grid+500BTM, not all IT or power delivered. ExecutedESA/sourceplannedenergizationnotobservedservice. State/localofficialquotesnotspendingrecordsorindependentpermitinspection. Noactualincentiveawardordisbursementverified. Referencepointnotindependentlyparcelcentroid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.avaiodigital.com/developments/little-rock-arkansas", "host": "avaiodigital.com", "date": "2026-01-12", "published": "2026-01-12", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 34.73305, "lng": -92.30867, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "AVAIO Leo development and planned energy components", "fields": {"project": "Leo", "location": "145th Street, Little Rock, Pulaski County, Arkansas", "operator_reference_point": {"lat": 34.623375, "lon": -92.246825}, "campus_acres": 296, "planned_total_baseload_power_mw": 1070, "planned_grid_power_mw": 570, "planned_behind_meter_baseload_mw": 500, "initial_grid_service_target": "2027-Q4", "developer_reported_status": "ground broken; site plan approved; ESA executed with Entergy Arkansas", "investment_quoted_usd": 6000000000, "jobs_quoted_min_exclusive": 500}, "notes": ["1070=570grid+500BTM, not all IT or power delivered. ExecutedESA/sourceplannedenergizationnotobservedservice. State/localofficialquotesnotspendingrecordsorindependentpermitinspection. Noactualincentiveawardordisbursementverified. Referencepointnotindependentlyparcelcentroid.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.avaiodigital.com/developments/little-rock-arkansas", "host": "avaiodigital.com", "date": "2026-01-12", "published": "2026-01-12", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Site work underway", "basis": "AVAIO’s current named Leo project page says it has broken ground on the Little Rock development.", "checked_on": "2026-10-16"}, "stage_review_limits": "Groundbreaking supports reported site activity, not completed data halls or operation. The electricity-service and energization schedule remains future. The January 12 linked update is not used as the publication date of the entire undated project page."}, "notes": ["Groundbreaking supports reported site activity, not completed data halls or operation. The electricity-service and energization schedule remains future. The January 12 linked update is not used as the publication date of the entire undated project page.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://www.avaiodigital.com/developments/little-rock-arkansas", "host": "www.avaiodigital.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arkansas · Pulaski · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. AVAIO’s current named Leo project page says it has broken ground on the Little Rock development. Groundbreaking supports reported site activity, not completed data halls or operation. The electricity-service and energization schedule remains future. The January 12 linked update is not used as the publication date of the entire undated project page.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "05119"}, "state_name": "Arkansas", "state_path": "/arkansas/"}, {"id": "google-west-memphis-ar", "state": "AR", "kind": "project", "name": "Google West Memphis Data Center Campus", "group": "building", "status": "Construction reported", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center development", "counties": ["Crittenden"], "city": "West Memphis", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Subscriber article body was not read. The contract-review headline does not establish Entergy contract terms, executed contributions or all permit approvals. Public caption only. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-10-02", "Google and Entergy announced the West Memphis development within a wider Arkansas infrastructure investment. This is an announcement, not a construction start, opening or site-only investment allocation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/", "host": "arkansasonline.com", "date": "2026-09-03", "published": "2026-09-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/", "host": "blog.google", "published": "2025-10-02", "date": "2025-10-02", "checked": "2026-10-16", "label": "Original Arkansas infrastructure announcement"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Current Google location directory; flags are not status proof"}, {"url": "https://arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F510%2F28051%2FEXHIBIT+B+-+Meeting+Minutes+09-15-2026.pdf", "host": "arkleg.state.ar.us", "published": "", "date": "", "checked": "2026-10-16", "label": "DRAFT recap of September 15 committee testimony"}, {"url": "https://www.entergy.com/news/entergy-arkansas-powers-googles-4b-investment-in-the-state", "host": "www.entergy.com", "published": "2025-10-02", "date": "2025-10-02", "checked": "2026-10-16", "label": "Original Entergy announcement"}, {"url": "https://www.entergy.com/news/entergy-customers-begin-seeing-benefits-from-data-center-agreements-fair-share-plus-pledge-keeps-money-in-customers-pockets", "host": "www.entergy.com", "published": "2026-08-27", "date": "2026-08-27", "checked": "2026-10-16", "label": "Regional operating/benefit forecast, not an opening record"}, {"url": "https://www.entergy.com/blog/statement-from-entergy-arkansas", "host": "www.entergy.com", "published": "2026-09-02", "date": "2026-09-02", "checked": "2026-10-16", "label": "Utility contract-arithmetic statement, not an executed agreement"}], "loc": {"lat": 35.22034, "lng": -90.32451, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "The Arkansas Democrat-Gazette's publicly visible caption documents June 1 construction of Google's planned four-billion-USD, 1,100-acre West Memphis campus.", "independently_verified_current_operating_status": null}, "notes": ["Subscriber article body was not read. The contract-review headline does not establish Entergy contract terms, executed contributions or all permit approvals. Public caption only.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/", "host": "arkansasonline.com", "date": "2026-09-03", "published": "2026-09-03", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Google pending-location follow-up October 16", "scope": "Explicit existing-record identity, source confidence and phase review. No new physical site, parcel, whole-campus completion, whole-state refresh or automatic directory-flag status.", "fields": {"identity_scope": "Google and Entergy explicitly name the West Memphis development. It matches the existing Google West Memphis research record; no new site or duplicate ID is created.", "reported_construction_scope": "The DRAFT September 15, 2026 committee recap reports Google representative testimony that construction is occurring at West Memphis. Its visible DRAFT watermark is absent from text extraction. This is reported construction, not adopted minutes, an agency construction approval, a site inspection, delivered halls or operation.", "document_status": {"status": "DRAFT", "meeting_date": "2026-09-15", "pdf_creation_metadata_date": "2026-10-16", "published_date": null, "approval_date": null, "scope": "Creation metadata does not establish publication or adoption. The draft's approval of August 6 minutes does not approve its own September 15 text."}, "provider_roles": [{"name": "Google", "role": "planned operator"}], "investment_scope": "Google's $4 billion commitment through 2027 includes statewide cloud/AI infrastructure and programs. The whole amount is not independently assigned as West Memphis construction cost. The community fund is a separate purpose, not a tax award.", "grid_scope": "Entergy describes planned 600 MW solar and 350 MW battery power in Jefferson County serving the grid. These are different resources, not West Memphis IT load, site generation or an additive campus capacity.", "forecast_scope": "Entergy's August 2026 early-2027 operating/benefit forecast covers Arkansas/Louisiana projects collectively; it is not a West Memphis opening date, verified current operation or realized saving.", "contract_scope": "The September utility statement disputes newspaper arithmetic and describes long-term payments and projected benefits. No executed contract or commission order was read; no payment, benefit total or tariff term is normalized here.", "water_scope": "The draft's separate Central Arkansas Water comments about proposed Google/AVAIO projects are not assigned to West Memphis and do not prove current statewide permit/application absence.", "operator_point_lead": {"lat": 35.1465, "lng": -90.1848, "adopted": false, "scope": "Current operator-directory reference only; existing approximate geometry remains unchanged pending an explicit source/geometry review."}}, "notes": ["Keep each source type, date and confidence visible. Reported activity is not a site inspection, legal permission, complete campus or current metered demand.", "All inherited geometry, addresses, jurisdictions, legacy MW, investment, jobs and opening fields remain unchanged.", "The construction label deliberately carries secondary-report confidence because its basis is an unadopted draft recap of testimony. No primary status confidence is claimed."], "sources": [{"url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/", "host": "blog.google", "published": "2025-10-02", "date": "2025-10-02", "checked": "2026-10-16", "label": "Original Arkansas infrastructure announcement"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Current Google location directory; flags are not status proof"}, {"url": "https://arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F510%2F28051%2FEXHIBIT+B+-+Meeting+Minutes+09-15-2026.pdf", "host": "arkleg.state.ar.us", "published": "", "date": "", "checked": "2026-10-16", "label": "DRAFT recap of September 15 committee testimony"}, {"url": "https://www.entergy.com/news/entergy-arkansas-powers-googles-4b-investment-in-the-state", "host": "www.entergy.com", "published": "2025-10-02", "date": "2025-10-02", "checked": "2026-10-16", "label": "Original Entergy announcement"}, {"url": "https://www.entergy.com/news/entergy-customers-begin-seeing-benefits-from-data-center-agreements-fair-share-plus-pledge-keeps-money-in-customers-pockets", "host": "www.entergy.com", "published": "2026-08-27", "date": "2026-08-27", "checked": "2026-10-16", "label": "Regional operating/benefit forecast, not an opening record"}, {"url": "https://www.entergy.com/blog/statement-from-entergy-arkansas", "host": "www.entergy.com", "published": "2026-09-02", "date": "2026-09-02", "checked": "2026-10-16", "label": "Utility contract-arithmetic statement, not an executed agreement"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Arkansas · West Memphis · Crittenden · Source context reviewed", "status_scope": "The DRAFT September 15, 2026 committee recap reports Google representative testimony that construction is occurring at West Memphis. Its visible DRAFT watermark is absent from text extraction. This is reported construction, not adopted minutes, an agency construction approval, a site inspection, delivered halls or operation.", "event_evidence": [{"date": "2025-10-02", "text": "Google and Entergy announced the West Memphis development within a wider Arkansas infrastructure investment. This is an announcement, not a construction start, opening or site-only investment allocation.", "kind": "announced", "sources": [{"url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/", "host": "blog.google", "published": "2025-10-02", "date": "2025-10-02", "checked": "2026-10-16", "label": "Original Arkansas infrastructure announcement"}, {"url": "https://www.entergy.com/news/entergy-arkansas-powers-googles-4b-investment-in-the-state", "host": "www.entergy.com", "published": "2025-10-02", "date": "2025-10-02", "checked": "2026-10-16", "label": "Original Entergy announcement"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "05035"}, "state_name": "Arkansas", "state_path": "/arkansas/"}, {"id": "amazon-gilroy-ca", "state": "CA", "kind": "facility", "name": "Amazon AWS Gilroy Data Center", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Santa Clara"], "city": "Gilroy", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Gilroy municipal entitlement, permits and phase-specific water/power. 49MWutility and50MWpotentialstorage power are not critical IT or99MWcompute. Twenty-five2.5MW emergency generators plus600kWhouse generator are redundancy, not extra utility demand. Water forecasts not actual withdrawals. Building permits/agency construction account are not customer commissioning. Recycled-water agreement/connection still future; no exact service date. Two data buildings plus security is not three data centers. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Only the current city stage and project identity are adopted. The 2028 first-phase opening remains a forecast; water/revenue projections and connection or generator ratings are not measured operation. No coordinate upgrade. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS", "host": "cityofgilroy.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 37.23143, "lng": -121.69482, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Gilroy municipal entitlement, permits and phase-specific water/power", "fields": {"agency": "City of Gilroy", "project": "AWS Gilroy Data Center AS20-23", "address": "8050 Camino Arroyo, Gilroy, California", "parcel": "841-69-044", "site_acres": 56, "agency_reported_stage": "under construction", "site_architectural_entitlement_approval_date": "2025-07-03", "appeal_received_date": "2025-07-21", "appeal_withdrawn_date": "2025-08-18", "grading_underground_utility_permits_date": "2025-12-11", "building_permit_date": "2026-03-19", "planned_data_center_buildings": 2, "security_buildings": 1, "total_building_sqft_approx": 438500, "each_data_center_sqft_approx": 218000, "security_building_sqft": 2500, "phase1_utility_connection_mw": 49, "potential_future_bess_power_mw_max": 50, "phase1_expected_potable_water_acre_feet_per_year": 23, "post_recycled_transition_expected_potable_water_acre_feet_per_year": 2, "water_transition_deadline": "within2years after phase1completion or before first phase2occupancy, whichever first", "water_answer_updated_date": "2026-08-12", "anticipated_recycled_connection_year": 2030}, "notes": ["49MWutility and50MWpotentialstorage power are not critical IT or99MWcompute. Twenty-five2.5MW emergency generators plus600kWhouse generator are redundancy, not extra utility demand. Water forecasts not actual withdrawals. Building permits/agency construction account are not customer commissioning. Recycled-water agreement/connection still future; no exact service date. Two data buildings plus security is not three data centers.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS", "host": "cityofgilroy.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "under construction", "status_basis": "Gilroy’s municipal project page explicitly labels AS 20-23 Under Construction."}, "notes": ["Only the current city stage and project identity are adopted. The 2028 first-phase opening remains a forecast; water/revenue projections and connection or generator ratings are not measured operation. No coordinate upgrade. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS", "host": "cityofgilroy.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "94129f9168be53d342a088e87d3af0d5993d2f522596d99df8ef2f97d4630749", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "California · Gilroy · Santa Clara · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "06085"}, "state_name": "California", "state_path": "/california/"}, {"id": "microsoft-alviso-san-jose-ca", "state": "CA", "kind": "facility", "name": "Microsoft Alviso Data Center Campus", "group": "building", "status": "Site development underway", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Santa Clara"], "city": "San Jose (Alviso)", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft SJC02 named transmission-load draft resolution. Proposed outcome text does not prove final approval or operating status. Proposed 75-percent net-revenue refund cap plus ITCC over fifteen years is not an actual tax incentive paid. Redundant 115-kV line is not additional usable MW or a second data center. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. California adopted customer-load resolution. Final adopted resolution supersedes earlier draft status only. Approval of customer-specific agreement does not certify construction completion, full energized load, actual refunds paid, a tax exemption or a statewide tariff. Follow-up modified agreement approval remains a separate procedural step. Source issuance date differs from adoption/effective date.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M594/K913/594913838.PDF", "host": "docs.cpuc.ca.gov", "date": "2026-01-15", "published": "2026-01-15", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M595/K970/595970063.PDF", "host": "docs.cpuc.ca.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://local.microsoft.com/blog/alviso-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2025-11-19", "date": "2025-11-19", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 37.16199, "lng": -121.73089, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Microsoft SJC02 named transmission-load draft resolution", "fields": {"draft_resolution": "E-5439", "draft_date": "2026-01-15", "utility_advice_letter": "7635-E", "utility_advice_letter_filed": "2025-07-01", "customer": "Microsoft Corporation", "project": "SJC02", "published_site_address": "1657 Alviso-Milpitas Road, San Jose, California", "proposed_customer_load_mw": 90, "power_basis": "whole customer transmission load, not explicit critical IT", "operation_target_month": "2027-01", "document_status": "DRAFT"}, "notes": ["Proposed outcome text does not prove final approval or operating status. Proposed 75-percent net-revenue refund cap plus ITCC over fifteen years is not an actual tax incentive paid. Redundant 115-kV line is not additional usable MW or a second data center.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M594/K913/594913838.PDF", "host": "docs.cpuc.ca.gov", "date": "2026-01-15", "published": "2026-01-15", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "utility-decisions-round8-2026-10-14.json", "scope": "California adopted customer-load resolution", "fields": {"final_resolution": "E-5439", "adoption_effective_date": "2026-01-15", "issuance_date": "2026-01-20", "approved_subject": "customer-specific transmission energization agreement with modifications", "customer_load_mw": 90, "power_basis": "whole customer transmission load, not explicit critical IT", "published_site_address": "1657 Alviso-Milpitas Road, San Jose, California", "operator_operation_target_month": "2027-01", "annual_infrastructure_refund_limit_percent_net_revenue": 75, "income_tax_component_adjustment_additional": true, "refund_period_years": 15}, "notes": ["Final adopted resolution supersedes earlier draft status only. Approval of customer-specific agreement does not certify construction completion, full energized load, actual refunds paid, a tax exemption or a statewide tariff. Follow-up modified agreement approval remains a separate procedural step. Source issuance date differs from adoption/effective date.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M595/K970/595970063.PDF", "host": "docs.cpuc.ca.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Company role source check60, October24,2026", "scope": "Microsoft identifies the named Alviso development in California and reports initial earthmoving and soil remediation. HITT Contracting Inc. is described as the general contractor. The elapsed summer2026 site preparation forecast does not prove completion or operation. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies the named Alviso development in California and reports initial earthmoving and soil remediation. HITT Contracting Inc. is described as the general contractor. The elapsed summer2026 site preparation forecast does not prove completion or operation. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."}, "provider_role": "developer"}, "notes": ["Microsoft identifies the named Alviso development in California and reports initial earthmoving and soil remediation. HITT Contracting Inc. is described as the general contractor. The elapsed summer2026 site preparation forecast does not prove completion or operation. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."], "sources": [{"url": "https://local.microsoft.com/blog/alviso-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2025-11-19", "date": "2025-11-19", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}, {"overlay": "Codex 3 research followup 1", "scope": "The original named Microsoft Alviso update explicitly reports that work began in fall 2025 with earthmoving and soil remediation. This supports site development underway scoped to preliminary land work. It does not establish vertical computing building construction, a completed shell or commissioned computing. The summer 2026 site preparation completion is a forecast, without an independently reported accomplishment in the selected account. Fall 2025 is not converted into an exact day. The original current provider capture and its actual October 24 retrieval receipt were reused with identical bytes, without a new request or an electricity contract being treated as operation.", "fields": {"current_stage_evidence": {"outcome": "named_alviso_actual_earthmoving_and_soil_remediation", "scope": "The original named Microsoft Alviso update explicitly reports that work began in fall 2025 with earthmoving and soil remediation. This supports site development underway scoped to preliminary land work. It does not establish vertical computing building construction, a completed shell or commissioned computing. The summer 2026 site preparation completion is a forecast, without an independently reported accomplishment in the selected account. Fall 2025 is not converted into an exact day. The original current provider capture and its actual October 24 retrieval receipt were reused with identical bytes, without a new request or an electricity contract being treated as operation."}, "source_read_scope": {"original_named_project_and_complete_construction_overview_read": true, "original_exact_source_capture_and_retrieval_receipt_reused": true, "no_new_network_request": true, "land_preparation_not_vertical_building_or_computing_operation": true, "summer2026_target_not_accomplished_completion": true, "fall2025_not_invented_exact_day": true}}, "notes": ["The original named Microsoft Alviso update explicitly reports that work began in fall 2025 with earthmoving and soil remediation. This supports site development underway scoped to preliminary land work. It does not establish vertical computing building construction, a completed shell or commissioned computing. The summer 2026 site preparation completion is a forecast, without an independently reported accomplishment in the selected account. Fall 2025 is not converted into an exact day. The original current provider capture and its actual October 24 retrieval receipt were reused with identical bytes, without a new request or an electricity contract being treated as operation.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://local.microsoft.com/blog/alviso-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2025-11-19", "date": "2025-11-19", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "California · San Jose (Alviso) · Santa Clara · Source context reviewed", "status_scope": "The original named Microsoft Alviso update explicitly reports that work began in fall 2025 with earthmoving and soil remediation. This supports site development underway scoped to preliminary land work. It does not establish vertical computing building construction, a completed shell or commissioned computing. The summer 2026 site preparation completion is a forecast, without an independently reported accomplishment in the selected account. Fall 2025 is not converted into an exact day. The original current provider capture and its actual October 24 retrieval receipt were reused with identical bytes, without a new request or an electricity contract being treated as operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "06085"}, "state_name": "California", "state_path": "/california/"}, {"id": "skybox-santa-clara-1200-memorex-drive-ca", "state": "CA", "kind": "facility", "name": "Skybox Santa Clara (1200 Memorex Drive)", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Santa Clara"], "city": "Santa Clara", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. 60 MW has explicit critical-processing basis but is design capacity, not independently verified commissioned/current operating IT. Project’s 550,000 square feet includes mixed development and is not wholly data hall area. Eleven acres, four-story data center and six-story office describe site/design scope. Thirty generators and sixty chillers are planned units, not operating counts or implied MW. Former Memorex 1961 history is not the data center opening date. No RFS or tenant independently verified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-04-21", "Santa Clara Council history records adoption on April 21, 2026 of authority for the Memorex Junction substation agreement amendment and specified future capacity terms. The source says the ramp depends on infrastructure and other conditions. Authority to execute an amendment is not completed energization, actual power demand or a data center opening."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.corgan.com/projects/skybox-santa-clara-data-center", "host": "corgan.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.skyboxdatacenters.com/locations/skybox-santaclara", "host": "www.skyboxdatacenters.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://santaclara.legistar.com/LegislationDetail.aspx?FullText=1&GUID=161F4AAA-FD45-4D4B-B16C-C9A0C332E696&ID=7987607&Options=&Search=", "host": "santaclara.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1200+Memorex+Drive%2C+Santa+Clara%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.95619620745609%2C37.35763028853755%2C-121.9437637925439%2C37.367511711462456&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "loc": {"lng": -121.94998, "lat": 37.362571, "precision": "address", "basis": "Officially filed project street 1200 Memorex Drive, Santa Clara, CA matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains building. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "regional-development-review-round32-2026-10-14.json", "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.", "fields": {"reported_context": "Architect Corgan’s undated project description specifies a speculative Skybox Santa Clara data center shell alongside an office tower, with 60 MW of critical processing load described in the design.", "independently_verified_current_operating_status": null, "architect_attributed_design_critical_processing_mw": 60, "commissioned_critical_it_mw": null}, "notes": ["60 MW has explicit critical-processing basis but is design capacity, not independently verified commissioned/current operating IT. Project’s 550,000 square feet includes mixed development and is not wholly data hall area. Eleven acres, four-story data center and six-story office describe site/design scope. Thirty generators and sixty chillers are planned units, not operating counts or implied MW. Former Memorex 1961 history is not the data center opening date. No RFS or tenant independently verified.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.corgan.com/projects/skybox-santa-clara-data-center", "host": "corgan.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 16", "scope": "The Skybox Santa Clara project main content explicitly lists Under Construction. Operator reported construction describes that current listing claim, matched to Memorex through the city utility record and architect account. The site navigation also groups Santa Clara among completed projects, so whole facility completion remains unverified. The April 21, 2026 Council action authorized a substation agreement amendment and a future conditional load ramp. It is not proof of executed amended terms, delivered power, completed server fit out or operation.", "fields": {"current_stage_evidence": {"outcome": "operator_main_project_construction_listing_with_navigation_conflict", "scope": "The Skybox Santa Clara project main content explicitly lists Under Construction. Operator reported construction describes that current listing claim, matched to Memorex through the city utility record and architect account. The site navigation also groups Santa Clara among completed projects, so whole facility completion remains unverified. The April 21, 2026 Council action authorized a substation agreement amendment and a future conditional load ramp. It is not proof of executed amended terms, delivered power, completed server fit out or operation."}, "scope_and_conflict": {"operator_main_content_stage": "Under Construction", "operator_navigation_category": "Completed Projects", "main_stage_not_whole_facility_completion_certification": true, "substation_agreement_authority_on": "2026-04-21", "future_load_ramp_not_delivered_capacity": true, "architect_planned_installations_not_verified_complete": true, "power_quantities_not_promoted_or_reclassified": true}}, "notes": ["The Skybox Santa Clara project main content explicitly lists Under Construction. Operator reported construction describes that current listing claim, matched to Memorex through the city utility record and architect account. The site navigation also groups Santa Clara among completed projects, so whole facility completion remains unverified. The April 21, 2026 Council action authorized a substation agreement amendment and a future conditional load ramp. It is not proof of executed amended terms, delivered power, completed server fit out or operation.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.skyboxdatacenters.com/locations/skybox-santaclara", "host": "www.skyboxdatacenters.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://santaclara.legistar.com/LegislationDetail.aspx?FullText=1&GUID=161F4AAA-FD45-4D4B-B16C-C9A0C332E696&ID=7987607&Options=&Search=", "host": "santaclara.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.corgan.com/projects/skybox-santa-clara-data-center", "host": "www.corgan.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 51, October 23, 2026", "scope": "Officially filed project street reference only. Existing Native status remains building. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.", "fields": {"location_review_decision": {"location": {"lng": -121.94998, "lat": 37.362571, "precision": "address", "basis": "Officially filed project street 1200 Memorex Drive, Santa Clara, CA matched to one calculated Census street range within the retained county. This is a street reference, not a surveyed roof, parcel, title, current operation or complete campus boundary. Existing Native status remains building. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "1200 Memorex Drive, Santa Clara, CA", "county_fips": ["06085"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["Officially filed project street reference only. Existing Native status remains building. No new physical stage, opening, construction finding, current operation, tenant, ownership, title, capacity, company role, roof or complete campus boundary is certified.", "The calculated reference lies beside an industrial street, rail corridor and large industrial forms. The acquisition date is unknown and may predate demolition or construction. The image does not certify the present building, electrical delivery or a new physical milestone. Imagery acquisition date is unknown and may predate construction.", "The earlier inherited approximate inventory point is not a reviewed destination. This explicit official project street review retains its exact predecessor and corrects only the map reference. No physical relocation, current physical milestone or surveyed boundary is inferred.", "Source Received, Posted, agenda, agreement and retrieval clocks remain separate from physical events. Corporate and agency contact addresses, generator yards, neighboring streets and map coordinates are not adopted. Canonical address and all protected Native facts remain exact.", "The City agreement places the named customer data center at1200MemorexDrive. Current operator SantaClara page has no numeric street in its body. The agreement does not certify current title, tenant, delivered electricity, whole campus completion or the separate MemorexJunctionsubstation as the data center."], "sources": [{"url": "https://santaclara.legistar.com/LegislationDetail.aspx?FullText=1&GUID=161F4AAA-FD45-4D4B-B16C-C9A0C332E696&ID=7987607&Options=&Search=", "host": "santaclara.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact official project street and bounded facility identity"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1200+Memorex+Drive%2C+Santa+Clara%2C+CA&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Literal unique calculated street range and county geography"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-121.95619620745609%2C37.35763028853755%2C-121.9437637925439%2C37.367511711462456&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting only, acquisition date unknown"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Filed project street reference, not a surveyed building or parcel", "summary": "California · Santa Clara · Santa Clara · Source context reviewed", "status_scope": "The Skybox Santa Clara project main content explicitly lists Under Construction. Operator reported construction describes that current listing claim, matched to Memorex through the city utility record and architect account. The site navigation also groups Santa Clara among completed projects, so whole facility completion remains unverified. The April 21, 2026 Council action authorized a substation agreement amendment and a future conditional load ramp. It is not proof of executed amended terms, delivered power, completed server fit out or operation.", "event_evidence": [{"date": "2026-04-21", "text": "Santa Clara Council history records adoption on April 21, 2026 of authority for the Memorex Junction substation agreement amendment and specified future capacity terms. The source says the ramp depends on infrastructure and other conditions. Authority to execute an amendment is not completed energization, actual power demand or a data center opening.", "kind": "approved", "sources": [{"url": "https://santaclara.legistar.com/LegislationDetail.aspx?FullText=1&GUID=161F4AAA-FD45-4D4B-B16C-C9A0C332E696&ID=7987607&Options=&Search=", "host": "santaclara.legistar.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "state_name": "California", "state_path": "/california/"}, {"id": "stack-svy03a-hayward-ca", "state": "CA", "kind": "facility", "name": "STACK SVY03A", "group": "building", "status": "Agency reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Alameda"], "city": "Hayward", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. STACK historical backup-power version versus later city account. EarlierMND67.2MWbackupdifferslaterHaywardcity76.6MWbackupreviewedRound7;dates/versionsmustremainseparate,donotsumoroverwriteIT.2025reviewnoticeisnotfinalCEC/localapprovaloropening. NoprovennumericcriticalITinthisnotice. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://ceqanet.lci.ca.gov/2025030999", "host": "ceqanet.lci.ca.gov", "date": "2025-03-24", "published": "2025-03-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.hayward-ca.gov/business/for-developers/data-center-development-applications", "host": "www.hayward-ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 37.6776, "lng": -121.86444, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "STACK historical backup-power version versus later city account", "fields": {"project_name": "SVY03A Data Center Campus", "applicant": "STACK Infrastructure", "notice_received_date": "2025-03-24", "locality": "Hayward, Alameda County, California", "site_acres": 11.3, "parcels": ["461-0085-016-00", "461-0085-052-01"], "planned_data_center_stories": 3, "historical_reviewed_backup_generation_mw_max": 67.2, "power_basis": "emergency backup generation, not critical IT"}, "notes": ["EarlierMND67.2MWbackupdifferslaterHaywardcity76.6MWbackupreviewedRound7;dates/versionsmustremainseparate,donotsumoroverwriteIT.2025reviewnoticeisnotfinalCEC/localapprovaloropening. NoprovennumericcriticalITinthisnotice.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ceqanet.lci.ca.gov/2025030999", "host": "ceqanet.lci.ca.gov", "date": "2025-03-24", "published": "2025-03-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 45", "scope": "The current original Hayward City table explicitly labels STACK SVY03A under construction and identifies its named application. Agency reported construction is supported by that present stage statement, not inferred from the May 2025 approval or absence of an appeal. Backup generation quantities are not treated as delivered IT capacity, and no completion, commissioning, opening day or every phase outcome is promoted.", "fields": {"current_stage_evidence": {"outcome": "current_city_table_explicit_svy03a_construction", "scope": "The current original Hayward City table explicitly labels STACK SVY03A under construction and identifies its named application. Agency reported construction is supported by that present stage statement, not inferred from the May 2025 approval or absence of an appeal. Backup generation quantities are not treated as delivered IT capacity, and no completion, commissioning, opening day or every phase outcome is promoted."}}, "notes": ["The current original Hayward City table explicitly labels STACK SVY03A under construction and identifies its named application. Agency reported construction is supported by that present stage statement, not inferred from the May 2025 approval or absence of an appeal. Backup generation quantities are not treated as delivered IT capacity, and no completion, commissioning, opening day or every phase outcome is promoted.", "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks, filing receipts and prospective dates are not physical opening days."], "sources": [{"url": "https://www.hayward-ca.gov/business/for-developers/data-center-development-applications", "host": "www.hayward-ca.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "California · Hayward · Alameda · Source context reviewed", "status_scope": "The current original Hayward City table explicitly labels STACK SVY03A under construction and identifies its named application. Agency reported construction is supported by that present stage statement, not inferred from the May 2025 approval or absence of an appeal. Backup generation quantities are not treated as delivered IT capacity, and no completion, commissioning, opening day or every phase outcome is promoted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "06001"}, "state_name": "California", "state_path": "/california/"}, {"id": "databank-vernon-la-ca", "state": "CA", "kind": "project", "name": "Vernon LA Campus (with Goodman Group)", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Colocation", "counties": ["Los Angeles"], "city": "Vernon", "address": "3094 E. Vernon Avenue - Vernon, CA 90058", "who": "Goodman", "end_user": "", "mw": null, "power": "", "power_note": "Planned full-fit-out IT capacity. First delivery and remaining phases are forecasts; no metered or fully energized amount is established.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Narrativeover140000purpose-builtspace andcard131000ITsqft need separate area fields; no area-total sum. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. Future delivery phases sum to planned32MW, not extra capacity. Goodman global work-in-progress and DataBank development portfolio totals excluded from project investment.", "date": "", "events": [["2026-04-07", "DataBank announced its Vernon joint venture with Goodman and prospective capacity delivery from December 2026 through September 2027. This is an announcement, not completed opening, energization or financial close."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/", "host": "databank.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/", "host": "databank.com", "date": "2026-04-07", "published": "2026-04-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.databank.com/data-centers/los-angeles/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}, {"url": "https://www.goodman.com/investor-centre/announcements-media/2025/goodman-group-tops-out-lax01-vernon-data-center-in-southern-california", "host": "www.goodman.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Goodman topping-out title/date and construction excerpt; selected text view"}, {"url": "https://www.databank.com/data-centers/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}, {"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "California Energy Commission primary project record"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3094+E.+Vernon+Avenue%2C+Vernon%2C+CA+90058&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Census calculated street range and county context"}, {"url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Census calculated street method and limits"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPImagery/ImageServer/exportImage?bbox=-118.22190708968417%2C34.00273777846003%2C-118.21540531945185%2C34.00812764550997&bboxSR=4326&imageSR=4326&size=1000%2C1000&format=jpg&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Aerial setting context only, acquisition date not established"}], "loc": {"lat": 34.005432711985, "lng": -118.218656204568, "precision": "approximate", "basis": "Published DataBank facility address 3094 E. Vernon Avenue - Vernon, CA 90058 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding. Existing native status remains unchanged. Shown as an approximate project area; the address does not establish a confirmed project parcel."}, "reviewed_evidence": [{"overlay": "field-verification-2026-10-14.json", "scope": "Field or source context only", "fields": {"facility_code": "LAX2", "street": "3094 E.VernonAvenue", "city": "Vernon", "critical_it_capacity_mw": 32, "it_area_sqft": 131000, "power_basis": "operator advertised criticalIT specification, not measured consumption", "marketed_service": "colocation"}, "notes": ["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.", "Narrativeover140000purpose-builtspace andcard131000ITsqft need separate area fields; no area-total sum.", "Current operator card explicitly names this facility and separates its specification from the market/campus totals.", "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/", "host": "databank.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "databank-equinix-review-round5-2026-10-14.json", "scope": "named source", "fields": {"published_address": "3094 E Vernon Avenue, Vernon, CA", "planned_capacity_mw": 32, "power_basis": "release capacity, not explicitly critical IT versus gross", "initial_delivery_target": {"mw": 6, "date": "2026-12"}, "remaining_delivery_target": {"mw": 26, "through": "2027-09"}, "joint_venture_partners": ["DataBank", "Goodman Group"], "joint_venture_equity_split_percent": [50, 50]}, "notes": ["Future delivery phases sum to planned32MW, not extra capacity. Goodman global work-in-progress and DataBank development portfolio totals excluded from project investment.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/", "host": "databank.com", "date": "2026-04-07", "published": "2026-04-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-DataBank-Existing-Depth-20261016", "scope": "Targeted existing-record DataBank code/service or project-stage, published-address and typed IT-capacity review. No admission, geocoding, physical-site certification or legal ownership finding.", "fields": {"operator_facility_code": "LAX2", "record_association_scope": "Existing research record associated by its DataBank facility code, state and named locality with the current operator page. The address is published service context, not independent parcel, municipal, ownership or physical-building identity verification.", "published_location_address": {"address": "3094 E. Vernon Avenue - Vernon, CA 90058", "scope": "Operator location heading as printed, including suite and postal text. No geocoding or point movement."}, "published_technical_specs": {"IT Square Feet": "131,000", "Critical IT Load": "32MW", "Power Design": "Block Redundant", "Cooling Design": "N+2", "Cab Density Air": "10kW+"}, "technical_capacity_scope": "Critical IT Load is the named-code operator-listed capacity, not utility service, backup generation, current metered use or proof every advertised MW is energized. The page does not establish a technical as-of date. Floor area is labeled IT Square Feet, not gross building area; power/cooling designs and cabinet densities are descriptions, not water use or total IT demand.", "metro_campus_scope": "Metro/campus headline totals and future expansion envelopes are not assigned to this code or added to its capacity. Published street and postal locality do not independently resolve legal jurisdiction. SLA, certification and renewable-energy marketing are not verified operational outcomes.", "future_delivery_scope": "The April 7, 2026 joint-venture announcement forecasts an initial 6 MW in December 2026 and a remaining 26 MW in stages through September 2027. These are prospective delivery envelopes, not accomplished dates or metered use. No separate typed 6/26 MW fact is created from the less-specific rollout wording.", "service_template_limits": "The facility page uses present-tense service language and 32 MW Critical IT Load. The dated joint-venture announcement makes first delivery prospective. The project remains Under construction; the typed 32 MW is a forecast full-fit-out IT envelope, not currently energized capacity.", "development_and_operator_roles": "The announcement names Goodman to complete development and DataBank as future operator. Historical acquisition and the venture percentage are not certified current parcel title. Goodman LAX01 topping-out context and DataBank LAX2 share the published 3094 E Vernon Avenue address; code naming is not two physical sites.", "current_status_basis": "Vernon development/construction context, with DataBank planned as operator and Goodman developing the site. The April 7, 2026 announcement forecasts first 6 MW in December 2026 and remaining 26 MW through September 2027. Generic present-tense facility/service language is not evidence of operation; actual shell readiness, energization and opening are unverified.", "code_search_alias_scope": "Explicit search aliases retain DataBank LAX2 and the Goodman LAX01 construction-title context at the corroborated published address. They do not certify a separate building, parcel or legal ownership.", "provider_roles": [{"name": "Goodman", "role": "developer"}, {"name": "DataBank", "role": "planned operator"}], "construction_evidence_scope": "The Goodman public view supplied selected construction text, title and date; the complete article body was not available in this review. It corroborates development and construction context only. Actual shell readiness, energization and opening remain unverified."}, "notes": ["Partial field review only. Original name, point/precision, city/county/jurisdiction, opening field and legacy MW/financial values remain unchanged.", "Capacity is operator-listed Critical IT Load, not metered consumption or a utility/generator figure. No sum across overlapping code, campus or expansion envelopes is asserted."], "sources": [{"url": "https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}, {"url": "https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/", "host": "www.databank.com", "published": "2026-04-07", "date": "2026-04-07", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}, {"url": "https://www.databank.com/data-centers/los-angeles/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}, {"url": "https://www.goodman.com/investor-centre/announcements-media/2025/goodman-group-tops-out-lax01-vernon-data-center-in-southern-california", "host": "www.goodman.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Goodman topping-out title/date and construction excerpt; selected text view"}, {"url": "https://www.databank.com/data-centers/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Primary-Campus-Holds-20261016", "scope": "Targeted primary campus/project stage and identity-scope review. No physical-site census, point/precision upgrade, actual delivery, metered use or legal title finding.", "fields": {"vernon_identity_comparison": {"goodman_energy_park": {"record_id": "goodman-energy-park-vernon-ca", "published_building_addresses": ["3163 East Vernon Avenue, Vernon, California", "3049 East Vernon Avenue, Vernon, California"], "source_context": "CEC proposed two-building Goodman Energy Park / VBGF proceeding"}, "databank_lax2": {"record_id": "databank-vernon-la-ca", "published_address": "3094 E. Vernon Avenue - Vernon, CA 90058", "source_context": "DataBank LAX2 / Goodman LAX01 development"}, "decision": "Retain separate research identities. Different published address contexts and a shared Goodman name do not establish a same-project or physical-building relationship. No merge, new site or point movement is supported."}, "identity_scope_limit": "The current CEC Energy Park description uses 3163 and 3049 East Vernon Avenue; DataBank LAX2 publishes 3094 E. Vernon Avenue. A shared Goodman name and overlapping inherited approximate markers do not support merging these research records. A parcel/project relationship requires its own evidence."}, "notes": ["Field-specific review only. Original name, approximate location and wrapper, city/county context, opening field, legacy MW, financial and ownership limits remain.", "Campus/component and regulatory proposal units are not interchangeable with separate physical sites or complete operational capacity."], "sources": [{"url": "https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}, {"url": "https://www.energy.ca.gov/powerplant/backup-generating-system/vernon-backup-generating-facility-vbgf", "host": "www.energy.ca.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "California Energy Commission primary project record"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 11, October 22, 2026", "scope": "Official facility street reference only. No canonical address, status, physical date, quantity, company role, jurisdiction, title, parcel, full campus or distinct building identity is adopted. Existing native status remains unchanged.", "fields": {"location_review_decision": {"location": {"lat": 34.005432711985, "lng": -118.218656204568, "precision": "address", "basis": "Published DataBank facility address 3094 E. Vernon Avenue - Vernon, CA 90058 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding. Existing native status remains unchanged."}, "reference_method": "Census interpolated street address", "published_address": "3094 E. Vernon Avenue - Vernon, CA 90058", "county_fips": ["06037"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["The current official numeric facility section identifies this existing record. All prior native address and status wrappers remain exact. Corporate headquarters, related facility cards and map coordinates are excluded.", "The unique Census street range and retained county boundary agree with the existing county. Numeric street identity is explicitly reviewed. The image center is on or beside a street in an industrial or office setting. No residential roof is selected. Nearby buildings are context only and no building, parcel or title is identified from appearance.", "Official USGS aerial setting context was visually reviewed. The acquisition date is not established and may predate construction. No aerial coordinate, commissioning date, current operation, property ownership, surveyed roof or full campus is adopted."], "sources": [{"url": "https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Official named LAX2 numeric street section"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3094+E.+Vernon+Avenue%2C+Vernon%2C+CA+90058&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Census calculated street range and county context"}, {"url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Census calculated street method and limits"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPImagery/ImageServer/exportImage?bbox=-118.22190708968417%2C34.00273777846003%2C-118.21540531945185%2C34.00812764550997&bboxSR=4326&imageSR=4326&size=1000%2C1000&format=jpg&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-22", "label": "Aerial setting context only, acquisition date not established"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate project area, not a confirmed parcel", "summary": "California · Vernon · Los Angeles · Source context reviewed", "search_extra": "DataBank LAX2 Vernon Goodman LAX01", "status_scope": "Vernon development/construction context, with DataBank planned as operator and Goodman developing the site. The April 7, 2026 announcement forecasts first 6 MW in December 2026 and remaining 26 MW through September 2027. Generic present-tense facility/service language is not evidence of operation; actual shell readiness, energization and opening are unverified.", "event_evidence": [{"date": "2026-04-07", "text": "DataBank announced its Vernon joint venture with Goodman and prospective capacity delivery from December 2026 through September 2027. This is an announcement, not completed opening, energization or financial close.", "kind": "announced", "sources": [{"url": "https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/", "host": "www.databank.com", "published": "2026-04-07", "date": "2026-04-07", "checked": "2026-10-16", "label": "DataBank current facility or company statement"}]}], "typed_power_facts": [{"measure": "it_capacity", "value": 32, "unit": "MW", "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "basis": "forecast", "scope": "Forecast full-fit-out Critical IT Load for the Vernon development. Rollout targets are not actual delivery; 6/26 MW narrative components are included in the 32 MW envelope, not additive.", "sources": ["https://www.databank.com/data-centers/los-angeles/los-angeles-vernon-data-center/", "https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "retained_reviewed_project_area", "scope": "The reviewed street reference identifies an approximate project area. No confirmed project parcel, building center or current operation is established by this display."}, "state_name": "California", "state_path": "/california/"}, {"id": "coresite-de3-denver-co", "state": "CO", "kind": "project", "name": "CoreSite DE3", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Colocation", "counties": ["Denver"], "city": "Denver", "address": "4900 Race St., Denver, CO 80216", "who": "CoreSite", "end_user": "", "mw": null, "power": "", "power_note": "Planned initial-building compute capacity only. Full campus capacity, utility service, backup generation and actual consumption remain separate; technical as-of date is not published.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Current page still uses targeted availability in 2026. A target year does not prove the facility has opened. Retain source unit CMW without silently converting to a differently defined MW field. Campus and first building are nested, not additive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-10-06", "CoreSite published a DE3 construction-progress announcement reporting a topping-off milestone. This is the publication day; the exact physical topping-off day and opening day are not established."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.coresite.com/data-center/de3-denver-co", "host": "coresite.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.coresite.com/data-center-locations/denver", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-16", "label": "CoreSite official location and specifications"}, {"url": "https://www.coresite.com/data-centers/locations", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-16", "label": "CoreSite official location and specifications"}, {"url": "https://www.coresite.com/en-us/data-centers/denver/de3-construction", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-16", "label": "CoreSite official community project information"}, {"url": "https://www.coresite.com/news/coresite-achieves-key-construction-milestone-for-new-de3-data-center-in-denver", "host": "www.coresite.com", "published": "2025-10-06", "date": "2025-10-06", "checked": "2026-10-16", "label": "CoreSite official construction progress announcement"}, {"url": "https://services1.arcgis.com/zdB7qR0BtYrg0Xpl/arcgis/rest/services/ODC_PROP_PARCELS_A/FeatureServer/245/query?where=SITUS_ADDRESS_LINE1+LIKE+%274900%25RACE%25%27&outFields=SCHEDNUM%2CSITUS_ADDRESS_LINE1%2CSITUS_CITY%2CSITUS_STATE%2CSITUS_ZIP%2CPARCEL_SOURCE%2CSITUS_X_COORD%2CSITUS_Y_COORD&outSR=4326&returnGeometry=true&f=json", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Denver reference parcels at 4900 N Race Street"}, {"url": "https://services1.arcgis.com/zdB7qR0BtYrg0Xpl/arcgis/rest/services/ODC_PROP_PARCELS_A/FeatureServer/245?f=pjson", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Denver parcel layer metadata and limits"}, {"url": "https://www.arcgis.com/sharing/rest/content/items/7c53bd0894134e80ae1e478c0789bf49?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Denver authoritative parcel publisher and use constraints"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4900+Race+St%2C+Denver%2C+CO+80216&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Census calculated address-range match"}, {"url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Census geocoder method and limitations"}, {"url": "https://apcdweb.dphe.state.co.us/PermitStatusAPI/api/vResultsAPIs", "host": "apcdweb.dphe.state.co.us", "published": "", "date": "", "checked": "2026-10-16", "label": "Colorado public air-application workflow data"}, {"url": "https://apcdweb.dphe.state.co.us/PermitStatus/", "host": "apcdweb.dphe.state.co.us", "published": "", "date": "", "checked": "2026-10-16", "label": "Colorado air-application column definitions"}, {"url": "https://services1.arcgis.com/zdB7qR0BtYrg0Xpl/arcgis/rest/services/ODC_PROP_PARCELS_A/FeatureServer/245/query?where=SITUS_ADDRESS_LINE1+LIKE+%274900%25RACE%25%27&returnCountOnly=true&f=json", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Count of Denver address-matched reference parcels"}], "loc": {"lat": 39.7861, "lng": -104.96278, "precision": "approximate", "basis": "Map area centered on Denver reference parcel 0214400131000 at the operator’s Race Street address, corroborated by Census address-range matching and Colorado air-application context. General-reference GIS, not surveyed property bounds, a verified building center or the full campus boundary."}, "reviewed_evidence": [{"overlay": "operator-specifications-round3-2026-10-14.json", "scope": "Field or source context only", "fields": {"advertised_building_area_sqft_approx": 170000, "advertised_building_power_cmw": 18, "advertised_campus_area_sqft_lower_bound": 590000, "advertised_campus_power_cmw": 60, "availability_target_year": 2026, "target_delivery_verified": false}, "notes": ["Current page still uses targeted availability in 2026. A target year does not prove the facility has opened. Retain source unit CMW without silently converting to a differently defined MW field. Campus and first building are nested, not additive.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.coresite.com/data-center/de3-denver-co", "host": "coresite.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-CoreSite-Locations-20261016", "scope": "Scoped CoreSite facility-code service/address review; original locations, jurisdiction, physical identity, dates and legacy figures remain unverified or separately sourced.", "fields": {"operator_facility_code": "DE3", "record_association_scope": "Existing CoreSite DE3 is associated by its unique CoreSite facility code, state and published locality with the primary operator page. A code/service context is not a separately verified physical building, campus boundary, legal owner or parcel. The inherited point and jurisdiction remain unchanged.", "published_location_address": {"text": "4900 Race St., Denver, CO 80216", "scope": "Postal facility address exactly as published. No missing postal code is supplied, no suite/building allocation is inferred and no point or jurisdiction is moved."}, "current_status_basis": "Operator-reported DE3 construction project. The current facility page says Coming Soon and the community page still forecasts late 2026 operation; the October 6, 2025 announcement reported construction topping off. Those sources support a construction project, not current operation, a confirmed opening day or completion of the wider three-building campus.", "published_technical_specs": {"GENERATORS": "N+1 Maintenance", "UPS/PDU/RPP": "Distributed redundant"}, "technical_scope": "Operator-published electrical/redundancy and staffing/service specifications with no published technical as-of date. AC/DC describes supply type, not MW; formulas are not installed capacity or energy use. A service-level agreement is not independently observed uptime. Future DE3 design specifications do not establish operation.", "planned_building_and_campus_scope": "DE3 is the first building in a planned three-building campus. The facility page describes 18 CMW for the initial building and 60 CMW for the campus; the community page describes 18 MW of compute power at full build. Only the separately typed initial-building forecast is adopted, with no campus total assigned as current load.", "published_floor_area": "170,000+ square feet on the current facility page; reconciliation with the older announcement remains open.", "floor_area_source_difference": {"current_facility_page": "170,000+ square feet", "2025-10-06_announcement": "180,000 square feet", "scope": "Different printed project areas remain visible. No cause, revision history, measured current area or exact reconciled floor area is inferred."}, "forecast_water_use_unclassified": "The community page forecasts average use of 115,000 gallons daily. Its use wording does not distinguish withdrawal from consumption; no typed volume, metered usage, permit limit or annual conversion is adopted.", "opening_target": "Late 2026 is the operator’s forecast, not an achieved opening or an exact date."}, "notes": ["Partial field review only. Existing name/ID, point, precision, city/counties, opening field, legacy MW/investment/jobs and prior source history are preserved.", "Operator brand is not a legal ownership finding. Certification and SLA marketing are not independent inspections or achieved uptime."], "sources": [{"url": "https://www.coresite.com/data-center/de3-denver-co", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-16", "label": "CoreSite official location and specifications"}, {"url": "https://www.coresite.com/data-center-locations/denver", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-16", "label": "CoreSite official location and specifications"}, {"url": "https://www.coresite.com/data-centers/locations", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-16", "label": "CoreSite official location and specifications"}, {"url": "https://www.coresite.com/en-us/data-centers/denver/de3-construction", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-16", "label": "CoreSite official community project information"}, {"url": "https://www.coresite.com/news/coresite-achieves-key-construction-milestone-for-new-de3-data-center-in-denver", "host": "www.coresite.com", "published": "2025-10-06", "date": "2025-10-06", "checked": "2026-10-16", "label": "CoreSite official construction progress announcement"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Location-Reference-Parcel-20261016", "scope": "Cited correction of an inherited approximate map point using an address-matched city reference parcel, corroborating Census street context and state air-application identity. No parcel survey, roof point, campus boundary or operating-status upgrade.", "fields": {"location_review_decision": {"method": "Area centroid of the exact-situs Denver reference polygon in Web Mercator, rounded to five decimal places", "previous_point": {"lat": 39.7392, "lng": -104.9903, "precision": "approximate", "basis": "Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."}, "replacement_point": {"lat": 39.7861, "lng": -104.96278}, "shift_m": 5721.0, "scope": "Explicit record/address/agency review. The project remains an approximate illustrative area, not a solid or roof pin; unrelated records and source candidates are not moved."}, "reference_parcel_context": {"schedule_number": "0214400131000", "situs_address": "4900 N RACE ST", "city": "Denver", "state": "CO", "query_rows": 3, "not_selected_approximate_address_rows": ["0214400129000", "0214400130000"], "scope": "Exact situs-address association to general-reference city GIS. The two APPRX-address strips are not selected as the project parcel. No legal ownership, surveyed line, building outline or complete campus footprint is certified."}, "census_address_range": {"matched_address": "4900 RACE ST, DENVER, CO, 80216", "coordinates": {"x": -104.963415884781, "y": 39.785256104963}, "tiger_line_id": "177303279", "side": "R", "address_range": "4900 to 4998", "scope": "Calculated along a Census address range. Corroborates the street area only; it is not a rooftop, surveyed parcel point, unit match or proof of operation."}, "rejected_operator_metadata": {"printed_latitude": 39.699484, "printed_longitude": -104.987019, "printed_street_address": "4900 N. Race Street", "scope": "The embedded coordinate conflicts with the visible operator street address and independent government context. It is retained as a rejected alternative and is not adopted."}, "location_limits": "Approximate reference area only. Source record count, operating/construction status, floor area, power, water, legal municipality, ownership and distinct physical-site identity are not established or changed by a map-center correction. The city GIS is not survey quality or suitable for engineering. The dashed circle remains illustrative, not a parcel boundary or a calculated error limit.", "air_application_context": {"agency_applicant": "CORESITE REAL ESTATE DE3, LLC", "facility_address": "CORESITE REAL ESTATE DE3 - CORESITE DE3, 4900 N RACE STREET, DENVER, COLORADO, 80216", "application_reference": "24DE0836", "airs_reference": "031-2609", "received_on": "2024-07-16", "displayed_service": "Final Approval", "issued_on": null, "raw_status": "", "scope": "Received is the application intake date, not approval or physical construction. Final Approval is the displayed Service workflow. No issued date is supplied, and no operational status, generator quantity or capacity is inferred."}}, "notes": ["Only the explicitly reviewed DE3 map center is corrected. All other Census matches remain unadopted candidates. Original source values and contradictory publisher coordinates are retained with their reasons.", "The operator address remains exactly as published. City and state agency address variants appear separately, without silently rewriting the source address.", "No status observation or physical milestone is created. Air-application workflow is not current operation or issued-permit proof."], "sources": [{"url": "https://www.coresite.com/data-center/de3-denver-co", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-16", "label": "CoreSite official location and specifications"}, {"url": "https://services1.arcgis.com/zdB7qR0BtYrg0Xpl/arcgis/rest/services/ODC_PROP_PARCELS_A/FeatureServer/245/query?where=SITUS_ADDRESS_LINE1+LIKE+%274900%25RACE%25%27&outFields=SCHEDNUM%2CSITUS_ADDRESS_LINE1%2CSITUS_CITY%2CSITUS_STATE%2CSITUS_ZIP%2CPARCEL_SOURCE%2CSITUS_X_COORD%2CSITUS_Y_COORD&outSR=4326&returnGeometry=true&f=json", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Denver reference parcels at 4900 N Race Street"}, {"url": "https://services1.arcgis.com/zdB7qR0BtYrg0Xpl/arcgis/rest/services/ODC_PROP_PARCELS_A/FeatureServer/245?f=pjson", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Denver parcel layer metadata and limits"}, {"url": "https://www.arcgis.com/sharing/rest/content/items/7c53bd0894134e80ae1e478c0789bf49?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Denver authoritative parcel publisher and use constraints"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4900+Race+St%2C+Denver%2C+CO+80216&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Census calculated address-range match"}, {"url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Census geocoder method and limitations"}, {"url": "https://apcdweb.dphe.state.co.us/PermitStatusAPI/api/vResultsAPIs", "host": "apcdweb.dphe.state.co.us", "published": "", "date": "", "checked": "2026-10-16", "label": "Colorado public air-application workflow data"}, {"url": "https://apcdweb.dphe.state.co.us/PermitStatus/", "host": "apcdweb.dphe.state.co.us", "published": "", "date": "", "checked": "2026-10-16", "label": "Colorado air-application column definitions"}, {"url": "https://services1.arcgis.com/zdB7qR0BtYrg0Xpl/arcgis/rest/services/ODC_PROP_PARCELS_A/FeatureServer/245/query?where=SITUS_ADDRESS_LINE1+LIKE+%274900%25RACE%25%27&returnCountOnly=true&f=json", "host": "services1.arcgis.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Count of Denver address-matched reference parcels"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check39, October23,2026", "scope": "CoreSite identifies the same named DE3 planned development and service street in the main body of its first party facility page and describes its own planned development there. The developer per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown. The original coming soon heading and targeted2026availability remain forecasts. They establish no accomplished opening, construction completion, commissioned computing, actual load or completion of the three building campus.", "fields": {"company_association": {"name": "CoreSite", "role": "developer", "identity_scope": "provider_brand_only", "scope": "CoreSite identifies the same named DE3 planned development and service street in the main body of its first party facility page and describes its own planned development there. The developer per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown. The original coming soon heading and targeted2026availability remain forecasts. They establish no accomplished opening, construction completion, commissioned computing, actual load or completion of the three building campus."}, "provider_role": "developer"}, "notes": ["CoreSite identifies the same named DE3 planned development and service street in the main body of its first party facility page and describes its own planned development there. The developer per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown. The original coming soon heading and targeted2026availability remain forecasts. They establish no accomplished opening, construction completion, commissioned computing, actual load or completion of the three building campus."], "sources": [{"url": "https://www.coresite.com/data-center/de3-denver-co", "host": "www.coresite.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate area, cited parcel/address context", "summary": "Colorado · Denver · Denver · Source context reviewed", "status_scope": "Operator-reported DE3 construction project. The current facility page says Coming Soon and the community page still forecasts late 2026 operation; the October 6, 2025 announcement reported construction topping off. Those sources support a construction project, not current operation, a confirmed opening day or completion of the wider three-building campus.", "event_evidence": [{"date": "2025-10-06", "text": "CoreSite published a DE3 construction-progress announcement reporting a topping-off milestone. This is the publication day; the exact physical topping-off day and opening day are not established.", "kind": "announced", "sources": [{"url": "https://www.coresite.com/news/coresite-achieves-key-construction-milestone-for-new-de3-data-center-in-denver", "host": "www.coresite.com", "published": "2025-10-06", "date": "2025-10-06", "checked": "2026-10-16", "label": "CoreSite official construction progress announcement"}]}], "typed_power_facts": [{"measure": "it_capacity", "value": 18, "unit": "MW", "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "basis": "forecast", "scope": "Operator community page forecast of 18 MW compute power for DE3 at full build. Initial building only, not the planned three-building campus’s 60 CMW, current energized IT load, actual consumption, approved utility service or generator capacity.", "sources": ["https://www.coresite.com/en-us/data-centers/denver/de3-construction"]}], "typed_water_facts": [{"measure": "supply_source", "value": "Denver Water is the operator-named future water supplier for DE3.", "unit": null, "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "basis": "operator_reported_statement", "scope": "Planned supplier statement, not an executed municipal agreement, water right, approved volume, metered withdrawal or current consumption.", "sources": ["https://www.coresite.com/en-us/data-centers/denver/de3-construction"]}, {"measure": "cooling_type", "value": "Operator describes recirculating and reusing water for cooling at the planned DE3 facility.", "unit": null, "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "basis": "operator_reported_statement", "scope": "Qualitative operator cooling description. The stated future average water-use estimate and evaporation share are not independently measured consumption, a withdrawal permit or proof of zero water use.", "sources": ["https://www.coresite.com/en-us/data-centers/denver/de3-construction"]}], "state_name": "Colorado", "state_path": "/colorado/"}, {"id": "hostdime-eatonville-fl", "state": "FL", "kind": "facility", "name": "HostDime Orlando Tier IV Data Center", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Orange"], "city": "Eatonville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. HostDime SuperNova construction and mixed-use area scope. 100kgrossincludesoffices/amenities,notalldataraisedfloor. CompanyCentralFloridasince2003notSuperNovaopening. TierIVdesign/Category5claimnotindependentcertifier/engineeringinspection. UndatedcurrentpagecannotestablishexactRFSday;do notdisplayoperatingfromgenericreserve-spaceCTA. No numericITMWinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Commissioning and intended compliance or Tier IV requirements are not proof the facility has opened or achieved each certification. No current MW load or parcel upgrade. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.hostdime.com/new-orlando-data-center", "host": "hostdime.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 28.51449, "lng": -81.32365, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "HostDime SuperNova construction and mixed-use area scope", "fields": {"operator": "HostDime", "facility": "SuperNova", "address": "1 Innovative Place, Orlando metro, Florida", "building_gross_sqft": 100000, "building_stories": 7, "dedicated_data_center_floors": 3, "designed_rack_capacity_min_exclusive": 1000, "operator_described_stage": "final construction, commissioning and facility preparation ahead of opening"}, "notes": ["100kgrossincludesoffices/amenities,notalldataraisedfloor. CompanyCentralFloridasince2003notSuperNovaopening. TierIVdesign/Category5claimnotindependentcertifier/engineeringinspection. UndatedcurrentpagecannotestablishexactRFSday;do notdisplayoperatingfromgenericreserve-spaceCTA. No numericITMWinreviewedbody.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.hostdime.com/new-orlando-data-center", "host": "hostdime.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "under construction", "status_basis": "HostDime says SuperNova remains in final construction, commissioning, inspections and preparation ahead of opening."}, "notes": ["Commissioning and intended compliance or Tier IV requirements are not proof the facility has opened or achieved each certification. No current MW load or parcel upgrade. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://www.hostdime.com/new-orlando-data-center", "host": "hostdime.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "655d97f1760e358127cbfa10d3035ff75ac37c053c5ce0c99174f5eed3190e91", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Florida · Eatonville · Orange · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "12095"}, "state_name": "Florida", "state_path": "/florida/"}, {"id": "dcblox-atlanta-east-conyers-ga", "state": "GA", "kind": "facility", "name": "DC BLOX Atlanta East Hyperscale Data Center Campus", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Rockdale"], "city": "Conyers", "address": "", "who": "DC BLOX", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. OriginalDecember12,2023body versus September8,2026updated header. Utility total216MWis not criticalIT. Historical delivery target is not a completed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Page title still coming soon. Completed-and-planned total154is not all energized. Prior216MWutility commitment uses a different basis. Do not add154to216or copy total to each building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/", "host": "dcblox.com", "date": "2023-12-12", "published": "2023-12-12", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.dcblox.com/data-centers/atlanta-data-centers/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/", "host": "www.dcblox.com", "published": "2024-11-14", "date": "2024-11-14", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 33.6544, "lng": -84.02696, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"acquired_acres": 72, "full_build_design_area_sqft": 750000, "utility_committed_total_power_mw": 216, "additional_tenant_area_sqft": 160000, "historical_expected_delivery": "2025-Q4"}, "notes": ["OriginalDecember12,2023body versus September8,2026updated header. Utility total216MWis not criticalIT. Historical delivery target is not a completed opening.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/", "host": "dcblox.com", "date": "2023-12-12", "published": "2023-12-12", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"published_address": "1726 Farmer Road, Conyers, GA30012", "campus_buildings": 4, "campus_area_sqft": 747787, "critical_capacity_completed_and_planned_mw": 154, "building_power_blocks_mw": [10, 48, 48, 48], "site_preparations_started_by": "2024-09"}, "notes": ["Page title still coming soon. Completed-and-planned total154is not all energized. Prior216MWutility commitment uses a different basis. Do not add154to216or copy total to each building.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/", "host": "dcblox.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "DC BLOX describes its Atlanta East campus in Conyers as in development and reports that campus construction has begun.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_construction", "scope": "DC BLOX describes its Atlanta East campus in Conyers as in development and reports that campus construction has begun."}}, "notes": ["The page also mixes operational and development categories. Its construction account supports this qualified stage only, not completed buildings or commissioning. The month-only site-preparation reference is not an exact event date."], "sources": [{"url": "https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check68, October24,2026", "scope": "The current Atlanta market page and dated edge announcement identify DC BLOX development of Atlanta East in Conyers. Shared regional totals and current page availability wording do not establish completion or commissioning of every component. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.", "fields": {"company_association": {"name": "DC BLOX", "role": "developer", "identity_scope": "provider_brand_only", "scope": "The current Atlanta market page and dated edge announcement identify DC BLOX development of Atlanta East in Conyers. Shared regional totals and current page availability wording do not establish completion or commissioning of every component. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."}, "provider_role": "developer"}, "notes": ["The current Atlanta market page and dated edge announcement identify DC BLOX development of Atlanta East in Conyers. Shared regional totals and current page availability wording do not establish completion or commissioning of every component. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."], "sources": [{"url": "https://www.dcblox.com/data-centers/atlanta-data-centers/", "host": "www.dcblox.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/", "host": "www.dcblox.com", "published": "2024-11-14", "date": "2024-11-14", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Conyers · Rockdale · Source context reviewed", "status_scope": "DC BLOX describes its Atlanta East campus in Conyers as in development and reports that campus construction has begun.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13247"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "microsoft-douglasville-ga", "state": "GA", "kind": "facility", "name": "Microsoft Douglasville Data Center Campus", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Douglas"], "city": "Douglasville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide qualification thresholds, no named-site award. Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county", "host": "dor.georgia.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://local.microsoft.com/communities/americas/greater-atlanta/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "loc": {"lat": 33.7182, "lng": -84.75584, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "statewide qualification thresholds, no named-site award", "fields": {}, "notes": ["Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county", "host": "dor.georgia.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch1", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "unresolved", "scope": "Georgia’s tax page describes statewide high-technology equipment exemption investment thresholds by county population. It does not name Microsoft Douglasville, establish a site award, quantify savings or prove current operation. No project-specific incentive is inferred."}}, "notes": ["Georgia’s tax page describes statewide high-technology equipment exemption investment thresholds by county population. It does not name Microsoft Douglasville, establish a site award, quantify savings or prove current operation. No project-specific incentive is inferred."], "sources": [{"url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county", "host": "dor.georgia.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed primary source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 12", "scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_construction", "scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted."}, "tax_source_scope": {"county_threshold_table_not_named_facility_registration": true, "incentive_threshold_not_actual_expenditure_or_operation": true}}, "notes": ["The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://local.microsoft.com/communities/americas/greater-atlanta/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Douglasville · Douglas · Source context reviewed", "status_scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13097"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "microsoft-east-point-ben-hill-road-ga", "state": "GA", "kind": "facility", "name": "Microsoft East Point Data Center (Ben Hill Road)", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Fulton"], "city": "East Point", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft regional Georgia context without exact Ben Hill match. Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}, {"url": "https://local.microsoft.com/communities/americas/greater-atlanta/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}, {"url": "https://local.microsoft.com/blog/east-point-georgia-datacenter-project-update/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "loc": {"lat": 33.83707, "lng": -84.43133, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Microsoft regional Georgia context without exact Ben Hill match", "fields": {"operator_region_label": "South Fulton County, Georgia", "regional_workforce_forecast": "hundreds of fulltime employees and contractors across operational facilities by end2026", "regional_cooling_description": "direct evaporative, no cooling water below29.4degreesCelsius"}, "notes": ["Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 12", "scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_construction", "scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities."}, "component_scope": {"site_phase_from_current_project_page": "Construction", "regional_jobs_not_allocated_to_site": true, "community_feedback_historical_context": "Microsoft describes neighborhood feedback and rock excavation discussions, including a February 26, 2024 information session. Its account is an operator statement, not an independently published formal complaint or regulator finding."}}, "notes": ["Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}, {"url": "https://local.microsoft.com/communities/americas/greater-atlanta/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}, {"url": "https://local.microsoft.com/blog/east-point-georgia-datacenter-project-update/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check59, October24,2026", "scope": "Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries."}, "provider_role": "developer"}, "notes": ["Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries."], "sources": [{"url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/", "host": "local.microsoft.com", "published": "2024-06-17", "date": "2024-06-17", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · East Point · Fulton · Source context reviewed", "status_scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13121"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "microsoft-palmetto-fulton-ga", "state": "GA", "kind": "facility", "name": "Microsoft Palmetto Data Center", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Fulton"], "city": "Palmetto", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft Palmetto construction chronology. October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://local.microsoft.com/communities/americas/greater-atlanta/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "loc": {"lat": 33.78294, "lng": -84.50774, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "Microsoft Palmetto construction chronology", "fields": {"operator_site_name": "Palmetto datacenter", "locality": "Palmetto, Georgia", "construction_start": "2024-04", "construction_start_precision": "month", "historical_construction_completion_estimate": "beginning of2025-10", "operator_community_information_session_date": "2024-07-23", "general_contractor": "Turner Construction Company"}, "notes": ["October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 12", "scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_construction", "scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day."}, "date_scope": {"reported_construction_start_month": "2024-04", "exact_start_day_established": false, "older_completion_forecast": "beginning of October 2025", "forecast_occurrence_verified": false}}, "notes": ["The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://local.microsoft.com/communities/americas/greater-atlanta/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}, {"url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check59, October24,2026", "scope": "Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site."}, "provider_role": "developer"}, "notes": ["Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site."], "sources": [{"url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-07-03", "date": "2024-07-03", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Palmetto · Fulton · Source context reviewed", "status_scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13121"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "northern-data-maysville-jackson-ga", "state": "GA", "kind": "facility", "name": "Northern Data Maysville Data Center", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Jackson"], "city": "Maysville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Canceled informational meeting is not a canceled project or a new denial. The city clerk's interpretation of code is attributed, not independently reviewed law. Maysville here is in Jackson County, Georgia, not Kentucky. No construction, critical IT, exact approval date or operating status established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/", "host": "wgtjradio.com", "date": "2026-05-31", "published": "2026-05-31", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.maysvilleneighbor.com/", "host": "www.maysvilleneighbor.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://cts.gaepd.org/Complaint/118359", "host": "cts.gaepd.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 34.13408, "lng": -83.56654, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "WGTJ reports cancellation of a Northern Data Maysville informational meeting because previous zoning/conditional-use action had already occurred and scheduling changed.", "independently_verified_current_operating_status": null}, "notes": ["Canceled informational meeting is not a canceled project or a new denial. The city clerk's interpretation of code is attributed, not independently reviewed law. Maysville here is in Jackson County, Georgia, not Kentucky. No construction, critical IT, exact approval date or operating status established.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/", "host": "wgtjradio.com", "date": "2026-05-31", "published": "2026-05-31", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 37", "scope": "The current original Industrial Drive community site explicitly identifies RUM Group as its responsible publisher and states that the computing facility is being built through Quake AI, whose business includes Northern Data. Reported construction is limited to that company account, not commissioning or an independently verified completion milestone. The agency complaint separately identifies Northern Data in Maysville, Jackson County. Its allegation about land disturbance and permit display is not an agency violation finding or independent proof of data hall construction. No acquisition, operator role, capacity or point is promoted.", "fields": {"current_stage_evidence": {"outcome": "company_reported_current_industrial_drive_construction", "scope": "The current original Industrial Drive community site explicitly identifies RUM Group as its responsible publisher and states that the computing facility is being built through Quake AI, whose business includes Northern Data. Reported construction is limited to that company account, not commissioning or an independently verified completion milestone. The agency complaint separately identifies Northern Data in Maysville, Jackson County. Its allegation about land disturbance and permit display is not an agency violation finding or independent proof of data hall construction. No acquisition, operator role, capacity or point is promoted."}}, "notes": ["The current original Industrial Drive community site explicitly identifies RUM Group as its responsible publisher and states that the computing facility is being built through Quake AI, whose business includes Northern Data. Reported construction is limited to that company account, not commissioning or an independently verified completion milestone. The agency complaint separately identifies Northern Data in Maysville, Jackson County. Its allegation about land disturbance and permit display is not an agency violation finding or independent proof of data hall construction. No acquisition, operator role, capacity or point is promoted.", "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."], "sources": [{"url": "https://www.maysvilleneighbor.com/", "host": "www.maysvilleneighbor.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://cts.gaepd.org/Complaint/118359", "host": "cts.gaepd.org", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Georgia · Maysville · Jackson · Source context reviewed", "status_scope": "The current original Industrial Drive community site explicitly identifies RUM Group as its responsible publisher and states that the computing facility is being built through Quake AI, whose business includes Northern Data. Reported construction is limited to that company account, not commissioning or an independently verified completion milestone. The agency complaint separately identifies Northern Data in Maysville, Jackson County. Its allegation about land disturbance and permit display is not an agency violation finding or independent proof of data hall construction. No acquisition, operator role, capacity or point is promoted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "13157"}, "state_name": "Georgia", "state_path": "/georgia/"}, {"id": "valorc3-boise-2-id", "state": "ID", "kind": "facility", "name": "ValorC3 Boise 2", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Ada"], "city": "Boise", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS. FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/", "host": "idahobusinessreview.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://valorc3.com/valorc3-boise-hyperscale-data-center-credit-facility/", "host": "valorc3.com", "published": "2026-04-29", "date": "2026-04-29", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://valorc3.com/valorc3-data-centers-announces-10mw-data-center-in-boise-idaho/", "host": "valorc3.com", "published": "2025-05-05", "date": "2025-05-05", "checked": "2026-10-17", "label": "Reviewed source context"}], "loc": {"lat": 43.4416, "lng": -116.2943, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json", "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.", "fields": {}, "notes": ["IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS.", "FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given.", "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."], "sources": [{"url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/", "host": "idahobusinessreview.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "operator-reported_construction", "scope": "ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction."}}, "notes": ["ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction."], "sources": [{"url": "https://valorc3.com/valorc3-boise-hyperscale-data-center-credit-facility/", "host": "valorc3.com", "published": "2026-04-29", "date": "2026-04-29", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://valorc3.com/valorc3-data-centers-announces-10mw-data-center-in-boise-idaho/", "host": "valorc3.com", "published": "2025-05-05", "date": "2025-05-05", "checked": "2026-10-17", "label": "Reviewed source context"}], "checked": "2026-10-17", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Idaho · Boise · Ada · Source context reviewed", "status_scope": "ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "16001"}, "state_name": "Idaho", "state_path": "/idaho/"}, {"id": "compass-hoffman-estates-il", "state": "IL", "kind": "facility", "name": "Compass Datacenters Hoffman Estates Campus", "group": "building", "status": "Agency-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cook"], "city": "Hoffman Estates", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Site work/demolition precedes construction; mid2026 power and late2025 construction were forecasts.194-million land cost and ten-billion project investment not additive capex; market-wide MW not campus capacity. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-02-17", "The village Compass update records development approval for the campus at the February 17 Village Board meeting. This is the development approval date, not an opening."], ["2025-03-19", "The village Compass update records the first permit for Building 1 and commencement of construction work on March 19, 2025. This is the reported start for that building, not construction or operation of every planned campus building."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.datacenterfrontier.com/hyperscale/article/55089460/suburban-chicago-welcomes-compass-datacenters-major-hyperscale-development-on-legacy-sears-hq-site", "host": "datacenterfrontier.com", "date": "2024-06-18", "published": "2024-06-18", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.arcgis.com/sharing/rest/content/items/a65ad687f0524c7aa731e2c89d850a53/data?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.arcgis.com/sharing/rest/content/items/3f2a99f012ed47fba035e99b2c6cb0e4/data?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.arcgis.com/sharing/rest/content/items/3ba19ce7e8c14f33892aa81bb9ed0136/data?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.hoffmanestates.org/", "host": "www.hoffmanestates.org", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}], "loc": {"lat": 41.86304, "lng": -87.84219, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round24-2026-10-14.json", "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.", "fields": {"reported_context": "Data Center Frontier reports Compass June13 launch of redevelopment at former Sears Hoffman Estates campus.", "independently_verified_current_operating_status": null}, "notes": ["Site work/demolition precedes construction; mid2026 power and late2025 construction were forecasts.194-million land cost and ten-billion project investment not additive capex; market-wide MW not campus capacity.", "Subsequent original decisions and current operator disclosures take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.datacenterfrontier.com/hyperscale/article/55089460/suburban-chicago-welcomes-compass-datacenters-major-hyperscale-development-on-legacy-sears-hq-site", "host": "datacenterfrontier.com", "date": "2024-06-18", "published": "2024-06-18", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 6", "scope": "The village linked Compass project update says construction is actively underway at the former Sears headquarters campus. It separately records development approval on February 17, 2025 and the first Building 1 permit and construction start on March 19, 2025. The label is the village reported construction stage, not completion or operation of all five planned buildings. The substation work remains a separate component.", "fields": {"current_stage_evidence": {"outcome": "agency_reported_construction", "scope": "The village linked Compass project update says construction is actively underway at the former Sears headquarters campus. It separately records development approval on February 17, 2025 and the first Building 1 permit and construction start on March 19, 2025. The label is the village reported construction stage, not completion or operation of all five planned buildings. The substation work remains a separate component."}}, "notes": ["The village linked Compass project update says construction is actively underway at the former Sears headquarters campus. It separately records development approval on February 17, 2025 and the first Building 1 permit and construction start on March 19, 2025. The label is the village reported construction stage, not completion or operation of all five planned buildings. The substation work remains a separate component.", "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."], "sources": [{"url": "https://www.arcgis.com/sharing/rest/content/items/a65ad687f0524c7aa731e2c89d850a53/data?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.arcgis.com/sharing/rest/content/items/3f2a99f012ed47fba035e99b2c6cb0e4/data?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.arcgis.com/sharing/rest/content/items/3ba19ce7e8c14f33892aa81bb9ed0136/data?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.hoffmanestates.org/", "host": "www.hoffmanestates.org", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Hoffman Estates · Cook · Source context reviewed", "status_scope": "The village linked Compass project update says construction is actively underway at the former Sears headquarters campus. It separately records development approval on February 17, 2025 and the first Building 1 permit and construction start on March 19, 2025. The label is the village reported construction stage, not completion or operation of all five planned buildings. The substation work remains a separate component.", "event_evidence": [{"date": "2025-02-17", "text": "The village Compass update records development approval for the campus at the February 17 Village Board meeting. This is the development approval date, not an opening.", "kind": "approved", "sources": [{"url": "https://www.arcgis.com/sharing/rest/content/items/a65ad687f0524c7aa731e2c89d850a53/data?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}]}, {"date": "2025-03-19", "text": "The village Compass update records the first permit for Building 1 and commencement of construction work on March 19, 2025. This is the reported start for that building, not construction or operation of every planned campus building.", "kind": "construction_start", "sources": [{"url": "https://www.arcgis.com/sharing/rest/content/items/a65ad687f0524c7aa731e2c89d850a53/data?f=json", "host": "www.arcgis.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17031"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "cyrusone-chi6-wood-dale-il", "state": "IL", "kind": "facility", "name": "CyrusOne Wood Dale Campus", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["DuPage"], "city": "Wood Dale", "address": "", "who": "CyrusOne", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Source datePublished metadata isMay13,2025, while modification isSeptember10,2026. Do not relabel this as a2026construction event, opening or delivered capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.", "date": "", "events": [["2025-05-13", "CyrusOne published its Wood Dale topping out release on May 13, 2025, reporting that the final structural beam was raised that day. This records the dated construction account and ceremony, not a data center opening, completed campus or proof of current operating service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony", "host": "cyrusone.com", "date": "2025-05-13", "published": "2025-05-13", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 41.85204, "lng": -88.08565, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "direct-operators-round5-2026-10-14.json", "scope": "named operator source", "fields": {"historical_construction_event": "topping out, structural framework milestone", "planned_buildings": 2, "future_building_area_sqft_lower_bound": 500000, "initial_it_capacity_mw": 18}, "notes": ["Source datePublished metadata isMay13,2025, while modification isSeptember10,2026. Do not relabel this as a2026construction event, opening or delivered capacity.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony", "host": "cyrusone.com", "date": "2025-05-13", "published": "2025-05-13", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations", "fields": {"program_report_year": 2025, "program_register_as_of": "2025-12-31", "applications_received": 35, "approved_owner_operator_applications": 34, "operator_certificates_issued": 34, "tenant_certificates_issued": 91, "construction_credit_certificates_issued": 0, "total_investment_commitments_usd": 10665815092, "estimated_tax_benefits_usd": 666613443, "estimated_tax_benefit_calculation_percent": 6.25, "listed_new_job_commitments": 731, "investment_commitment_period_months": 60}, "notes": ["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 22", "scope": "CyrusOne May 13, 2025 release reports placement of the final structural beam at the Wood Dale data center during a topping out ceremony. Company reported construction describes that dated structural milestone. The source uses future terms for completed buildings and does not establish current commissioning, service availability or whole campus completion. An Illinois incentive certification or an unrelated Aurora facility is not substituted for operation. No exact opening day, delivered capacity or provider role is changed.", "fields": {"current_stage_evidence": {"outcome": "dated_wood_dale_structural_work_not_current_commissioning", "scope": "CyrusOne May 13, 2025 release reports placement of the final structural beam at the Wood Dale data center during a topping out ceremony. Company reported construction describes that dated structural milestone. The source uses future terms for completed buildings and does not establish current commissioning, service availability or whole campus completion. An Illinois incentive certification or an unrelated Aurora facility is not substituted for operation. No exact opening day, delivered capacity or provider role is changed."}}, "notes": ["CyrusOne May 13, 2025 release reports placement of the final structural beam at the Wood Dale data center during a topping out ceremony. Company reported construction describes that dated structural milestone. The source uses future terms for completed buildings and does not establish current commissioning, service availability or whole campus completion. An Illinois incentive certification or an unrelated Aurora facility is not substituted for operation. No exact opening day, delivered capacity or provider role is changed.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony", "host": "www.cyrusone.com", "published": "2025-05-13", "date": "2025-05-13", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check 10, October 23, 2026", "scope": "CyrusOne describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not evidence of current operation, completed construction, legal ownership or a confirmed parcel. No status, location, physical date, technical figure or environmental outcome is promoted. The May 13, 2025 topping out announcement establishes the company project relationship at that reported period. It does not establish present stage or completion since publication.", "fields": {"company_association": {"name": "CyrusOne", "role": "developer", "identity_scope": "provider_brand_only", "scope": "CyrusOne describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not evidence of current operation, completed construction, legal ownership or a confirmed parcel. No status, location, physical date, technical figure or environmental outcome is promoted. The May 13, 2025 topping out announcement establishes the company project relationship at that reported period. It does not establish present stage or completion since publication."}, "provider_role": "developer"}, "notes": ["CyrusOne describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not evidence of current operation, completed construction, legal ownership or a confirmed parcel. No status, location, physical date, technical figure or environmental outcome is promoted. The May 13, 2025 topping out announcement establishes the company project relationship at that reported period. It does not establish present stage or completion since publication.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony", "host": "www.cyrusone.com", "published": "2025-05-13", "date": "2025-05-13", "checked": "2026-10-23", "label": "First party named facility portfolio or campus development source, scoped relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Wood Dale · DuPage · Source context reviewed", "status_scope": "CyrusOne May 13, 2025 release reports placement of the final structural beam at the Wood Dale data center during a topping out ceremony. Company reported construction describes that dated structural milestone. The source uses future terms for completed buildings and does not establish current commissioning, service availability or whole campus completion. An Illinois incentive certification or an unrelated Aurora facility is not substituted for operation. No exact opening day, delivered capacity or provider role is changed.", "event_evidence": [{"date": "2025-05-13", "text": "CyrusOne published its Wood Dale topping out release on May 13, 2025, reporting that the final structural beam was raised that day. This records the dated construction account and ceremony, not a data center opening, completed campus or proof of current operating service.", "kind": "announced", "sources": [{"url": "https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony", "host": "www.cyrusone.com", "published": "2025-05-13", "date": "2025-05-13", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17043"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "cyrusone-yorkville-chi11-il", "state": "IL", "kind": "facility", "name": "CyrusOne Yorkville Technology Campus (CHI-11)", "group": "building", "status": "Site development underway", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Kendall"], "city": "Yorkville", "address": "", "who": "CyrusOne", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Yorkville plan and proposed revisions. Developer page says revised one-story design still seeks approval. Area reduction is not final building area. Tax revenue is a forecast; property-tax statement is not proof of absence of a separate sales-tax program or all incentives. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus", "host": "cyrusone.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}], "loc": {"lat": 41.59073, "lng": -88.42879, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "direct-operators-round5-2026-10-14.json", "scope": "Yorkville plan and proposed revisions", "fields": {"operator_reported_city_approval_year": 2024, "operator_reported_utility_improvement_start_year": 2025, "operator_reported_site_work_start": "early2026", "planned_full_buildout_investment_usd_lower_bound": 1000000000, "proposed_area_reduction_sqft_approx": 300000, "first_building_completion_target": "late2027", "full_operations_target_year": 2028, "forecast_annual_local_tax_revenue_usd_approx": 15000000, "operator_property_tax_abatement_statement": "not requesting property tax abatement"}, "notes": ["Developer page says revised one-story design still seeks approval. Area reduction is not final building area. Tax revenue is a forecast; property-tax statement is not proof of absence of a separate sales-tax program or all incentives.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus", "host": "cyrusone.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S3-Illinois-DCEO-2025-20261015", "scope": "Illinois DCEO 2025 program entry for C1 Yorkville LLC in Yorkville. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.", "fields": {"reported_program_party": "C1 Yorkville LLC", "reported_program_locality": "Yorkville", "mou_year_reported": 2024, "program_report_as_of": "2025-12-31", "investment_commitment_usd": 250000000, "formula_based_tax_benefit_estimate_usd": 15625000, "new_jobs_in_program_table": 20, "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.", "program_identity_scope": "Explicit facility designation or company/locality association with the existing CyrusOne Yorkville Technology Campus (CHI-11) research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint."}, "notes": ["The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.", "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.", "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."], "sources": [{"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}], "checked": "2026-10-15", "whole_record_certified": false}, {"overlay": "orchestra-status-2026-10-19", "scope": "CyrusOne states that water and sanitary improvements began in 2025 and site work began in early 2026 at Yorkville. The first building and operations remain future targets; this label is site development, not physical data-hall construction or commissioned service. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "fields": {"current_stage_evidence": {"outcome": "site_development_underway", "scope": "CyrusOne states that water and sanitary improvements began in 2025 and site work began in early 2026 at Yorkville. The first building and operations remain future targets; this label is site development, not physical data-hall construction or commissioned service. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."}}, "notes": ["CyrusOne states that water and sanitary improvements began in 2025 and site work began in early 2026 at Yorkville. The first building and operations remain future targets; this label is site development, not physical data-hall construction or commissioned service."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Operator source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 10, October 23, 2026", "scope": "CyrusOne describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not evidence of current operation, completed construction, legal ownership or a confirmed parcel. No status, location, physical date, technical figure or environmental outcome is promoted. The page includes proposed plan revisions and future completion and service targets. Those remain company plans, not observed physical milestones.", "fields": {"company_association": {"name": "CyrusOne", "role": "developer", "identity_scope": "provider_brand_only", "scope": "CyrusOne describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not evidence of current operation, completed construction, legal ownership or a confirmed parcel. No status, location, physical date, technical figure or environmental outcome is promoted. The page includes proposed plan revisions and future completion and service targets. Those remain company plans, not observed physical milestones."}, "provider_role": "developer"}, "notes": ["CyrusOne describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not evidence of current operation, completed construction, legal ownership or a confirmed parcel. No status, location, physical date, technical figure or environmental outcome is promoted. The page includes proposed plan revisions and future completion and service targets. Those remain company plans, not observed physical milestones.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://www.cyrusone.com/data-centers/north-america/yorkville-technology-campus", "host": "www.cyrusone.com", "published": "", "date": "", "checked": "2026-10-23", "label": "First party named facility portfolio or campus development source, scoped relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Yorkville · Kendall · Source context reviewed", "status_scope": "CyrusOne states that water and sanitary improvements began in 2025 and site work began in early 2026 at Yorkville. The first building and operations remain future targets; this label is site development, not physical data-hall construction or commissioned service. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17093"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "equinix-ch8-minooka-il", "state": "IL", "kind": "facility", "name": "Equinix CH8 Minooka", "group": "building", "status": "Village reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Grundy"], "city": "Minooka", "address": "", "who": "Equinix", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. Patch January23,2025, updatedMarch7, is a COMMUNITY CONTRIBUTION by village-trustee candidate Josh Stell, describing personal attendance at an Equinix proposal meeting. It is not Patch staff reporting, official minutes or a village endorsement. Limited original witness context supports an early Minooka proposal near Ridge Road between Holt and Wildy; it does not corroborate CH8 facility code. Approximately300acres, multi-billion-dollar investment, $20million annualtax and160-plus permanentjobs are contributor-reported proposal/forecast claims, not verified parcels, spending, receipts or jobs. No MW disclosed. No variance intention or promised communityfiber equals enacted conditions, executedservice or deliveredbenefit. Exact centroid pin remains unverified. Not full-field, exact parcel, currentoperations or independently audited numerical certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://patch.com/illinois/channahon-minooka/equinix-proposes-billion-dollar-data-center-investment-minooka-nodx", "host": "patch.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.minooka.com/business-development/economic-development/transparency-portal/", "host": "www.minooka.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.minooka.com/news/posts/minooka-data-center-faq-and-fact-sheet/", "host": "www.minooka.com", "published": "2026-07-30", "date": "2026-07-30", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 41.29726, "lng": -88.43158, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json", "scope": "Named municipal/limited original-witness or operator context; dates and source origins explicit.", "fields": {}, "notes": ["Patch January23,2025, updatedMarch7, is a COMMUNITY CONTRIBUTION by village-trustee candidate Josh Stell, describing personal attendance at an Equinix proposal meeting. It is not Patch staff reporting, official minutes or a village endorsement. Limited original witness context supports an early Minooka proposal near Ridge Road between Holt and Wildy; it does not corroborate CH8 facility code.", "Approximately300acres, multi-billion-dollar investment, $20million annualtax and160-plus permanentjobs are contributor-reported proposal/forecast claims, not verified parcels, spending, receipts or jobs. No MW disclosed. No variance intention or promised communityfiber equals enacted conditions, executedservice or deliveredbenefit. Exact centroid pin remains unverified.", "Not full-field, exact parcel, currentoperations or independently audited numerical certification."], "sources": [{"url": "https://patch.com/illinois/channahon-minooka/equinix-proposes-billion-dollar-data-center-investment-minooka-nodx", "host": "patch.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 22", "scope": "Minooka current Transparency Portal explicitly says the Equinix campus is under construction at Ridge Road and Holt Road. Village reported construction describes that named campus, not completed individual buildings, delivered power or operating service. The portal lists air monitoring reports through October 12, 2026; listing those reports does not certify their measurements or a contamination finding. The separate annexed property and planned campus dimensions are not new location or quantity facts in this lane.", "fields": {"current_stage_evidence": {"outcome": "current_village_named_campus_construction_not_monitoring_result_or_operation", "scope": "Minooka current Transparency Portal explicitly says the Equinix campus is under construction at Ridge Road and Holt Road. Village reported construction describes that named campus, not completed individual buildings, delivered power or operating service. The portal lists air monitoring reports through October 12, 2026; listing those reports does not certify their measurements or a contamination finding. The separate annexed property and planned campus dimensions are not new location or quantity facts in this lane."}}, "notes": ["Minooka current Transparency Portal explicitly says the Equinix campus is under construction at Ridge Road and Holt Road. Village reported construction describes that named campus, not completed individual buildings, delivered power or operating service. The portal lists air monitoring reports through October 12, 2026; listing those reports does not certify their measurements or a contamination finding. The separate annexed property and planned campus dimensions are not new location or quantity facts in this lane.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.minooka.com/business-development/economic-development/transparency-portal/", "host": "www.minooka.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.minooka.com/news/posts/minooka-data-center-faq-and-fact-sheet/", "host": "www.minooka.com", "published": "2026-07-30", "date": "2026-07-30", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check23, October23,2026", "scope": "Government records identify the named project applicant or developer brand. Developer per source describes that filing relationship only. It does not establish the legal operator, legal property owner, independent environmental compliance, construction completion or current operation. No status, location, address, building code allocation, dates, quantities, tenant identity, permits or concerns are promoted. The Village of Minooka identifies the Equinix Data Center campus development at Ridge and Holt and separately describes the additional annexed area at Holt and Wabena. Its July 30,2026 fact sheet announcement names the approved Equinix development. This supports the Equinix development relationship for the campus only. The CH8 component code, exact footprint, commissioning and individual building allocation are not established here. Weekly air monitoring links and a sound study listing are not findings from those unread documents. No monitoring result, environmental assurance or physical stage is adopted.", "fields": {"company_association": {"name": "Equinix", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Government records identify the named project applicant or developer brand. Developer per source describes that filing relationship only. It does not establish the legal operator, legal property owner, independent environmental compliance, construction completion or current operation. No status, location, address, building code allocation, dates, quantities, tenant identity, permits or concerns are promoted. The Village of Minooka identifies the Equinix Data Center campus development at Ridge and Holt and separately describes the additional annexed area at Holt and Wabena. Its July 30,2026 fact sheet announcement names the approved Equinix development. This supports the Equinix development relationship for the campus only. The CH8 component code, exact footprint, commissioning and individual building allocation are not established here. Weekly air monitoring links and a sound study listing are not findings from those unread documents. No monitoring result, environmental assurance or physical stage is adopted."}, "provider_role": "developer"}, "notes": ["Government records identify the named project applicant or developer brand. Developer per source describes that filing relationship only. It does not establish the legal operator, legal property owner, independent environmental compliance, construction completion or current operation. No status, location, address, building code allocation, dates, quantities, tenant identity, permits or concerns are promoted. The Village of Minooka identifies the Equinix Data Center campus development at Ridge and Holt and separately describes the additional annexed area at Holt and Wabena. Its July 30,2026 fact sheet announcement names the approved Equinix development. This supports the Equinix development relationship for the campus only. The CH8 component code, exact footprint, commissioning and individual building allocation are not established here. Weekly air monitoring links and a sound study listing are not findings from those unread documents. No monitoring result, environmental assurance or physical stage is adopted.", "Source retrieval dates remain separate from document publication and actual physical milestones."], "sources": [{"url": "https://www.minooka.com/business-development/economic-development/transparency-portal/", "host": "www.minooka.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Government project record, developer relationship reviewed"}, {"url": "https://www.minooka.com/news/posts/minooka-data-center-faq-and-fact-sheet/", "host": "www.minooka.com", "published": "2026-07-30", "date": "2026-07-30", "checked": "2026-10-23", "label": "Government project record, developer relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Illinois · Minooka · Grundy · Source context reviewed", "status_scope": "Minooka current Transparency Portal explicitly says the Equinix campus is under construction at Ridge Road and Holt Road. Village reported construction describes that named campus, not completed individual buildings, delivered power or operating service. The portal lists air monitoring reports through October 12, 2026; listing those reports does not certify their measurements or a contamination finding. The separate annexed property and planned campus dimensions are not new location or quantity facts in this lane.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "17063"}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "hydravault-chicago-il", "state": "IL", "kind": "project", "name": "HydraVault Chicago", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cook"], "city": "Chicago", "address": "", "who": "HydraVault", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations. 34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.hydravault.com/", "host": "www.hydravault.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://www.hydravault.com/press/hydravault-secures-construction-permit", "host": "www.hydravault.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Exact original named computing street, distinct from contacts and technical fields"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2538+South+Wabash+Avenue%2C+Chicago%2C+IL+60616&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Complete literal published street query; calculated range only"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-87.6320594141385%2C41.84162028853755%2C-87.61879458586151%2C41.851501711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Actually viewed source street setting; acquisition date unknown"}], "loc": {"lng": -87.625427, "lat": 41.846561, "precision": "approximate", "basis": "The original HydraVault computing source identifies 2538 South Wabash Avenue, Chicago, IL 60616. One complete literal Census street query uniquely supports this calculated street reference inside the unchanged county. The October 28, 2025 operator release explicitly locates the data center at this street; nearby 350 East Cermak is only an interconnection context. Original December 2026 access projection and current May 2027 header remain source statements, with no stage or date change. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction. Shown as an approximate project area; the address does not establish a confirmed project parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Illinois statewide owner/operator certificate register and commitments,notbuilding-levelallocations", "fields": {"program_report_year": 2025, "program_register_as_of": "2025-12-31", "applications_received": 35, "approved_owner_operator_applications": 34, "operator_certificates_issued": 34, "tenant_certificates_issued": 91, "construction_credit_certificates_issued": 0, "total_investment_commitments_usd": 10665815092, "estimated_tax_benefits_usd": 666613443, "estimated_tax_benefit_calculation_percent": 6.25, "listed_new_job_commitments": 731, "investment_commitment_period_months": 60}, "notes": ["34approvedapplications/certificates not34verified physical operating buildings;91tenantcertificates not91more sites. Investment commitments not audited spend;666.6Mcalculated6.25percent estimate not actual foregone tax measured.731listednewjobs not observed employment. Company/campus totals cannot repeat for each building. Legal entity aliases and exactbuilding crosswalk remain explicit holds.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S3-Illinois-DCEO-2025-20261015", "scope": "Illinois DCEO 2025 program entry for HydraVault LLC in Chicago. The source reports an MOU/certificate context as of December 31, 2025, not actual payments, current certificate eligibility or a physical-site census.", "fields": {"reported_program_party": "HydraVault LLC", "reported_program_locality": "Chicago", "mou_year_reported": 2025, "program_report_as_of": "2025-12-31", "investment_commitment_usd": 270000000, "formula_based_tax_benefit_estimate_usd": 16875000, "new_jobs_in_program_table": 20, "financial_scope": "Investment is a reported commitment within an agreed 60-month window. Tax benefit is an estimate at 6.25% of commitment, not paid benefits or verified savings. Reported job counts do not independently establish actual hiring or payroll. No amount is added to legacy investment/jobs fields.", "program_identity_scope": "Explicit facility designation or company/locality association with the existing HydraVault Chicago research record. The relationship is a scoped research inference, not proof of a distinct campus, parcel, current operator role or exact certificate footprint.", "operator_stage_basis": "Current website explicitly states construction is underway.", "provider_role": "developer", "operator_future_access_target": "Early user access May 2027. This is a future target, not an opening date or delivered capacity."}, "notes": ["The report combines owners and operators; no specific party role, legal ownership, tax performance, recapture status or current certificate eligibility is inferred. The report gives a year, not an exact MOU execution or opening date.", "Current operating stage needs separate primary evidence. A tax-program approval is not a construction approval, an operating building or proof of an exact parcel. Original coordinates, precision, opening, locality and legacy financial/power figures remain unchanged.", "The source table row estimates sum to $1 more than the printed aggregate. Both are retained as published. This record uses its printed row value, with no correction or aggregate allocation."], "sources": [{"url": "https://www.hydravault.com/", "host": "www.hydravault.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf", "host": "dceo.illinois.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}], "checked": "2026-10-15", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 72, 2026-10-24", "scope": "Exact original named computing source street and one complete literal Census query only. Every original group, role, quantity, name, address, county and source version stays exact. No roof, tenant floor, legal title, actual construction stage, operating event or complete campus is certified.", "fields": {"location_review_decision": {"location": {"lng": -87.625427, "lat": 41.846561, "precision": "address", "basis": "The original HydraVault computing source identifies 2538 South Wabash Avenue, Chicago, IL 60616. One complete literal Census street query uniquely supports this calculated street reference inside the unchanged county. The October 28, 2025 operator release explicitly locates the data center at this street; nearby 350 East Cermak is only an interconnection context. Original December 2026 access projection and current May 2027 header remain source statements, with no stage or date change. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "2538 South Wabash Avenue, Chicago, IL 60616", "county_fips": ["17031"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["Exact original named computing source street and one complete literal Census query only. Every original group, role, quantity, name, address, county and source version stays exact. No roof, tenant floor, legal title, actual construction stage, operating event or complete campus is certified.", "The inherited general area coordinate was not independently admitted as a reviewed computing street reference. The original HydraVault source explicitly identifies 2538 South Wabash Avenue, Chicago, IL 60616 as the named computing location. One complete literal Census query returns a unique calculated street range inside unchanged county 17031. The measured correction is 3.2 metres. Exact original named computing facility street, not city or publisher mail. Every original group, role, quantity, name, address, county and source version remains unchanged. The source street and calculated Census range do not establish a roof, title, actual construction stage, operating event or complete campus. This is a source reference correction, not physical relocation.", "Exact original named computing facility street, not city or publisher mail. Every original group, role, quantity, name, address, county and source version remains unchanged. The source street and calculated Census range do not establish a roof, title, actual construction stage, operating event or complete campus.", "The street setting shows dense urban blocks, major transport corridors, parking and sports fields. The calculated street point selects no computing roof or tenant floor. Imagery acquisition date is unknown and may predate construction."], "sources": [{"url": "https://www.hydravault.com/press/hydravault-secures-construction-permit", "host": "www.hydravault.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Exact original named computing street, distinct from contacts and technical fields"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2538+South+Wabash+Avenue%2C+Chicago%2C+IL+60616&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Complete literal published street query; calculated range only"}, {"url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-87.6320594141385%2C41.84162028853755%2C-87.61879458586151%2C41.851501711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image", "host": "imagery.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Actually viewed source street setting; acquisition date unknown"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Approximate project area, not a confirmed parcel", "summary": "Illinois · Chicago · Cook · Source context reviewed", "status_scope": "Current operator evidence for HydraVault Chicago. This stage is independent of the historical incentive entry; full technical capacity, campus completion and exact point precision are not certified.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "retained_reviewed_project_area", "scope": "The reviewed street reference identifies an approximate project area. No confirmed project parcel, building center or current operation is established by this display."}, "state_name": "Illinois", "state_path": "/illinois/"}, {"id": "google-project-louie-monrovia-in", "state": "IN", "kind": "project", "name": "Google Project Louie (Morgan County)", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Morgan"], "city": "Monrovia", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. utility procurement testimony without exact site match. AESIndianaCause46394testimonyherecoversresourceprocurementRFPdesign,evaluation andgenerationbids,notidentifiedGoogleMonroviaProjectLouiesiteapproval. Aggregate14.2GWresourcesoffered and26.7GWproposaloptionsnotdatacenterloadornewbuiltgeneration. Publicredactedcopyonly; noattempttoobtainorreconstructconfidentialattachments. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf", "host": "iurc.portal.in.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/morgan-county-indiana/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 39.48164, "lng": -86.44632, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "utility procurement testimony without exact site match", "fields": {}, "notes": ["AESIndianaCause46394testimonyherecoversresourceprocurementRFPdesign,evaluation andgenerationbids,notidentifiedGoogleMonroviaProjectLouiesiteapproval. Aggregate14.2GWresourcesoffered and26.7GWproposaloptionsnotdatacenterloadornewbuiltgeneration. Publicredactedcopyonly; noattempttoobtainorreconstructconfidentialattachments.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf", "host": "iurc.portal.in.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Morgan County, Indiana is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "The named Morgan County page explicitly says construction begins in 2026 and discusses the preconstruction Monrovia community harvest. No month or exact construction-start day is published.", "current_status_basis": "Google’s named Morgan County page reports construction beginning in 2026 and describes activity before construction began. The operator supports an Under construction observation; the year-only account does not establish an exact start day or current energization. Generic operational/careers text is not operation proof."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/morgan-county-indiana/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Indiana · Monrovia · Morgan · Source context reviewed", "status_scope": "Google’s named Morgan County page reports construction beginning in 2026 and describes activity before construction began. The operator supports an Under construction observation; the year-only account does not establish an exact start day or current energization. Generic operational/careers text is not operation proof.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "18109"}, "state_name": "Indiana", "state_path": "/indiana/"}, {"id": "edged-energy-ankeny-ia", "state": "IA", "kind": "facility", "name": "Edged Ankeny (Des Moines) Data Center", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Polk"], "city": "Ankeny", "address": "", "who": "Edged", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 24monthscompletionestimatefromrelease, notexactopeningdateoroperatingproof.52Mgallonsannualsavingsdesigncomparisonnotmeasuredwateruse. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-08-06", "Edged published the Ankeny structural framework milestone account August 6, 2025. The release reports a topping out event the previous day, while full operation remains an end of 2026 target. This publication date is not a facility opening or exact commissioning day."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://edged.us/news/des-moines-iowa", "host": "edged.us", "date": "2025-05-06", "published": "2025-05-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale", "host": "edged.us", "published": "2025-08-06", "date": "2025-08-06", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://edged.us/des-moines", "host": "edged.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 41.65867, "lng": -93.57113, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "captured-operator-review-round6-2026-10-14.json", "scope": "named operator source", "fields": {"groundbreaking_announcement": "2025-05-06", "planned_critical_capacity_mw": 13.2, "published_city": "Ankeny, Iowa", "expected_construction_duration_months": 24}, "notes": ["24monthscompletionestimatefromrelease, notexactopeningdateoroperatingproof.52Mgallonsannualsavingsdesigncomparisonnotmeasuredwateruse.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://edged.us/news/des-moines-iowa", "host": "edged.us", "date": "2025-05-06", "published": "2025-05-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 26", "scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.", "fields": {"current_stage_evidence": {"outcome": "company_reported_named_ankeny_structural_completion_not_operation", "scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes."}}, "notes": ["Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale", "host": "edged.us", "published": "2025-08-06", "date": "2025-08-06", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://edged.us/des-moines", "host": "edged.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check25, October23,2026", "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction.", "fields": {"company_association": {"name": "Edged", "role": "operator", "identity_scope": "provider_brand_only", "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction."}, "provider_role": "operator"}, "notes": ["Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction."], "sources": [{"url": "https://edged.us/des-moines", "host": "edged.us", "published": "", "date": "", "checked": "2026-10-23", "label": "First party named campus and scoped operator relationship"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Ankeny · Polk · Source context reviewed", "status_scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.", "event_evidence": [{"date": "2025-08-06", "text": "Edged published the Ankeny structural framework milestone account August 6, 2025. The release reports a topping out event the previous day, while full operation remains an end of 2026 target. This publication date is not a facility opening or exact commissioning day.", "kind": "announced", "sources": [{"url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale", "host": "edged.us", "published": "2025-08-06", "date": "2025-08-06", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19153"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "edged-council-bluffs-ia", "state": "IA", "kind": "facility", "name": "Edged Council Bluffs Data Center Campus (Project Lola)", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Pottawattamie"], "city": "Council Bluffs", "address": "", "who": "Edged", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Plan approval does not establish a delivered building, working substation or current opening. Keep the revised size distinct from the superseded concept. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-09-11", "Edged published its Council Bluffs OMA01 1 and OMA01 2 structural framework milestone account September 11, 2026. The company reports topping out of the two buildings that day. This records the company account and does not establish campus operation or delivery of all marketed capacity."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.3newsnow.com/council-bluffs/council-bluffs-project-lola-data-center-reduced-in-size-still-planned-near-iowa-western", "host": "3newsnow.com", "date": "2025-06-10", "published": "2025-06-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs", "host": "edged.us", "published": "2026-09-11", "date": "2026-09-11", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 41.33659, "lng": -95.54273, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "KMTV reports Council Bluffs amended Project Lola from 450,000 to 285,000 square feet and reduced building height.", "independently_verified_current_operating_status": null}, "notes": ["Plan approval does not establish a delivered building, working substation or current opening. Keep the revised size distinct from the superseded concept.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.3newsnow.com/council-bluffs/council-bluffs-project-lola-data-center-reduced-in-size-still-planned-near-iowa-western", "host": "3newsnow.com", "date": "2025-06-10", "published": "2025-06-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 26", "scope": "Edged September 11, 2026 release explicitly reports the topping out and completion of the structural frameworks of OMA01 1 and OMA01 2 in Council Bluffs. Reported construction describes those two named building milestones within the campus, not completion of every future phase, commissioned service or independent verification of the entire marketed capacity. The inherited Project Lola identity, roles and location remain unchanged.", "fields": {"current_stage_evidence": {"outcome": "company_reported_two_council_bluffs_structural_frameworks_not_campus_operation", "scope": "Edged September 11, 2026 release explicitly reports the topping out and completion of the structural frameworks of OMA01 1 and OMA01 2 in Council Bluffs. Reported construction describes those two named building milestones within the campus, not completion of every future phase, commissioned service or independent verification of the entire marketed capacity. The inherited Project Lola identity, roles and location remain unchanged."}}, "notes": ["Edged September 11, 2026 release explicitly reports the topping out and completion of the structural frameworks of OMA01 1 and OMA01 2 in Council Bluffs. Reported construction describes those two named building milestones within the campus, not completion of every future phase, commissioned service or independent verification of the entire marketed capacity. The inherited Project Lola identity, roles and location remain unchanged.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs", "host": "edged.us", "published": "2026-09-11", "date": "2026-09-11", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check25, October23,2026", "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The September 11, 2026 company release describes development of its Council Bluffs campus. Developer per source does not establish current operation, a land title or completion of the whole campus. The two named structures do not become two new records.", "fields": {"company_association": {"name": "Edged", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The September 11, 2026 company release describes development of its Council Bluffs campus. Developer per source does not establish current operation, a land title or completion of the whole campus. The two named structures do not become two new records."}, "provider_role": "developer"}, "notes": ["Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The September 11, 2026 company release describes development of its Council Bluffs campus. Developer per source does not establish current operation, a land title or completion of the whole campus. The two named structures do not become two new records."], "sources": [{"url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs", "host": "edged.us", "published": "2026-09-11", "date": "2026-09-11", "checked": "2026-10-23", "label": "First party named campus and scoped developer relationship"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Council Bluffs · Pottawattamie · Source context reviewed", "status_scope": "Edged September 11, 2026 release explicitly reports the topping out and completion of the structural frameworks of OMA01 1 and OMA01 2 in Council Bluffs. Reported construction describes those two named building milestones within the campus, not completion of every future phase, commissioned service or independent verification of the entire marketed capacity. The inherited Project Lola identity, roles and location remain unchanged.", "event_evidence": [{"date": "2026-09-11", "text": "Edged published its Council Bluffs OMA01 1 and OMA01 2 structural framework milestone account September 11, 2026. The company reports topping out of the two buildings that day. This records the company account and does not establish campus operation or delivery of all marketed capacity.", "kind": "announced", "sources": [{"url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs", "host": "edged.us", "published": "2026-09-11", "date": "2026-09-11", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19155"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "microsoft-ginger-east-ia", "state": "IA", "kind": "facility", "name": "Microsoft Project Ginger East Data Center", "group": "building", "status": "Agency-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Polk"], "city": "West Des Moines", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status. GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/", "host": "gowestdesmoines.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/", "host": "businessrecord.com", "date": "2025-04-24", "published": "2025-04-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://gowestdesmoines.com/portfolio-works/microsoft-ginger-east-data-center/", "host": "gowestdesmoines.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://local.microsoft.com/blog/ginger-east-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2025-01-08", "date": "2025-01-08", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 41.6408, "lng": -93.59669, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round16-2026-10-14.json", "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.", "fields": {"source_republished_report_date": "2024-07-17", "campus_address": "1475 SE Maffitt Lake Road", "historical_building_permits": 2, "area_each_sqft": 244676, "permit_valuation_each_usd": 384000000, "reported_contractor": "Weitz"}, "notes": ["City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status.", "GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/", "host": "gowestdesmoines.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.", "independently_verified_current_operating_status": null}, "notes": ["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/", "host": "businessrecord.com", "date": "2025-04-24", "published": "2025-04-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 12", "scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.", "fields": {"current_stage_evidence": {"outcome": "agency_reported_construction", "scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion."}}, "notes": ["The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://gowestdesmoines.com/portfolio-works/microsoft-ginger-east-data-center/", "host": "gowestdesmoines.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check60, October24,2026", "scope": "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."}, "provider_role": "developer"}, "notes": ["Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."], "sources": [{"url": "https://local.microsoft.com/blog/ginger-east-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2025-01-08", "date": "2025-01-08", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · West Des Moines · Polk · Source context reviewed", "status_scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19153"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "microsoft-ginger-west-ia", "state": "IA", "kind": "facility", "name": "Microsoft Project Ginger West Data Center", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Polk"], "city": "West Des Moines", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/", "host": "businessrecord.com", "date": "2025-04-24", "published": "2025-04-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 41.70395, "lng": -93.52293, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round16-2026-10-14.json", "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.", "fields": {"construction_completion_target": "Summer2028; season precision only", "general_contractor": "Turner Construction", "actual_operational_date": null}, "notes": ["Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.", "independently_verified_current_operating_status": null}, "notes": ["Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/", "host": "businessrecord.com", "date": "2025-04-24", "published": "2025-04-24", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 12", "scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_construction", "scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted."}, "construction_scope": {"estimated_completion_period": "summer 2028", "source_explicitly_separates_completion_from_operation": true, "physical_operation_verified": false}}, "notes": ["The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check59, October24,2026", "scope": "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street."}, "provider_role": "developer"}, "notes": ["Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street."], "sources": [{"url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2025-01-08", "date": "2025-01-08", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · West Des Moines · Polk · Source context reviewed", "status_scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19153"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "qts-cedar-rapids-ia", "state": "IA", "kind": "facility", "name": "QTS Cedar Rapids Data Center Campus", "group": "building", "status": "Operator-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Linn"], "city": "Cedar Rapids", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cedar Rapids official development agreement announcement. City announcement supports agreement approval account but signed terms not read here.18Mover20years conditional commitment not already paid.30permanentjobs distinct from hundreds of construction/trade jobs. Water-free cooling does not mean zero total site water consumption. No exact critical IT MW, commissioning or actual spend adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://cedar-rapids.org/news_detail_T6_R2180.php", "host": "cedar-rapids.org", "date": "2025-02-12", "published": "2025-02-12", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://q.com/data-centers/cedar-rapids/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "loc": {"lat": 42.10908, "lng": -91.57601, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Cedar Rapids official development agreement announcement", "fields": {"agency": "City of Cedar Rapids, Iowa", "announcement_date": "2025-02-12", "operator": "QTS Cedar Rapids LLC", "city_reported_agreement_approval_date": "2025-01-28", "site": "Big Cedar Industrial Center", "site_acres": 612, "minimum_planned_investment_usd": 750000000, "community_betterment_commitment_usd_max": 18000000, "commitment_years": 20, "payment_trigger": "following first construction phase", "minimum_first_two_phase_fulltime_jobs": 30, "jobs_per_first_phase": 15}, "notes": ["City announcement supports agreement approval account but signed terms not read here.18Mover20years conditional commitment not already paid.30permanentjobs distinct from hundreds of construction/trade jobs. Water-free cooling does not mean zero total site water consumption. No exact critical IT MW, commissioning or actual spend adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://cedar-rapids.org/news_detail_T6_R2180.php", "host": "cedar-rapids.org", "date": "2025-02-12", "published": "2025-02-12", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 2", "scope": "QTS explicitly describes the Cedar Rapids campus as being built in Big Cedar Industrial Center. This is an operator reported campus construction context. It does not establish an exact start day, completed buildings, operating service, capacity delivered, water use or the outcome of regulatory review.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_construction", "scope": "QTS explicitly describes the Cedar Rapids campus as being built in Big Cedar Industrial Center. This is an operator reported campus construction context. It does not establish an exact start day, completed buildings, operating service, capacity delivered, water use or the outcome of regulatory review."}}, "notes": ["QTS explicitly describes the Cedar Rapids campus as being built in Big Cedar Industrial Center. This is an operator reported campus construction context. It does not establish an exact start day, completed buildings, operating service, capacity delivered, water use or the outcome of regulatory review."], "sources": [{"url": "https://q.com/data-centers/cedar-rapids/", "host": "q.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Iowa · Cedar Rapids · Linn · Source context reviewed", "status_scope": "QTS explicitly describes the Cedar Rapids campus as being built in Big Cedar Industrial Center. This is an operator reported campus construction context. It does not establish an exact start day, completed buildings, operating service, capacity delivered, water use or the outcome of regulatory review.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "19113"}, "state_name": "Iowa", "state_path": "/iowa/"}, {"id": "beale-project-pilot-de-soto-ks", "state": "KS", "kind": "facility", "name": "Beale Project Pilot (De Soto)", "group": "building", "status": "Site preparation reported", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Johnson"], "city": "De Soto", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeSoto incentives ceiling versus project cost and water scope. 50B is reported incentive-eligible private investment ceiling, not city general debt, actual spend or50Bpublicsubsidy. Original final agreement/bonds not inspected. Specific tenant unknown despite namechecking Google/Meta/Amazon/Microsoft. Water rights increased capacity belongs city system; generic millions-gallons/day examples not measured Pilot use. NearbyPanasonicandFlintCommerce warehouse distinct from computing buildings. No critical ITMW or current operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-10-01", "The City of De Soto October 2, 2026 notice reports Council approval of the second Beale supplemental agreement at its October 1 meeting. Revised water forecasts, infrastructure commitments and conditional community contributions remain distinct from actual demand, completed construction or paid benefits."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/", "host": "johnsoncountypost.com", "date": "2025-08-26", "published": "2025-08-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://desotoks.us/496/Beale-Data-Center", "host": "desotoks.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.desotoks.us/m/newsflash/home/detail/357", "host": "www.desotoks.us", "published": "2026-10-02", "date": "2026-10-02", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.desotoks.us/DocumentCenter/View/3368/Data-Center-Project---Developer-Presentation-Slidedeck", "host": "www.desotoks.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 38.89464, "lng": -94.83439, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round13-2026-10-14.json", "scope": "DeSoto incentives ceiling versus project cost and water scope", "fields": {"project": "Project Pilot", "developer_entity": "Mount Sunflower Properties LLC, managed by Beale Infrastructure", "city": "DeSoto, Kansas", "reported_site_acres": 290, "reported_project_investment_usd": 3100000000, "reported_incentive_eligible_irb_ceiling_usd": 50000000000, "planned_buildings": 4, "planned_each_building_sqft": 285000, "planned_combined_sqft": 1140000, "first_building_target_year": 2027, "fullbuildout_duration_years_range": [5, 9], "reported_per_building_abatement_years": 10}, "notes": ["50B is reported incentive-eligible private investment ceiling, not city general debt, actual spend or50Bpublicsubsidy. Original final agreement/bonds not inspected. Specific tenant unknown despite namechecking Google/Meta/Amazon/Microsoft. Water rights increased capacity belongs city system; generic millions-gallons/day examples not measured Pilot use. NearbyPanasonicandFlintCommerce warehouse distinct from computing buildings. No critical ITMW or current operations.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/", "host": "johnsoncountypost.com", "date": "2025-08-26", "published": "2025-08-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 65", "scope": "The complete original City project page explicitly reports grading and early site preparation underway and conditional Phase 1 site plan approval. This supports site preparation reported, without certifying completed computing buildings, commissioned service or a first construction day. Older pending approval and 2027 delivery language remains separate from the updated account. The complete October 2 City notice reports Council approval of a second supplement on October 1. Forecast water demand, funding commitments and benefits are not actual usage, payments or measured effects. All ten original presentation text pages were read; its older plans and public proprietary footer do not establish current full permissions or a named tenant.", "fields": {"current_stage_evidence": {"outcome": "city_reported_grading_and_early_site_preparation", "scope": "The complete original City project page explicitly reports grading and early site preparation underway and conditional Phase 1 site plan approval. This supports site preparation reported, without certifying completed computing buildings, commissioned service or a first construction day. Older pending approval and 2027 delivery language remains separate from the updated account. The complete October 2 City notice reports Council approval of a second supplement on October 1. Forecast water demand, funding commitments and benefits are not actual usage, payments or measured effects. All ten original presentation text pages were read; its older plans and public proprietary footer do not establish current full permissions or a named tenant."}, "source_read_scope": {"complete_current_city_faq_and_oct2_notice_bodies_read": true, "all10_original_developer_presentation_text_pages_read": true, "older_pending_and_updated_preparation_accounts_distinct": true, "conditional_approval_not_commissioning": true, "forecast_payments_not_actual": true, "no_new_tenant_power_water_or_incentive_exports": true}}, "notes": ["The complete original City project page explicitly reports grading and early site preparation underway and conditional Phase 1 site plan approval. This supports site preparation reported, without certifying completed computing buildings, commissioned service or a first construction day. Older pending approval and 2027 delivery language remains separate from the updated account. The complete October 2 City notice reports Council approval of a second supplement on October 1. Forecast water demand, funding commitments and benefits are not actual usage, payments or measured effects. All ten original presentation text pages were read; its older plans and public proprietary footer do not establish current full permissions or a named tenant.", "Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."], "sources": [{"url": "https://desotoks.us/496/Beale-Data-Center", "host": "desotoks.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.desotoks.us/m/newsflash/home/detail/357", "host": "www.desotoks.us", "published": "2026-10-02", "date": "2026-10-02", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.desotoks.us/DocumentCenter/View/3368/Data-Center-Project---Developer-Presentation-Slidedeck", "host": "www.desotoks.us", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Kansas · De Soto · Johnson · Source context reviewed", "status_scope": "The complete original City project page explicitly reports grading and early site preparation underway and conditional Phase 1 site plan approval. This supports site preparation reported, without certifying completed computing buildings, commissioned service or a first construction day. Older pending approval and 2027 delivery language remains separate from the updated account. The complete October 2 City notice reports Council approval of a second supplement on October 1. Forecast water demand, funding commitments and benefits are not actual usage, payments or measured effects. All ten original presentation text pages were read; its older plans and public proprietary footer do not establish current full permissions or a named tenant.", "event_evidence": [{"date": "2026-10-01", "text": "The City of De Soto October 2, 2026 notice reports Council approval of the second Beale supplemental agreement at its October 1 meeting. Revised water forecasts, infrastructure commitments and conditional community contributions remain distinct from actual demand, completed construction or paid benefits.", "kind": "approved", "sources": [{"url": "https://www.desotoks.us/m/newsflash/home/detail/357", "host": "www.desotoks.us", "published": "2026-10-02", "date": "2026-10-02", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "20091"}, "state_name": "Kansas", "state_path": "/kansas/"}, {"id": "applied-digital-delta-forge-1-la", "state": "LA", "kind": "facility", "name": "Applied Digital Delta Forge 1 AI Factory Campus", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Rapides"], "city": "Boyce", "address": "", "who": "Applied Digital", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 418 is direct plus218indirect, not418onsite permanent jobs. Forecast not completed build or current consumption. 300MW is explicitly criticalIT combined initial two buildings, not300each. Sales/use exemption qualification has no dollar award quantified here. Closed loop does not prove zero total water. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page 42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus", "host": "opportunitylouisiana.gov", "date": "2026-05-26", "published": "2026-05-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results", "host": "ir.applieddigital.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Applied Digital reviewed source"}], "loc": {"lat": 31.19849, "lng": -92.53323, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named government source", "fields": {"development_announcement_date": "2026-05-26", "planned_investment_usd": 3600000000, "planned_initial_critical_it_mw": 300, "planned_initial_buildings": 2, "campus_acres_approx": 300, "site_development_start_month": "2026-01", "initial_operations_target": "mid2027", "expected_direct_full_time_onsite_jobs": 200, "expected_indirect_jobs": 218, "peak_construction_jobs_min_exclusive": 1000, "government_reported_equipment_sales_use_exemption_qualification": true}, "notes": ["418 is direct plus218indirect, not418onsite permanent jobs. Forecast not completed build or current consumption. 300MW is explicitly criticalIT combined initial two buildings, not300each. Sales/use exemption qualification has no dollar award quantified here. Closed loop does not prove zero total water.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus", "host": "opportunitylouisiana.gov", "date": "2026-05-26", "published": "2026-05-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Issuer reports; readiness is not metered grid demand.", "fields": {"announcement_date": "2026-10-07", "fiscal_quarter_ended": "2026-08-31", "polaris_forge_1_reported_ready_for_service_date": "2026-10-01", "polaris_forge_1_reported_operational_critical_it_mw": 250, "other_named_ai_campuses_reported_stage": "Various construction stages", "jamestown_crypto_facility_mw_as_of_quarter_end": 106, "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180, "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300, "potential_base_electron_generation_mw": 1200}, "notes": ["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results", "host": "ir.applieddigital.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Issuer Form10Q Business Update, printed page 42; named-campus construction statement", "fields": {"current_status": "under construction", "status_basis": "Delta Forge 1 is explicitly described as under construction.", "status_as_of": "2026-10-07", "report_period_ended": "2026-08-31"}, "notes": ["Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40", "events": [], "whole_record_certified": false}, {"overlay": "overnight-discovery-2026-10-17", "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.", "fields": {"issuer_annual_property_context": {"issuer": "Applied Digital", "reporting_period": "2026-05-31", "source_name": "Delta Forge 1", "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."}}, "notes": ["No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Applied Digital reviewed source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Company role source check 30, October 23, 2026", "scope": "Applied Digital identifies the same uniquely named Delta Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.", "fields": {"company_association": {"name": "Applied Digital", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Applied Digital identifies the same uniquely named Delta Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."}, "provider_role": "developer"}, "notes": ["Applied Digital identifies the same uniquely named Delta Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Louisiana · Boyce · Rapides · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "22079"}, "state_name": "Louisiana", "state_path": "/louisiana/"}, {"id": "aws-benton-bossier-parish-la", "state": "LA", "kind": "facility", "name": "Amazon Web Services Bossier Parish Campus (Benton)", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Bossier"], "city": "Benton", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-02-23", "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record."], ["2026-06-10", "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "opportunitylouisiana.gov", "date": "2026-02-23", "published": "2026-02-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 32.67819, "lng": -93.60513, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "historical two-campus regional project with potential duplicate operator/customer records", "fields": {"historical_announcement_date": "2026-02-23", "historical_regional_planned_investment_usd": 12000000000, "expected_regional_direct_jobs": 540, "expected_regional_indirect_jobs": 1700, "expected_regional_construction_jobs_max": 1500, "developer_owner": "STACK Infrastructure", "customer": "Amazon", "regional_scope": "Caddo and Bossier Parishes"}, "notes": ["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "opportunitylouisiana.gov", "date": "2026-02-23", "published": "2026-02-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 77", "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "fields": {"current_stage_evidence": {"outcome": "developer_explicit_named_parish_campus_construction", "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity."}, "source_read_scope": {"complete_original_state_and_both_developer_release_bodies_read": true, "june10_explicit_construction_not_february_forecast_alone": true, "existing_company_records_not_four_new_physical_campuses": true, "no_identity_role_municipal_or_parcel_changes": true, "no_jobs_funding_resource_or_capacity_measurements_adopted": true}}, "notes": ["The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "www.opportunitylouisiana.gov", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Louisiana · Benton · Bossier · Source context reviewed", "status_scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "event_evidence": [{"date": "2026-02-23", "text": "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.", "kind": "announced", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "www.opportunitylouisiana.gov", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}]}, {"date": "2026-06-10", "text": "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.", "kind": "announced", "sources": [{"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "22015"}, "state_name": "Louisiana", "state_path": "/louisiana/"}, {"id": "aws-blanchard-caddo-parish-la", "state": "LA", "kind": "facility", "name": "Amazon Web Services Caddo Parish Campus (Blanchard)", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Caddo"], "city": "Blanchard", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-02-23", "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record."], ["2026-06-10", "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "opportunitylouisiana.gov", "date": "2026-02-23", "published": "2026-02-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 32.58038, "lng": -93.88281, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "historical two-campus regional project with potential duplicate operator/customer records", "fields": {"historical_announcement_date": "2026-02-23", "historical_regional_planned_investment_usd": 12000000000, "expected_regional_direct_jobs": 540, "expected_regional_indirect_jobs": 1700, "expected_regional_construction_jobs_max": 1500, "developer_owner": "STACK Infrastructure", "customer": "Amazon", "regional_scope": "Caddo and Bossier Parishes"}, "notes": ["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "opportunitylouisiana.gov", "date": "2026-02-23", "published": "2026-02-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 77", "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "fields": {"current_stage_evidence": {"outcome": "developer_explicit_named_parish_campus_construction", "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity."}, "source_read_scope": {"complete_original_state_and_both_developer_release_bodies_read": true, "june10_explicit_construction_not_february_forecast_alone": true, "existing_company_records_not_four_new_physical_campuses": true, "no_identity_role_municipal_or_parcel_changes": true, "no_jobs_funding_resource_or_capacity_measurements_adopted": true}}, "notes": ["The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "www.opportunitylouisiana.gov", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Louisiana · Blanchard · Caddo · Source context reviewed", "status_scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "event_evidence": [{"date": "2026-02-23", "text": "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.", "kind": "announced", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "www.opportunitylouisiana.gov", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}]}, {"date": "2026-06-10", "text": "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.", "kind": "announced", "sources": [{"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "22017"}, "state_name": "Louisiana", "state_path": "/louisiana/"}, {"id": "stack-bossier-parish-la", "state": "LA", "kind": "facility", "name": "Bossier Parish Campus (with Amazon)", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Bossier"], "city": "Benton", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-02-23", "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record."], ["2026-06-10", "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "opportunitylouisiana.gov", "date": "2026-02-23", "published": "2026-02-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 32.69406, "lng": -93.62246, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "historical two-campus regional project with potential duplicate operator/customer records", "fields": {"historical_announcement_date": "2026-02-23", "historical_regional_planned_investment_usd": 12000000000, "expected_regional_direct_jobs": 540, "expected_regional_indirect_jobs": 1700, "expected_regional_construction_jobs_max": 1500, "developer_owner": "STACK Infrastructure", "customer": "Amazon", "regional_scope": "Caddo and Bossier Parishes"}, "notes": ["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "opportunitylouisiana.gov", "date": "2026-02-23", "published": "2026-02-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 77", "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "fields": {"current_stage_evidence": {"outcome": "developer_explicit_named_parish_campus_construction", "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity."}, "source_read_scope": {"complete_original_state_and_both_developer_release_bodies_read": true, "june10_explicit_construction_not_february_forecast_alone": true, "existing_company_records_not_four_new_physical_campuses": true, "no_identity_role_municipal_or_parcel_changes": true, "no_jobs_funding_resource_or_capacity_measurements_adopted": true}}, "notes": ["The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "www.opportunitylouisiana.gov", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Louisiana · Benton · Bossier · Source context reviewed", "status_scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "event_evidence": [{"date": "2026-02-23", "text": "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.", "kind": "announced", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "www.opportunitylouisiana.gov", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}]}, {"date": "2026-06-10", "text": "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.", "kind": "announced", "sources": [{"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "22015"}, "state_name": "Louisiana", "state_path": "/louisiana/"}, {"id": "stack-caddo-parish-la", "state": "LA", "kind": "facility", "name": "Caddo Parish Campus (with Amazon)", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Caddo"], "city": "Blanchard", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. historical two-campus regional project with potential duplicate operator/customer records. Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-02-23", "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record."], ["2026-06-10", "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "opportunitylouisiana.gov", "date": "2026-02-23", "published": "2026-02-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 32.59975, "lng": -93.90396, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "historical two-campus regional project with potential duplicate operator/customer records", "fields": {"historical_announcement_date": "2026-02-23", "historical_regional_planned_investment_usd": 12000000000, "expected_regional_direct_jobs": 540, "expected_regional_indirect_jobs": 1700, "expected_regional_construction_jobs_max": 1500, "developer_owner": "STACK Infrastructure", "customer": "Amazon", "regional_scope": "Caddo and Bossier Parishes"}, "notes": ["Four upstream AWS/STACK labels may refer to two shared campuses, not four physical sites; exact parcel crosswalk required. 12B is combined, not each. Later August18,2026 third-campus/18B update already separately reviewed in round3; do not present this older regional scope as current total. Programs offered/expected participation not quantified paid awards.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "opportunitylouisiana.gov", "date": "2026-02-23", "published": "2026-02-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 77", "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "fields": {"current_stage_evidence": {"outcome": "developer_explicit_named_parish_campus_construction", "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity."}, "source_read_scope": {"complete_original_state_and_both_developer_release_bodies_read": true, "june10_explicit_construction_not_february_forecast_alone": true, "existing_company_records_not_four_new_physical_campuses": true, "no_identity_role_municipal_or_parcel_changes": true, "no_jobs_funding_resource_or_capacity_measurements_adopted": true}}, "notes": ["The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "www.opportunitylouisiana.gov", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Louisiana · Blanchard · Caddo · Source context reviewed", "status_scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity.", "event_evidence": [{"date": "2026-02-23", "text": "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.", "kind": "announced", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion", "host": "www.opportunitylouisiana.gov", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/", "host": "www.stackinfra.com", "published": "2026-02-23", "date": "2026-02-23", "checked": "2026-10-24", "label": "Reviewed operator source"}]}, {"date": "2026-06-10", "text": "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.", "kind": "announced", "sources": [{"url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/", "host": "www.stackinfra.com", "published": "2026-06-10", "date": "2026-06-10", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "22017"}, "state_name": "Louisiana", "state_path": "/louisiana/"}, {"id": "hut8-river-bend-west-feliciana-la", "state": "LA", "kind": "project", "name": "Hut 8 River Bend AI Data Center Campus", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "AI data center campus", "counties": ["West Feliciana"], "city": "St. Francisville", "address": "", "who": "Hut 8", "end_user": "", "mw": null, "power": "", "power_note": "River Bend: 245 MW contracted IT and 330 MW utility capacity under construction describe the same initial development at different electrical boundaries. They are not additive or metered load; conditional expansion is excluded.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 330MWutility and245MWcriticalIT are separate scopes, not additive.1000MWfull-site utility potential not operating IT.10Bmaximum phase1investment not audited spend;268jobs includes193indirect. State program participation expected, no paid rebate or executed award value. Reported construction underway not operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-12-17", "Hut 8 announced a 245 MW IT lease for River Bend. This is a commercial announcement, not an opening or physical construction-start day."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center", "host": "opportunitylouisiana.gov", "date": "2025-12-17", "published": "2025-12-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results", "host": "www.hut8.com", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-16", "label": "Hut 8 Q2 construction update"}, {"url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value", "host": "www.hut8.com", "published": "2025-12-17", "date": "2025-12-17", "checked": "2026-10-16", "label": "River Bend lease announcement"}], "loc": {"lat": 30.8759, "lng": -91.41253, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named government source", "fields": {"development_announcement_date": "2025-12-17", "phase1_investment_usd_max": 10000000000, "phase1_initial_utility_capacity_mw": 330, "phase1_critical_it_capacity_mw": 245, "potential_full_site_utility_capacity_mw_max": 1000, "expected_phase1_direct_jobs_min": 75, "expected_phase1_indirect_jobs": 193, "peak_phase1_construction_workers_approx": 1000, "operations_target": "2027-Q2", "tenant": "Fluidstack", "tenant_lease_backstop": "Google"}, "notes": ["330MWutility and245MWcriticalIT are separate scopes, not additive.1000MWfull-site utility potential not operating IT.10Bmaximum phase1investment not audited spend;268jobs includes193indirect. State program participation expected, no paid rebate or executed award value. Reported construction underway not operations.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center", "host": "opportunitylouisiana.gov", "date": "2025-12-17", "published": "2025-12-17", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-AI-Campus-Depth-20261016", "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.", "fields": {"documented_construction": "Vertical works and the campus substation were in construction in the August 4 update.", "initial_utility_capacity": "330 MW of utility capacity under construction; not 330 MW of IT or measured consumption.", "contracted_it_capacity": "245 MW of IT capacity in the announced Fluidstack lease, not currently commissioned load.", "initial_hall_delivery_target": "Q2 2027, forecast at the August 4 report date; no exact commissioning day.", "future_expansion_scope": "Hut 8 describes up to 1,000 MW of additional utility capacity and a distinct Fluidstack right of first offer for up to 1,000 MW of additional IT capacity. Both depend on future expansion; neither is current capacity.", "tenant_and_backstop_scope": "Fluidstack is the contracted tenant; Google backs specified payment obligations. This does not make Google the physical operator or certify tenant occupancy.", "expansion_source_difference": "The Louisiana announcement describes potential scaling to up to 1,000 MW of utility capacity, while Hut 8 describes up to 1,000 MW of additional utility capacity. These same-day source envelopes differ. The future full-campus limit remains unresolved."}, "notes": ["Initial utility service, contracted IT and conditional expansion are different scopes and cannot be added. Earlier retained government context and the operator expansion language remain side by side.", "A lease/backstop, projected investment or future delivery quarter does not establish present operation, paid incentives or a verified parcel."], "sources": [{"url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results", "host": "www.hut8.com", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-16", "label": "Hut 8 Q2 construction update"}, {"url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value", "host": "www.hut8.com", "published": "2025-12-17", "date": "2025-12-17", "checked": "2026-10-16", "label": "River Bend lease announcement"}, {"url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center", "host": "www.opportunitylouisiana.gov", "published": "2025-12-17", "date": "2025-12-17", "checked": "2026-10-16", "label": "Louisiana River Bend announcement"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Louisiana · St. Francisville · West Feliciana · Source context reviewed", "status_scope": "Hut 8 reported River Bend vertical and substation construction on August 4, 2026. Initial hall delivery remained a Q2 2027 target; operation and the full expansion are not established.", "event_evidence": [{"date": "2025-12-17", "text": "Hut 8 announced a 245 MW IT lease for River Bend. This is a commercial announcement, not an opening or physical construction-start day.", "kind": "announced", "sources": [{"url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value", "host": "www.hut8.com", "published": "2025-12-17", "date": "2025-12-17", "checked": "2026-10-16", "label": "River Bend lease announcement"}]}], "typed_power_facts": [{"measure": "it_capacity", "value": 245, "unit": "MW", "basis": "contracted", "as_of": "2025-12-17", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Initial Fluidstack lease IT capacity; commissioning is future.", "sources": ["https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value"]}, {"measure": "utility_capacity", "value": 330, "unit": "MW", "basis": "forecast", "as_of": "2026-08-04", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Initial River Bend utility capacity under construction, not energized load or an issued utility permit.", "sources": ["https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "22125"}, "state_name": "Louisiana", "state_path": "/louisiana/"}, {"id": "meta-hyperion-richland-parish-la", "state": "LA", "kind": "project", "name": "Meta Hyperion", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "AI data center campus", "counties": ["Richland"], "city": "Delhi vicinity", "address": "", "who": "Meta", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undated current page says5GWtopline but later says over2GW; retain scope/version discrepancy rather than summing. Compute label is not independently established utility gross or energized load.50B+label is Louisiana investment, not proven site spend. Contracts are committed value, not additional capex. Consumer savings and teacher-bonus claims require independent fiscal evidence before headline use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-13", "Meta announced an expansion of its Richland Parish/Hyperion project, describing 5 GW of future compute capacity. The release is not a first-power or operating milestone."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.atmeta.com/richland-parish-data-center/", "host": "datacenters.atmeta.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/", "host": "datacenters.atmeta.com", "published": "2026-07-13", "date": "2026-07-13", "checked": "2026-10-16", "label": "Hyperion expansion announcement"}, {"url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/", "host": "about.fb.com", "published": "2025-10-21", "date": "2025-10-21", "checked": "2026-10-16", "label": "Historical Hyperion venture announcement"}], "loc": {"lat": 32.41738, "lng": -91.76324, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"initial_announcement_month": "2024-12", "planned_compute_capacity_gw": 5, "data_center_investment_louisiana_usd_min_exclusive": 50000000000, "forecast_peak_construction_jobs_min_exclusive": 7500, "forecast_operational_jobs": 1000, "operator_reported_louisiana_contracts_usd_min_exclusive": 1600000000}, "notes": ["Undated current page says5GWtopline but later says over2GW; retain scope/version discrepancy rather than summing. Compute label is not independently established utility gross or energized load.50B+label is Louisiana investment, not proven site spend. Contracts are committed value, not additional capex. Consumer savings and teacher-bonus claims require independent fiscal evidence before headline use.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.atmeta.com/richland-parish-data-center/", "host": "datacenters.atmeta.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-AI-Campus-Depth-20261016", "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.", "fields": {"documented_construction": "Meta describes ongoing work with its general contractors following groundbreaking; the current project page still describes building the Richland Parish campus.", "future_compute_capacity_label": "The July 13 expansion announcement labels 5 GW as future compute capacity. It is not independently classified as utility capacity, IT load or metered consumption.", "historical_venture_scope": "The October 21, 2025 announcement reports a Meta/Blue Owl funds venture and construction-management role. It is historical transaction context, not a current parcel-title or sole-ownership certification.", "compute_capacity_limits": "The 5 GW compute label is a future expansion description. The reviewed source does not define an energized utility/IT boundary or building-level allocation."}, "notes": ["Compute capacity is retained in the source wording; no unsupported conversion to IT or utility MW is typed. Regional investment, contractor commitments, jobs and customer savings are different measures and are not site technical totals.", "Construction is documented, but a completed campus, opening day and precise site footprint remain unverified.", "Earlier retained context noted mixed 5-GW/over-2-GW wording. The current captured page and July 13 expansion announcement state 5 GW of future compute capacity; earlier labels are not represented as current measurements."], "sources": [{"url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/", "host": "datacenters.atmeta.com", "published": "2026-07-13", "date": "2026-07-13", "checked": "2026-10-16", "label": "Hyperion expansion announcement"}, {"url": "https://datacenters.atmeta.com/richland-parish-data-center/", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Current Richland Parish project page"}, {"url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/", "host": "about.fb.com", "published": "2025-10-21", "date": "2025-10-21", "checked": "2026-10-16", "label": "Historical Hyperion venture announcement"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Louisiana · Delhi vicinity · Richland · Source context reviewed", "status_scope": "Meta describes Hyperion/Richland Parish as an active construction and expansion project. Its July 13, 2026 update and current project page do not certify an operating training cluster or energized capacity.", "event_evidence": [{"date": "2026-07-13", "text": "Meta announced an expansion of its Richland Parish/Hyperion project, describing 5 GW of future compute capacity. The release is not a first-power or operating milestone.", "kind": "announced", "sources": [{"url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/", "host": "datacenters.atmeta.com", "published": "2026-07-13", "date": "2026-07-13", "checked": "2026-10-16", "label": "Hyperion expansion announcement"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "22083"}, "state_name": "Louisiana", "state_path": "/louisiana/"}, {"id": "project-cannoli-van-buren-township-wayne-county-mi", "state": "MI", "kind": "project", "name": "Project Cannoli", "group": "building", "status": "Site work reported", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center development", "counties": ["Wayne"], "city": "Van Buren Township", "address": "", "who": "Panattoni", "end_user": "Google (announced participant)", "mw": null, "power": "1,000 MW original maximum utility-service request (March 17, 2026)", "power_note": "Original March 17, 2026 DTE requested maximum utility load, not IT, metered demand or delivered power. The adjustable December 2027 to December 2028 ramp is a plan, not an opening. October 1 utility-contract approval is conditional; acceptance and fulfillment are not verified.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cannoli official FAQ with quoted utility load schedule. Town FAQ quotes utility testimony, underlying contract/order not read in this row. Load ramp adjustable.2.7GWnew generation/resource portfolio is not site capacity and not additive to1GW. Development-agreement link does not prove executed effective terms. Ratepayer protection statements are not measured bill outcomes. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-03-17", "Google announced a Michigan data-center/energy collaboration and said it was evaluating Van Buren Township. The later county statement identifies Cannoli; the date is not final-plan approval, site-work commencement or 2700 MW of site IT capacity."], ["2026-02-11", "Van Buren Township Planning Commission granted Project Cannoli preliminary site plan approval with conditions, 5–2. This is a preliminary planning milestone, not final plan approval, an issued building permit, satisfied conditions or operation."], ["2026-10-01", "MPSC conditionally approved DTE and Google electricity contracts in U-22058. Acceptance and other conditions apply; this is a utility-contract milestone, not local siting or construction permission, completed obligations, energized service or operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://vbtmi.gov/departments/municipal_services/data_center_faq.php", "host": "vbtmi.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.panattoni.com/vanburen/", "host": "www.panattoni.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Developer Project Cannoli design and proposed water supplier"}, {"url": "https://www.waynecountymi.gov/News/Commission/Wayne-County-Commission-Van-Buren-%E2%80%9CProject-Cannoli%E2%80%9D-Data-Center-Statement", "host": "www.waynecountymi.gov", "published": "2026-10-01", "date": "2026-10-01", "checked": "2026-10-16", "label": "Wayne County public statement, extracted text view"}, {"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/clean-energy-reliability-michigan/", "host": "blog.google", "published": "2026-03-17", "date": "2026-03-17", "checked": "2026-10-16", "label": "Michigan development and grid-resource announcement"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Current Google location directory; flags are not status proof"}, {"url": "https://www.wemu.org/wemu-news/2026-10-15/van-buren-township-planning-commission-approves-data-center-plan", "host": "www.wemu.org", "published": "2026-10-15", "date": "2026-10-15", "checked": "2026-10-16", "label": "WEMU reporting of preliminary work and a plan vote"}, {"url": "https://vbtmi.gov/Document_Center/Agendas%20&%20Minutes/Planning%20Commission/2024/Minutes/2-11-26%20PC%20Min.pdf", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "February 11, 2026 planning minutes, page 20: preliminary approval with conditions"}, {"url": "https://vbtmi.gov/Document_Center/Agendas%20&%20Minutes/Planning%20Commission/2024/Packets/10-14-26%20PC%20Packet.pdf", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "October 14, 2026 agenda packet; August staff reviews and proposed final plans"}, {"url": "https://vbtmi.gov/Document_Center/Department/Municipal%20Services/Development%20Agreement%20VBT%202026.05.20%20final.pdf", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Posted development agreement; blank developer and township signature pages"}, {"url": "https://vbtmi.gov/government/agendas___minutes/planning_commission.php", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Planning commission document index checked October 16, 2026"}, {"url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00002YBZ99AAH", "host": "mi-psc.my.site.com", "published": "2026-10-01", "date": "2026-10-01", "checked": "2026-10-16", "label": "October 1, 2026 MPSC order U-22058-0187; operative provisions pages 137 to 141"}, {"url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001pUwYcAAK", "host": "mi-psc.my.site.com", "published": "2026-03-17", "date": "2026-03-17", "checked": "2026-10-16", "label": "March 17, 2026 original DTE application/testimony; maximum requested load and adjustable ramp, PDF page 10"}], "loc": {"lat": 42.25283, "lng": -83.28002, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Cannoli official FAQ with quoted utility load schedule", "fields": {"project_name": "Cannoli", "published_location_description": "nearI94andHaggertyRoad,VanBurenTownship,Michigan", "site_maximum_contract_load_mw": 1000, "contract_load_basis": "maximum customer load,not explicitly criticalIT", "utility_testimony_quoted_load_ramp_start_month": "2027-12", "utility_testimony_quoted_max_load_month": "2028-12", "separate_new_grid_resource_capacity_gw": 2.7}, "notes": ["Town FAQ quotes utility testimony, underlying contract/order not read in this row. Load ramp adjustable.2.7GWnew generation/resource portfolio is not site capacity and not additive to1GW. Development-agreement link does not prove executed effective terms. Ratepayer protection statements are not measured bill outcomes.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://vbtmi.gov/departments/municipal_services/data_center_faq.php", "host": "vbtmi.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Google pending-location follow-up October 16", "scope": "Explicit existing-record identity, source confidence and phase review. No new physical site, parcel, whole-campus completion, whole-state refresh or automatic directory-flag status.", "fields": {"identity_scope": "The existing Project Cannoli ID is retained. Wayne County explicitly identifies the proposed Google Van Buren Township project as Cannoli; Panattoni names itself developer. No new Google Michigan ID is created.", "provider_roles": [{"name": "Panattoni", "role": "developer"}, {"name": "Google", "role": "planned operator"}], "google_role_scope": "Google is the announced data-center participant; the planned-operator role is a scoped interpretation of Google's own development announcement/current directory and the county identity bridge. No current operator, legal parcel owner, signed tenancy or corporate parent is certified.", "reported_site_work_scope": "WEMU's October 15 report says preliminary construction has begun. Site work is reported, not independently inspected data-hall construction, delivered capacity or operation. The developer's proposed-campus wording is retained; the primary final-plan decision and conditions have not been read.", "reported_plan_vote": {"report_published_on": "2026-10-15", "body_vote_day": "Wednesday", "image_caption_meeting_date": "2026-10-15", "normalized_exact_vote_date": null, "scope": "The report describes final-plan approval but its caption date and weekday differ. No exact approval milestone is invented, and no issued building/occupancy permission or legal condition is asserted."}, "county_tax_scope": "The October 1 county statement links Google/Cannoli but expressly separates its tax-benefit veto override from construction authorization and a development agreement. Its October 14 final-plan review was prospective on October 1. Estimated incentives and promised community payments are not realized savings or paid benefits.", "water_supply_design": "Panattoni names Great Lakes Water Authority supply and designs without groundwater use. This is a prospective developer commitment, not an independently read water contract, permit, measured withdrawal or zero total water use.", "environmental_design_scope": "Panattoni describes no discharge to Belleville Lake/ground, Tier 4 backup generators and noise/landscape design commitments. These are design statements, not issued permits, operating test results, zero emissions or proven legal compliance.", "power_scope": "The 2.7 GW DTE collaboration describes a grid resource portfolio, not site IT capacity. Inherited FAQ-quoted 1000 MW maximum contract load and ramp dates remain unnormalized until their underlying utility documents are reviewed.", "location_scope": "The approximate inherited point remains unchanged. Road descriptions, developer renderings, the county statement and news are not a reviewed parcel or exact building pin."}, "notes": ["Keep each source type, date and confidence visible. Reported activity is not a site inspection, legal permission, complete campus or current metered demand.", "All inherited geometry, addresses, jurisdictions, legacy MW, investment, jobs and opening fields remain unchanged.", "WEMU is secondary reporting, not a primary approval record. Its road label I-95 conflicts with the inherited official I-94 context; no address or point is changed. The caption/weekday conflict keeps an exact approval date unset."], "sources": [{"url": "https://www.panattoni.com/vanburen/", "host": "www.panattoni.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Developer Project Cannoli design and proposed water supplier"}, {"url": "https://www.waynecountymi.gov/News/Commission/Wayne-County-Commission-Van-Buren-%E2%80%9CProject-Cannoli%E2%80%9D-Data-Center-Statement", "host": "www.waynecountymi.gov", "published": "2026-10-01", "date": "2026-10-01", "checked": "2026-10-16", "label": "Wayne County public statement, extracted text view"}, {"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/clean-energy-reliability-michigan/", "host": "blog.google", "published": "2026-03-17", "date": "2026-03-17", "checked": "2026-10-16", "label": "Michigan development and grid-resource announcement"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Current Google location directory; flags are not status proof"}, {"url": "https://www.wemu.org/wemu-news/2026-10-15/van-buren-township-planning-commission-approves-data-center-plan", "host": "www.wemu.org", "published": "2026-10-15", "date": "2026-10-15", "checked": "2026-10-16", "label": "WEMU reporting of preliminary work and a plan vote"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Primary project scope and county-only location review, October 16, 2026", "scope": "Bounded primary-source planning and location review; current physical activity is separately sourced.", "fields": {"preliminary_plan_decision": {"meeting_date": "2026-02-11", "document_page": 20, "action": "Preliminary site plan approval with conditions", "vote": {"yes": 5, "no": 2}, "applicant": "PDC AK LPIC, LLC c/o Panattoni Development Company", "planned_buildings": {"data_processing": 3, "administrative_office": 1, "network_service": 1}, "scope": "Historical preliminary approval only; not final plan approval, building permit, satisfied conditions, actual building construction or operation."}, "preliminary_approval_conditions": {"document_page": 20, "development_agreement": "Township Board authorization required before final site plan approval, including GLWA main connection/meter details, sanitary discharge limits and metering, recurring noise monitoring, construction access and phasing.", "sewer_discharge_limit_million_gallons_per_day": 0.75, "water_scope": "Condition concerning sewer discharge, not measured water consumption, water withdrawal or an operating discharge permit."}, "october_final_plan_review": {"agenda_date": "2026-10-14", "agenda_case": "25-041", "staff_review_date": "2026-08-19", "plans_date": "2026-07-29", "document_pages": [1, 14, 15], "proposed_buildings": {"data_processing": 3, "administrative_office": 1, "network_service": 2}, "campus_area_acres": 282.2, "separate_switching_station": true, "scope": "Final-plan agenda and dated staff review, not the October vote, fulfilled conditions or issued construction permission."}, "proposed_area_conflict": {"document_pages": [14, 15], "narrative_footprint_sqft": 973247, "table_footprint_sqft": 973364, "table_gross_floor_area_sqft": 1423112, "office_footprint_revision_sqft": 117, "scope": "Different stated proposed design measures retained verbatim as numbers; no constructed area, reconciled survey, IT load or building count census inferred."}, "plan_location_scope": {"document_pages": [1, 2, 14], "bounds": "East of Haggerty Road, north of I-94 North Service Drive, west of Hannan Road, south of Wayne County Community College and I-275.", "agency_address_not_site": "46425 Tyler Road is the Township address, not the data center street address.", "separate_temporary_yard": {"case": "26-013", "parcel_ids": ["83-051-99-0001-004", "83-051-99-0002-701", "83-051-99-0002-702"], "scope": "Corby Energy temporary construction yard across Haggerty; not adopted as Cannoli campus parcels."}, "precise_parcel_or_map_point_adopted": false, "scope": "The inherited approximate point still needs explicit plan-to-authoritative-geometry review."}, "engineering_review_conditions": {"letter_date": "2026-08-20", "document_pages": [24, 25], "engineering_plans_submitted_on": "2026-07-03", "initial_engineering_review_on": "2026-08-07", "proposed_glwa_connection": "24-inch water main toward the GLWA main within Tyler Road, with connection, meter and engineering details to finalize.", "phase_three_timing": null, "permit_scope": "Staff says the plan summary lists County SESC and EGLE NPDES permits as obtained, but requests the actual approvals. Their numbers, issuance and conditions have not been independently verified here.", "scope": "Staff review and planned utility design; not final engineering approval, measured water demand, confirmed permit issuance or completed infrastructure."}, "posted_agreement_execution_limits": {"printed_date": "2026-05-19", "document_pages": [16, 17], "developer_name": "PDC VBT, LLC", "developer_signature_blank": true, "township_signatures_blank": true, "execution_verified": false, "effective_agreement_date_verified": false, "scope": "Posted text contains a stated effective date and legal description but blank signatures/notarial fields. Filename final and upload/PDF creation dates do not establish execution, recordation or satisfied terms."}, "primary_final_decision_hold": {"checked_on": "2026-10-16", "index_latest_minutes_linked": "2026-09-23", "october_14_packet_linked": true, "october_14_minutes_link_found": false, "normalized_final_vote_date": null, "scope": "No October 14 minutes link found on the checked public index; absence of a link does not establish that no minutes or decision exists. The earlier reported vote/caption date conflict remains unresolved."}}, "notes": ["Historical February preliminary decision has exact date and conditions; October packet is not adopted minutes.", "Physical activity retains its separately cited Site work reported label and secondary-report confidence. No new current-stage, power, water, opening, building or parcel claim."], "sources": [{"url": "https://vbtmi.gov/Document_Center/Agendas%20&%20Minutes/Planning%20Commission/2024/Minutes/2-11-26%20PC%20Min.pdf", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "February 11, 2026 planning minutes, page 20: preliminary approval with conditions"}, {"url": "https://vbtmi.gov/Document_Center/Agendas%20&%20Minutes/Planning%20Commission/2024/Packets/10-14-26%20PC%20Packet.pdf", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "October 14, 2026 agenda packet; August staff reviews and proposed final plans"}, {"url": "https://vbtmi.gov/Document_Center/Department/Municipal%20Services/Development%20Agreement%20VBT%202026.05.20%20final.pdf", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Posted development agreement; blank developer and township signature pages"}, {"url": "https://vbtmi.gov/government/agendas___minutes/planning_commission.php", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Planning commission document index checked October 16, 2026"}, {"url": "https://vbtmi.gov/departments/municipal_services/data_center_faq.php", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Township Project Cannoli FAQ and public document links"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "S6-Cannoli-Utility-20261016", "scope": "Selected primary utility-order and original requested-load evidence only. Conditional electricity contracts are separate from physical stage, local planning permission, fulfilled conditions, parcel identity, IT capacity and actual consumption.", "fields": {"utility_case_identity": {"docket": "U-22058", "filing": "U-22058-0187", "order_date": "2026-10-01", "customer": "Google LLC", "utility": "DTE Electric Company", "location_scope": "Van Buren Township, Michigan", "pages": [1, 2], "scope": "Order describes the proposed Google facility and its service agreements. The existing Cannoli/Google association remains separately supported by the county statement and company announcement; no new record, operator-role change or parcel identity is inferred."}, "original_utility_request": {"application_date": "2026-03-17", "maximum_requested_load_mw": 1000, "contract_capacity_mw": 1000, "adjustable_planned_ramp_start": "2027-12", "adjustable_planned_ramp_end": "2028-12", "construction_load_may_precede_ramp": true, "pdf_page": 10, "scope": "Original applicant testimony, not a current measured load, IT capacity, actual energization or opening. The later conditional order is a separate legal milestone; the original requested figure is not reclassified as delivered or unconditionally approved service."}, "conditional_utility_approval": {"date": "2026-10-01", "decision": "conditional approval of PSA and CCAA", "physical_construction_or_operation_certified": false, "scope": "The historical utility-contract decision does not establish final local planning approval, an issued building/air/water permit, completed conditions, energized service or data-hall construction."}, "operative_conditions": {"A": {"pages": [138], "requirement": "Conditionally approves the March 17 primary supply and clean capacity accelerator agreements with Google."}, "B": {"pages": [137, 138], "requirement": "Conditions approval on cost-coverage representations and requires DTE to file express acceptance of all conditions within 30 days of the order. The cost-shifting protection has the footnote 19 exclusion."}, "C": {"pages": [138], "requirement": "Requires operating parameters to be updated as necessary for regulatory, reliability and transmission requirements before and after energization."}, "D": {"pages": [138], "requirement": "Removes caps on Google or DTE contributions toward line extension and electric infrastructure upgrades needed to serve Google."}, "E": {"pages": [139], "requirement": "Requires the financial compensation mechanism to be treated as ordinary income."}, "F": {"pages": [139], "requirement": "Requires same-year retirement and clean-energy-plan use of transferred renewable credits when removed from DTE renewable portfolio standard compliance."}, "G": {"pages": [139], "requirement": "Requires supplements to U-22168 integrated resource/clean energy plans within 21 days, comparing loads with and without Google, separately and combined with Green Chile, and modeling extension of credit-transfer/demand-response arrangements beyond May 31, 2033."}, "H": {"pages": [139, 140], "requirement": "Requires renewable-plan supplements within 21 days comparing Google and combined Green Chile loads, non-per-meter surcharge options and equitable incremental compliance cost recovery."}, "I": {"pages": [140], "requirement": "Requires a new contested application for updated interconnection procedures and a draft battery import/export tariff within 120 days."}, "J": {"pages": [140], "requirement": "Requires the next capacity demonstration to analyze Google and Green Chile loads separately and together using the stated direct loss-of-load method."}, "K": {"pages": [140], "requirement": "Requires energy-waste-reduction coordination plus analysis of incremental costs for the 2 percent savings target and related surcharges."}, "L": {"pages": [140, 141], "requirement": "Requires the next general rate case to include interconnection cost allocation and rate design proposals, six studies and reproducible supporting data, under seal if necessary."}, "M": {"pages": [141], "requirement": "Requires an application reviewing termination payments and collateral within three years after load-ramp completion."}, "N": {"pages": [141], "requirement": "Requires quarterly and annual reporting beginning April 15, 2027."}, "O": {"pages": [141], "requirement": "Consolidates renewable-plan case U-22057 into U-22168 for future amended renewable-plan filings; this is docket administration, not a merger of physical data center projects."}}, "acceptance_and_revision_requirements": {"express_acceptance_within_days": 30, "revised_special_contract_within_days_if_revision_needed": 30, "acceptance_filing_verified": false, "revised_contract_verified": false, "all_conditions_fulfilled_verified": false, "pages": [137, 138], "scope": "The order requires acceptance. Revised contracts are required only if DTE finds a revision necessary because of the conditions. This review does not establish whether later filings exist or whether compliance is complete; it makes no delinquency or noncompliance finding."}, "cost_protection_scope": {"pages": [137, 138], "footnote": 19, "choice_customer_exclusion": true, "universal_no_rate_impact_guarantee": false, "measured_bill_outcome_verified": false, "scope": "The order conditions approval on Google covering costs and assigns collateral shortfall risk to DTE. Its other-customer protection excludes customers not paying power supply costs, such as choice customers; footnote 19 reports the Staff finding that those customers will pay more. This is the stated order and cited analysis, not an observed bill outcome."}, "regulatory_followup_scope": {"resource_plan_case": "U-22168", "renewable_plan_case_consolidated_from": "U-22057", "resource_supplement_within_days": 21, "new_interconnection_tariff_application_within_days": 120, "reporting_begins": "2027-04-15", "collateral_review_within_years_after_ramp_completion": 3, "fulfillment_verified": false, "scope": "These are prospective requirements in the order. No completed filings, new scheduled job or fulfilled obligation is inferred; Green Chile combined-load analysis does not merge the sites or add their capacities."}, "physical_stage_and_location_limits": {"status_change": false, "location_change": false, "street_address_adopted": false, "parcel_geometry_adopted": false, "opening_date_adopted": false, "scope": "The original testimony describes about 280 acres, while local planning material uses 282.2 acres. Those are differently scoped plan descriptions, not a survey, title or permission to relocate the inherited approximate point. Site work reported retains its separate secondary confidence."}, "quantity_separation": {"legacy_mw_changed": false, "it_capacity_adopted": false, "approved_service_adopted": false, "metered_power_adopted": false, "grid_resources_added_to_request": false, "scope": "The original 1000 MW requested service is not added to renewable, storage, capacity-credit or regional grid-resource figures and is not normalized to IT load. No water quantity is introduced."}, "source_date_and_review_scope": {"order_date": "2026-10-01", "application_date": "2026-03-17", "checked": "2026-10-16", "order_pdf_pages_text_read": [1, 2, 3, 137, 138, 139, 140, 141], "order_pdf_pages_visually_checked": [1, 2, 137, 138, 139, 140, 141], "testimony_pdf_pages_text_and_visually_checked": [10], "whole_documents_certified": false, "scope": "Local October 16 capture/check date is separate from document dates and UTC October 17 response timestamps. Only the specified pages underpin this field review; no full 147-page order or 250-page filing audit is claimed."}}, "notes": ["October 1 utility-contract approval is conditional. DTE acceptance, any required revisions and later compliance remain unverified. The order has an explicit choice-customer cost-protection exclusion. Original requested load and adjustable ramp are not delivered power or an opening. Site work reported retains its own secondary source; the point remains approximate."], "sources": [{"url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00002YBZ99AAH", "host": "mi-psc.my.site.com", "published": "2026-10-01", "date": "2026-10-01", "checked": "2026-10-16", "label": "October 1, 2026 MPSC order U-22058-0187; operative provisions pages 137 to 141"}, {"url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001pUwYcAAK", "host": "mi-psc.my.site.com", "published": "2026-03-17", "date": "2026-03-17", "checked": "2026-10-16", "label": "March 17, 2026 original DTE application/testimony; maximum requested load and adjustable ramp, PDF page 10"}, {"url": "https://www.waynecountymi.gov/News/Commission/Wayne-County-Commission-Van-Buren-%E2%80%9CProject-Cannoli%E2%80%9D-Data-Center-Statement", "host": "www.waynecountymi.gov", "published": "2026-10-01", "date": "2026-10-01", "checked": "2026-10-16", "label": "Wayne County public statement, extracted text view"}, {"url": "https://vbtmi.gov/Document_Center/Agendas%20&%20Minutes/Planning%20Commission/2024/Packets/10-14-26%20PC%20Packet.pdf", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "October 14, 2026 agenda packet; August staff reviews and proposed final plans"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Michigan · Van Buren Township · Wayne · Source context reviewed", "search_extra": "Google Van Buren Township Project Cannoli Panattoni", "status_scope": "WEMU's October 15 report says preliminary construction has begun. Site work is reported, not independently inspected data-hall construction, delivered capacity or operation. The developer's proposed-campus wording is retained; the primary final-plan decision and conditions have not been read.", "event_evidence": [{"date": "2026-03-17", "text": "Google announced a Michigan data-center/energy collaboration and said it was evaluating Van Buren Township. The later county statement identifies Cannoli; the date is not final-plan approval, site-work commencement or 2700 MW of site IT capacity.", "kind": "announced", "sources": [{"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/clean-energy-reliability-michigan/", "host": "blog.google", "published": "2026-03-17", "date": "2026-03-17", "checked": "2026-10-16", "label": "Michigan development and grid-resource announcement"}]}, {"date": "2026-02-11", "text": "Van Buren Township Planning Commission granted Project Cannoli preliminary site plan approval with conditions, 5–2. This is a preliminary planning milestone, not final plan approval, an issued building permit, satisfied conditions or operation.", "kind": "approved", "sources": [{"url": "https://vbtmi.gov/Document_Center/Agendas%20&%20Minutes/Planning%20Commission/2024/Minutes/2-11-26%20PC%20Min.pdf", "host": "vbtmi.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "February 11, 2026 planning minutes, page 20: preliminary approval with conditions"}]}, {"date": "2026-10-01", "text": "MPSC conditionally approved DTE and Google electricity contracts in U-22058. Acceptance and other conditions apply; this is a utility-contract milestone, not local siting or construction permission, completed obligations, energized service or operation.", "kind": "approved", "sources": [{"url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00002YBZ99AAH", "host": "mi-psc.my.site.com", "published": "2026-10-01", "date": "2026-10-01", "checked": "2026-10-16", "label": "October 1, 2026 MPSC order U-22058-0187; operative provisions pages 137 to 141"}]}], "typed_water_facts": [{"measure": "supply_source", "value": "Planned Great Lakes Water Authority supply without groundwater use.", "unit": null, "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "basis": "operator_reported_statement", "scope": "Undated developer design commitment only. Not an executed water contract, a permit, measured withdrawal/consumption or zero total water use.", "sources": ["https://www.panattoni.com/vanburen/"]}], "typed_power_facts": [{"measure": "utility_service_request", "value": 1000, "unit": "MW", "basis": "requested", "as_of": "2026-03-17", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Original March 17 DTE applicant testimony, PDF page 10: 1000 MW maximum requested/contract load with an adjustable December 2027 to December 2028 ramp. Construction load may precede that ramp. Not measured demand, IT capacity, actual energization, an opening date or unconditionally approved service; the October 1 conditional utility order is recorded separately.", "sources": ["https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00001pUwYcAAK"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "26163"}, "state_name": "Michigan", "state_path": "/michigan/"}, {"id": "stargate-saline-township-mi", "state": "MI", "kind": "facility", "name": "Stargate The Barn Campus", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Washtenaw"], "city": "Saline Township", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Michigan final storage-project approval, separate from DC IT. 1.383GWand332MWareENERGYSTORAGEpowernotSalineAIcriticalIToradditionalDCload.332isfirstsubsetoftotal1.383not1.715GW. Orderapprovesstorageandcontracts,notallDCconstructionorenergization. CustomerfundingundertheESAandno-rate-increasefindingforthisapprovalnotunlimitedfuturebillguarantee;costallocation/recoveryreservedforfutureappropriate ratecase. Storagecrediteligibilitycompanyclaimnotactualtaxcreditpaid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27397", "host": "adms.apps.lara.state.mi.us", "date": "2026-03-27", "published": "2026-03-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.walbridge.com/about/news-events/news-item/walbridge-is-building-the-largest-project-in-its-110-year-history-right-here-in-michigan/", "host": "www.walbridge.com", "published": "2026-05-05", "date": "2026-05-05", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 42.22763, "lng": -83.83656, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Michigan final storage-project approval, separate from DC IT", "fields": {"regulator": "Michigan Public Service Commission", "case": "U-21990", "order_date": "2026-03-27", "action": "approvedColdCreek,FishCreek,PineRiverstorageprojectsandrelatedcontracts", "customer": "Green Chile Ventures LLC, Oracle subsidiary", "earlier_special_contract_approval_date": "2025-12-18", "dte_conditions_acceptance_date": "2026-01-15", "authorized_storage_resource_total_gw": 1.383, "storage_projects_this_order_mw": 332, "projects": [{"name": "Cold Creek", "county": "Branch, Michigan", "storage_dispatchable_mw": 100}, {"name": "Fish Creek", "county": "Montcalm, Michigan", "storage_dispatchable_mw": 132}, {"name": "Pine River", "county": "Gratiot, Michigan", "storage_dispatchable_mw": 100}], "expected_storage_commercial_operation_no_later_than": "2027-Q2", "cost_allocation_recovery_method_approved_by_this_order": false}, "notes": ["1.383GWand332MWareENERGYSTORAGEpowernotSalineAIcriticalIToradditionalDCload.332isfirstsubsetoftotal1.383not1.715GW. Orderapprovesstorageandcontracts,notallDCconstructionorenergization. CustomerfundingundertheESAandno-rate-increasefindingforthisapprovalnotunlimitedfuturebillguarantee;costallocation/recoveryreservedforfutureappropriate ratecase. Storagecrediteligibilitycompanyclaimnotactualtaxcreditpaid.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27397", "host": "adms.apps.lara.state.mi.us", "date": "2026-03-27", "published": "2026-03-27", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Under construction", "basis": "Walbridge’s May 5, 2026 release identifies itself as general contractor for Related Digital’s Saline Township campus for Oracle and OpenAI and reports substantial trade work already completed at the site.", "checked_on": "2026-10-16"}, "stage_review_limits": "This is the contractor’s direct report of physical work. It is separate from the MPSC storage approvals and does not establish completed data halls, operational capacity, a precise first-work date or an unconditional customer-bill guarantee."}, "notes": ["This is the contractor’s direct report of physical work. It is separate from the MPSC storage approvals and does not establish completed data halls, operational capacity, a precise first-work date or an unconditional customer-bill guarantee.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://www.walbridge.com/about/news-events/news-item/walbridge-is-building-the-largest-project-in-its-110-year-history-right-here-in-michigan/", "host": "www.walbridge.com", "published": "2026-05-05", "date": "2026-05-05", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Michigan · Saline Township · Washtenaw · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. Walbridge’s May 5, 2026 release identifies itself as general contractor for Related Digital’s Saline Township campus for Oracle and OpenAI and reports substantial trade work already completed at the site. This is the contractor’s direct report of physical work. It is separate from the MPSC storage approvals and does not establish completed data halls, operational capacity, a precise first-work date or an unconditional customer-bill guarantee.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "26161"}, "state_name": "Michigan", "state_path": "/michigan/"}, {"id": "centra-msp1-eagan-mn", "state": "MN", "kind": "facility", "name": "CENTRA MSP1", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Dakota"], "city": "Eagan", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CENTRA Eagan utility and critical capacity. 12MVAapparentpowernotIT.92000footprintnotnecessarilycombinedtwo-storygrossarea. TierIIIplusisoperator-designclaim,notindependentUptimecertificate. PublishedISO270001spellingnotcorrectedtoverifiedISO27001cert. DesignPUEnotmeasured. No exactopeningdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.centradigital.com/data-centers/msp1", "host": "centradigital.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.centradigital.com/post/centra-breaks-ground-on-msp1", "host": "www.centradigital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 44.67195, "lng": -93.06517, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "CENTRA Eagan utility and critical capacity", "fields": {"operator": "CENTRA Digital", "site_code": "MSP1", "address": "3640 Nasseff Way, Eagan, Minnesota55123", "utility_capacity_mva": 12, "critical_capacity_mw": 8.1, "building_footprint_sqft": 92000, "building_stories": 2, "rack_capability_kw_max": 150, "design_pue_target_max": 1.35}, "notes": ["12MVAapparentpowernotIT.92000footprintnotnecessarilycombinedtwo-storygrossarea. TierIIIplusisoperator-designclaim,notindependentUptimecertificate. PublishedISO270001spellingnotcorrectedtoverifiedISO27001cert. DesignPUEnotmeasured. No exactopeningdate.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.centradigital.com/data-centers/msp1", "host": "centradigital.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 58", "scope": "The original CENTRA MSP1 project article announces groundbreaking and describes transforming and modernizing a former enterprise facility into a future interconnection hub in Eagan. This supports reported construction and adaptive reuse within the issuer account, without an independently established first physical work day or commissioned computing. The current facility page offers racks and suites, but that sales description alone does not prove customer deployment or completed commissioning. Its technical, Tier and compliance marketing is not independently certified or exported as new quantities, location or role fields.", "fields": {"current_stage_evidence": {"outcome": "original_issuer_reports_groundbreaking_and_retrofit_service_not_proven", "scope": "The original CENTRA MSP1 project article announces groundbreaking and describes transforming and modernizing a former enterprise facility into a future interconnection hub in Eagan. This supports reported construction and adaptive reuse within the issuer account, without an independently established first physical work day or commissioned computing. The current facility page offers racks and suites, but that sales description alone does not prove customer deployment or completed commissioning. Its technical, Tier and compliance marketing is not independently certified or exported as new quantities, location or role fields."}, "source_read_scope": {"original_project_article_main_body_read": true, "current_facility_page_main_body_read": true, "adaptive_reuse_and_future_service_wording_retained": true, "sales_offering_not_commissioned_computing": true, "groundbreaking_not_exact_first_physical_work_day": true, "tier_and_quantity_claims_not_exported": true}}, "notes": ["The original CENTRA MSP1 project article announces groundbreaking and describes transforming and modernizing a former enterprise facility into a future interconnection hub in Eagan. This supports reported construction and adaptive reuse within the issuer account, without an independently established first physical work day or commissioned computing. The current facility page offers racks and suites, but that sales description alone does not prove customer deployment or completed commissioning. Its technical, Tier and compliance marketing is not independently certified or exported as new quantities, location or role fields.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.centradigital.com/data-centers/msp1", "host": "www.centradigital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.centradigital.com/post/centra-breaks-ground-on-msp1", "host": "www.centradigital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Minnesota · Eagan · Dakota · Source context reviewed", "status_scope": "The original CENTRA MSP1 project article announces groundbreaking and describes transforming and modernizing a former enterprise facility into a future interconnection hub in Eagan. This supports reported construction and adaptive reuse within the issuer account, without an independently established first physical work day or commissioned computing. The current facility page offers racks and suites, but that sales description alone does not prove customer deployment or completed commissioning. Its technical, Tier and compliance marketing is not independently certified or exported as new quantities, location or role fields.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "27037"}, "state_name": "Minnesota", "state_path": "/minnesota/"}, {"id": "connect-data-centers-eagan-mn", "state": "MN", "kind": "facility", "name": "Connect Data Centers - Eagan (powered by Oppidan)", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Dakota"], "city": "Eagan", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Oppidan Eagan build-to-suit groundbreaking. Year-onlycompletionforecastnotobservedopening. Onlytwoground-upactiveMinnesotaprojectsclaimishistoricaldeveloperstatementnotcurrentstatewidecensus. No numericITMW, tenantname, signedleaseorparcel. Excelsiorheadquartersnotfacility. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-06-05", "Oppidan published its June 5, 2025 account of the Connect Eagan groundbreaking and described the ground up project as underway. This dates issuer publication and reported construction context, not an independently established first work day, completion or commissioned computing."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan", "host": "oppidan.com", "date": "2025-06-05", "published": "2025-06-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 44.68723, "lng": -93.08184, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Oppidan Eagan build-to-suit groundbreaking", "fields": {"developer": "Oppidan", "project": "Connect Data Centers Eagan", "groundbreaking_announcement_date": "2025-06-05", "planned_area_sqft": 61000, "site_description": "Argenta Trail, south of YMCA, Eagan, Minnesota", "developer_role": "landlord financing and developing build-to-suit with unnamed tenant", "expected_completion_year": 2026}, "notes": ["Year-onlycompletionforecastnotobservedopening. Onlytwoground-upactiveMinnesotaprojectsclaimishistoricaldeveloperstatementnotcurrentstatewidecensus. No numericITMW, tenantname, signedleaseorparcel. Excelsiorheadquartersnotfacility.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan", "host": "oppidan.com", "date": "2025-06-05", "published": "2025-06-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 58", "scope": "The original June 5, 2025 Oppidan release reports breaking ground at the named Connect data center project on Argenta Trail in Eagan and explicitly describes ground up projects currently underway. This supports reported construction within the issuer account as of that publication. Its target completion in 2026 is not an accomplished opening. The ceremony and release date are not independently certified as the first day of physical work. The source describes financing, landlord and development relationships, which are not converted into a new computing operator role. Expected community benefits and quantities are not promoted.", "fields": {"current_stage_evidence": {"outcome": "original_issuer_reports_named_project_underway", "scope": "The original June 5, 2025 Oppidan release reports breaking ground at the named Connect data center project on Argenta Trail in Eagan and explicitly describes ground up projects currently underway. This supports reported construction within the issuer account as of that publication. Its target completion in 2026 is not an accomplished opening. The ceremony and release date are not independently certified as the first day of physical work. The source describes financing, landlord and development relationships, which are not converted into a new computing operator role. Expected community benefits and quantities are not promoted."}, "source_read_scope": {"original_dated_issuer_release_main_body_read": true, "ground_up_currently_underway_language_read": true, "target2026_not_actual_completion": true, "landlord_developer_not_promoted_to_computing_operator": true, "no_quantity_or_role_export": true}}, "notes": ["The original June 5, 2025 Oppidan release reports breaking ground at the named Connect data center project on Argenta Trail in Eagan and explicitly describes ground up projects currently underway. This supports reported construction within the issuer account as of that publication. Its target completion in 2026 is not an accomplished opening. The ceremony and release date are not independently certified as the first day of physical work. The source describes financing, landlord and development relationships, which are not converted into a new computing operator role. Expected community benefits and quantities are not promoted.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan", "host": "oppidan.com", "published": "2025-06-05", "date": "2025-06-05", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Minnesota · Eagan · Dakota · Source context reviewed", "status_scope": "The original June 5, 2025 Oppidan release reports breaking ground at the named Connect data center project on Argenta Trail in Eagan and explicitly describes ground up projects currently underway. This supports reported construction within the issuer account as of that publication. Its target completion in 2026 is not an accomplished opening. The ceremony and release date are not independently certified as the first day of physical work. The source describes financing, landlord and development relationships, which are not converted into a new computing operator role. Expected community benefits and quantities are not promoted.", "event_evidence": [{"date": "2025-06-05", "text": "Oppidan published its June 5, 2025 account of the Connect Eagan groundbreaking and described the ground up project as underway. This dates issuer publication and reported construction context, not an independently established first work day, completion or commissioned computing.", "kind": "announced", "sources": [{"url": "https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan", "host": "oppidan.com", "published": "2025-06-05", "date": "2025-06-05", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "27037"}, "state_name": "Minnesota", "state_path": "/minnesota/"}, {"id": "avaio-taurus-brandon-ms", "state": "MS", "kind": "facility", "name": "AVAIO Digital Taurus", "group": "building", "status": "Developer-reported groundbreaking", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Rankin"], "city": "Brandon", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Hundreds of indirect jobs include construction; not a quantified permanent onsite total. No site MW or dollar exemption value supplied. Construction target not delivery proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/", "host": "governorreeves.ms.gov", "date": "2025-08-19", "published": "2025-08-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.avaiodigital.com/developments/brandon-mississippi", "host": "www.avaiodigital.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "loc": {"lat": 32.26403, "lng": -89.94563, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named government source", "fields": {"announcement_date": "2025-08-19", "planned_investment_usd": 6000000000, "expected_direct_jobs_min": 60, "construction_completion_target": "2027-H1", "government_reported_tax_program_approval": "Mississippi Data Center Enterprises exemption", "published_location": "East Metropolitan Center Business and Industrial Park, Brandon, Rankin County"}, "notes": ["Hundreds of indirect jobs include construction; not a quantified permanent onsite total. No site MW or dollar exemption value supplied. Construction target not delivery proof.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/", "host": "governorreeves.ms.gov", "date": "2025-08-19", "published": "2025-08-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "next-status-2026-10-19", "scope": "AVAIO reports that it has broken ground on Project Taurus in Brandon, Mississippi.", "fields": {"current_stage_evidence": {"outcome": "developer_reported_groundbreaking", "scope": "AVAIO reports that it has broken ground on Project Taurus in Brandon, Mississippi."}}, "notes": ["Its first-occupancy and power-delivery dates are future forecasts, not completed facilities or commissioned capacity. The linked update date does not establish an exact physical start day."], "sources": [{"url": "https://www.avaiodigital.com/developments/brandon-mississippi", "host": "www.avaiodigital.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Mississippi · Brandon · Rankin · Source context reviewed", "status_scope": "AVAIO reports that it has broken ground on Project Taurus in Brandon, Mississippi.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "28121"}, "state_name": "Mississippi", "state_path": "/mississippi/"}, {"id": "aws-clinton-hinds-ms", "state": "MS", "kind": "facility", "name": "AWS Clinton Data Center", "group": "building", "status": "Agency reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Hinds"], "city": "Clinton", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Clinton municipal AWS reuse announcement. 1Bplanned investment, not actual spent or separate amount to add again to Amazon statewide25B. Reused industrial plant not newly built whole facility from scratch. Thousands of additional construction/supplychain jobs not all permanent direct onsite. Ceremony/announcement not actual customer opening; no ITMW or exact parcel in reviewed section. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-06-09", "The original Clinton City June 9, 2026 publication describes the AWS former Delphi conversion and celebrates its investment. This dates the City statement rather than an exact first construction day, commissioned computing opening or accomplished future benefits."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://clintonms.org/awsdatacenter/", "host": "clintonms.org", "date": "2026-06-09", "published": "2026-06-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers", "host": "www.aboutamazon.com", "published": "2026-04-09", "date": "2026-04-09", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 32.26649, "lng": -90.44266, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Clinton municipal AWS reuse announcement", "fields": {"agency": "City of Clinton, Mississippi", "announcement_date": "2026-06-09", "project_operator": "AWS", "project_use": "repurpose former Delphi manufacturing plant as data center", "planned_investment_usd": 1000000000, "expected_full_operation_positions_min_inclusive": 100}, "notes": ["1Bplanned investment, not actual spent or separate amount to add again to Amazon statewide25B. Reused industrial plant not newly built whole facility from scratch. Thousands of additional construction/supplychain jobs not all permanent direct onsite. Ceremony/announcement not actual customer opening; no ITMW or exact parcel in reviewed section.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://clintonms.org/awsdatacenter/", "host": "clintonms.org", "date": "2026-06-09", "published": "2026-06-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 75", "scope": "The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred.", "fields": {"current_stage_evidence": {"outcome": "city_and_issuer_named_former_delphi_conversion", "scope": "The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred."}, "source_read_scope": {"complete_original_city_and_issuer_bodies_read": true, "explicit_repurposing_not_investment_alone": true, "issuer_original_jsonld_date_published20260409_read": true, "no_statewide_savings_as_building_measurement": true, "no_power_water_jobs_capacity_or_role_changes": true}}, "notes": ["The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://clintonms.org/awsdatacenter/", "host": "clintonms.org", "published": "2026-06-09", "date": "2026-06-09", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers", "host": "www.aboutamazon.com", "published": "2026-04-09", "date": "2026-04-09", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Mississippi · Clinton · Hinds · Source context reviewed", "status_scope": "The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred.", "event_evidence": [{"date": "2026-06-09", "text": "The original Clinton City June 9, 2026 publication describes the AWS former Delphi conversion and celebrates its investment. This dates the City statement rather than an exact first construction day, commissioned computing opening or accomplished future benefits.", "kind": "announced", "sources": [{"url": "https://clintonms.org/awsdatacenter/", "host": "clintonms.org", "published": "2026-06-09", "date": "2026-06-09", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "28049"}, "state_name": "Mississippi", "state_path": "/mississippi/"}, {"id": "xai-macrohardrr-southaven-ms", "state": "MS", "kind": "facility", "name": "MACROHARDRR (xAI Southaven Data Center III)", "group": "building", "status": "Agency reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["DeSoto"], "city": "Southaven", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not assign nearly2GW company computing power to the Mississippi building alone. Past forecast is not verified actual opening. Hundreds of jobs is not an exact number. Governor January8announcement says acquired-building retrofit and forecasts February opening; nearly2GW describes total company computing power after expansion. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named xAI project with duplicate-record and system-power holds. Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified.", "date": "", "events": [["2026-01-08", "The original Mississippi Governor January 8, 2026 release names MACROHARDRR and reports ongoing building rehabilitation. Its February operating forecast and incentive approval do not certify that computing operation began or that nearby power infrastructure is the same facility."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/", "host": "governorreeves.ms.gov", "date": "2026-01-08", "published": "2026-01-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 34.87558, "lng": -89.99096, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "field-verification-2026-10-14.json", "scope": "Field or source context only", "fields": {"city": "Southaven", "county": "DeSoto", "investment_usd_min": 20000000000, "investment_basis": "announced corporate investment in Southaven project", "event_status": "retrofitting as of2026-01-08", "opening_forecast": "2026-02", "incentive": "MDA data center sales/use exemption approved; city/county fee-in-lieu support; values not stated"}, "notes": ["Do not assign nearly2GW company computing power to the Mississippi building alone.", "Past forecast is not verified actual opening.", "Hundreds of jobs is not an exact number.", "Governor January8announcement says acquired-building retrofit and forecasts February opening; nearly2GW describes total company computing power after expansion.", "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/", "host": "governorreeves.ms.gov", "date": "2026-01-08", "published": "2026-01-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named xAI project with duplicate-record and system-power holds", "fields": {"project_name": "MACROHARDRR", "historical_announcement_date": "2026-01-08", "announced_project_corporate_investment_usd_min_exclusive": 20000000000, "reported_existing_building_retrofit": true, "historical_operation_target_month": "2026-02", "government_reported_incentive_approval": "Mississippi DataCenterIncentive sales/use exemption", "local_incentive_type": "Southaven andDeSotoCounty fee-in-lieu agreements"}, "notes": ["Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/", "host": "governorreeves.ms.gov", "date": "2026-01-08", "published": "2026-01-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 75", "scope": "The complete original Governor release explicitly names MACROHARDRR and says a purchased building is being retrofitted for computing. This supports agency reported construction at the January 8 statement scope. The anticipated February 2026 operating start is not independently established as accomplished. A nearby power plant and an existing Tennessee computing site are separate components. Investment, incentives, future computing power and job projections are not current installed load or operation, and other Southaven records are not merged.", "fields": {"current_stage_evidence": {"outcome": "state_named_macrohardrr_building_rehabilitation", "scope": "The complete original Governor release explicitly names MACROHARDRR and says a purchased building is being retrofitted for computing. This supports agency reported construction at the January 8 statement scope. The anticipated February 2026 operating start is not independently established as accomplished. A nearby power plant and an existing Tennessee computing site are separate components. Investment, incentives, future computing power and job projections are not current installed load or operation, and other Southaven records are not merged."}, "source_read_scope": {"complete_original_governor_release_body_read": true, "explicit_retrospective_retrofit_not_incentive_alone": true, "february2026_forecast_not_accomplished_operation": true, "separate_power_plant_tennessee_and_other_southaven_records_not_merged": true}}, "notes": ["The complete original Governor release explicitly names MACROHARDRR and says a purchased building is being retrofitted for computing. This supports agency reported construction at the January 8 statement scope. The anticipated February 2026 operating start is not independently established as accomplished. A nearby power plant and an existing Tennessee computing site are separate components. Investment, incentives, future computing power and job projections are not current installed load or operation, and other Southaven records are not merged.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/", "host": "governorreeves.ms.gov", "published": "2026-01-08", "date": "2026-01-08", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Mississippi · Southaven · DeSoto · Source context reviewed", "status_scope": "The complete original Governor release explicitly names MACROHARDRR and says a purchased building is being retrofitted for computing. This supports agency reported construction at the January 8 statement scope. The anticipated February 2026 operating start is not independently established as accomplished. A nearby power plant and an existing Tennessee computing site are separate components. Investment, incentives, future computing power and job projections are not current installed load or operation, and other Southaven records are not merged.", "event_evidence": [{"date": "2026-01-08", "text": "The original Mississippi Governor January 8, 2026 release names MACROHARDRR and reports ongoing building rehabilitation. Its February operating forecast and incentive approval do not certify that computing operation began or that nearby power infrastructure is the same facility.", "kind": "announced", "sources": [{"url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/", "host": "governorreeves.ms.gov", "published": "2026-01-08", "date": "2026-01-08", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "28033"}, "state_name": "Mississippi", "state_path": "/mississippi/"}, {"id": "lumon-solutions-marshfield-mo", "state": "MO", "kind": "facility", "name": "Marshfield Data Center (Lumon Solutions)", "group": "building", "status": "Agency reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Webster"], "city": "Marshfield", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County report identifies a project, but does not name Lumon in the reviewed text. Facility/developer crosswalk remains pending. No analogy from a different McDonald County facility is adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-05-21", "The original Webster County May 21, 2026 update describes ongoing construction of its Rifle Range Road computing project. The linked original Conservation report names Lumon Solutions Marshfield LLC, but neither the statement nor report is computing commissioning."], ["2026-05-14", "The original Conservation report is generated May 14, 2026 and the linked original DNR groundwater email is dated the same day. These are document dates for a resource review and forecast, not proof of site clearance, actual consumption or current aquifer measurements."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://webstercountymo.gov/commission-data-center-update-may-21/", "host": "webstercountymo.gov", "date": "2026-05-21", "published": "2026-05-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf", "host": "webstercountymo.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-MO-DNR-email-re-impact-of-data-center-well.pdf", "host": "webstercountymo.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 37.28092, "lng": -92.87578, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {"county_reported_status": "under construction", "county": "Webster", "site_description": "Rifle Range Road, northeast of Marshfield"}, "notes": ["County report identifies a project, but does not name Lumon in the reviewed text. Facility/developer crosswalk remains pending. No analogy from a different McDonald County facility is adopted.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://webstercountymo.gov/commission-data-center-update-may-21/", "host": "webstercountymo.gov", "date": "2026-05-21", "published": "2026-05-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 74", "scope": "The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence.", "fields": {"current_stage_evidence": {"outcome": "county_construction_and_original_named_lumon_crosswalk", "scope": "The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence."}, "source_read_scope": {"complete_original_county_update_body_read": true, "original_conservation_report_all_six_page_text_read": true, "physical_page3_map_pixels_not_reviewed": true, "original_two_page_groundwater_email_complete_text_read": true, "conservation_page1_explicit_company_crosswalk_resolves_prior_hold": true, "resource_review_not_site_clearance_or_species_absence": true, "historical2017_monitoring_not_current_measured_water_effects": true, "no_c4_resource_quantity_or_location_changes": true}}, "notes": ["The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://webstercountymo.gov/commission-data-center-update-may-21/", "host": "webstercountymo.gov", "published": "2026-05-21", "date": "2026-05-21", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf", "host": "webstercountymo.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-MO-DNR-email-re-impact-of-data-center-well.pdf", "host": "webstercountymo.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Missouri · Marshfield · Webster · Source context reviewed", "status_scope": "The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence.", "event_evidence": [{"date": "2026-05-21", "text": "The original Webster County May 21, 2026 update describes ongoing construction of its Rifle Range Road computing project. The linked original Conservation report names Lumon Solutions Marshfield LLC, but neither the statement nor report is computing commissioning.", "kind": "announced", "sources": [{"url": "https://webstercountymo.gov/commission-data-center-update-may-21/", "host": "webstercountymo.gov", "published": "2026-05-21", "date": "2026-05-21", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf", "host": "webstercountymo.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}, {"date": "2026-05-14", "text": "The original Conservation report is generated May 14, 2026 and the linked original DNR groundwater email is dated the same day. These are document dates for a resource review and forecast, not proof of site clearance, actual consumption or current aquifer measurements.", "kind": "announced", "sources": [{"url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf", "host": "webstercountymo.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-MO-DNR-email-re-impact-of-data-center-well.pdf", "host": "webstercountymo.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "29225"}, "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "nebius-independence-mo", "state": "MO", "kind": "facility", "name": "Nebius AI Factory (Independence)", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Jackson"], "city": "Independence", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.arconational.com/nebius-independence-mo/", "host": "arconational.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.00837, "lng": -94.34625, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round28-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "ARCO's project page labels Nebius Independence under construction and describes a first 200 MW computing-capacity building of about 490,000 square feet within a planned 1.2 GW campus.", "independently_verified_current_operating_status": null}, "notes": ["First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.arconational.com/nebius-independence-mo/", "host": "arconational.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 74", "scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.", "fields": {"current_stage_evidence": {"outcome": "contractor_explicit_named_independence_construction", "scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed."}, "source_read_scope": {"complete_original_current_contractor_project_body_read": true, "explicit_under_construction_not_completed_build": true, "first_building_not_full_campus_commissioning": true, "no_rate_water_noise_or_capacity_certification": true}}, "notes": ["The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.arconational.com/nebius-independence-mo/", "host": "www.arconational.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Missouri · Independence · Jackson · Source context reviewed", "status_scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "29095"}, "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "patmos-kansas-city-mo", "state": "MO", "kind": "facility", "name": "Patmos KC Star Building Campus", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Jackson"], "city": "Kansas City", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-01-12", "The original Patmos January 12, 2026 release announces financing for continued conversion and infrastructure work at its Kansas City campus. The loan announcement is separate from exact completion of the forecast March work or computing commissioning across the campus."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/", "host": "kctv5.com", "date": "2026-01-12", "published": "2026-01-12", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.patmos.tech/news/patmos-secures-100m-cpace", "host": "www.patmos.tech", "published": "", "date": "", "checked": "2026-10-23", "label": "Named computing facility or project street in original source body"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1601+McGee+Street%2C+Kansas+City%2C+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Complete literal Census street response and county context"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.58623606447564%2C39.09006428853755%2C-94.57350393552436%2C39.09994571146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting with unknown image acquisition date"}, {"url": "https://www.patmos.tech/tech-campus", "host": "www.patmos.tech", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lng": -94.57987, "lat": 39.095005, "precision": "address", "basis": "The original January 12, 2026 operator announcement identifies the former Kansas City Star property and mixed use AI campus at 1601 McGee Street, Kansas City, Missouri. One complete literal Census street range supplies only a calculated reference in Jackson County, without selecting a data hall, tenant room or roof boundary. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."}, "reviewed_evidence": [{"overlay": "regional-development-review-round30-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "KCTV5 reports Patmos bought the former KC Star building after occupying part of it and announced a 100-million-USD clean-energy loan for further improvements.", "independently_verified_current_operating_status": null}, "notes": ["The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/", "host": "kctv5.com", "date": "2026-01-12", "published": "2026-01-12", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 55, October 23, 2026", "scope": "Explicit source bound reference only. Existing status group unknown remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.", "fields": {"location_review_decision": {"location": {"lng": -94.57987, "lat": 39.095005, "precision": "address", "basis": "The original January 12, 2026 operator announcement identifies the former Kansas City Star property and mixed use AI campus at 1601 McGee Street, Kansas City, Missouri. One complete literal Census street range supplies only a calculated reference in Jackson County, without selecting a data hall, tenant room or roof boundary. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."}, "reference_method": "Census interpolated street address", "published_address": "1601 McGee Street, Kansas City, MO", "county_fips": ["29095"], "operator_coordinates_adopted": false, "corporate_address_adopted": false}}, "notes": ["The named operator announcement explicitly ties 1601 McGee Street to its former newspaper property retrofit and AI data center project. The general technology campus page is corroboration only. Financing amounts, executed leases, forecast March 2026 completion and reported earlier buildouts do not create new roles, physical stages, quantities or opening events in this location review.", "Explicit source bound reference only. Existing status group unknown remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.", "Dense downtown blocks, large roof forms, road corridors, parking and an arena are visible. The source numeric street identifies the former newspaper property without selecting an individual data hall, tenant space, roof boundary or current computing milestone.", "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official sources now support only the bounded reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, without a claim of physical relocation or a new physical milestone."], "sources": [{"url": "https://www.patmos.tech/news/patmos-secures-100m-cpace", "host": "www.patmos.tech", "published": "", "date": "", "checked": "2026-10-23", "label": "Named computing facility or project street in original source body"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1601+McGee+Street%2C+Kansas+City%2C+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Complete literal Census street response and county context"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.58623606447564%2C39.09006428853755%2C-94.57350393552436%2C39.09994571146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting with unknown image acquisition date"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 74", "scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.", "fields": {"current_stage_evidence": {"outcome": "issuer_named_kansascity_continued_construction_account", "scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster."}, "source_read_scope": {"complete_original_issuer_release_and_current_general_campus_body_read": true, "continued_work_explicit_not_inferred_from_loan_alone": true, "forecast_march2026_not_accomplished": true, "signed_tenants_and_built_capacity_not_full_campus_operation": true, "no_financial_capacity_or_role_fields_changed": true}}, "notes": ["The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.patmos.tech/news/patmos-secures-100m-cpace", "host": "www.patmos.tech", "published": "2026-01-12", "date": "2026-01-12", "checked": "2026-10-24", "label": "Reviewed operator source"}, {"url": "https://www.patmos.tech/tech-campus", "host": "www.patmos.tech", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Calculated official source street reference, not a surveyed roof or parcel", "summary": "Missouri · Kansas City · Jackson · Source context reviewed", "status_scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.", "event_evidence": [{"date": "2026-01-12", "text": "The original Patmos January 12, 2026 release announces financing for continued conversion and infrastructure work at its Kansas City campus. The loan announcement is separate from exact completion of the forecast March work or computing commissioning across the campus.", "kind": "announced", "sources": [{"url": "https://www.patmos.tech/news/patmos-secures-100m-cpace", "host": "www.patmos.tech", "published": "2026-01-12", "date": "2026-01-12", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "state_name": "Missouri", "state_path": "/missouri/"}, {"id": "archgreen-grand-island-hall-ne", "state": "NE", "kind": "facility", "name": "ArchGreen Grand Island Data Center", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": true, "type": "Crypto/HPC (inventory classification)", "counties": ["Hall"], "city": "Grand Island", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Same page says development completed and currently under construction. Actual commissioning and exact build completion remain null. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.arch-green.com/project-1-3", "host": "arch-green.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.88438, "lng": -98.51504, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.", "fields": {"reported_context": "ArchGreen operator page names modular crypto development west of Grand Island in Hall County.", "independently_verified_current_operating_status": null}, "notes": ["Same page says development completed and currently under construction. Actual commissioning and exact build completion remain null.", "Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.arch-green.com/project-1-3", "host": "arch-green.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 73", "scope": "The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted.", "fields": {"current_stage_evidence": {"outcome": "developer_explicit_named_grandisland_construction", "scope": "The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted."}, "source_read_scope": {"complete_original_current_developer_project_body_read": true, "completed_development_not_completed_construction": true, "undated_page_not_invented_event_day": true, "separate_doniphan_project_not_merged": true}}, "notes": ["The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.arch-green.com/project-1-3", "host": "www.arch-green.com", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nebraska · Grand Island · Hall · Source context reviewed", "status_scope": "The complete original developer project body explicitly says the modular cryptocurrency project west of Grand Island in Hall County is currently under construction. Its separate completed development wording is not treated as physical construction completion or computing operation. The developer reports receipt of a conditional use permit, without an independently read final County instrument in this review. The page has no independently established exact publication or first construction day. No Doniphan project, permit quantity or operating load is substituted.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "31079"}, "state_name": "Nebraska", "state_path": "/nebraska/"}, {"id": "centra-rno2-keystone-reno-nv", "state": "NV", "kind": "facility", "name": "CENTRA RNO2 (Keystone Data Center)", "group": "building", "status": "Construction documented by City", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Washoe"], "city": "Reno", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.. City names Centra Keystone project and reports CUP approval January15,2025 with no appeal filed at that point, allowing building-permit stage. Not a certificate of occupancy, all permits or current RFS. Question22 alleges3MWinitial/6.67MW and12MWadvertisement. City answer refers electrical capacity/service to NVEnergy; it does NOT supply executed power agreement or independently verify12MWIT/current demand. Question assertions are not city findings. Question29 refers to26000gallons initial cooling fill; answer describes changed cooling/documentation, not measured daily consumption. City answer onpage11 anticipates about2acre-feet without printing a time period; no gallons/day/year conversion or zero-water claim adopted. City describes15ftchillerbarrier,53dBAambient and43dBAequipment target, not measured operating compliance. Its residential-zoning applicability and regulator statements are city interpretations, not an independently reviewed court decision. OnlyselectedFAQpages read. Not whole record/current operating census, legal compliance or independent meter certification.", "date": "", "events": [["2025-01-15", "The original City of Reno Keystone FAQ reports Planning Commission conditional use approval on January 15, 2025 and says no appeal followed that decision. This is a land use approval account, separate from building completion, utility delivery and computing service."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300", "host": "reno.gov", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.69393, "lng": -119.69512, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-originals-model-and-approval-stages-round55-2026-10-15.json", "scope": "Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.", "fields": {}, "notes": ["City names Centra Keystone project and reports CUP approval January15,2025 with no appeal filed at that point, allowing building-permit stage. Not a certificate of occupancy, all permits or current RFS.", "Question22 alleges3MWinitial/6.67MW and12MWadvertisement. City answer refers electrical capacity/service to NVEnergy; it does NOT supply executed power agreement or independently verify12MWIT/current demand. Question assertions are not city findings.", "Question29 refers to26000gallons initial cooling fill; answer describes changed cooling/documentation, not measured daily consumption. City answer onpage11 anticipates about2acre-feet without printing a time period; no gallons/day/year conversion or zero-water claim adopted.", "City describes15ftchillerbarrier,53dBAambient and43dBAequipment target, not measured operating compliance. Its residential-zoning applicability and regulator statements are city interpretations, not an independently reviewed court decision. OnlyselectedFAQpages read.", "Not whole record/current operating census, legal compliance or independent meter certification."], "sources": [{"url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300", "host": "reno.gov", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 67", "scope": "The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation.", "fields": {"current_stage_evidence": {"outcome": "city_documented_keystone_construction", "scope": "The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation."}, "source_read_scope": {"complete_original_fifteen_page_faq_text_read": true, "blank_last_page_retained": true, "july28_is_document_update_not_opening": true, "existing_concern_episode_not_duplicated": true, "city_responses_not_independent_measured_performance": true, "project_conditions_not_countywide_ban": true}}, "notes": ["The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."], "sources": [{"url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300", "host": "www.reno.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nevada · Reno · Washoe · Source context reviewed", "status_scope": "The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation.", "event_evidence": [{"date": "2025-01-15", "text": "The original City of Reno Keystone FAQ reports Planning Commission conditional use approval on January 15, 2025 and says no appeal followed that decision. This is a land use approval account, separate from building completion, utility delivery and computing service.", "kind": "approved", "sources": [{"url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300", "host": "www.reno.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "32031"}, "state_name": "Nevada", "state_path": "/nevada/"}, {"id": "microsoft-silver-springs-lyon-county-nv", "state": "NV", "kind": "facility", "name": "Microsoft Silver Springs Data Center Campus", "group": "building", "status": "Operator-reported site preparation", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Lyon"], "city": "Silver Springs", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. energy-infrastructure decision without exact campus match. Decision concerns NV Energy transmission right-of-way and345kVline, not a named Microsoft data-center approval or345MWload. No site capacity, current operation, campus parcel or investment adopted. June17toJuly17,2026appeal window does not establish appeal outcome. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold", "host": "blm.gov", "date": "2026-06-18", "published": "2026-06-18", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2026-09-28", "date": "2026-09-28", "checked": "2026-10-17", "label": "Reviewed primary source"}, {"url": "https://www.lyon-county.org/AgendaCenter/ViewFile/Minutes/_03052026-1993", "host": "www.lyon-county.org", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed primary source"}, {"url": "https://www.lyon-county.org/AgendaCenter/ViewFile/Minutes/_02102026-1977", "host": "www.lyon-county.org", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed primary source"}], "loc": {"lat": 39.05224, "lng": -119.22368, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "energy-infrastructure decision without exact campus match", "fields": {}, "notes": ["Decision concerns NV Energy transmission right-of-way and345kVline, not a named Microsoft data-center approval or345MWload. No site capacity, current operation, campus parcel or investment adopted. June17toJuly17,2026appeal window does not establish appeal outcome.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold", "host": "blm.gov", "date": "2026-06-18", "published": "2026-06-18", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch1", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_site_preparation", "scope": "Microsoft reports early site preparation, earthmoving and utility relocation in September 2026. County minutes independently identify the Microsoft campus and Nighthawk infrastructure approval, not the present civil-work milestone. This is operator-reported preparation, not energized or completed buildings. The substation address and 345/120 kV voltage are not a campus building address or MW."}}, "notes": ["Microsoft reports early site preparation, earthmoving and utility relocation in September 2026. County minutes independently identify the Microsoft campus and Nighthawk infrastructure approval, not the present civil-work milestone. This is operator-reported preparation, not energized or completed buildings. The substation address and 345/120 kV voltage are not a campus building address or MW."], "sources": [{"url": "https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2026-09-28", "date": "2026-09-28", "checked": "2026-10-17", "label": "Reviewed primary source"}, {"url": "https://www.lyon-county.org/AgendaCenter/ViewFile/Minutes/_03052026-1993", "host": "www.lyon-county.org", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed primary source"}, {"url": "https://www.lyon-county.org/AgendaCenter/ViewFile/Minutes/_02102026-1977", "host": "www.lyon-county.org", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed primary source"}, {"url": "https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold", "host": "www.blm.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed primary source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Company role source check59, October24,2026", "scope": "Microsoft identifies its own Silver Springs data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft describes early site work and names Q&D Construction LLC as general contractor. Dust control, staggered traffic and expected construction stages are source statements, not verified effects, a completion or an opening.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies its own Silver Springs data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft describes early site work and names Q&D Construction LLC as general contractor. Dust control, staggered traffic and expected construction stages are source statements, not verified effects, a completion or an opening."}, "provider_role": "developer"}, "notes": ["Microsoft identifies its own Silver Springs data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft describes early site work and names Q&D Construction LLC as general contractor. Dust control, staggered traffic and expected construction stages are source statements, not verified effects, a completion or an opening."], "sources": [{"url": "https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2026-09-28", "date": "2026-09-28", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Nevada · Silver Springs · Lyon · Source context reviewed", "status_scope": "Microsoft reports early site preparation, earthmoving and utility relocation in September 2026. County minutes independently identify the Microsoft campus and Nighthawk infrastructure approval, not the present civil-work milestone. This is operator-reported preparation, not energized or completed buildings. The substation address and 345/120 kV voltage are not a campus building address or MW.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "32019"}, "state_name": "Nevada", "state_path": "/nevada/"}, {"id": "nebius-vineland-nj", "state": "NJ", "kind": "facility", "name": "Nebius Vineland Data Center", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cumberland"], "city": "Vineland", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nebius Vineland tenant/owner distinction and PILOT claim. Nebiusist enantnotDataOnepropertyowner;do notduplicateasnewbuildingforboth. OperatorPILOTaccountnotactualordinance/signedcontractread;notamountsavedorpaid. One-timefillnotannualuse;poolcomparisonnotconvertedwithoutdefinedpoolvolume. FuelcelltechnologydoesnotmeanzeroGHG. No numericITMWinreviewedpage.2027forecastnotobservedservice. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. The 2027 operational target is a forecast, not achieved energization. A PILOT ordinance and fuel-cell claims are not actual tax payments, present operating load or an independent rate-impact finding. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://nebius.com/vinelandnj", "host": "nebius.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.3865, "lng": -75.1254, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round10-2026-10-14.json", "scope": "Nebius Vineland tenant/owner distinction and PILOT claim", "fields": {"tenant": "Nebius", "facility_owner_operator_as_reported": "DataOne", "construction_contractor": "Northeast Precast", "locality": "Vineland, New Jersey", "operator_described_status": "construction ongoing", "expected_operation_year": 2027, "operator_reported_tax_arrangement": "five-year PILOT ordinance approved January2026", "expected_construction_jobs_approx": 1000, "expected_permanent_onsite_jobs_approx": 200, "power_partner": "Bloom Energy", "cooling_initial_fill_gallons": 1000000, "annual_water_use_description": "approximatelysevenOlympicswimmingpools,mainlytypicalofficeuse"}, "notes": ["Nebiusist enantnotDataOnepropertyowner;do notduplicateasnewbuildingforboth. OperatorPILOTaccountnotactualordinance/signedcontractread;notamountsavedorpaid. One-timefillnotannualuse;poolcomparisonnotconvertedwithoutdefinedpoolvolume. FuelcelltechnologydoesnotmeanzeroGHG. No numericITMWinreviewedpage.2027forecastnotobservedservice.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://nebius.com/vinelandnj", "host": "nebius.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Named-site current agency/operator stage, reviewed October 15, 2026", "fields": {"current_status": "under construction", "status_basis": "Nebius explicitly says construction remains ongoing at the Vineland site."}, "notes": ["The 2027 operational target is a forecast, not achieved energization. A PILOT ordinance and fuel-cell claims are not actual tax payments, present operating load or an independent rate-impact finding. Publication date of this current page is not established; the review date is not an event date."], "sources": [{"url": "https://nebius.com/vinelandnj", "host": "nebius.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "7c27bc2317972cd2aedacd5e11a1da9993c955bdb4a5e652bb44cefd5225004d", "events": [], "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New Jersey · Vineland · Cumberland · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "34011"}, "state_name": "New Jersey", "state_path": "/new-jersey/"}, {"id": "stargate-project-jupiter-dona-ana-nm", "state": "NM", "kind": "facility", "name": "Stargate Project Jupiter", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Dona Ana"], "city": "Santa Teresa", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition. 360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification. Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement. No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.", "date": "", "events": [["2026-04-27", "Oracle original April 27, 2026 release describes ongoing Jupiter construction and announces an updated fuel cell power design. This dates the issuer statement without certifying installed generation, completed construction, measured environmental benefits or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/", "host": "elpasomatters.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/", "host": "oracle.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 32.35265, "lng": -106.83267, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json", "scope": "Original reporter/issuer named-project context, with inference and stages explicit.", "fields": {}, "notes": ["DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition.", "360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified.", "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."], "sources": [{"url": "https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/", "host": "elpasomatters.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json", "scope": "Original reporter/issuer named-project context, with inference and stages explicit.", "fields": {}, "notes": ["Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement.", "No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.", "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."], "sources": [{"url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/", "host": "oracle.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 72", "scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.", "fields": {"current_stage_evidence": {"outcome": "issuer_explicit_jupiter_construction_account", "scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred."}, "source_read_scope": {"complete_original_issuer_release_and_forward_looking_limits_read": true, "explicit_construction_not_inferred_from_power_design": true, "future_environmental_and_rate_assurances_not_measured_findings": true, "no_capacity_or_role_changes": true}}, "notes": ["The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/", "host": "www.oracle.com", "published": "2026-04-27", "date": "2026-04-27", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New Mexico · Santa Teresa · Dona Ana · Source context reviewed", "status_scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.", "event_evidence": [{"date": "2026-04-27", "text": "Oracle original April 27, 2026 release describes ongoing Jupiter construction and announces an updated fuel cell power design. This dates the issuer statement without certifying installed generation, completed construction, measured environmental benefits or computing operation.", "kind": "announced", "sources": [{"url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/", "host": "www.oracle.com", "published": "2026-04-27", "date": "2026-04-27", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "35013"}, "state_name": "New Mexico", "state_path": "/new-mexico/"}, {"id": "empire-ai-gamma-buffalo-ny", "state": "NY", "kind": "facility", "name": "Empire AI Gamma", "group": "building", "status": "Government reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Erie"], "city": "Buffalo", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Beta operating milestone and separate Gamma construction target. Headline Beta fully online must not become Gamma operating. Alpha/Beta/Gamma phases and supercomputer systems are not automatically separate physical facilities.40Mrefers Beta system, not Gamma buildout. Waste-heat reuse future design not measured energy savings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-08-05", "The Governor published its account of continuing Gamma facility construction August 5, 2026, separately reporting Beta online. This records the dated government account, not an exact construction start or completion of the future Gamma facility."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new", "host": "governor.ny.gov", "date": "2026-08-05", "published": "2026-08-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 42.71725, "lng": -78.72853, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Beta operating milestone and separate Gamma construction target", "fields": {"beta_online_announcement_date": "2026-08-05", "gamma_government_reported_status": "construction continues", "gamma_expected_completion": "2027-year-end"}, "notes": ["Headline Beta fully online must not become Gamma operating. Alpha/Beta/Gamma phases and supercomputer systems are not automatically separate physical facilities.40Mrefers Beta system, not Gamma buildout. Waste-heat reuse future design not measured energy savings.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new", "host": "governor.ny.gov", "date": "2026-08-05", "published": "2026-08-05", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 30", "scope": "The Governor August 5, 2026 release explicitly says construction continues on the permanent Gamma facility and expects completion by the end of 2027. Government reported construction applies to that named facility account. Beta being fully online is not Gamma operation, and the expected completion date and future thermal network benefits are not accomplished outcomes. No exact construction start, opening day, technical quantity, role or location field is promoted.", "fields": {"current_stage_evidence": {"outcome": "government_explicit_named_gamma_construction_not_beta_operation", "scope": "The Governor August 5, 2026 release explicitly says construction continues on the permanent Gamma facility and expects completion by the end of 2027. Government reported construction applies to that named facility account. Beta being fully online is not Gamma operation, and the expected completion date and future thermal network benefits are not accomplished outcomes. No exact construction start, opening day, technical quantity, role or location field is promoted."}}, "notes": ["The Governor August 5, 2026 release explicitly says construction continues on the permanent Gamma facility and expects completion by the end of 2027. Government reported construction applies to that named facility account. Beta being fully online is not Gamma operation, and the expected completion date and future thermal network benefits are not accomplished outcomes. No exact construction start, opening day, technical quantity, role or location field is promoted.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new", "host": "www.governor.ny.gov", "published": "2026-08-05", "date": "2026-08-05", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "New York · Buffalo · Erie · Source context reviewed", "status_scope": "The Governor August 5, 2026 release explicitly says construction continues on the permanent Gamma facility and expects completion by the end of 2027. Government reported construction applies to that named facility account. Beta being fully online is not Gamma operation, and the expected completion date and future thermal network benefits are not accomplished outcomes. No exact construction start, opening day, technical quantity, role or location field is promoted.", "event_evidence": [{"date": "2026-08-05", "text": "The Governor published its account of continuing Gamma facility construction August 5, 2026, separately reporting Beta online. This records the dated government account, not an exact construction start or completion of the future Gamma facility.", "kind": "announced", "sources": [{"url": "https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new", "host": "www.governor.ny.gov", "published": "2026-08-05", "date": "2026-08-05", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "36029"}, "state_name": "New York", "state_path": "/new-york/"}, {"id": "microsoft-conover-catawba-county-nc", "state": "NC", "kind": "facility", "name": "Microsoft Conover Data Center", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Catawba"], "city": "Conover", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-06-23", "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Conover opening, an executed incentive amendment or three independent project announcements."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "catawbacountync.gov", "date": "2026-06-23", "published": "2026-06-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "www.conovernc.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://local.microsoft.com/blog/lyle-creek-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-05-15", "date": "2024-05-15", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 35.66222, "lng": -81.21492, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Catawba multi-site joint statement", "fields": {"joint_statement_publication_date": "2026-06-23", "historical_project_announcement_month": "2022-11", "regional_planned_investment_usd_min": 1000000000, "regional_planned_data_centers": 4, "regional_development_period_years": 10, "announced_local_property_tax_commitment": "pay based on full value; local agreements being amended"}, "notes": ["Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "catawbacountync.gov", "date": "2026-06-23", "published": "2026-06-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 13", "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Conover record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.", "fields": {"current_stage_evidence": {"outcome": "joint_county_programme_individual_stage_held", "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Conover record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear."}, "programme_scope": {"joint_statement_on": "2026-06-23", "programme_municipalities": ["Conover", "Hickory", "Maiden"], "individual_site_stage_verified": false, "projected_water_share_not_actual_withdrawal_or_site_allocation": true, "amendments_in_progress_not_executed_agreements": true}}, "notes": ["The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Conover record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "www.catawbacountync.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "www.conovernc.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check60, October24,2026", "scope": "Microsoft identifies Lyle Creek near Highway16 in Catawba County. Its September2026 report concerns the first building and additional phases. Earlier Morgan Corp and later Whiting Turner descriptions are dated contractor context. Blasting descriptions, schedules and additional buildings do not create an observed nuisance outcome, opening or new site count. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies Lyle Creek near Highway16 in Catawba County. Its September2026 report concerns the first building and additional phases. Earlier Morgan Corp and later Whiting Turner descriptions are dated contractor context. Blasting descriptions, schedules and additional buildings do not create an observed nuisance outcome, opening or new site count. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."}, "provider_role": "developer"}, "notes": ["Microsoft identifies Lyle Creek near Highway16 in Catawba County. Its September2026 report concerns the first building and additional phases. Earlier Morgan Corp and later Whiting Turner descriptions are dated contractor context. Blasting descriptions, schedules and additional buildings do not create an observed nuisance outcome, opening or new site count. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."], "sources": [{"url": "https://local.microsoft.com/blog/lyle-creek-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-05-15", "date": "2024-05-15", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}, {"overlay": "Codex 3 research followup 1", "scope": "The original named Lyle Creek update contains a September 2026 section that explicitly reports work on the first building exterior, framing, drywall, underground infrastructure and mechanical and electrical installation. This supports company reported construction at the first building and associated campus work scope. The earlier February forecast and May construction account remain separately dated sections. The original page publication day is not the September update day or a first commissioning day. Contractor changes do not establish a legal operator role, and conditional or historical rock work statements are not measured harm, a public complaint or computing operation.", "fields": {"current_stage_evidence": {"outcome": "named_lyle_creek_september2026_first_building_construction", "scope": "The original named Lyle Creek update contains a September 2026 section that explicitly reports work on the first building exterior, framing, drywall, underground infrastructure and mechanical and electrical installation. This supports company reported construction at the first building and associated campus work scope. The earlier February forecast and May construction account remain separately dated sections. The original page publication day is not the September update day or a first commissioning day. Contractor changes do not establish a legal operator role, and conditional or historical rock work statements are not measured harm, a public complaint or computing operation."}, "source_read_scope": {"original_named_project_and_complete_september_may_february2026_and_may2024_sections_read": true, "source_publication_day_distinct_from_month_only_update": true, "actual_exterior_interior_and_mechanical_work_not_forecast_alone": true, "no_independent_uptime_harm_or_contractor_operator_role_finding": true, "original_exact_capture_and_retrieval_receipt_reused": true, "no_new_network_request": true}}, "notes": ["The original named Lyle Creek update contains a September 2026 section that explicitly reports work on the first building exterior, framing, drywall, underground infrastructure and mechanical and electrical installation. This supports company reported construction at the first building and associated campus work scope. The earlier February forecast and May construction account remain separately dated sections. The original page publication day is not the September update day or a first commissioning day. Contractor changes do not establish a legal operator role, and conditional or historical rock work statements are not measured harm, a public complaint or computing operation.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://local.microsoft.com/blog/lyle-creek-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-05-15", "date": "2024-05-15", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "North Carolina · Conover · Catawba · Source context reviewed", "event_evidence": [{"date": "2026-06-23", "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Conover opening, an executed incentive amendment or three independent project announcements.", "kind": "announced", "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "www.catawbacountync.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "www.conovernc.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}]}], "status_scope": "The original named Lyle Creek update contains a September 2026 section that explicitly reports work on the first building exterior, framing, drywall, underground infrastructure and mechanical and electrical installation. This supports company reported construction at the first building and associated campus work scope. The earlier February forecast and May construction account remain separately dated sections. The original page publication day is not the September update day or a first commissioning day. Contractor changes do not establish a legal operator role, and conditional or historical rock work statements are not measured harm, a public complaint or computing operation.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "37035"}, "state_name": "North Carolina", "state_path": "/north-carolina/"}, {"id": "microsoft-hickory-catawba-county-nc", "state": "NC", "kind": "facility", "name": "Microsoft Hickory Data Center", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Catawba"], "city": "Hickory", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-06-23", "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Hickory opening, an executed incentive amendment or three independent project announcements."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "conovernc.gov", "date": "2026-06-23", "published": "2026-06-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "www.catawbacountync.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://local.microsoft.com/blog/stover-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-09-19", "date": "2024-09-19", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 35.67175, "lng": -81.22532, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Catawba multi-site joint statement", "fields": {"joint_statement_publication_date": "2026-06-23", "historical_project_announcement_month": "2022-11", "regional_planned_investment_usd_min": 1000000000, "regional_planned_data_centers": 4, "regional_development_period_years": 10, "announced_local_property_tax_commitment": "pay based on full value; local agreements being amended"}, "notes": ["Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "conovernc.gov", "date": "2026-06-23", "published": "2026-06-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 13", "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Hickory record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.", "fields": {"current_stage_evidence": {"outcome": "joint_county_programme_individual_stage_held", "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Hickory record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear."}, "programme_scope": {"joint_statement_on": "2026-06-23", "programme_municipalities": ["Conover", "Hickory", "Maiden"], "individual_site_stage_verified": false, "projected_water_share_not_actual_withdrawal_or_site_allocation": true, "amendments_in_progress_not_executed_agreements": true}}, "notes": ["The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Hickory record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "www.catawbacountync.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "www.conovernc.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check60, October24,2026", "scope": "Microsoft identifies the Hickory and Stover project in Catawba County. The May2026 account distinguishes utility and foundation work from a forecast steel milestone. Dated Ames and Clayco contractor accounts remain separate. The postponed church information session and later site meeting are not a facility street or future hearing. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies the Hickory and Stover project in Catawba County. The May2026 account distinguishes utility and foundation work from a forecast steel milestone. Dated Ames and Clayco contractor accounts remain separate. The postponed church information session and later site meeting are not a facility street or future hearing. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."}, "provider_role": "developer"}, "notes": ["Microsoft identifies the Hickory and Stover project in Catawba County. The May2026 account distinguishes utility and foundation work from a forecast steel milestone. Dated Ames and Clayco contractor accounts remain separate. The postponed church information session and later site meeting are not a facility street or future hearing. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."], "sources": [{"url": "https://local.microsoft.com/blog/stover-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-09-19", "date": "2024-09-19", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}, {"overlay": "Codex 3 research followup 1", "scope": "The original named Hickory and Stover update contains a May 2026 section explicitly reporting underground utility installation and foundation work in progress. This supports company reported construction scoped to foundations and associated infrastructure. End of June steel work remains a forecast rather than verified installation. The February section explicitly distinguished early earthwork from vertical building. The earlier postponed community session and separately rescheduled October 21, 2024 session are past schedules rather than verified attendance or a new hearing. Meeting venue text does not move the computing site into another municipality. No exact current completion, operation, legal role or measured rock work impact is inferred.", "fields": {"current_stage_evidence": {"outcome": "named_hickory_may2026_foundations_and_utilities", "scope": "The original named Hickory and Stover update contains a May 2026 section explicitly reporting underground utility installation and foundation work in progress. This supports company reported construction scoped to foundations and associated infrastructure. End of June steel work remains a forecast rather than verified installation. The February section explicitly distinguished early earthwork from vertical building. The earlier postponed community session and separately rescheduled October 21, 2024 session are past schedules rather than verified attendance or a new hearing. Meeting venue text does not move the computing site into another municipality. No exact current completion, operation, legal role or measured rock work impact is inferred."}, "source_read_scope": {"original_named_project_complete_may_and_february2026_and_earlier_construction_session_sections_read": true, "month_only_update_not_invented_exact_day": true, "june_steel_target_not_actual_installation": true, "meeting_venue_not_site_location_change": true, "past_rescheduled_session_not_completed_meeting": true, "original_exact_capture_and_retrieval_receipt_reused": true, "no_new_network_request": true}}, "notes": ["The original named Hickory and Stover update contains a May 2026 section explicitly reporting underground utility installation and foundation work in progress. This supports company reported construction scoped to foundations and associated infrastructure. End of June steel work remains a forecast rather than verified installation. The February section explicitly distinguished early earthwork from vertical building. The earlier postponed community session and separately rescheduled October 21, 2024 session are past schedules rather than verified attendance or a new hearing. Meeting venue text does not move the computing site into another municipality. No exact current completion, operation, legal role or measured rock work impact is inferred.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://local.microsoft.com/blog/stover-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-09-19", "date": "2024-09-19", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "North Carolina · Hickory · Catawba · Source context reviewed", "event_evidence": [{"date": "2026-06-23", "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Hickory opening, an executed incentive amendment or three independent project announcements.", "kind": "announced", "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "www.catawbacountync.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "www.conovernc.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}]}], "status_scope": "The original named Hickory and Stover update contains a May 2026 section explicitly reporting underground utility installation and foundation work in progress. This supports company reported construction scoped to foundations and associated infrastructure. End of June steel work remains a forecast rather than verified installation. The February section explicitly distinguished early earthwork from vertical building. The earlier postponed community session and separately rescheduled October 21, 2024 session are past schedules rather than verified attendance or a new hearing. Meeting venue text does not move the computing site into another municipality. No exact current completion, operation, legal role or measured rock work impact is inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "37035"}, "state_name": "North Carolina", "state_path": "/north-carolina/"}, {"id": "microsoft-maiden-catawba-county-nc", "state": "NC", "kind": "facility", "name": "Microsoft Maiden Data Center", "group": "building", "status": "Company reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Catawba"], "city": "Maiden", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Catawba multi-site joint statement. Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-06-23", "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Maiden opening, an executed incentive amendment or three independent project announcements."], ["2024-04-01", "Microsoft reports that Boyd Farm construction began April 1, 2024 with clearing and grading. This is the issuer reported preliminary site construction day, rather than first vertical building, computing commissioning or a completed later forecast."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "catawbacountync.gov", "date": "2026-06-23", "published": "2026-06-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "www.conovernc.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-04-30", "date": "2024-04-30", "checked": "2026-10-24", "label": "Reviewed operator source"}], "loc": {"lat": 35.64236, "lng": -81.21318, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Catawba multi-site joint statement", "fields": {"joint_statement_publication_date": "2026-06-23", "historical_project_announcement_month": "2022-11", "regional_planned_investment_usd_min": 1000000000, "regional_planned_data_centers": 4, "regional_development_period_years": 10, "announced_local_property_tax_commitment": "pay based on full value; local agreements being amended"}, "notes": ["Same joint statement on county and municipal websites, not two independent confirmations.1B/fourcenters/10years regional across Conover,Hickory,Maiden, not each. Amendments in progress not executed removal of every incentive.1percentwater-production claim has regional scope and forecast basis, not measured per-site gallons. No individual site operating milestone.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "catawbacountync.gov", "date": "2026-06-23", "published": "2026-06-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 13", "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Maiden record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.", "fields": {"current_stage_evidence": {"outcome": "joint_county_programme_individual_stage_held", "scope": "The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Maiden record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear."}, "programme_scope": {"joint_statement_on": "2026-06-23", "programme_municipalities": ["Conover", "Hickory", "Maiden"], "individual_site_stage_verified": false, "projected_water_share_not_actual_withdrawal_or_site_allocation": true, "amendments_in_progress_not_executed_agreements": true}}, "notes": ["The June 23 joint local government statement discusses the Microsoft programme across Conover, Hickory and Maiden and addresses water, infrastructure and incentive questions. It does not assign an explicit current physical stage to this individual Maiden record. References to existing and under construction data centers in the county also include other companies. Projected county water capacity shares, amended agreement intentions and general economic statements are not measured site demand, executed amendments or proof of this site opening. Physical stage remains unclear.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "www.catawbacountync.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "www.conovernc.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check60, October24,2026", "scope": "Microsoft identifies Boyd Farms off Zeb Haynes Road in Maiden. Its May2026 update names Clark Construction, separate from the earlier Morgan account. Possible controlled blasting remains conditional on approval. Neither an elapsed construction forecast nor a conditional rock removal request is a verified outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies Boyd Farms off Zeb Haynes Road in Maiden. Its May2026 update names Clark Construction, separate from the earlier Morgan account. Possible controlled blasting remains conditional on approval. Neither an elapsed construction forecast nor a conditional rock removal request is a verified outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."}, "provider_role": "developer"}, "notes": ["Microsoft identifies Boyd Farms off Zeb Haynes Road in Maiden. Its May2026 update names Clark Construction, separate from the earlier Morgan account. Possible controlled blasting remains conditional on approval. Neither an elapsed construction forecast nor a conditional rock removal request is a verified outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."], "sources": [{"url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-04-30", "date": "2024-04-30", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}, {"overlay": "Codex 3 research followup 1", "scope": "The original named Boyd Farm update contains a May 2026 section explicitly reporting continuing foundations, utilities and infrastructure construction. This supports company reported construction at that scope. Early June slab and later utility milestones remain prospective rather than completed work. The older timeline explicitly reports an April 1, 2024 construction start involving clearing and grading; that exact reported site preparation start is separate from vertical construction or computing commissioning. Its earlier spring 2025 forecast is not treated as accomplished completion in light of the later construction account. Potential controlled blasting remains subject to approval and notice, without proof that it occurred or caused harm.", "fields": {"current_stage_evidence": {"outcome": "named_boyd_farm_may2026_construction", "scope": "The original named Boyd Farm update contains a May 2026 section explicitly reporting continuing foundations, utilities and infrastructure construction. This supports company reported construction at that scope. Early June slab and later utility milestones remain prospective rather than completed work. The older timeline explicitly reports an April 1, 2024 construction start involving clearing and grading; that exact reported site preparation start is separate from vertical construction or computing commissioning. Its earlier spring 2025 forecast is not treated as accomplished completion in light of the later construction account. Potential controlled blasting remains subject to approval and notice, without proof that it occurred or caused harm."}, "source_read_scope": {"original_named_project_complete_may2026_and_earlier_construction_timeline_and_rock_sections_read": true, "explicit_april1_2024_start_not_announcement_or_computing_commissioning": true, "potential_blasting_not_actual_harm": true, "month_only_update_not_invented_exact_day": true, "original_exact_capture_and_retrieval_receipt_reused": true, "no_new_network_request": true}}, "notes": ["The original named Boyd Farm update contains a May 2026 section explicitly reporting continuing foundations, utilities and infrastructure construction. This supports company reported construction at that scope. Early June slab and later utility milestones remain prospective rather than completed work. The older timeline explicitly reports an April 1, 2024 construction start involving clearing and grading; that exact reported site preparation start is separate from vertical construction or computing commissioning. Its earlier spring 2025 forecast is not treated as accomplished completion in light of the later construction account. Potential controlled blasting remains subject to approval and notice, without proof that it occurred or caused harm.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-04-30", "date": "2024-04-30", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "North Carolina · Maiden · Catawba · Source context reviewed", "event_evidence": [{"date": "2026-06-23", "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Maiden opening, an executed incentive amendment or three independent project announcements.", "kind": "announced", "sources": [{"url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/", "host": "www.catawbacountync.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}, {"url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41", "host": "www.conovernc.gov", "published": "2026-06-23", "date": "2026-06-23", "checked": "2026-10-22", "label": "Reviewed government record"}]}, {"date": "2024-04-01", "text": "Microsoft reports that Boyd Farm construction began April 1, 2024 with clearing and grading. This is the issuer reported preliminary site construction day, rather than first vertical building, computing commissioning or a completed later forecast.", "kind": "construction_start", "sources": [{"url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2024-04-30", "date": "2024-04-30", "checked": "2026-10-24", "label": "Reviewed operator source"}]}], "status_scope": "The original named Boyd Farm update contains a May 2026 section explicitly reporting continuing foundations, utilities and infrastructure construction. This supports company reported construction at that scope. Early June slab and later utility milestones remain prospective rather than completed work. The older timeline explicitly reports an April 1, 2024 construction start involving clearing and grading; that exact reported site preparation start is separate from vertical construction or computing commissioning. Its earlier spring 2025 forecast is not treated as accomplished completion in light of the later construction account. Potential controlled blasting remains subject to approval and notice, without proof that it occurred or caused harm.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "37035"}, "state_name": "North Carolina", "state_path": "/north-carolina/"}, {"id": "applied-digital-polaris-forge-2-harwood-nd", "state": "ND", "kind": "facility", "name": "Applied Digital Polaris Forge 2", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Cass"], "city": "Harwood", "address": "", "who": "Applied Digital", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Minnkota Harwood project load and workforce forecast. 3Bdeveloper investment excludes unspecified additional tenant investment; not money already spent.280MWnot per building or measured. Utility ratepayer assurances not independently audited actual future bills. Company2021founding does not date Harwood opening. No exact parcel, current energization or customer lease read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page 42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.minnkota.com/minnkota-website/our-press/data-center-faqs", "host": "minnkota.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results", "host": "ir.applieddigital.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Applied Digital reviewed source"}], "loc": {"lat": 46.93297, "lng": -97.2482, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Minnkota Harwood project load and workforce forecast", "fields": {"utility": "Minnkota Power Cooperative", "retail_utility": "Cass County Electric Cooperative", "developer_operator": "Applied Digital", "location": "near Harwood, North Dakota", "planned_buildings": 2, "combined_planned_area_sqft_min_exclusive": 1800000, "projected_applied_digital_investment_usd_min_exclusive": 3000000000, "expected_fulltime_personnel_min_exclusive": 200, "expected_peak_construction_workers_approx": 700, "expected_peak_electrical_usage_mw": 280, "power_basis": "expected facility peak usage, not explicit critical IT"}, "notes": ["3Bdeveloper investment excludes unspecified additional tenant investment; not money already spent.280MWnot per building or measured. Utility ratepayer assurances not independently audited actual future bills. Company2021founding does not date Harwood opening. No exact parcel, current energization or customer lease read.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.minnkota.com/minnkota-website/our-press/data-center-faqs", "host": "minnkota.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Issuer reports; readiness is not metered grid demand.", "fields": {"announcement_date": "2026-10-07", "fiscal_quarter_ended": "2026-08-31", "polaris_forge_1_reported_ready_for_service_date": "2026-10-01", "polaris_forge_1_reported_operational_critical_it_mw": 250, "other_named_ai_campuses_reported_stage": "Various construction stages", "jamestown_crypto_facility_mw_as_of_quarter_end": 106, "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180, "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300, "potential_base_electron_generation_mw": 1200}, "notes": ["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results", "host": "ir.applieddigital.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Issuer Form10Q Business Update, printed page 42; named-campus construction statement", "fields": {"current_status": "under construction", "status_basis": "Polaris Forge 2 is explicitly described as under construction.", "status_as_of": "2026-10-07", "report_period_ended": "2026-08-31"}, "notes": ["Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40", "events": [], "whole_record_certified": false}, {"overlay": "overnight-discovery-2026-10-17", "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.", "fields": {"issuer_annual_property_context": {"issuer": "Applied Digital", "reporting_period": "2026-05-31", "source_name": "Polaris Forge 2", "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."}}, "notes": ["No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Applied Digital reviewed source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Company role source check 30, October 23, 2026", "scope": "Applied Digital identifies the same uniquely named Polaris Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.", "fields": {"company_association": {"name": "Applied Digital", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Applied Digital identifies the same uniquely named Polaris Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."}, "provider_role": "developer"}, "notes": ["Applied Digital identifies the same uniquely named Polaris Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "North Dakota · Harwood · Cass · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "38017"}, "state_name": "North Dakota", "state_path": "/north-dakota/"}, {"id": "applied-digital-polaris-forge-3-oliver-nd", "state": "ND", "kind": "facility", "name": "Applied Digital Polaris Forge 3", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Oliver"], "city": "Hanover", "address": "", "who": "Applied Digital", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Application filing and repealed pause are not zoning approval. Summer groundbreaking and 18 to 24 month completion were hopes, not observed milestones. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page 42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/", "host": "kfyrtv.com", "date": "2026-05-04", "published": "2026-05-04", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results", "host": "ir.applieddigital.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Applied Digital reviewed source"}], "loc": {"lat": 47.11529, "lng": -101.34065, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.", "fields": {"reported_context": "KFYR reports Applied Digital filed Oliver County rezoning request after county repealed its moratorium.", "independently_verified_current_operating_status": null}, "notes": ["Application filing and repealed pause are not zoning approval. Summer groundbreaking and 18 to 24 month completion were hopes, not observed milestones.", "Original executed approvals, current operator disclosures and subsequent decisions take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/", "host": "kfyrtv.com", "date": "2026-05-04", "published": "2026-05-04", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round22-2026-10-14.json", "scope": "Issuer reports; readiness is not metered grid demand.", "fields": {"announcement_date": "2026-10-07", "fiscal_quarter_ended": "2026-08-31", "polaris_forge_1_reported_ready_for_service_date": "2026-10-01", "polaris_forge_1_reported_operational_critical_it_mw": 250, "other_named_ai_campuses_reported_stage": "Various construction stages", "jamestown_crypto_facility_mw_as_of_quarter_end": 106, "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180, "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300, "potential_base_electron_generation_mw": 1200}, "notes": ["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results", "host": "ir.applieddigital.com", "date": "2026-10-07", "published": "2026-10-07", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Atlas targeted primary-source follow-up", "scope": "Issuer Form10Q Business Update, printed page 42; named-campus construction statement", "fields": {"current_status": "under construction", "status_basis": "Polaris Forge 3 is explicitly described as under construction.", "status_as_of": "2026-10-07", "report_period_ended": "2026-08-31"}, "notes": ["Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "checked": "2026-10-15", "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40", "events": [], "whole_record_certified": false}, {"overlay": "overnight-discovery-2026-10-17", "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.", "fields": {"issuer_annual_property_context": {"issuer": "Applied Digital", "reporting_period": "2026-05-31", "source_name": "Polaris Forge 3", "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."}}, "notes": ["No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-17", "label": "Applied Digital reviewed source"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Company role source check 30, October 23, 2026", "scope": "Applied Digital identifies the same uniquely named Polaris Forge 3 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.", "fields": {"company_association": {"name": "Applied Digital", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Applied Digital identifies the same uniquely named Polaris Forge 3 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."}, "provider_role": "developer"}, "notes": ["Applied Digital identifies the same uniquely named Polaris Forge 3 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."], "sources": [{"url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm", "host": "ir.applieddigital.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "North Dakota · Hanover · Oliver · Source context reviewed", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "38065"}, "state_name": "North Dakota", "state_path": "/north-dakota/"}, {"id": "aws-project-cosmos-marysville-oh", "state": "OH", "kind": "facility", "name": "AWS Project Cosmos", "group": "building", "status": "City-reported site preparation", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Union"], "city": "Marysville", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Marysville two distinct data-center projects and approval chronology. Two separate city projects; do not label Anadonna as AWS without tenant proof. First reading not final adoption day; city reports CRA approved but actual signed terms not read here. Approximate annual4Mpayroll per project not jobs count or investment. Atleast50fulltimejobs plural FAQ scope ambiguous; not assigned each. No numeric ITMW or observed commissioning. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://marysvilleohio.org/772/Data-Center-FAQs", "host": "marysvilleohio.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.31227, "lng": -83.38558, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "public-institution-review-round11-2026-10-14.json", "scope": "Marysville two distinct data-center projects and approval chronology", "fields": {"agency": "City of Marysville, Ohio", "named_projects": [{"operator": "AWS", "project": "US33 Innovation Park", "address": "14684 Industrial Parkway", "site_acres_approx": 55, "estimated_building_sqft_approx": 500000, "estimated_investment_usd_approx": 1000000000, "agency_reported_site_readiness_start": "early2026", "construction_forecast_through_year": 2027}, {"applicant": "Anadonna LLC", "project": "Marysville South", "site_acres_approx": 600, "estimated_building_sqft_range": [750000, 1000000], "estimated_investment_usd_min_inclusive_approx": 1000000000, "pud_rezoning_month": "2024-08", "cra_donation_agreement_first_reading_date": "2025-11-10"}]}, "notes": ["Two separate city projects; do not label Anadonna as AWS without tenant proof. First reading not final adoption day; city reports CRA approved but actual signed terms not read here. Approximate annual4Mpayroll per project not jobs count or investment. Atleast50fulltimejobs plural FAQ scope ambiguous; not assigned each. No numeric ITMW or observed commissioning.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://marysvilleohio.org/772/Data-Center-FAQs", "host": "marysvilleohio.org", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "county-status-2026-10-19", "scope": "Marysville reports that site readiness work for its AWS US 33 Innovation Park project began in early 2026.", "fields": {"current_stage_evidence": {"outcome": "city_reported_site_preparation", "scope": "Marysville reports that site readiness work for its AWS US 33 Innovation Park project began in early 2026."}}, "notes": ["The city distinguishes this AWS project from the separate Anadonna / Marysville South development. Site preparation does not establish completed halls or operation. Construction through 2027 remains a forecast, and the early 2026 reference gives no exact start day."], "sources": [{"url": "https://marysvilleohio.org/772/Data-Center-FAQs", "host": "marysvilleohio.org", "published": "", "date": "", "checked": "2026-10-19", "label": "Original county or city record for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Marysville · Union · Source context reviewed", "status_scope": "Marysville reports that site readiness work for its AWS US 33 Innovation Park project began in early 2026.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39159"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "aws-galaxy-sidney-oh", "state": "OH", "kind": "facility", "name": "AWS Project Galaxy  -  Sidney, OH", "group": "building", "status": "City-reported site preparation", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Shelby"], "city": "Sidney", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Advocacy/commerciallead-product tracker is not an independently examined cityagreement.180 to 350 millionforegonetax and 2.4 to 4.6 millionperjob are tracker estimates over 30 years, not cashaward/currentcost;50 millionPILOTis 15 yearcumulative, not annualreceivedrevenue. Generic 300 gpmexample is NOTGalaxywaterdemand. Source says utility/tariff undisclosed then guessesAEP 85 percentapplies; do not adopt supplier or tariff.80/100 risk is proprietary editorialscore, not measuredtechnicalrisk. January 2026 construction/2030 target are attributed and currentoperationunknown. NoMW, executedESAoractualincentiveverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://stopohiodatacenters.org/shelby-county", "host": "stopohiodatacenters.org", "date": "2026-04-26", "published": "2026-04-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.sidneyoh.com/526/Sidney-Data-Center-FAQ", "host": "www.sidneyoh.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original county or city record for the qualified stage"}], "loc": {"lat": 40.33151, "lng": -84.20458, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round34-2026-10-14.json", "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.", "fields": {"reported_context": "StopOhioDataCenters’ ShelbyCounty tracker describes ProjectGalaxy atSidney and reports 30 yearreal-propertyabatement/PILOT/constructionterms drawn from other reporting and cityFAQ.", "independently_verified_current_operating_status": null}, "notes": ["Advocacy/commerciallead-product tracker is not an independently examined cityagreement.180 to 350 millionforegonetax and 2.4 to 4.6 millionperjob are tracker estimates over 30 years, not cashaward/currentcost;50 millionPILOTis 15 yearcumulative, not annualreceivedrevenue. Generic 300 gpmexample is NOTGalaxywaterdemand. Source says utility/tariff undisclosed then guessesAEP 85 percentapplies; do not adopt supplier or tariff.80/100 risk is proprietary editorialscore, not measuredtechnicalrisk. January 2026 construction/2030 target are attributed and currentoperationunknown. NoMW, executedESAoractualincentiveverified.", "Later originals and observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://stopohiodatacenters.org/shelby-county", "host": "stopohiodatacenters.org", "date": "2026-04-26", "published": "2026-04-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "county-status-2026-10-19", "scope": "Sidney describes tree felling and test-pit work at its AWS Project Galaxy/Rey development.", "fields": {"current_stage_evidence": {"outcome": "city_reported_site_preparation", "scope": "Sidney describes tree felling and test-pit work at its AWS Project Galaxy/Rey development."}}, "notes": ["The city describes tree-clearing work in the week of March 2, 2026. This supports early site work only, not completed halls or operation. Its October 5 update label is not the first-publication date or a physical-stage day. Reported company plans do not establish measured environmental effects."], "sources": [{"url": "https://www.sidneyoh.com/526/Sidney-Data-Center-FAQ", "host": "www.sidneyoh.com", "published": "", "date": "", "checked": "2026-10-19", "label": "Original county or city record for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Sidney · Shelby · Source context reviewed", "status_scope": "Sidney describes tree felling and test-pit work at its AWS Project Galaxy/Rey development.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39149"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "microsoft-heath-oh", "state": "OH", "kind": "facility", "name": "Microsoft Heath Data Center", "group": "building", "status": "Site development underway", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Licking"], "city": "Heath", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization. Future tree-removal or work-hour text does not establish a new hearing or current road closure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.11236, "lng": -82.53349, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round16-2026-10-14.json", "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.", "fields": {"latest_dated_update": "2026-07", "reported_activity": "Summer site preparation, grading, stormwater controls and fencing; substation work expected to begin.", "general_contractor": "Ames Construction", "vertical_construction_schedule": "Not determined/awaiting detail in March2026 update.", "older_mass_grading_forecast": "February through November2026", "actual_operational_date": null, "reported_access": "Thornwood Drive construction entrance; second off Lees Road planned"}, "notes": ["Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization.", "Future tree-removal or work-hour text does not establish a new hearing or current road closure.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 13", "scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_preliminary_site_development", "scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred."}, "phase_scope": {"reported_activity_period": "July 2026", "preliminary_site_works_distinct_from_vertical_construction": true, "datacenter_operation_verified": false, "month_not_converted_into_exact_start_day": true}}, "notes": ["Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check59, October24,2026", "scope": "Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred."}, "provider_role": "developer"}, "notes": ["Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred."], "sources": [{"url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/", "host": "local.microsoft.com", "published": "2026-03-02", "date": "2026-03-02", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Heath · Licking · Source context reviewed", "status_scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39089"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "microsoft-hebron-oh", "state": "OH", "kind": "facility", "name": "Microsoft Hebron Data Center", "group": "building", "status": "Site development underway", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Licking"], "city": "Hebron", "address": "", "who": "Microsoft", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization. Future tree-removal or work-hour text does not establish a new hearing or current road closure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 40.03946, "lng": -82.45869, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "operator-primary-review-round16-2026-10-14.json", "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.", "fields": {"latest_dated_update": "2026-07", "reported_activity": "Summer site preparation, grading, stormwater controls and fencing; substation work expected to begin.", "general_contractor": "Ames Construction", "vertical_construction_schedule": "Not determined/awaiting detail in March2026 update.", "older_mass_grading_forecast": "February through November2026", "actual_operational_date": null, "reported_access": "Temporary Canyon Road entrance; permanent east entrance by industrial park planned"}, "notes": ["Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization.", "Future tree-removal or work-hour text does not establish a new hearing or current road closure.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/", "host": "local.microsoft.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 13", "scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.", "fields": {"current_stage_evidence": {"outcome": "operator_reported_preliminary_site_development", "scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred."}, "phase_scope": {"reported_activity_period": "July 2026", "preliminary_site_works_distinct_from_vertical_construction": true, "datacenter_operation_verified": false, "month_not_converted_into_exact_start_day": true}}, "notes": ["Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."], "sources": [{"url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/", "host": "local.microsoft.com", "published": "", "date": "", "checked": "2026-10-22", "label": "Reviewed operator source"}], "checked": "2026-10-22", "whole_record_certified": false}, {"overlay": "Company role source check59, October24,2026", "scope": "Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability.", "fields": {"company_association": {"name": "Microsoft", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability."}, "provider_role": "developer"}, "notes": ["Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability."], "sources": [{"url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/", "host": "local.microsoft.com", "published": "2025-11-13", "date": "2025-11-13", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Ohio · Hebron · Licking · Source context reviewed", "status_scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "39089"}, "state_name": "Ohio", "state_path": "/ohio/"}, {"id": "humboldt-gibson-county-bitcoin-mine-tn", "state": "TN", "kind": "facility", "name": "Humboldt Bitcoin Mining Facility (near Gibson County Industrial Park)", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": true, "type": "Crypto/HPC (inventory classification)", "counties": ["Gibson"], "city": "Humboldt", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Agreement to enter a contract is not an executed agreement. Two million gallons is projected ANNUAL evaporative/misting water, not daily use or a closed-loop claim. The release's no-local-incentives assertion does not cover all state/federal programs. Utility gross revenue, net margin and city-tax forecasts are separate from capex and actual receipts. Utility reserve and water-capacity assertions are attributed local claims, not independently measured available resources. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-23", "The City of Humboldt, Humboldt Utilities and Chamber published their joint project release July 23, 2026 and reported the nearby cryptocurrency facility under construction. This dates the official account, not the first physical work day, construction completion or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://humboldtchamber.com/local-officials-release-details-on-humboldt-data-center/", "host": "humboldtchamber.com", "date": "2026-07-23", "published": "2026-07-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 35.99619, "lng": -88.93248, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "A joint Humboldt city, utility and chamber release describes a roughly two-acre, 15 MW cryptocurrency project under construction, with interruptible-service arrangements planned.", "independently_verified_current_operating_status": null}, "notes": ["Agreement to enter a contract is not an executed agreement. Two million gallons is projected ANNUAL evaporative/misting water, not daily use or a closed-loop claim. The release's no-local-incentives assertion does not cover all state/federal programs. Utility gross revenue, net margin and city-tax forecasts are separate from capex and actual receipts. Utility reserve and water-capacity assertions are attributed local claims, not independently measured available resources.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://humboldtchamber.com/local-officials-release-details-on-humboldt-data-center/", "host": "humboldtchamber.com", "date": "2026-07-23", "published": "2026-07-23", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 55", "scope": "The original July 23, 2026 joint City, utility and Chamber release explicitly describes the cryptocurrency facility near the Gibson County Industrial Park as under construction at the time of the release. This supports reported construction within that dated project scope. Its planned mining use, engineering review, future service commitments, community assurances and other facilities do not establish commissioned computing. The release identifies resident questions and provides institutional responses, whose expectations are retained without treating them as independent measured outcomes or complete underlying studies. No exact work start, provider identity, parcel, quantity or utility field is changed.", "fields": {"current_stage_evidence": {"outcome": "official_reported_construction_as_of_july23", "scope": "The original July 23, 2026 joint City, utility and Chamber release explicitly describes the cryptocurrency facility near the Gibson County Industrial Park as under construction at the time of the release. This supports reported construction within that dated project scope. Its planned mining use, engineering review, future service commitments, community assurances and other facilities do not establish commissioned computing. The release identifies resident questions and provides institutional responses, whose expectations are retained without treating them as independent measured outcomes or complete underlying studies. No exact work start, provider identity, parcel, quantity or utility field is changed."}, "source_read_scope": {"joint_issuer_identity_verified_in_main_body": true, "original_release_main_project_and_concern_sections_read": true, "institutional_response_sections_read": ["Electrical service and emergency priority", "Water use expectations", "Infrastructure cost statements", "Noise and location", "Financial expectations", "Future projects"], "underlying_studies_and_executed_contracts_not_read": true, "community_assurances_not_measured_outcomes": true, "no_technical_or_financial_quantity_fields_exported": true}}, "notes": ["The original July 23, 2026 joint City, utility and Chamber release explicitly describes the cryptocurrency facility near the Gibson County Industrial Park as under construction at the time of the release. This supports reported construction within that dated project scope. Its planned mining use, engineering review, future service commitments, community assurances and other facilities do not establish commissioned computing. The release identifies resident questions and provides institutional responses, whose expectations are retained without treating them as independent measured outcomes or complete underlying studies. No exact work start, provider identity, parcel, quantity or utility field is changed.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://humboldtchamber.com/local-officials-release-details-on-humboldt-data-center/", "host": "humboldtchamber.com", "published": "2026-07-23", "date": "2026-07-23", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Tennessee · Humboldt · Gibson · Source context reviewed", "status_scope": "The original July 23, 2026 joint City, utility and Chamber release explicitly describes the cryptocurrency facility near the Gibson County Industrial Park as under construction at the time of the release. This supports reported construction within that dated project scope. Its planned mining use, engineering review, future service commitments, community assurances and other facilities do not establish commissioned computing. The release identifies resident questions and provides institutional responses, whose expectations are retained without treating them as independent measured outcomes or complete underlying studies. No exact work start, provider identity, parcel, quantity or utility field is changed.", "event_evidence": [{"date": "2026-07-23", "text": "The City of Humboldt, Humboldt Utilities and Chamber published their joint project release July 23, 2026 and reported the nearby cryptocurrency facility under construction. This dates the official account, not the first physical work day, construction completion or computing operation.", "kind": "announced", "sources": [{"url": "https://humboldtchamber.com/local-officials-release-details-on-humboldt-data-center/", "host": "humboldtchamber.com", "published": "2026-07-23", "date": "2026-07-23", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "47053"}, "state_name": "Tennessee", "state_path": "/tennessee/"}, {"id": "aligned-project-caprock-hale-county-tx", "state": "TX", "kind": "facility", "name": "Aligned Data Centers Project Caprock", "group": "building", "status": "Developer-reported groundbreaking", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Hale"], "city": "Abernathy", "address": "", "who": "Aligned Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 540MWnot explicitcriticalIT.5Bexpected regionaleconomic impact is not audited spend. Operator ratepayer/water protection statements not approved tariff or measured water findings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/", "host": "aligneddc.com", "date": "2026-04-09", "published": "2026-04-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "loc": {"lat": 34.07045, "lng": -101.82685, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "captured-operator-review-round6-2026-10-14.json", "scope": "named operator source", "fields": {"planned_campus_power_mw": 540, "campus_acres": 313, "planned_area_sqft": 1650000, "planned_facilities": 6, "first_facility_code": "LBB01", "first_service_target": "2027-Q1", "expected_regional_economic_investment_usd": 5000000000}, "notes": ["540MWnot explicitcriticalIT.5Bexpected regionaleconomic impact is not audited spend. Operator ratepayer/water protection statements not approved tariff or measured water findings.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/", "host": "aligneddc.com", "date": "2026-04-09", "published": "2026-04-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "status-continuation-2026-10-19", "scope": "Aligned reports groundbreaking for Project Caprock in Hale County, beginning with an initial data center phase.", "fields": {"current_stage_evidence": {"outcome": "developer_reported_groundbreaking", "scope": "Aligned reports groundbreaking for Project Caprock in Hale County, beginning with an initial data center phase."}}, "notes": ["A groundbreaking report does not establish completed halls or operation. The prospective service quarter remains a forecast; no exact physical-stage date is established by this review."], "sources": [{"url": "https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/", "host": "aligneddc.com", "published": "2026-04-09", "date": "2026-04-09", "checked": "2026-10-19", "label": "Original source for the qualified stage"}], "checked": "2026-10-19", "whole_record_certified": false}, {"overlay": "Company role source check 13, October 23, 2026", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The April 9, 2026 announcement identifies Project Caprock and a planned first data center with a future service target. Neither full campus capacity nor that future target is adopted as delivered.", "fields": {"company_association": {"name": "Aligned Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The April 9, 2026 announcement identifies Project Caprock and a planned first data center with a future service target. Neither full campus capacity nor that future target is adopted as delivered."}, "provider_role": "developer"}, "notes": ["Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The April 9, 2026 announcement identifies Project Caprock and a planned first data center with a future service target. Neither full campus capacity nor that future target is adopted as delivered.", "Source dates remain separate from physical milestones and the retained status field."], "sources": [{"url": "https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/", "host": "aligneddc.com", "published": "2026-04-09", "date": "2026-04-09", "checked": "2026-10-23", "label": "First party exact named code or campus text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Abernathy · Hale · Source context reviewed", "status_scope": "Aligned reports groundbreaking for Project Caprock in Hale County, beginning with an initial data center phase.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48189"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "fluidstack-abernathy-tx", "state": "TX", "kind": "facility", "name": "Fluidstack Abernathy AI Campus", "group": "building", "status": "Filing reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Hale"], "city": "Abernathy", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. TeraWulf separate Abernathy sale and Hancock tenant announcement. 168MWTexas and401MWKentucky are separate projects.450Minvestment not reported sale price or total Abernathy campus capex. Signed transaction agreement does not prove later closing. Issuer reports executed Anthropic lease, but signed lease itself not inspected.19Bforecast lease revenue is neither construction investment nor tax incentive/payment.482MWKentucky utility demand remains separate from401IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-06", "TeraWulf published its Abernathy interest sale agreement announcement on July 6, 2026. The later second quarter filing reports that the Company no longer holds the interest. This records the dated financial announcement, not a physical construction start, data center opening or shutdown."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://investors.terawulf.com/news-events/press-releases/detail/142/", "host": "investors.terawulf.com", "date": "2026-07-06", "published": "2026-07-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000092/0001083301-26-000092.pdf", "host": "investors.terawulf.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack", "host": "investors.terawulf.com", "published": "2026-07-06", "date": "2026-07-06", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/wulf-20260630.htm", "host": "investors.terawulf.com", "published": "2026-08-05", "date": "2026-08-05", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 34.08695, "lng": -101.84485, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "TeraWulf separate Abernathy sale and Hancock tenant announcement", "fields": {"release_date": "2026-07-06", "abernathy_project_critical_it_mw": 168, "abernathy_jv_established_year": 2025, "terawulf_stake_sale_percent": 50.1, "terawulf_investment_being_monetized_usd_approx": 450000000, "abernathy_transaction_stage": "definitive sale agreement, closing not observed in this source", "kentucky_separate_project": {"name": "Justified Data, Hawesville", "announced_lease_tenant": "Anthropic", "announced_executed_lease_years": 20, "critical_it_mw": 401, "initial_service_target": "2027-H2", "full_capacity_target": "early 2028", "forecast_initial_term_contract_revenue_usd_approx": 19000000000}}, "notes": ["168MWTexas and401MWKentucky are separate projects.450Minvestment not reported sale price or total Abernathy campus capex. Signed transaction agreement does not prove later closing. Issuer reports executed Anthropic lease, but signed lease itself not inspected.19Bforecast lease revenue is neither construction investment nor tax incentive/payment.482MWKentucky utility demand remains separate from401IT.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://investors.terawulf.com/news-events/press-releases/detail/142/", "host": "investors.terawulf.com", "date": "2026-07-06", "published": "2026-07-06", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 21", "scope": "TeraWulf first quarter 2026 filing explicitly reports phased construction of the Abernathy campus, with delivery targeted for the second half of 2026. Filing reported construction describes that dated company account, not commissioning or present completion. Its later second quarter filing reports sale of the Company interest after the July 6 agreement; financial divestment is not physical facility operation or shutdown. The later filing does not establish completed campus delivery. Lake Mariner operating capacity and the Anthropic Justified Data lease belong to different campuses. No ownership role, construction start, opening day or quantity is changed.", "fields": {"current_stage_evidence": {"outcome": "dated_abernathy_phased_construction_not_forecast_completion_or_financial_operation", "scope": "TeraWulf first quarter 2026 filing explicitly reports phased construction of the Abernathy campus, with delivery targeted for the second half of 2026. Filing reported construction describes that dated company account, not commissioning or present completion. Its later second quarter filing reports sale of the Company interest after the July 6 agreement; financial divestment is not physical facility operation or shutdown. The later filing does not establish completed campus delivery. Lake Mariner operating capacity and the Anthropic Justified Data lease belong to different campuses. No ownership role, construction start, opening day or quantity is changed."}, "source_scope": {"physical_phase_filing_period": "first quarter 2026", "construction_paragraph_pdf_page_visually_read": 51, "delivery_forecast": "second half of 2026", "lake_mariner_capacity_not_abernathy_capacity": true, "july_financial_transaction_not_physical_milestone": true, "no_provider_role_change": true}}, "notes": ["TeraWulf first quarter 2026 filing explicitly reports phased construction of the Abernathy campus, with delivery targeted for the second half of 2026. Filing reported construction describes that dated company account, not commissioning or present completion. Its later second quarter filing reports sale of the Company interest after the July 6 agreement; financial divestment is not physical facility operation or shutdown. The later filing does not establish completed campus delivery. Lake Mariner operating capacity and the Anthropic Justified Data lease belong to different campuses. No ownership role, construction start, opening day or quantity is changed.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000092/0001083301-26-000092.pdf", "host": "investors.terawulf.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack", "host": "investors.terawulf.com", "published": "2026-07-06", "date": "2026-07-06", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/wulf-20260630.htm", "host": "investors.terawulf.com", "published": "2026-08-05", "date": "2026-08-05", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Abernathy · Hale · Source context reviewed", "status_scope": "TeraWulf first quarter 2026 filing explicitly reports phased construction of the Abernathy campus, with delivery targeted for the second half of 2026. Filing reported construction describes that dated company account, not commissioning or present completion. Its later second quarter filing reports sale of the Company interest after the July 6 agreement; financial divestment is not physical facility operation or shutdown. The later filing does not establish completed campus delivery. Lake Mariner operating capacity and the Anthropic Justified Data lease belong to different campuses. No ownership role, construction start, opening day or quantity is changed.", "event_evidence": [{"date": "2026-07-06", "text": "TeraWulf published its Abernathy interest sale agreement announcement on July 6, 2026. The later second quarter filing reports that the Company no longer holds the interest. This records the dated financial announcement, not a physical construction start, data center opening or shutdown.", "kind": "announced", "sources": [{"url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack", "host": "investors.terawulf.com", "published": "2026-07-06", "date": "2026-07-06", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48189"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "google-meitner-pampa-tx", "state": "TX", "kind": "project", "name": "Google Meitner Energy Center", "group": "building", "status": "Construction announced", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Gray"], "city": "Pampa", "address": "", "who": "Google", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The article implies an already completed Intersect acquisition; the original seller instead dates completion to March 10, 2026. A parent transaction does not prove site tenant identity. Direct and broader jobs differ, and off-grid or cooling assertions are not verified permit terms. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Transaction price is company acquisition consideration, not Pampa construction spending. This does not independently establish end tenant at Meitner. Existing grid-tied assets spun into IPX Power. Do not label all former Intersect generation/storage assets Google-owned;4.4GWsolar and8.8GWhstorage use different units and belong to described IPX portfolio.", "date": "", "events": [["2026-06-04", "Google and Intersect announced construction of the Meitner Energy Center, including a data center and separate co-located generation in Gray and Roberts Counties. Announcement date; exact physical construction-start and energization dates are not established."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/", "host": "newschannel10.com", "date": "2026-01-16", "published": "2026-01-16", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.tpg.com/news-and-insights/tpg-announces-completion-of-4-75-billion-sale-of-intersect-to-google-launches-ipx-power-as-independent-power-producer", "host": "tpg.com", "date": "2026-03-10", "published": "2026-03-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.datacenters.google/locations/texas/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/", "host": "blog.google", "published": "2026-06-04", "date": "2026-06-04", "checked": "2026-10-16", "label": "Google official location source"}], "loc": {"lat": 35.40079, "lng": -100.81274, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "KFDA reports December groundbreaking for Meitner in Pampa and three planned 750,000-square-foot buildings.", "independently_verified_current_operating_status": null}, "notes": ["The article implies an already completed Intersect acquisition; the original seller instead dates completion to March 10, 2026. A parent transaction does not prove site tenant identity. Direct and broader jobs differ, and off-grid or cooling assertions are not verified permit terms.", "Current original approvals, disclosures and later outcomes take precedence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/", "host": "newschannel10.com", "date": "2026-01-16", "published": "2026-01-16", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "regional-development-review-round26-2026-10-14.json", "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.", "fields": {"reported_context": "Original seller announcement dates completion of Google acquisition of Intersect digital power business to March10,2026; agreement announced December22,2025.", "parent_transaction_completion_announcement_date": "2026-03-10", "parent_transaction_agreement_announcement_date": "2025-12-22", "sale_price_usd_excluding_assumed_debt": 4750000000}, "notes": ["Transaction price is company acquisition consideration, not Pampa construction spending. This does not independently establish end tenant at Meitner.", "Existing grid-tied assets spun into IPX Power. Do not label all former Intersect generation/storage assets Google-owned;4.4GWsolar and8.8GWhstorage use different units and belong to described IPX portfolio.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.tpg.com/news-and-insights/tpg-announces-completion-of-4-75-billion-sale-of-intersect-to-google-launches-ipx-power-as-independent-power-producer", "host": "tpg.com", "date": "2026-03-10", "published": "2026-03-10", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-Google-Locations-20261016", "scope": "Named Google location research context; regional campus and individual building identity remain separate.", "fields": {"operator_location_scope": "Pampa, Texas is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.", "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.", "current_development_scope": "The June 4, 2026 operator announcement explicitly announces construction of the Meitner Energy Center with Intersect in Gray and Roberts Counties. Data center and co-located generation remain separate; future coming-online language is not an accomplished energization.", "current_status_basis": "Google and Intersect announced construction of the Meitner Energy Center on June 4, 2026, in Gray and Roberts Counties. This is an operator construction announcement, not verified completion, an energized data center or commissioned generation. Existing inherited Gray County attributes and approximate point remain unchanged; broader source geography is separate."}, "notes": ["A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."], "sources": [{"url": "https://www.datacenters.google/locations/texas/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://www.datacenters.google/locations/", "host": "www.datacenters.google", "published": "", "date": "", "checked": "2026-10-16", "label": "Google official location source"}, {"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/", "host": "blog.google", "published": "2026-06-04", "date": "2026-06-04", "checked": "2026-10-16", "label": "Google official location source"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Pampa · Gray · Source context reviewed", "status_scope": "Google and Intersect announced construction of the Meitner Energy Center on June 4, 2026, in Gray and Roberts Counties. This is an operator construction announcement, not verified completion, an energized data center or commissioned generation. Existing inherited Gray County attributes and approximate point remain unchanged; broader source geography is separate.", "event_evidence": [{"date": "2026-06-04", "text": "Google and Intersect announced construction of the Meitner Energy Center, including a data center and separate co-located generation in Gray and Roberts Counties. Announcement date; exact physical construction-start and energization dates are not established.", "kind": "announced", "sources": [{"url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/", "host": "blog.google", "published": "2026-06-04", "date": "2026-06-04", "checked": "2026-10-16", "label": "Google official location source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48179"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "hut8-beacon-point-robstown-tx", "state": "TX", "kind": "project", "name": "Hut 8 Beacon Point AI Campus", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "AI data center campus", "counties": ["Nueces"], "city": "Robstown", "address": "", "who": "Hut 8", "end_user": "", "mw": null, "power": "", "power_note": "Beacon Point: 704 MW contracted IT across both leases sits within 1,000 MW of secured utility capacity. The two boundaries are not additive. Construction and delivery forecasts are separate from operation and measured consumption.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Initial fill is not daily water use; under 10,000 gallons per day describes local domestic demand. Lease revenue and financing are not capex. June 9 bond closing was a forecast, not an observed closing. Incentive statements conflict between the article body and fact box, so the canonical incentive field stays unknown. No identified tenant or actual commissioning date. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-20", "Hut 8 announced Beacon Point Phase 2, reporting a second 352 MW IT lease and 704 MW contracted IT across the campus. This is not a commissioning event."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county", "host": "kristv.com", "date": "2026-06-08", "published": "2026-06-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results", "host": "www.hut8.com", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-16", "label": "Hut 8 Q2 construction update"}, {"url": "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease", "host": "www.hut8.com", "published": "2026-07-20", "date": "2026-07-20", "checked": "2026-10-16", "label": "Beacon Point Phase 2 announcement"}], "loc": {"lat": 27.72366, "lng": -97.64729, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round27-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "KRIS reports Hut 8 Beacon Point's planned 352 MW critical IT inside a 1,000 MW AEP interconnection plan, with an initial 1.8-million-gallon cooling fill trucked from outside the county.", "independently_verified_current_operating_status": null, "planned_critical_it_mw": 352, "planned_interconnection_mw": 1000, "initial_cooling_fill_gallons": 1800000, "incentives": null}, "notes": ["Initial fill is not daily water use; under 10,000 gallons per day describes local domestic demand. Lease revenue and financing are not capex. June 9 bond closing was a forecast, not an observed closing. Incentive statements conflict between the article body and fact box, so the canonical incentive field stays unknown. No identified tenant or actual commissioning date.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/calallen/beacon-point-ai-massive-data-center-planned-for-nueces-county", "host": "kristv.com", "date": "2026-06-08", "published": "2026-06-08", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-AI-Campus-Depth-20261016", "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.", "fields": {"documented_construction": "Phase 1 and the campus substation were under construction; the July Phase 2 announcement describes site preparation.", "secured_utility_capacity": "1,000 MW of utility capacity under an AEP Texas interconnection agreement; not currently energized IT or measured load.", "contracted_it_capacity": "704 MW of contracted IT capacity across two 352 MW leases. The leases overlap the campus utility envelope and are not another 704 MW of utility service.", "initial_energization_target": "Q1 2027 in the reviewed disclosures, a forecast rather than an accomplished milestone.", "initial_hall_delivery_target": "Q3 2027 in the August 4 update; this is separate from energization and has no exact accomplished day.", "tenant_identity_scope": "The issuer describes the same investment-grade tenant for both leases but does not name it. No hyperscaler identity is inferred."}, "notes": ["The older 352 MW description is the first leased phase; the July 20 announcement adds a second lease and explicitly reports 704 MW contracted IT. It does not mean the full campus is operating.", "The unnamed tenant remains unnamed. Contract values and financing are not capital spending, and local water/incentive claims are not promoted from earlier news context."], "sources": [{"url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results", "host": "www.hut8.com", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-16", "label": "Hut 8 Q2 construction update"}, {"url": "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease", "host": "www.hut8.com", "published": "2026-07-20", "date": "2026-07-20", "checked": "2026-10-16", "label": "Beacon Point Phase 2 announcement"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Robstown · Nueces · Source context reviewed", "status_scope": "Hut 8 reported Beacon Point Phase 1 and substation construction in its August 4, 2026 update. Phase 2/site preparation and leased capacity do not establish completion of the full campus.", "event_evidence": [{"date": "2026-07-20", "text": "Hut 8 announced Beacon Point Phase 2, reporting a second 352 MW IT lease and 704 MW contracted IT across the campus. This is not a commissioning event.", "kind": "announced", "sources": [{"url": "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease", "host": "www.hut8.com", "published": "2026-07-20", "date": "2026-07-20", "checked": "2026-10-16", "label": "Beacon Point Phase 2 announcement"}]}], "typed_power_facts": [{"measure": "it_capacity", "value": 704, "unit": "MW", "basis": "contracted", "as_of": "2026-07-20", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Two announced 352 MW IT leases, Phase 1 plus Phase 2; delivery remains future.", "sources": ["https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease"]}, {"measure": "utility_capacity", "value": 1000, "unit": "MW", "basis": "forecast", "as_of": "2026-07-20", "as_of_basis": "source_dated", "observed_on": "2026-10-16", "scope": "Campus utility capacity secured under an AEP Texas interconnection agreement; not an accomplished energization or metered demand.", "sources": ["https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48355"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "meta-el-paso-tx", "state": "TX", "kind": "project", "name": "Meta El Paso AI Data Center Campus", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "AI data center campus", "counties": ["El Paso"], "city": "El Paso", "address": "", "who": "Meta", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Expansion announcement, not full energization. Completion date absent. Texas renewable projects exceeding 5000 MW are statewide generation, not campus IT. Water restoration and 2030 targets are goals, not measured annual withdrawals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-28", "Meta published an El Paso venture announcement describing construction underway and a forecast 2028 capacity rollout. The date does not establish financial close or construction start."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/", "host": "datacenters.atmeta.com", "date": "2026-03-26", "published": "2026-03-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/", "host": "about.fb.com", "published": "2026-07-28", "date": "2026-07-28", "checked": "2026-10-16", "label": "El Paso construction and venture announcement"}], "loc": {"lat": 31.76867, "lng": -106.23478, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "captured-operator-review-round6-2026-10-14.json", "scope": "named operator source", "fields": {"planned_capacity_mw": 1000, "power_basis": "not explicitly critical IT", "planned_investment_usd_min_exclusive": 10000000000, "operational_jobs_once_completed_min_exclusive": 300, "peak_construction_jobs_min_exclusive": 4000, "groundbreaking_year": 2025}, "notes": ["Expansion announcement, not full energization. Completion date absent. Texas renewable projects exceeding 5000 MW are statewide generation, not campus IT. Water restoration and 2030 targets are goals, not measured annual withdrawals.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/", "host": "datacenters.atmeta.com", "date": "2026-03-26", "published": "2026-03-26", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S4-AI-Campus-Depth-20261016", "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.", "fields": {"documented_construction": "The July 28 issuer announcement explicitly identifies the El Paso campus as under construction.", "future_compute_capacity_label": "Meta labels 1 GW as planned compute capacity, without establishing a utility/IT boundary or measured operation.", "capacity_rollout_target": "The venture expected capacity to begin coming online in 2028; year precision and forecast status are retained.", "announcement_date_scope": "The visible header shows July 28 and July 27, 2026; article:published_time is July 28. The dated event is the published announcement, not construction start or financial close.", "prospective_transaction_scope": "The announced venture expected an 80/20 BlackRock-funds/Meta interest and closing in coming days. Neither actual closing nor current legal title is established by that prospective wording."}, "notes": ["The future compute label does not enter utility, IT or operating power totals. The venture announcement distinguishes transaction plans from observed construction.", "No opening, exact construction start, tenant occupancy, completed financial close or verified parcel is invented."], "sources": [{"url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/", "host": "about.fb.com", "published": "2026-07-28", "date": "2026-07-28", "checked": "2026-10-16", "label": "El Paso construction and venture announcement"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · El Paso · El Paso · Source context reviewed", "status_scope": "Meta explicitly described the El Paso campus as under construction in its July 28, 2026 announcement. Capacity delivery and venture closing were prospective, not completed outcomes.", "event_evidence": [{"date": "2026-07-28", "text": "Meta published an El Paso venture announcement describing construction underway and a forecast 2028 capacity rollout. The date does not establish financial close or construction start.", "kind": "announced", "sources": [{"url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/", "host": "about.fb.com", "published": "2026-07-28", "date": "2026-07-28", "checked": "2026-10-16", "label": "El Paso construction and venture announcement"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48141"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "databank-red-oak-tx", "state": "TX", "kind": "project", "name": "Red Oak Campus", "group": "building", "status": "Construction reported", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Ellis"], "city": "Red Oak", "address": "", "who": "DataBank", "end_user": "", "mw": null, "power": "", "power_note": "Prospective eight-building Red Oak campus full-buildout IT envelope. Overlaps with listed Phase 1/components; not operating, delivered, metered or utility capacity. The 240/300 MW first-phase source difference remains unresolved.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum400MWsubstation,300MWITpotential,240MWfourcards and480MWfullprogram. Wholecampus record must be parent of individualbuildings;8buildings are futureprogram. Operator describes292-acreRedOakcampus with futureeightbuildingprogram; listedfirstfour60MWbuildings are not automatically proof240MWcommissioned. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. reposted news summary, duplicate event. Operator news summary credits the DallasMorningNews and repeats the April21construction financing event. Use the separate original operator release for facts; no second financing or project count. Updated-dateApril22is not a new project event. named source. Loan is financing, not total campus capital spent or an incentive. Combined capacity applies to first three, not each building or all eight. Fully leased is not commissioned or operating. Other company credit/securitization amounts excluded.", "date": "", "events": [["2026-06-15", "DataBank announced a $650 million Red Oak construction-financing upsize to a $2.65 billion campus package, separate from an $800 million corporate revolver. This dated financing announcement is not project expenditure, an opening or an independently verified loan-instrument review."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.databank.com/data-centers/dallas/red-oak-campus/", "host": "databank.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/", "host": "databank.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/", "host": "databank.com", "date": "2026-04-21", "published": "2026-04-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/", "host": "www.databank.com", "published": "2025-11-10", "date": "2025-11-10", "checked": "2026-10-16", "label": "DataBank construction article updated November 10, 2025"}, {"url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/", "host": "www.databank.com", "published": "2026-06-15", "date": "2026-06-15", "checked": "2026-10-16", "label": "DataBank June 15 financing announcement"}, {"url": "https://www.databank.com/resources/news/everybodys-talking-about-data-centers-now-tour-one/", "host": "www.databank.com", "published": "2026-09-22", "date": "2026-09-22", "checked": "2026-10-16", "label": "DataBank September 22 summary of CoStar; not the underlying loan documents"}], "loc": {"lat": 32.36524, "lng": -96.81294, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "field-verification-2026-10-14.json", "scope": "Field or source context only", "fields": {"city": "Red Oak", "campus_acres": 292, "phase1_substation_mw": 400, "phase1_critical_it_potential_mw_max": 300, "full_program_critical_it_potential_mw": 480, "listed_buildings": ["DFW9", "DFW10", "DFW11", "DFW12"], "advertised_each_building_it_mw": 60, "power_basis": "design/marketing potential; commissioning not verified"}, "notes": ["Do not sum400MWsubstation,300MWITpotential,240MWfourcards and480MWfullprogram.", "Wholecampus record must be parent of individualbuildings;8buildings are futureprogram.", "Operator describes292-acreRedOakcampus with futureeightbuildingprogram; listedfirstfour60MWbuildings are not automatically proof240MWcommissioned.", "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.databank.com/data-centers/dallas/red-oak-campus/", "host": "databank.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "databank-equinix-review-round5-2026-10-14.json", "scope": "reposted news summary, duplicate event", "fields": {}, "notes": ["Operator news summary credits the DallasMorningNews and repeats the April21construction financing event. Use the separate original operator release for facts; no second financing or project count. Updated-dateApril22is not a new project event.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/", "host": "databank.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "databank-equinix-review-round5-2026-10-14.json", "scope": "named source", "fields": {"construction_loan_usd": 2000000000, "financed_initial_buildings": ["DFW9", "DFW10", "DFW11"], "planned_campus_buildings": 8, "initial_three_buildings_combined_area_sqft": 600000, "initial_three_buildings_combined_capacity_mw": 180, "power_basis": "release says power; critical IT versus gross not independently defined", "initial_three_buildings_lease_status": "leased as of release"}, "notes": ["Loan is financing, not total campus capital spent or an incentive. Combined capacity applies to first three, not each building or all eight. Fully leased is not commissioned or operating. Other company credit/securitization amounts excluded.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/", "host": "databank.com", "date": "2026-04-21", "published": "2026-04-21", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S2-Texas-Comptroller-20261015", "scope": "DataBank Red Oak campus and three named building program contexts.", "fields": {"current_source_scope": "The operator identifies DFW9, DFW10 and DFW11 on its Red Oak campus. A separate 2026-04-21 financing announcement concerns those three facilities.", "identity_limits": "These are program contexts for buildings within the existing campus record. No opening or full-campus completion is inferred.", "texas_program_entries": [{"registered_name": "DFW 9", "program": "qualifying data center", "registration_anchor": "DC047213-OW1", "program_effective_on": "2025-10-01", "exemption_end_on": null, "listed_owner_names": ["DB Data Center Red Oak, LLC"], "listed_occupant_names": ["Oracle America Cloud Services LLC"], "listed_operator_names": ["Databank Holdings LTD", "Oracle America, Inc."]}, {"registered_name": "DFW 10", "program": "qualifying data center", "registration_anchor": "DC961212-OW1", "program_effective_on": "2025-10-01", "exemption_end_on": null, "listed_owner_names": ["DB Data Center Red Oak, LLC"], "listed_occupant_names": ["Oracle America Cloud Services LLC"], "listed_operator_names": ["Databank Holdings LTD", "Oracle America, Inc."]}, {"registered_name": "DFW 11", "program": "qualifying data center", "registration_anchor": "DC018720-OW1", "program_effective_on": "2025-10-01", "exemption_end_on": null, "listed_owner_names": ["DB Data Center Red Oak, LLC"], "listed_occupant_names": ["Oracle America Cloud Services LLC"], "listed_operator_names": ["Databank Holdings LTD", "Oracle America, Inc."]}], "provider_brand": "DataBank"}, "notes": ["The DFW12 row has an internal registration-spacing issue and remains held; it is not silently normalized into a canonical registration.", "Different campus headlines describe design, future phases and individual facilities. Financing, leasing and published addresses alone do not establish current operation. Status stays unclear.", "Program effective and exemption-end dates are not physical opening, energization or closure dates. Listed program participants do not independently verify parcel title, legal corporate relationships or current tenant occupancy.", "No new map coordinates, precise pins, metered use or legacy MW totals are adopted."], "sources": [{"url": "https://www.databank.com/data-centers/dallas/red-oak-campus/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/", "host": "www.databank.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-15", "label": "Reviewed operator source"}], "checked": "2026-10-15", "whole_record_certified": false}, {"overlay": "S2-Texas-Comptroller-20261015", "scope": "Provider-role display refinement: the source establishes a developer brand, not current operating service.", "fields": {"provider_role": "developer"}, "notes": ["The main provider fact is labeled Developer. The source does not resolve the campus operating stage; status remains unclear."], "sources": [{"url": "https://www.databank.com/data-centers/dallas/red-oak-campus/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/", "host": "www.databank.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-15", "label": "Reviewed operator source"}], "checked": "2026-10-15", "whole_record_certified": false}, {"overlay": "Primary-Campus-Holds-20261016", "scope": "Targeted primary campus/project stage and identity-scope review. No physical-site census, point/precision upgrade, actual delivery, metered use or legal title finding.", "fields": {"published_component_contexts": [{"code": "DFW9", "address": "3080 Batchler Rd. - Red Oak, TX 75154", "planned_it_capacity_mw": 60}, {"code": "DFW10", "address": "3330 Batchler Rd. - Red Oak, TX 75154", "planned_it_capacity_mw": 60}, {"code": "DFW11", "address": "3320 Batchler Rd. - Red Oak, TX 75154", "planned_it_capacity_mw": 60}, {"code": "DFW12", "address": "3440 Batchler Rd. - Red Oak, TX 75154", "planned_it_capacity_mw": 60}], "phase_one_it_envelope_mw": 240, "capacity_source_difference": "Current campus headline and November 10, 2025 construction article use 240 MW for Phase 1, while the current campus narrative says up to 300 MW. The difference remains unresolved. Neither becomes a delivered amount or an additional typed sum.", "full_buildout_scope": "480 MW is the prospective eight-building full-buildout critical IT envelope. Four advertised 60 MW code components and the 240/300 MW first-phase alternatives overlap with it; they are not extra capacity. The separate 400 MW substation is a different measure.", "construction_and_target_scope": "The operator article updated November 10, 2025 says construction was underway and targets initial Ready for Service in Q2 2026. That target has passed without an accomplished opening/energization source in this review. Later financing and directory listings do not by themselves establish delivery or current service.", "financing_history_scope": "The June 15, 2026 release announces a $650 million campus construction-financing upsize, bringing that campus package to $2.65 billion, separately from an $800 million corporate revolver. The September 22 operator summary of CoStar reports more than $3.45 billion of campus construction financing without the underlying instruments here. These dated claims are not a verified current debt balance, project investment, tax incentive, expenditure or additive total.", "current_status_basis": "Construction is explicitly reported by the operator in its November 10, 2025 update; June 15, 2026 financing supports construction of a fourth building. This is a construction-phase campus context, not evidence all eight buildings are complete or that the expired Q2 2026 service target occurred. Current delivery and energized capacity remain unverified."}, "notes": ["Field-specific review only. Original name, approximate location and wrapper, city/county context, opening field, legacy MW, financial and ownership limits remain.", "Campus/component and regulatory proposal units are not interchangeable with separate physical sites or complete operational capacity."], "sources": [{"url": "https://www.databank.com/data-centers/dallas/red-oak-campus/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-16", "label": "DataBank primary project record"}, {"url": "https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/", "host": "www.databank.com", "published": "2025-11-10", "date": "2025-11-10", "checked": "2026-10-16", "label": "DataBank construction article updated November 10, 2025"}, {"url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/", "host": "www.databank.com", "published": "2026-06-15", "date": "2026-06-15", "checked": "2026-10-16", "label": "DataBank June 15 financing announcement"}, {"url": "https://www.databank.com/resources/news/everybodys-talking-about-data-centers-now-tour-one/", "host": "www.databank.com", "published": "2026-09-22", "date": "2026-09-22", "checked": "2026-10-16", "label": "DataBank September 22 summary of CoStar; not the underlying loan documents"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "overnight-discovery-2026-10-17", "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.", "fields": {"texas_current_program_contexts": {"checked": "2026-10-17", "reference_rows": [{"association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.", "registered_name": "DFW 9", "program": "Qualifying data center", "registration_number": "DC047213-OW1"}, {"association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.", "registered_name": "DFW 10", "program": "Qualifying data center", "registration_number": "DC961212-OW1"}, {"association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.", "registered_name": "DFW 11", "program": "Qualifying data center", "registration_number": "DC018720-OW1"}], "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."}}, "notes": ["No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."], "sources": [{"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Current qualifying data-center and large-project registered lists"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Company role source check 34, October 23, 2026", "scope": "DataBank identifies the same named Red Oak Campus in its own source. DataBank reports construction financing and plans for named Red Oak buildings. Developer per source records its development relationship only. Loans, leases, renderings and forecast capacity do not prove spent investment, commissioning, a tenant identity, current computing or completed buildings. This review records the DataBank brand relationship, without establishing legal title, sole control or a distinct legal entity. Existing status, location, address, county, quantities, dates and component identity remain exact. Undated source publication dates remain unknown.", "fields": {"company_association": {"name": "DataBank", "role": "developer", "identity_scope": "provider_brand_only", "scope": "DataBank identifies the same named Red Oak Campus in its own source. DataBank reports construction financing and plans for named Red Oak buildings. Developer per source records its development relationship only. Loans, leases, renderings and forecast capacity do not prove spent investment, commissioning, a tenant identity, current computing or completed buildings. This review records the DataBank brand relationship, without establishing legal title, sole control or a distinct legal entity. Existing status, location, address, county, quantities, dates and component identity remain exact. Undated source publication dates remain unknown."}, "provider_role": "developer"}, "notes": ["DataBank identifies the same named Red Oak Campus in its own source. DataBank reports construction financing and plans for named Red Oak buildings. Developer per source records its development relationship only. Loans, leases, renderings and forecast capacity do not prove spent investment, commissioning, a tenant identity, current computing or completed buildings. This review records the DataBank brand relationship, without establishing legal title, sole control or a distinct legal entity. Existing status, location, address, county, quantities, dates and component identity remain exact. Undated source publication dates remain unknown."], "sources": [{"url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/", "host": "www.databank.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/", "host": "www.databank.com", "published": "2026-06-15", "date": "2026-06-15", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.databank.com/data-centers/dallas/red-oak-campus/", "host": "www.databank.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Red Oak · Ellis · Source context reviewed", "search_extra": "DataBank Red Oak DFW9 DFW10 DFW11 DFW12 Batchler Road", "status_scope": "Construction is explicitly reported by the operator in its November 10, 2025 update; June 15, 2026 financing supports construction of a fourth building. This is a construction-phase campus context, not evidence all eight buildings are complete or that the expired Q2 2026 service target occurred. Current delivery and energized capacity remain unverified.", "event_evidence": [{"date": "2026-06-15", "text": "DataBank announced a $650 million Red Oak construction-financing upsize to a $2.65 billion campus package, separate from an $800 million corporate revolver. This dated financing announcement is not project expenditure, an opening or an independently verified loan-instrument review.", "kind": "announced", "sources": [{"url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/", "host": "www.databank.com", "published": "2026-06-15", "date": "2026-06-15", "checked": "2026-10-16", "label": "DataBank June 15 financing announcement"}]}], "typed_power_facts": [{"measure": "it_capacity", "value": 480, "unit": "MW", "as_of": null, "as_of_basis": "not_published", "observed_on": "2026-10-16", "basis": "forecast", "scope": "Prospective eight-building Red Oak campus full-buildout IT envelope. Overlaps with listed Phase 1/components; not operating, delivered, metered or utility capacity. The 240/300 MW first-phase source difference remains unresolved.", "sources": ["https://www.databank.com/data-centers/dallas/red-oak-campus/", "https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48139"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "vantage-frontier-shackelford-county-tx", "state": "TX", "kind": "facility", "name": "Vantage Frontier Campus", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Shackelford"], "city": "", "address": "", "who": "Vantage Data Centers", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/", "host": "vantage-dc.com", "date": "2025-08-19", "published": "2025-08-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 32.73597, "lng": -99.35405, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"planned_investment_usd_min_exclusive": 25000000000, "planned_gpu_compute_capacity_gw": 1.4, "campus_acres": 1200, "planned_buildings": 10, "planned_area_sqft": 3700000, "construction_stage_at_release": "begun", "first_building_delivery_target": "2026-H2", "forecast_jobs_construction_and_operations_min_exclusive": 5000}, "notes": ["Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/", "host": "vantage-dc.com", "date": "2025-08-19", "published": "2025-08-19", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Under construction", "basis": "Vantage’s August 19, 2025 announcement explicitly says construction had begun on the named Frontier campus. The current Shackelford County page continues to describe the first building’s delivery as scheduled for the second half of 2026.", "checked_on": "2026-10-16"}, "stage_review_limits": "The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity."}, "notes": ["The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/", "host": "vantage-dc.com", "published": "2025-08-19", "date": "2025-08-19", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}, {"url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 15, October 23, 2026", "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning.", "fields": {"company_association": {"name": "Vantage Data Centers", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning."}, "provider_role": "developer"}, "notes": ["Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning.", "Publication dates and stated targets remain separate from actual physical milestones."], "sources": [{"url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/", "host": "vantage-dc.com", "published": "2025-08-19", "date": "2025-08-19", "checked": "2026-10-23", "label": "First party exact campus or code text, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Shackelford · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. Vantage’s August 19, 2025 announcement explicitly says construction had begun on the named Frontier campus. The current Shackelford County page continues to describe the first building’s delivery as scheduled for the second half of 2026. The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "48417"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "cipher-barber-lake-colorado-city-tx", "state": "TX", "kind": "project", "name": "Cipher Digital Barber Lake", "group": "building", "status": "Under construction", "crypto": false, "type": "HPC data-center development", "counties": ["Mitchell"], "city": "Colorado City", "address": "951 County Road 204, Colorado City, TX 79512", "who": "Cipher Digital", "mw": null, "power": "", "power_note": "Barber Lake:300 MW gross contracted HPC scope from the June 8 issuer exhibit. It is not IT load, current delivered service, a power-meter reading or a completed-campus total. Later delivery milestones remain phased.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "Company reports on-site water supply and no draw from the city system; total consumption is not established.", "incentives": "", "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.", "date": "", "events": [["2026-09-25", "Cipher announced an amended Barber Lake lease and phased future hall delivery/rent milestones from Q4 2026 through Q1 2027; no actual opening date is established by this announcement."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-expands-barber-lake-lease-term-20-years", "host": "investors.cipherdigital.com", "published": "2026-09-25", "date": "2026-09-25", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-fluidstack-and-anthropic-commit-10-million-repair", "host": "investors.cipherdigital.com", "published": "2026-09-14", "date": "2026-09-14", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534", "host": "www.tdlr.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government project record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm", "host": "www.sec.gov", "published": "2026-06-08", "date": "2026-06-08", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}, {"url": "https://data.texas.gov/resource/5eqq-7nad.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000", "host": "data.texas.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Texas Commission on Environmental Quality source context"}], "loc": {"lat": 32.30622, "lng": -100.92121, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": false, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Colorado City · Mitchell County · no site point", "reviewed_evidence": [{"overlay": "S2-Texas-Comptroller-20261015", "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.", "fields": {"provider_brand": "Cipher Digital", "provider_role": "developer", "texas_program_scope": "Exact program rows and participant roles retained. Effective/exemption dates are not opening, closure, actual tenancy, legal title or realized savings.", "current_stage": "Construction/commissioning and tenant compute deployment continue; September 25 amendment shifts phased hall delivery across Q4 2026 to Q1 2027. October 13 update still describes approaching initial rent. Energization or beneficial access is not proof of completed HPC service.", "project_address": "951 County Road 204, Colorado City, TX 79512 is the TDLR project-location address in Mitchell County. No contact/mailing address or map point is adopted.", "accessibility_registration": "TABS2026023534 is an Architectural Barriers registration, Review Complete, with source start 2025-10-13/completion 2026-12-08 and 800000 sqft scope. These are registered project fields, not verified physical milestones or an issued building permit. Estimated$50 million is not actual spend or public tax cost.", "water_supply_statement": "Cipher's September 14 statement says Barber Lake uses an on-site supply and does not draw from Colorado City's system. This is a company statement about supply scope, not measured zero total consumption, a water-rights finding or independent proof of no local impact.", "lease_and_program_roles": "Fluidstack lease and the program-listed Anthropic occupant are separate source roles. Backstop/lease duration and announced future contracted revenue do not establish current tenancy, completion, capex or tax savings."}, "notes": ["This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."], "sources": [{"url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-expands-barber-lake-lease-term-20-years", "host": "investors.cipherdigital.com", "published": "2026-09-25", "date": "2026-09-25", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-fluidstack-and-anthropic-commit-10-million-repair", "host": "investors.cipherdigital.com", "published": "2026-09-14", "date": "2026-09-14", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534", "host": "www.tdlr.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government project record"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm", "host": "www.sec.gov", "published": "2026-06-08", "date": "2026-06-08", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed government record"}], "checked": "2026-10-15", "whole_record_certified": false}, {"overlay": "overnight-discovery-2026-10-17", "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.", "fields": {"texas_current_program_contexts": {"checked": "2026-10-17", "reference_rows": [{"association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.", "registered_name": "Cipher Barber Lake LLC Data Center", "program": "Qualifying large data center project", "registration_number": "LD910271-OW2"}], "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."}}, "notes": ["No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."], "sources": [{"url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php", "host": "comptroller.texas.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Current qualifying data-center and large-project registered lists"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "texas-registry-2026-10-17", "scope": "Official Texas registry source context, with initial eligibility and component triage. Not a physical-site census or current-stage review.", "fields": {"texas_registry_air_context": {"regulated_entity": "RN112273891", "registry_name": ["BARBER LAKE DATA CENTER PROJECT"], "program_contexts": [{"program": "AIRNSR", "identifiers": ["182754"]}], "association_scope": "Barber Lake project, Cipher Barber Lake customer and 951 CR204 agree with the existing cited Barber Lake street context. Contractor affiliates and alternate CR/Co Rd spelling are not extra sites.", "limits": "Registry authorizations, emissions reporting and historical customer affiliations can overlap. ACTIVE is a registry value, not proof of signed permit issuance, current operation, title or complete campus buildout. No generator MW, coordinates, street address or physical stage is promoted."}}, "notes": ["AIRNSR and AIROP entries are registry contexts, not substitutes for signed permits. AIREI is emissions reporting, not a permit. Customer and status dates are not opening, completion or current ownership dates.", "The extract is a selected portion of Central Registry and the name/industry query is incomplete for all generator permits. Nonmatches are not evidence of absence."], "sources": [{"url": "https://data.texas.gov/resource/5eqq-7nad.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000", "host": "data.texas.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Texas Commission on Environmental Quality source context"}], "checked": "2026-10-17", "whole_record_certified": false}], "raw_status": "under construction", "status_field": "current_status", "status_scope": "HPC construction and phased tenant deployment; September 30 source state disclosed October 13. Future hall/rent milestones are not accomplished opening dates.", "event_evidence": [{"date": "2026-09-25", "text": "Cipher announced an amended Barber Lake lease and phased future hall delivery/rent milestones from Q4 2026 through Q1 2027; no actual opening date is established by this announcement.", "kind": "announced", "sources": [{"url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-expands-barber-lake-lease-term-20-years", "host": "investors.cipherdigital.com", "published": "2026-09-25", "date": "2026-09-25", "checked": "2026-10-15", "label": "Reviewed company source"}]}], "building_contexts": [{"id": "building:cipher-barber-lake-registration-context", "name": "Barber Lake accessibility-project building context", "phase": null, "identity_scope": "Named TDLR project context only; distinct physical building/campus identity remains unresolved.", "address": "951 County Road 204, Colorado City, TX 79512", "status": "unknown", "status_scope": "Accessibility workflow does not establish physical building operating status.", "field_sources": {"name": ["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"], "phase": ["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"], "identity_scope": ["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"], "address": ["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"], "status": ["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"], "status_scope": ["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023534"]}, "conflicts": {}}], "typed_power_facts": [{"measure": "contracted_gross_capacity", "value": 300, "unit": "MW", "as_of": "2026-06-08", "as_of_basis": "source_dated", "observed_on": "2026-10-15", "basis": "contracted", "scope": "Barber Lake:300 MW gross contracted HPC scope from the June 8 issuer exhibit. It is not IT load, current delivered service, a power-meter reading or a completed-campus total. Later delivery milestones remain phased.", "sources": ["https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm"]}], "typed_water_facts": [{"measure": "supply_source", "value": "Operator reports on-site supply and no draw from the Colorado City municipal system.", "unit": null, "as_of": "2026-09-14", "as_of_basis": "source_dated", "observed_on": "2026-10-15", "basis": "operator_reported_statement", "scope": "Qualitative issuer statement about supply source only. Total withdrawal/consumption, water rights, permitted volume and independent local-impact review remain unestablished. No zero-usage volume is inferred.", "sources": ["https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-fluidstack-and-anthropic-commit-10-million-repair"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "no_site_point", "county_display": "48335"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "cipher-stingray-andrews-county-tx", "state": "TX", "kind": "project", "name": "Cipher Digital Stingray", "group": "building", "status": "Under construction", "crypto": false, "type": "HPC data-center development", "counties": ["Andrews"], "city": "Andrews", "address": "", "who": "Cipher Digital", "mw": null, "power": "", "power_note": "Stingray:70 MW critical IT capacity under contract for future phased HPC delivery, separately stated from 100 gross MW. This is not delivered or metered IT load. April/May 2027 rent milestones are targets; construction remains the supported stage.", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update", "host": "investors.cipherdigital.com", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm", "host": "www.sec.gov", "published": "2026-06-08", "date": "2026-06-08", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/exh992revduploadtoworkiv.htm", "host": "www.sec.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Reviewed company source"}], "loc": {"lat": 32.27409, "lng": -102.63496, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": false, "precision_label": "Exact site not published; shown at county level", "summary": "Texas · Andrews · Andrews County · no site point", "reviewed_evidence": [{"overlay": "S2-Texas-Comptroller-20261015", "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.", "fields": {"provider_brand": "Cipher Digital", "provider_role": "developer", "current_stage": "HPC construction: earthwork, underground electrical work, foundations and steel erection disclosed as of September 30. Past energization forecasts and a signed lease do not establish current HPC operation.", "county_context": "Older issuer exhibit explicitly places the acquired Stingray site in Andrews County, Texas; June 2026 exhibit locates the HPC development in Andrews. No point/parcel or contact address is adopted.", "contracted_capacity_and_dates": "June 8 exhibit separates 100 gross MW from 70 IT MW under contract. April 1/May 1,2027 network/data-hall rent dates are targets, not accomplished operation."}, "notes": ["This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."], "sources": [{"url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update", "host": "investors.cipherdigital.com", "published": "2026-08-04", "date": "2026-08-04", "checked": "2026-10-15", "label": "Reviewed company source"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm", "host": "www.sec.gov", "published": "2026-06-08", "date": "2026-06-08", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/exh992revduploadtoworkiv.htm", "host": "www.sec.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Issuer filing or furnished exhibit"}, {"url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm", "host": "www.sec.gov", "published": "2026-10-13", "date": "2026-10-13", "checked": "2026-10-15", "label": "Reviewed company source"}], "checked": "2026-10-15", "whole_record_certified": false}], "raw_status": "under construction", "status_field": "current_status", "status_scope": "HPC construction, based on September 30 source state furnished October 13. Contracted future capacity and rent targets do not establish operating service.", "typed_power_facts": [{"measure": "it_capacity", "value": 70, "unit": "MW", "as_of": "2026-06-08", "as_of_basis": "source_dated", "observed_on": "2026-10-15", "basis": "contracted", "scope": "Stingray:70 MW critical IT capacity under contract for future phased HPC delivery, separately stated from 100 gross MW. This is not delivered or metered IT load. April/May 2027 rent milestones are targets; construction remains the supported stage.", "sources": ["https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm"]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "no_site_point", "county_display": "48003"}, "state_name": "Texas", "state_path": "/texas/"}, {"id": "creekstone-delta-ut", "state": "UT", "kind": "facility", "name": "Creekstone Energy Delta Gigasite", "group": "building", "status": "Site infrastructure underway", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Millard"], "city": "Delta", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 10GW ultimate company aim with integrated generation, not verified IT load or current capacity. 50percent post-performance reduction is not upfront grant or172Mpaid. Exact executed agreement and actual tax performance not reviewed. No evaporative cooling claim does not mean zero domestic water or zero emissions. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/", "host": "business.utah.gov", "date": "2026-04-09", "published": "2026-04-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.creekstone.energy/", "host": "www.creekstone.energy", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "loc": {"lat": 39.10653, "lng": -113.13674, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "named government source", "fields": {"government_tax_incentive_announcement": "2026-04-09", "planned_investment_usd": 17082408000, "investment_timeline_years": 20, "expected_new_jobs": 106, "tax_program": "post-performance REDTIF", "announced_credit_rate_percent": 50, "projected_new_state_tax_revenue_usd": 344381185, "operator_full_build_capacity_goal_gw": 10, "construction_start_qualified_period": "late2025"}, "notes": ["10GW ultimate company aim with integrated generation, not verified IT load or current capacity. 50percent post-performance reduction is not upfront grant or172Mpaid. Exact executed agreement and actual tax performance not reviewed. No evaporative cooling claim does not mean zero domestic water or zero emissions.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/", "host": "business.utah.gov", "date": "2026-04-09", "published": "2026-04-09", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Site infrastructure underway", "basis": "The current Delta project description reports construction underway and specifically identifies the gas interconnect as under construction. Utah’s April 9, 2026 release also reports campus construction began in late 2025.", "checked_on": "2026-10-16"}, "stage_review_limits": "This is work on an integrated power and digital-infrastructure development. It does not establish completed data halls, operating IT capacity or the first day of construction."}, "notes": ["This is work on an integrated power and digital-infrastructure development. It does not establish completed data halls, operating IT capacity or the first day of construction.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://www.creekstone.energy/", "host": "www.creekstone.energy", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}, {"url": "https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/", "host": "business.utah.gov", "published": "2026-04-09", "date": "2026-04-09", "checked": "2026-10-16", "label": "Reviewed government evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Utah · Delta · Millard · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. The current Delta project description reports construction underway and specifically identifies the gas interconnect as under construction. Utah’s April 9, 2026 release also reports campus construction began in late 2025. This is work on an integrated power and digital-infrastructure development. It does not establish completed data halls, operating IT capacity or the first day of construction.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "49027"}, "state_name": "Utah", "state_path": "/utah/"}, {"id": "cleanarc-ruther-glen-va", "state": "VA", "kind": "project", "name": "CleanArc VA1", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Caroline"], "city": "Ruther Glen", "address": "", "who": "CleanArc", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer-issued release. Grid capacity is explicitly the source basis. Future power phases, tax revenue and jobs are forecasts. Groundbreaking does not establish delivered capacity or current operating occupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2025-11-20", "CleanArc reported the start of construction at its VA1 campus in Caroline County. Announced capacity and delivery dates remain separate forecasts."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.prnewswire.com/news-releases/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-302621903.html", "host": "prnewswire.com", "date": "2025-11-20", "published": "2025-11-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.cleanarcdatacenters.com/press-release/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-2-2/2/", "host": "www.cleanarcdatacenters.com", "published": "2025-11-20", "date": "2025-11-20", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Virginia DEQ air-site registry"}, {"url": "https://www.cleanarcdatacenters.com/va1/", "host": "www.cleanarcdatacenters.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}], "loc": {"lat": 38.05941, "lng": -77.32264, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-events-round3-2026-10-14.json", "scope": "Field or source context only", "fields": {"county": "Caroline", "construction_event": "groundbreaking", "event_date": "2025-11-20", "advertised_grid_capacity_mw": 900, "grid_capacity_phases": [{"mw": 300, "target": "2027-Q1"}, {"mw": 300, "target": "2030"}, {"mw": 300, "target": "2033-2035"}], "forecast_annual_county_tax_revenue_usd": 13000000, "forecast_permanent_jobs_minimum": 50}, "notes": ["Developer-issued release. Grid capacity is explicitly the source basis. Future power phases, tax revenue and jobs are forecasts. Groundbreaking does not establish delivered capacity or current operating occupancy.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.prnewswire.com/news-releases/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-302621903.html", "host": "prnewswire.com", "date": "2025-11-20", "published": "2025-11-20", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "S2-Virginia-DEQ-20261015", "scope": "CleanArc VA1 campus: reported construction start, with the air registration still classified Planned.", "fields": {"agency_registration_number": "74341", "agency_air_operational_status": "Planned", "agency_registered_address": "TBD, Ruther Glen, VA, 22546", "agency_principal_product": "Data Center", "current_status": "under construction"}, "notes": ["The operator dates groundbreaking to 2025-11-20. Its location page has an elapsed 3Q 2026 delivery forecast, which is not evidence of delivery.600 MW+ buildout and900 MW grid descriptions have different labels; neither is adopted as installed IT or metered demand.", "The DEQ dataset warns of source errors, collection-scale and currency limits. A registration operational classification is separate from an issued permit, whole-campus completion and parcel precision."], "sources": [{"url": "https://www.cleanarcdatacenters.com/press-release/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-2-2/2/", "host": "www.cleanarcdatacenters.com", "published": "2025-11-20", "date": "2025-11-20", "checked": "2026-10-15", "label": "Reviewed operator source"}, {"url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-15", "label": "Virginia DEQ air-site registry"}, {"url": "https://www.cleanarcdatacenters.com/va1/", "host": "www.cleanarcdatacenters.com", "published": "", "date": "", "checked": "2026-10-15", "label": "Reviewed operator source"}], "checked": "2026-10-15", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Ruther Glen · Caroline · Source context reviewed", "event_evidence": [{"date": "2025-11-20", "text": "CleanArc reported the start of construction at its VA1 campus in Caroline County. Announced capacity and delivery dates remain separate forecasts.", "kind": "construction_start", "sources": [{"url": "https://www.cleanarcdatacenters.com/press-release/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-2-2/2/", "host": "www.cleanarcdatacenters.com", "published": "2025-11-20", "date": "2025-11-20", "checked": "2026-10-15", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51033"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "cloudhq-lc3-va", "state": "VA", "kind": "facility", "name": "CloudHQ LC3", "group": "building", "status": "Under construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Loudoun"], "city": "Ashburn", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CloudHQ LC campus power conflict and LC3 scope. Headline1256MW and narrative over1.7GW conflict or have unspecified phase scope. Never assign either full-campus total to LC3 alone. Area text8,500,00SFand789.676SM malformed; canonical area held. No measured current consumption, calendar construction start or observed RFS date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://cloudhq.com/campus/lc-campus/", "host": "cloudhq.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "loc": {"lat": 39.05705, "lng": -77.63285, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "primary-source-review-round9-2026-10-14.json", "scope": "CloudHQ LC campus power conflict and LC3 scope", "fields": {"campus": "LC", "operator_campus_reference_point": {"lat": 39.01015, "lon": -77.4627}, "headline_total_critical_it_mw": 1256, "headline_available_critical_it_mw": 756, "narrative_planned_critical_it_gw_min_exclusive": 1.7, "planned_campus_data_centers": 14, "operator_status_description": "LC3 and LC4 under construction", "canonical_lc3_critical_it_mw": null}, "notes": ["Headline1256MW and narrative over1.7GW conflict or have unspecified phase scope. Never assign either full-campus total to LC3 alone. Area text8,500,00SFand789.676SM malformed; canonical area held. No measured current consumption, calendar construction start or observed RFS date.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://cloudhq.com/campus/lc-campus/", "host": "cloudhq.com", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "overnight-status-2026-10-16", "scope": "Named project and operator-service status review; phase and source limits retained.", "fields": {"current_stage_evidence": {"outcome": "supported_label", "label": "Under construction", "basis": "CloudHQ’s current LC campus narrative explicitly identifies LC3 and LC4 as under construction. This review applies that statement to the existing LC3 research context.", "checked_on": "2026-10-16"}, "stage_review_limits": "The campus header, availability figure and narrative envelope remain distinct and conflicting campus measures; none is assigned to LC3 or treated as delivered IT. No LC4 record, building count or precise parcel is created."}, "notes": ["The campus header, availability figure and narrative envelope remain distinct and conflicting campus measures; none is assigned to LC3 or treated as delivered IT. No LC4 record, building count or precise parcel is created.", "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."], "sources": [{"url": "https://cloudhq.com/campus/lc-campus/", "host": "cloudhq.com", "published": "", "date": "", "checked": "2026-10-16", "label": "Reviewed current operator evidence"}], "checked": "2026-10-16", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Ashburn · Loudoun · Source context reviewed", "status_scope": "Primary source review checked 2026-10-16. CloudHQ’s current LC campus narrative explicitly identifies LC3 and LC4 as under construction. This review applies that statement to the existing LC3 research context. The campus header, availability figure and narrative envelope remain distinct and conflicting campus measures; none is assigned to LC3 or treated as delivered IT. No LC4 record, building count or precise parcel is created.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51107"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "aws-lake-anna-technology-campus-louisa-va", "state": "VA", "kind": "facility", "name": "Lake Anna Technology Campus (LATC)", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Louisa"], "city": "Louisa", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-06-18", "The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.louisacounty.gov/3258/Data-Centers", "host": "louisacounty.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.louisacounty.gov/m/faq?cat=40", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.louisacounty.gov/Blog.aspx?IID=59", "host": "www.louisacounty.gov", "published": "2026-06-18", "date": "2026-06-18", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 37.979, "lng": -77.96292, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "neighbor-primary-review-round4-2026-10-14.json", "scope": "Field or source context only", "fields": {}, "notes": ["Preferred county data-center information page is a project-navigation hub. Review each named project document and dated county action separately before assigning the site status, capacity or incentive.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.louisacounty.gov/3258/Data-Centers", "host": "louisacounty.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "encore-2026-10-17-batch2", "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.", "fields": {"current_stage_evidence": {"outcome": "unresolved", "scope": "Louisa County identifies Lake Anna separately from North Creek. Its June 18, 2026 water update says initial construction WILL temporarily rely on groundwater; that future arrangement does not establish an observed construction start. The June 2025 guide’s general campus wording is not a current individual phase report. Reservoir delivery forecast for early 2027 is prospective, and reservoir safe yield is not AWS consumption. Current stage remains unresolved."}}, "notes": ["Louisa County identifies Lake Anna separately from North Creek. Its June 18, 2026 water update says initial construction WILL temporarily rely on groundwater; that future arrangement does not establish an observed construction start. The June 2025 guide’s general campus wording is not a current individual phase report. Reservoir delivery forecast for early 2027 is prospective, and reservoir safe yield is not AWS consumption. Current stage remains unresolved."], "sources": [{"url": "https://www.louisacounty.gov/3258/Data-Centers", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.louisacounty.gov/m/faq?cat=40", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.louisacounty.gov/Blog.aspx?IID=59", "host": "www.louisacounty.gov", "published": "2026-06-18", "date": "2026-06-18", "checked": "2026-10-17", "label": "Reviewed source context"}, {"url": "https://www.louisacounty.gov/DocumentCenter/View/11955/Data-Centers-in-Louisa-County", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-17", "label": "Reviewed source context"}], "checked": "2026-10-17", "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 49", "scope": "The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.", "fields": {"current_stage_evidence": {"outcome": "county_reported_vertical_construction", "scope": "The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified."}, "source_read_scope": {"budget_selected_pdf_pages": [1, 88], "annual_selected_text_pages": [10, 28], "entire_financial_reports_not_reviewed": true}}, "notes": ["The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.louisacounty.gov/DocumentCenter/View/12544/FY27-Louisa-County-Adopted-Budget-Book-?bidId=", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.louisacounty.gov/Blog.aspx?IID=59", "host": "www.louisacounty.gov", "published": "2026-06-18", "date": "2026-06-18", "checked": "2026-10-23", "label": "Reviewed government record"}, {"url": "https://www.louisacounty.gov/ArchiveCenter/ViewFile/Item/101", "host": "www.louisacounty.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Louisa · Louisa · Source context reviewed", "typed_water_facts": [{"measure": "supply_source", "value": "Future initial-phase groundwater, followed by planned reservoir supply", "unit": null, "basis": "operator_reported_statement", "as_of": "2026-06-18", "as_of_basis": "source_dated", "observed_on": "2026-10-17", "scope": "County-reported FUTURE initial-construction water arrangement and early-2027 reservoir forecast. It does not establish an observed construction start, delivered reservoir water, a withdrawal quantity or actual consumption.", "sources": ["https://www.louisacounty.gov/Blog.aspx?IID=59"]}], "status_scope": "The County FY2027 adopted budget selected page explicitly says that vertical construction has begun on the Lake Anna Tech Campus. Its June 18, 2026 public update also refers to initial Lake Anna construction. Reported construction is limited to that campus work and does not establish all phases complete, a building opening or computing operation. Future water infrastructure targets remain forecasts. Exact construction start and budget publication days are unverified.", "event_evidence": [{"date": "2026-06-18", "text": "The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation.", "kind": "announced", "sources": [{"url": "https://www.louisacounty.gov/Blog.aspx?IID=59", "host": "www.louisacounty.gov", "published": "2026-06-18", "date": "2026-06-18", "checked": "2026-10-23", "label": "Reviewed government record"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51109"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "google-project-peanut-chester-va", "state": "VA", "kind": "facility", "name": "Project Peanut", "group": "building", "status": "County reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Chesterfield"], "city": "Chester", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits. USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons", "host": "vpm.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://www.chesterfield.gov/5989/Data-Centers", "host": "www.chesterfield.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "loc": {"lat": 37.39038, "lng": -77.59991, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json", "scope": "Original local reporting or attributed original syndication; project and regional groups separate.", "fields": {}, "notes": ["VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits.", "USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere.", "No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."], "sources": [{"url": "https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons", "host": "vpm.org", "date": "", "published": "", "checked": "2026-10-15", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 19", "scope": "The current Chesterfield page July 2026 status table explicitly lists Peanut LLC at Bermuda Hundred Road as under construction. County reported construction describes that campus table period and its named project, without certifying individual building completion, commissioning, operating service or a current provider role. The separate Upper Magnolia Green and Watkins Centre proposals are not transferred to Peanut. Source table water limits and building counts are not adopted as new quantities, and no exact construction start or opening day is inferred.", "fields": {"current_stage_evidence": {"outcome": "county_named_project_construction_table_with_period_scope", "scope": "The current Chesterfield page July 2026 status table explicitly lists Peanut LLC at Bermuda Hundred Road as under construction. County reported construction describes that campus table period and its named project, without certifying individual building completion, commissioning, operating service or a current provider role. The separate Upper Magnolia Green and Watkins Centre proposals are not transferred to Peanut. Source table water limits and building counts are not adopted as new quantities, and no exact construction start or opening day is inferred."}, "source_scope": {"county_status_table_period": "July 2026", "table_row_project": "Peanut LLC", "individual_building_completion_unverified": true, "source_check_not_construction_start": true, "no_role_or_quantity_changes": true}}, "notes": ["The current Chesterfield page July 2026 status table explicitly lists Peanut LLC at Bermuda Hundred Road as under construction. County reported construction describes that campus table period and its named project, without certifying individual building completion, commissioning, operating service or a current provider role. The separate Upper Magnolia Green and Watkins Centre proposals are not transferred to Peanut. Source table water limits and building counts are not adopted as new quantities, and no exact construction start or opening day is inferred.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://www.chesterfield.gov/5989/Data-Centers", "host": "www.chesterfield.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed government record"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": false, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Chester · Chesterfield · Source context reviewed", "status_scope": "The current Chesterfield page July 2026 status table explicitly lists Peanut LLC at Bermuda Hundred Road as under construction. County reported construction describes that campus table period and its named project, without certifying individual building completion, commissioning, operating service or a current provider role. The separate Upper Magnolia Green and Watkins Centre proposals are not transferred to Peanut. Source table water limits and building counts are not adopted as new quantities, and no exact construction start or opening day is inferred.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51041"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "pointone-remington-technology-park-fauquier-va", "state": "VA", "kind": "facility", "name": "Remington Technology Park", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Fauquier"], "city": "Remington", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the caption and short public introduction were read. Encoded premium content was not decoded. No exact approval instrument, operator, specific power or 2026 construction is established from the preview. Other Remington proposals must not inherit this campus status. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2026-07-09", "PointOne published a Remington Technology Park release on July 9, 2026 reporting a fuel cell equipment yard rezoning amendment and campus construction. This dates the developer publication, not the exact first physical work day, a verified operating power plant or computing operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html", "host": "fauquier.com", "date": "2026-02-25", "published": "2026-02-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard", "host": "www.pointonecorp.com", "published": "2026-07-09", "date": "2026-07-09", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.pointonecorp.com/locations", "host": "www.pointonecorp.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 38.78003, "lng": -77.77777, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "regional-development-review-round30-2026-10-14.json", "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.", "fields": {"reported_context": "Fauquier Times' public caption says Remington Technology Park was the one approved campus among five nearby proposals at that historical date.", "independently_verified_current_operating_status": null}, "notes": ["Only the caption and short public introduction were read. Encoded premium content was not decoded. No exact approval instrument, operator, specific power or 2026 construction is established from the preview. Other Remington proposals must not inherit this campus status.", "Original approvals and later observed outcomes take precedence; future dates have no assumed result.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.fauquier.com/localnews/most-remington-data-center-projects-still-pending/article_1ac479e7-f4db-4446-840c-d633459584bf.html", "host": "fauquier.com", "date": "2026-02-25", "published": "2026-02-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 50", "scope": "The original July 9, 2026 PointOne release describes construction commencing and continuing at Remington Technology Park after a fuel cell equipment yard rezoning amendment. The current developer location page retains the named campus. Reported construction is limited to the developer campus account, not evidence that a fuel cell plant or computing facility is operating. Exact first work day, commissioned phases, energy delivery, financial benefits and full capacity remain unverified.", "fields": {"current_stage_evidence": {"outcome": "developer_reported_campus_construction", "scope": "The original July 9, 2026 PointOne release describes construction commencing and continuing at Remington Technology Park after a fuel cell equipment yard rezoning amendment. The current developer location page retains the named campus. Reported construction is limited to the developer campus account, not evidence that a fuel cell plant or computing facility is operating. Exact first work day, commissioned phases, energy delivery, financial benefits and full capacity remain unverified."}}, "notes": ["The original July 9, 2026 PointOne release describes construction commencing and continuing at Remington Technology Park after a fuel cell equipment yard rezoning amendment. The current developer location page retains the named campus. Reported construction is limited to the developer campus account, not evidence that a fuel cell plant or computing facility is operating. Exact first work day, commissioned phases, energy delivery, financial benefits and full capacity remain unverified.", "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."], "sources": [{"url": "https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard", "host": "www.pointonecorp.com", "published": "2026-07-09", "date": "2026-07-09", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.pointonecorp.com/locations", "host": "www.pointonecorp.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Virginia · Remington · Fauquier · Source context reviewed", "status_scope": "The original July 9, 2026 PointOne release describes construction commencing and continuing at Remington Technology Park after a fuel cell equipment yard rezoning amendment. The current developer location page retains the named campus. Reported construction is limited to the developer campus account, not evidence that a fuel cell plant or computing facility is operating. Exact first work day, commissioned phases, energy delivery, financial benefits and full capacity remain unverified.", "event_evidence": [{"date": "2026-07-09", "text": "PointOne published a Remington Technology Park release on July 9, 2026 reporting a fuel cell equipment yard rezoning amendment and campus construction. This dates the developer publication, not the exact first physical work day, a verified operating power plant or computing operation.", "kind": "announced", "sources": [{"url": "https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard", "host": "www.pointonecorp.com", "published": "2026-07-09", "date": "2026-07-09", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "51061"}, "state_name": "Virginia", "state_path": "/virginia/"}, {"power": "", "power_note": "", "investment": "", "jobs": "", "utility": "", "water": "", "incentives": "", "date": "", "opened": "", "tier": "", "id": "edgecore-as01-sterling-va", "state": "VA", "kind": "project", "name": "EdgeCore AS01 Sterling project", "group": "building", "status": "Construction permitted", "crypto": false, "type": "Hyperscale data center project", "counties": ["Loudoun"], "city": "Sterling", "address": "45831 Maries Road, Sterling, VA 20166", "who": "EdgeCore Digital Infrastructure", "mw": null, "acres": null, "note": "The two-location 114 MW / 685,000 square foot operator envelope and $1.5 billion financing are combined scopes, not quantities assigned to this record. Individual-building IT capacity, metered use, full delivery and a physical opening day are unverified. No point is adopted from the DEQ entrance/centroid coordinates. The county street address is a published permit/assessment context, not a verified roof or operator postal-address certification.", "events": [["2026-04-21", "EdgeCore announced combined AS01/AS02 construction financing. The $1.5 billion loan envelope is not an individual-site investment or a construction-start/opening day. Initial occupancy remained a future target."]], "timeline": [], "sources": [{"url": "https://edgecore.com/locations/ashburn-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-16", "label": "EdgeCore current two-location Ashburn plan"}, {"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia", "host": "edgecore.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-16", "label": "EdgeCore AS01/AS02 financing announcement"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&outFields=ID%2CPermitNumber%2CPermitType%2CPermitStatus%2CParcelPIN%2CAPPLYDATE%2CISSUEDATE%2CFINALIZEDATE%2CMAIN%2CADDRESSLINE1%2CADDRESSLINE2%2CADDRESSLINE3%2CPREDIRECTION%2CSTREETTYPE%2CPOSTDIRECTION%2CUNITORSUITE%2CCITY%2CSTATE%2CDESCRIPTION%2CDataSnapshot%2CLASTINSPECTIONDATE%2CEXPIREDATE&returnGeometry=false&orderByFields=ParcelPIN%2CAPPLYDATE%2CID&resultRecordCount=2000&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued rows"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&returnIdsOnly=true&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued ids"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&returnCountOnly=true&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued count"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1?f=pjson", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun landmarc issued layer"}, {"url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Virginia DEQ data-center-flagged air-site registry"}, {"url": "https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Virginia DEQ air-dataset scope and reference-coordinate limits"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=45831+Maries+Road%2C+Sterling%2C+VA+20166&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Unique county match of the exact registered street"}, {"url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/2/query?where=%28AD_ADDRESS%3D22425+AND+AM_STR_NAME%3D%27SOUS+VIDE%27%29+OR+%28AD_ADDRESS%3D45831+AND+AM_STR_NAME%3D%27MARIES%27%29+OR+%28AD_ADDRESS%3D44371+AND+AM_STR_NAME%3D%27GIGABIT%27%29&outFields=OBJECTID%2CAD_POINT_TYPE%2CAD_ADDRESS%2CAD_MCPI%2CAD_UPD_DATE%2CAM_TOWN%2CAM_ZIP%2CAM_STR_NAME%2CAM_STR_TYPE%2CAM_STATE%2CFULL_ADDRESS_TSZ&returnGeometry=true&outSR=4326&resultRecordCount=50&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact retained service street to parcel PIN join"}, {"url": "https://logis.loudoun.gov/gis/rest/services/COL_LatLong/Parcels_LatLong/MapServer/0/query?where=PA_MCPI%3D%27030292034000%27&outFields=OBJECTID%2CPA_MCPI%2CPA_TYPE%2CPA_UNITS%2CPA_SOURCE%2CPA_PLAT_NUM%2CPA_PLAT_LOT%2CPA_UPD_DATE%2CPA_ADD_DATE%2CPA_END_DATE&returnGeometry=true&outSR=4326&resultRecordCount=25&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact parcel identifier and complete reference geometry"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.42074133990613%2C39.01737844412504%2C-77.40917866009386%2C39.026361555874956&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting, acquisition date unknown"}], "loc": {"lng": -77.41496, "lat": 39.02187, "precision": "approximate", "basis": "Approximate calculated center of exact official Loudoun County GIS source parcel 030292034000 for AS01 at 45831 Maries Road, Sterling, VA 20166. No roof, surveyed legal boundary, title, tenant, complete campus or new physical milestone is certified. Source geometry and imagery acquisition dates are unknown. Existing native status remains building."}, "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": false, "precision_label": "Approximate source parcel reference, not a roof or complete campus", "summary": "Virginia · EdgeCore AS01 county permit and operator project context", "reviewed_evidence": [{"overlay": "EdgeCore Ashburn permit/identity and Reno schedule follow-up", "scope": "County LandMARC lists issued building/fit-out work in its October 16, 2026 data snapshot. Construction permitted describes that administrative scope, not verified physical progress, completed operation, an occupancy certificate or delivered IT. The operator still gives future initial-occupancy targets.", "fields": {"operator_code": "AS01", "operator_location_scope": "Two separate Sterling locations on Maries Road and Moran Road; road-to-code assignment is not inferred solely from the combined marketing page. County permit text explicitly names AS01, and the AS02 assessment improvement links that code to its county parcel.", "combined_operator_plan": {"it_capacity_mw": 114, "building_square_feet": 685000, "scope": "AS01 plus AS02 combined full-buildout forecast; not an individual-site fact or delivered capacity."}, "occupancy_target": {"label": "November 2026", "precision": "month", "scope": "Initial occupancy target from April 21, 2026 operator release; no invented first-of-month day or confirmed opening."}, "financing_scope": "$1.5 billion combined AS01/AS02 limited-recourse senior secured term loans; not project expenditure, individual-site investment, incentives or current balance.", "county_permit_rows": [{"ID": 2650185, "PermitNumber": "BLDC-2024-063290", "PermitType": "Building (Commercial)", "PermitStatus": "Issued", "ParcelPIN": "030292034000", "APPLYDATE": 1734122907000, "ISSUEDATE": 1740546000000, "FINALIZEDATE": null, "MAIN": 1, "ADDRESSLINE1": "45831", "ADDRESSLINE2": "MARIES", "ADDRESSLINE3": "", "PREDIRECTION": " ", "STREETTYPE": "RD", "POSTDIRECTION": " ", "UNITORSUITE": "", "CITY": "STERLING", "STATE": "VA", "DESCRIPTION": "Core and Shell building with an admin area. Also includes a 3rd floor data center build out which consist of 24 MWs. Electronic copy", "DataSnapshot": 1792150202000, "LASTINSPECTIONDATE": 1790603191000, "EXPIREDATE": 1806327991000}, {"ID": 1368850, "PermitNumber": "BLDC-2025-057092", "PermitType": "Building (Commercial)", "PermitStatus": "Issued", "ParcelPIN": "030292034000", "APPLYDATE": 1766080225000, "ISSUEDATE": 1772082000000, "FINALIZEDATE": null, "MAIN": 1, "ADDRESSLINE1": "45831", "ADDRESSLINE2": "MARIES", "ADDRESSLINE3": "", "PREDIRECTION": " ", "STREETTYPE": "RD", "POSTDIRECTION": " ", "UNITORSUITE": "", "CITY": "STERLING", "STATE": "VA", "DESCRIPTION": "TENANT FIT OUT (TFO) OF EXISTING ROOMS WITHIN THE EDGECORE AS01 DATA CENTER BUILDING. THE TENANT IMPROVEMENTS INCLUDE THE INTERIOR FIT OUT OF THREE EXISTING 36MW DATA HALLS AND OFFICE SPACES WITH AN APPROXIMATE TOTAL AREA OF 107,583 SQUARE FEET.", "DataSnapshot": 1792150202000, "LASTINSPECTIONDATE": 1787580618000, "EXPIREDATE": 1803309018000}], "county_permit_date_scope": {"data_snapshot": "2026-10-16T11:30:02+00:00", "issued_dates": ["2025-02-26", "2026-02-26"], "scope": "Agency timestamps retain their exact scope. Issue dates are administrative permit dates, inspection dates do not certify passed results or occupancy, and null finalized dates do not prove absence of any other permission."}, "county_address_context": {"published_address": "45831 Maries Road, Sterling, VA 20166", "parcel_pin": "030292034000", "scope": "County permit address and parcel reference, not a geocoded roof, full campus boundary or certified present legal title."}, "deq_registration_context": {"registration": "74306", "registered_name": "MECP1 Ashburn 2 LLC", "registered_address": "45831 Maries Road", "air_status": "Planned", "scope": "Planned air-registration classification remains separate from later building-work permits and data-center operating status. No issued air permit, successor or coordinate is inferred."}, "identity_review_scope": "Named operator code AS01 and exact county permit-address/parcel context reviewed against all 1,880 canonical IDs, 314 held IDs, the 2,136-row original inventory and the complete 198-row DEQ snapshot. No existing operator-code name or exact published street matched. This admits a source-scoped project research identity, not a surveyed site, legal owner or verified distinct physical building. Nearby CyrusOne records and the older four-building EdgeCore Dulles lead are not merged. The two operator-listed locations are less than two miles apart; their combined commercial figures are not per-site quantities.", "technical_scope_limits": "Literal MW strings inside permit descriptions are not normalized, multiplied, summed or assigned an IT/utility measure. The 114 MW operator combined plan is not duplicated as per-site typed power."}, "notes": ["The two-location 114 MW / 685,000 square foot operator envelope and $1.5 billion financing are combined scopes, not quantities assigned to this record. Individual-building IT capacity, metered use, full delivery and a physical opening day are unverified. No point is adopted from the DEQ entrance/centroid coordinates. The county street address is a published permit/assessment context, not a verified roof or operator postal-address certification."], "sources": [{"url": "https://edgecore.com/locations/ashburn-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-16", "label": "EdgeCore current two-location Ashburn plan"}, {"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia", "host": "edgecore.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-16", "label": "EdgeCore AS01/AS02 financing announcement"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&outFields=ID%2CPermitNumber%2CPermitType%2CPermitStatus%2CParcelPIN%2CAPPLYDATE%2CISSUEDATE%2CFINALIZEDATE%2CMAIN%2CADDRESSLINE1%2CADDRESSLINE2%2CADDRESSLINE3%2CPREDIRECTION%2CSTREETTYPE%2CPOSTDIRECTION%2CUNITORSUITE%2CCITY%2CSTATE%2CDESCRIPTION%2CDataSnapshot%2CLASTINSPECTIONDATE%2CEXPIREDATE&returnGeometry=false&orderByFields=ParcelPIN%2CAPPLYDATE%2CID&resultRecordCount=2000&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued rows"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&returnIdsOnly=true&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued ids"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&returnCountOnly=true&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued count"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1?f=pjson", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun landmarc issued layer"}, {"url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Virginia DEQ data-center-flagged air-site registry"}, {"url": "https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Virginia DEQ air-dataset scope and reference-coordinate limits"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 20, October 23, 2026", "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The dated April 21, 2026 financing article explicitly names both AS01 and AS02 in Sterling as distinct developments. Their combined advertised load and area are not assigned to each. Scheduled November 2026 and July 2027 initial occupancy are future month precision targets, not occurred events. Financing does not establish commissioned service, property ownership or a tenant identity.", "fields": {"company_association": {"name": "EdgeCore Digital Infrastructure", "role": "developer", "identity_scope": "provider_brand_only", "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The dated April 21, 2026 financing article explicitly names both AS01 and AS02 in Sterling as distinct developments. Their combined advertised load and area are not assigned to each. Scheduled November 2026 and July 2027 initial occupancy are future month precision targets, not occurred events. Financing does not establish commissioned service, property ownership or a tenant identity."}, "provider_role": "developer"}, "notes": ["EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The dated April 21, 2026 financing article explicitly names both AS01 and AS02 in Sterling as distinct developments. Their combined advertised load and area are not assigned to each. Scheduled November 2026 and July 2027 initial occupancy are future month precision targets, not occurred events. Financing does not establish commissioned service, property ownership or a tenant identity.", "The financing article is dated April 21, 2026. Other current pages have no established publication date. Neither publication, financing nor stated plans are physical milestones."], "sources": [{"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia", "host": "edgecore.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-23", "label": "First party exact AS component development, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 county context cohort 44, October 23, 2026", "scope": "County context review of the exact agency street only. This review adds no site reference. Any separately reviewed site reference retains its own precision and source scope. County evidence does not certify a roof, full campus, legal parcel, municipal boundary, physical stage, party role or quantity.", "fields": {"county_context": {"fips": ["51107"], "names": ["Loudoun"], "point_admission": false}}, "notes": ["Agency air registry classifications and the data center flag are not physical facility findings. Registered agency coordinates and names do not become a site point or current party role.", "The original empty county and jurisdiction wrappers remain in conflicts and source history. Canonical addresses and all native locations stay exact.", "Independent Harrisonburg city is selected only by its unique source street county equivalent, without treating every postal city as an incorporated jurisdiction.", "One unique Census county equivalent and county polygon agree. The calculated coordinate remains research evidence only, with no public site point or destination."], "sources": [{"url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact agency registration and registered street"}, {"url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=45831+Maries+Road%2C+Sterling%2C+VA+20166&benchmark=Public_AR_Current&vintage=Current_Current&format=json", "host": "geocoding.geo.census.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Unique county match of the exact registered street"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 49, October 23, 2026", "scope": "Approximate official source parcel reference only. Existing native status remains building. No roof, tenant unit, surveyed legal boundary, complete campus, title, source role or new physical stage is admitted.", "fields": {"location_review_decision": {"location": {"lng": -77.41496, "lat": 39.02187, "precision": "approximate", "basis": "Approximate calculated center of exact official Loudoun County GIS source parcel 030292034000 for AS01 at 45831 Maries Road, Sterling, VA 20166. No roof, surveyed legal boundary, title, tenant, complete campus or new physical milestone is certified. Source geometry and imagery acquisition dates are unknown. Existing native status remains building."}, "reference_method": "Approximate county reference parcel center", "reference_parcel": {"identifier": "030292034000", "identifier_field": "PA_MCPI", "objectid": 107748, "agency": "Loudoun County GIS", "reference_method": "calculated_polygon_centroid", "not_survey_quality": true, "legal_title_verified": false, "independent_building_identity": false, "full_campus_verified": false, "operator_ownership_verified": false, "county_codes_inferred": false, "geometry_acquisition_date": null}, "operator_coordinates_adopted": false, "census_range_adopted": false}}, "notes": ["Exact retained AS01 government permit and registry street 45831 Maries Road, Sterling, VA 20166 binds current official county address identifier138019 to parcel PIN030292034000. The current combined operator plan names Maries and Moran roads without selecting a roof or new service unit. Government permit predecessors retain all original source history. Future occupancy periods November2026forAS01andJuly2027forAS02remain targets, with no actual opening or quantity adopted. Native building group is preserved.", "Approximate official source parcel reference only. Existing native status remains building. No roof, tenant unit, surveyed legal boundary, complete campus, title, source role or new physical stage is admitted.", "The frame shows roads, parking, several separate large commercial forms, vegetation and disturbed ground. The official source parcel center remains only an approximate reference candidate. No roof, complete campus, legal boundary, current construction milestone or tenant is selected.", "There is no prior native site coordinate. This first contained reference follows explicit source identity and county review. A displayed county ring is discovery context rather than a previous verified site; no physical relocation, roof, full campus or new physical stage is inferred."], "sources": [{"url": "https://edgecore.com/locations/ashburn-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Combined Ashburn two location plan, roads only"}, {"url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/2/query?where=%28AD_ADDRESS%3D22425+AND+AM_STR_NAME%3D%27SOUS+VIDE%27%29+OR+%28AD_ADDRESS%3D45831+AND+AM_STR_NAME%3D%27MARIES%27%29+OR+%28AD_ADDRESS%3D44371+AND+AM_STR_NAME%3D%27GIGABIT%27%29&outFields=OBJECTID%2CAD_POINT_TYPE%2CAD_ADDRESS%2CAD_MCPI%2CAD_UPD_DATE%2CAM_TOWN%2CAM_ZIP%2CAM_STR_NAME%2CAM_STR_TYPE%2CAM_STATE%2CFULL_ADDRESS_TSZ&returnGeometry=true&outSR=4326&resultRecordCount=50&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact retained service street to parcel PIN join"}, {"url": "https://logis.loudoun.gov/gis/rest/services/COL_LatLong/Parcels_LatLong/MapServer/0/query?where=PA_MCPI%3D%27030292034000%27&outFields=OBJECTID%2CPA_MCPI%2CPA_TYPE%2CPA_UNITS%2CPA_SOURCE%2CPA_PLAT_NUM%2CPA_PLAT_LOT%2CPA_UPD_DATE%2CPA_ADD_DATE%2CPA_END_DATE&returnGeometry=true&outSR=4326&resultRecordCount=25&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact parcel identifier and complete reference geometry"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.42074133990613%2C39.01737844412504%2C-77.40917866009386%2C39.026361555874956&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting, acquisition date unknown"}], "checked": "2026-10-23", "whole_record_certified": false}], "raw_status": "under construction", "status_field": "current_status", "status_scope": "County LandMARC lists issued building/fit-out work in its October 16, 2026 data snapshot. Construction permitted describes that administrative scope, not verified physical progress, completed operation, an occupancy certificate or delivered IT. The operator still gives future initial-occupancy targets.", "event_evidence": [{"date": "2026-04-21", "text": "EdgeCore announced combined AS01/AS02 construction financing. The $1.5 billion loan envelope is not an individual-site investment or a construction-start/opening day. Initial occupancy remained a future target.", "kind": "announced", "sources": [{"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia", "host": "edgecore.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-16", "label": "EdgeCore AS01/AS02 financing announcement"}]}], "reviewed_area_context": {"checked": "2026-10-23", "confidence": "inference", "fips": ["51107"], "review_id": "location-codex2-context044-edgecore-as01-sterling-va", "scope": "County context review of the exact agency street only. This review adds no site reference. Any separately reviewed site reference retains its own precision and source scope. County evidence does not certify a roof, full campus, legal parcel, municipal boundary, physical stage, party role or quantity.", "source_urls": ["https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=45831+Maries+Road%2C+Sterling%2C+VA+20166&benchmark=Public_AR_Current&vintage=Current_Current&format=json"]}, "state_name": "Virginia", "state_path": "/virginia/"}, {"power": "", "power_note": "", "investment": "", "jobs": "", "utility": "", "water": "", "incentives": "", "date": "", "opened": "", "tier": "", "id": "edgecore-as02-sterling-va", "state": "VA", "kind": "project", "name": "EdgeCore AS02 Sterling project", "group": "building", "status": "Construction permitted", "crypto": false, "type": "Hyperscale data center project", "counties": ["Loudoun"], "city": "Sterling", "address": "22425 Sous Vide Lane, Sterling, VA 20166", "who": "EdgeCore Digital Infrastructure", "mw": null, "acres": null, "note": "The two-location 114 MW / 685,000 square foot operator envelope and $1.5 billion financing are combined scopes, not quantities assigned to this record. Individual-building IT capacity, metered use, full delivery and a physical opening day are unverified. No point is adopted from the DEQ entrance/centroid coordinates. The county street address is a published permit/assessment context, not a verified roof or operator postal-address certification. County assessment uses 22425 Sous Vide Lane while the operator describes Moran Road. The assessor card retains EDGECORE AS02, 28MW and a maintenance banner. The improvement label is not a typed IT/utility figure, current completion percentage, measured supply or legal-title certification; no street-renaming date is inferred.", "events": [["2026-04-21", "EdgeCore announced combined AS01/AS02 construction financing. The $1.5 billion loan envelope is not an individual-site investment or a construction-start/opening day. Initial occupancy remained a future target."]], "timeline": [], "sources": [{"url": "https://edgecore.com/locations/ashburn-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-16", "label": "EdgeCore current two-location Ashburn plan"}, {"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia", "host": "edgecore.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-16", "label": "EdgeCore AS01/AS02 financing announcement"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&outFields=ID%2CPermitNumber%2CPermitType%2CPermitStatus%2CParcelPIN%2CAPPLYDATE%2CISSUEDATE%2CFINALIZEDATE%2CMAIN%2CADDRESSLINE1%2CADDRESSLINE2%2CADDRESSLINE3%2CPREDIRECTION%2CSTREETTYPE%2CPOSTDIRECTION%2CUNITORSUITE%2CCITY%2CSTATE%2CDESCRIPTION%2CDataSnapshot%2CLASTINSPECTIONDATE%2CEXPIREDATE&returnGeometry=false&orderByFields=ParcelPIN%2CAPPLYDATE%2CID&resultRecordCount=2000&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued rows"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&returnIdsOnly=true&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued ids"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&returnCountOnly=true&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued count"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1?f=pjson", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun landmarc issued layer"}, {"url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Virginia DEQ data-center-flagged air-site registry"}, {"url": "https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Virginia DEQ air-dataset scope and reference-coordinate limits"}, {"url": "https://reparcelasmt.loudoun.gov/PT/datalets/datalet.aspx?LMparent=20&UseSearch=no&jur=107&mode=commercial&pin=045465016000&taxyr=2026", "host": "reparcelasmt.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "ashburn as02 county commercial"}, {"url": "https://reparcelasmt.loudoun.gov/PT/datalets/datalet.aspx?mode=profileall&UseSearch=no&pin=045465016000&jur=107&taxyr=2026&LMparent=20", "host": "reparcelasmt.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "ashburn as02 county profile"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=ParcelPIN%3D%27045465016000%27&outFields=ID%2CPermitNumber%2CPermitType%2CPermitStatus%2CParcelPIN%2CMAIN%2CADDRESSLINE1%2CADDRESSLINE2%2CADDRESSLINE3%2CPREDIRECTION%2CSTREETTYPE%2CPOSTDIRECTION%2CUNITORSUITE%2CCITY%2CSTATE%2CDESCRIPTION%2CDataSnapshot&returnGeometry=true&outSR=4326&orderByFields=ID&resultRecordCount=2000&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact county authority permit street only"}, {"url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/2/query?where=%28AD_ADDRESS%3D22425+AND+AM_STR_NAME%3D%27SOUS+VIDE%27%29+OR+%28AD_ADDRESS%3D45831+AND+AM_STR_NAME%3D%27MARIES%27%29+OR+%28AD_ADDRESS%3D44371+AND+AM_STR_NAME%3D%27GIGABIT%27%29&outFields=OBJECTID%2CAD_POINT_TYPE%2CAD_ADDRESS%2CAD_MCPI%2CAD_UPD_DATE%2CAM_TOWN%2CAM_ZIP%2CAM_STR_NAME%2CAM_STR_TYPE%2CAM_STATE%2CFULL_ADDRESS_TSZ&returnGeometry=true&outSR=4326&resultRecordCount=50&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact retained service street to parcel PIN join"}, {"url": "https://logis.loudoun.gov/gis/rest/services/COL_LatLong/Parcels_LatLong/MapServer/0/query?where=PA_MCPI%3D%27045465016000%27&outFields=OBJECTID%2CPA_MCPI%2CPA_TYPE%2CPA_UNITS%2CPA_SOURCE%2CPA_PLAT_NUM%2CPA_PLAT_LOT%2CPA_UPD_DATE%2CPA_ADD_DATE%2CPA_END_DATE&returnGeometry=true&outSR=4326&resultRecordCount=25&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact parcel identifier and complete reference geometry"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.45166915064831%2C38.990588444125045%2C-77.4401108493517%2C38.99957155587496&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting, acquisition date unknown"}], "loc": {"lng": -77.44589, "lat": 38.99508, "precision": "approximate", "basis": "Approximate calculated center of exact official Loudoun County GIS source parcel 045465016000 for AS02 at 22425 Sous Vide Lane, Sterling, VA 20166. No roof, surveyed legal boundary, title, tenant, complete campus or new physical milestone is certified. Source geometry and imagery acquisition dates are unknown. Existing native status remains building."}, "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": false, "precision_label": "Approximate source parcel reference, not a roof or complete campus", "summary": "Virginia · EdgeCore AS02 county permit and operator project context", "reviewed_evidence": [{"overlay": "EdgeCore Ashburn permit/identity and Reno schedule follow-up", "scope": "County LandMARC lists issued building/fit-out work in its October 16, 2026 data snapshot. Construction permitted describes that administrative scope, not verified physical progress, completed operation, an occupancy certificate or delivered IT. The operator still gives future initial-occupancy targets.", "fields": {"operator_code": "AS02", "operator_location_scope": "Two separate Sterling locations on Maries Road and Moran Road; road-to-code assignment is not inferred solely from the combined marketing page. County permit text explicitly names AS01, and the AS02 assessment improvement links that code to its county parcel.", "combined_operator_plan": {"it_capacity_mw": 114, "building_square_feet": 685000, "scope": "AS01 plus AS02 combined full-buildout forecast; not an individual-site fact or delivered capacity."}, "occupancy_target": {"label": "July 2027", "precision": "month", "scope": "Initial occupancy target from April 21, 2026 operator release; no invented first-of-month day or confirmed opening."}, "financing_scope": "$1.5 billion combined AS01/AS02 limited-recourse senior secured term loans; not project expenditure, individual-site investment, incentives or current balance.", "county_permit_rows": [{"ID": 384402, "PermitNumber": "BLDC-2025-044428", "PermitType": "Building (Commercial)", "PermitStatus": "Issued", "ParcelPIN": "045465016000", "APPLYDATE": 1758901512000, "ISSUEDATE": 1764133200000, "FINALIZEDATE": null, "MAIN": 1, "ADDRESSLINE1": "22425", "ADDRESSLINE2": "SOUS VIDE", "ADDRESSLINE3": "", "PREDIRECTION": " ", "STREETTYPE": "LN", "POSTDIRECTION": " ", "UNITORSUITE": "", "CITY": "STERLING", "STATE": "VA", "DESCRIPTION": "Interior Alteration - Phase 2", "DataSnapshot": 1792150202000, "LASTINSPECTIONDATE": null, "EXPIREDATE": 1779681600000}, {"ID": 1699724, "PermitNumber": "BLDC-2026-029377", "PermitType": "Building (Commercial)", "PermitStatus": "Issued", "ParcelPIN": "045465016000", "APPLYDATE": 1781811567000, "ISSUEDATE": 1786334400000, "FINALIZEDATE": null, "MAIN": 1, "ADDRESSLINE1": "22425", "ADDRESSLINE2": "SOUS VIDE", "ADDRESSLINE3": "", "PREDIRECTION": " ", "STREETTYPE": "LN", "POSTDIRECTION": " ", "UNITORSUITE": "", "CITY": "STERLING", "STATE": "VA", "DESCRIPTION": "Tenant Fit-Out \nData Hall build out for three 14 MW's (92,748 sq. ft. total), which contains busway and hot aisle containment. Also, added build out of admin area of 1,900 sq. ft and build out of storage area of 4,890 sq. ft. Total work area of 99,538 sq. ft.", "DataSnapshot": 1792150202000, "LASTINSPECTIONDATE": null, "EXPIREDATE": 1801890000000}], "county_permit_date_scope": {"data_snapshot": "2026-10-16T11:30:02+00:00", "issued_dates": ["2025-11-26", "2026-08-10"], "scope": "Agency timestamps retain their exact scope. Issue dates are administrative permit dates, inspection dates do not certify passed results or occupancy, and null finalized dates do not prove absence of any other permission."}, "county_address_context": {"published_address": "22425 Sous Vide Lane, Sterling, VA 20166", "parcel_pin": "045465016000", "scope": "County permit address and parcel reference, not a geocoded roof, full campus boundary or certified present legal title."}, "deq_registration_context": {"registration": "74315", "registered_name": "1501 Moran Road Development Owner LLC", "registered_address": "22425 Sous Vide Lane", "air_status": "Planned", "scope": "Planned air-registration classification remains separate from later building-work permits and data-center operating status. No issued air permit, successor or coordinate is inferred."}, "identity_review_scope": "Named operator code AS02 and exact county permit-address/parcel context reviewed against all 1,880 canonical IDs, 314 held IDs, the 2,136-row original inventory and the complete 198-row DEQ snapshot. No existing operator-code name or exact published street matched. This admits a source-scoped project research identity, not a surveyed site, legal owner or verified distinct physical building. Nearby CyrusOne records and the older four-building EdgeCore Dulles lead are not merged. The two operator-listed locations are less than two miles apart; their combined commercial figures are not per-site quantities.", "technical_scope_limits": "Literal MW strings inside permit descriptions are not normalized, multiplied, summed or assigned an IT/utility measure. The 114 MW operator combined plan is not duplicated as per-site typed power.", "assessment_card_scope": {"improvement_name": "EDGECORE AS02, 28MW", "primary_address": "22425 SOUS VIDE LN", "parcel_pin": "045465016000", "recorded_owner_label": "1501 MORAN ROAD DEVELOPMENT OWNER LLC", "banner": "System currently unavailable due to maintenance, although the normally returned page contains record data.", "footer_updated": "2026-09-10", "scope": "Tax-year 2026 assessment and improvement labeling, not a current title, physical-building count, measured capacity or operating certification."}}, "notes": ["The two-location 114 MW / 685,000 square foot operator envelope and $1.5 billion financing are combined scopes, not quantities assigned to this record. Individual-building IT capacity, metered use, full delivery and a physical opening day are unverified. No point is adopted from the DEQ entrance/centroid coordinates. The county street address is a published permit/assessment context, not a verified roof or operator postal-address certification. County assessment uses 22425 Sous Vide Lane while the operator describes Moran Road. The assessor card retains EDGECORE AS02, 28MW and a maintenance banner. The improvement label is not a typed IT/utility figure, current completion percentage, measured supply or legal-title certification; no street-renaming date is inferred."], "sources": [{"url": "https://edgecore.com/locations/ashburn-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-16", "label": "EdgeCore current two-location Ashburn plan"}, {"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia", "host": "edgecore.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-16", "label": "EdgeCore AS01/AS02 financing announcement"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&outFields=ID%2CPermitNumber%2CPermitType%2CPermitStatus%2CParcelPIN%2CAPPLYDATE%2CISSUEDATE%2CFINALIZEDATE%2CMAIN%2CADDRESSLINE1%2CADDRESSLINE2%2CADDRESSLINE3%2CPREDIRECTION%2CSTREETTYPE%2CPOSTDIRECTION%2CUNITORSUITE%2CCITY%2CSTATE%2CDESCRIPTION%2CDataSnapshot%2CLASTINSPECTIONDATE%2CEXPIREDATE&returnGeometry=false&orderByFields=ParcelPIN%2CAPPLYDATE%2CID&resultRecordCount=2000&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued rows"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&returnIdsOnly=true&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued ids"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=UPPER%28DESCRIPTION%29+LIKE+%27%25EDGECORE%25%27+OR+UPPER%28DESCRIPTION%29+LIKE+%27%25EDGE+CORE%25%27+OR+ParcelPIN+IN+%28%27045465016000%27%2C%27030292034000%27%29&returnCountOnly=true&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun edgecore issued count"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1?f=pjson", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "loudoun landmarc issued layer"}, {"url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Virginia DEQ data-center-flagged air-site registry"}, {"url": "https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "Virginia DEQ air-dataset scope and reference-coordinate limits"}, {"url": "https://reparcelasmt.loudoun.gov/PT/datalets/datalet.aspx?LMparent=20&UseSearch=no&jur=107&mode=commercial&pin=045465016000&taxyr=2026", "host": "reparcelasmt.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "ashburn as02 county commercial"}, {"url": "https://reparcelasmt.loudoun.gov/PT/datalets/datalet.aspx?mode=profileall&UseSearch=no&pin=045465016000&jur=107&taxyr=2026&LMparent=20", "host": "reparcelasmt.loudoun.gov", "published": "", "date": "", "checked": "2026-10-16", "label": "ashburn as02 county profile"}], "checked": "2026-10-16", "whole_record_certified": false}, {"overlay": "Company role source check 20, October 23, 2026", "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The dated April 21, 2026 financing article explicitly names both AS01 and AS02 in Sterling as distinct developments. Their combined advertised load and area are not assigned to each. Scheduled November 2026 and July 2027 initial occupancy are future month precision targets, not occurred events. Financing does not establish commissioned service, property ownership or a tenant identity.", "fields": {"company_association": {"name": "EdgeCore Digital Infrastructure", "role": "developer", "identity_scope": "provider_brand_only", "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The dated April 21, 2026 financing article explicitly names both AS01 and AS02 in Sterling as distinct developments. Their combined advertised load and area are not assigned to each. Scheduled November 2026 and July 2027 initial occupancy are future month precision targets, not occurred events. Financing does not establish commissioned service, property ownership or a tenant identity."}, "provider_role": "developer"}, "notes": ["EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The dated April 21, 2026 financing article explicitly names both AS01 and AS02 in Sterling as distinct developments. Their combined advertised load and area are not assigned to each. Scheduled November 2026 and July 2027 initial occupancy are future month precision targets, not occurred events. Financing does not establish commissioned service, property ownership or a tenant identity.", "The financing article is dated April 21, 2026. Other current pages have no established publication date. Neither publication, financing nor stated plans are physical milestones."], "sources": [{"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia", "host": "edgecore.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-23", "label": "First party exact AS component development, scoped provider relationship reviewed"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 county context cohort 44, October 23, 2026", "scope": "County context review of the exact agency street only. This review adds no site reference. Any separately reviewed site reference retains its own precision and source scope. County evidence does not certify a roof, full campus, legal parcel, municipal boundary, physical stage, party role or quantity.", "fields": {"county_context": {"fips": ["51107"], "names": ["Loudoun"], "point_admission": false}}, "notes": ["Agency air registry classifications and the data center flag are not physical facility findings. Registered agency coordinates and names do not become a site point or current party role.", "The original empty county and jurisdiction wrappers remain in conflicts and source history. Canonical addresses and all native locations stay exact.", "Independent Harrisonburg city is selected only by its unique source street county equivalent, without treating every postal city as an incorporated jurisdiction.", "The literal Sous Vide Lane address has zero Census matches, retained exactly. Seventy complete current county permit rows have exact22425 SOUS VIDE LN and parcel045465016000, all without geometry. County authority alone establishes this county context. Permit counts, statuses, descriptions and issue categories are not adopted as building counts, physical progress, quantities or site coordinates."], "sources": [{"url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "host": "gisdata.deq.virginia.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact agency registration and registered street"}, {"url": "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=ParcelPIN%3D%27045465016000%27&outFields=ID%2CPermitNumber%2CPermitType%2CPermitStatus%2CParcelPIN%2CMAIN%2CADDRESSLINE1%2CADDRESSLINE2%2CADDRESSLINE3%2CPREDIRECTION%2CSTREETTYPE%2CPOSTDIRECTION%2CUNITORSUITE%2CCITY%2CSTATE%2CDESCRIPTION%2CDataSnapshot&returnGeometry=true&outSR=4326&orderByFields=ID&resultRecordCount=2000&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact county authority permit street only"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Codex 2 location cohort 49, October 23, 2026", "scope": "Approximate official source parcel reference only. Existing native status remains building. No roof, tenant unit, surveyed legal boundary, complete campus, title, source role or new physical stage is admitted.", "fields": {"location_review_decision": {"location": {"lng": -77.44589, "lat": 38.99508, "precision": "approximate", "basis": "Approximate calculated center of exact official Loudoun County GIS source parcel 045465016000 for AS02 at 22425 Sous Vide Lane, Sterling, VA 20166. No roof, surveyed legal boundary, title, tenant, complete campus or new physical milestone is certified. Source geometry and imagery acquisition dates are unknown. Existing native status remains building."}, "reference_method": "Approximate county reference parcel center", "reference_parcel": {"identifier": "045465016000", "identifier_field": "PA_MCPI", "objectid": 109753, "agency": "Loudoun County GIS", "reference_method": "calculated_polygon_centroid", "not_survey_quality": true, "legal_title_verified": false, "independent_building_identity": false, "full_campus_verified": false, "operator_ownership_verified": false, "county_codes_inferred": false, "geometry_acquisition_date": null}, "operator_coordinates_adopted": false, "census_range_adopted": false}}, "notes": ["Exact retained AS02 government permit and registry street 22425 Sous Vide Lane, Sterling, VA 20166 binds current official county address identifier138032 to parcel PIN045465016000. The current combined operator plan names Maries and Moran roads without selecting a roof or new service unit. Government permit predecessors retain all original source history. Future occupancy periods November2026forAS01andJuly2027forAS02remain targets, with no actual opening or quantity adopted. Native building group is preserved.", "Approximate official source parcel reference only. Existing native status remains building. No roof, tenant unit, surveyed legal boundary, complete campus, title, source role or new physical stage is admitted.", "The frame shows a large commercial form, surrounding roads and parking, vegetation and other separate buildings. The exact source parcel center remains approximate. No image coordinate, building footprint, current stage, title or complete campus is selected.", "There is no prior native site coordinate. This first contained reference follows explicit source identity and county review. A displayed county ring is discovery context rather than a previous verified site; no physical relocation, roof, full campus or new physical stage is inferred."], "sources": [{"url": "https://edgecore.com/locations/ashburn-data-center", "host": "edgecore.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Combined Ashburn two location plan, roads only"}, {"url": "https://logis.loudoun.gov/gis/rest/services/COL/LandRecords/MapServer/2/query?where=%28AD_ADDRESS%3D22425+AND+AM_STR_NAME%3D%27SOUS+VIDE%27%29+OR+%28AD_ADDRESS%3D45831+AND+AM_STR_NAME%3D%27MARIES%27%29+OR+%28AD_ADDRESS%3D44371+AND+AM_STR_NAME%3D%27GIGABIT%27%29&outFields=OBJECTID%2CAD_POINT_TYPE%2CAD_ADDRESS%2CAD_MCPI%2CAD_UPD_DATE%2CAM_TOWN%2CAM_ZIP%2CAM_STR_NAME%2CAM_STR_TYPE%2CAM_STATE%2CFULL_ADDRESS_TSZ&returnGeometry=true&outSR=4326&resultRecordCount=50&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact retained service street to parcel PIN join"}, {"url": "https://logis.loudoun.gov/gis/rest/services/COL_LatLong/Parcels_LatLong/MapServer/0/query?where=PA_MCPI%3D%27045465016000%27&outFields=OBJECTID%2CPA_MCPI%2CPA_TYPE%2CPA_UNITS%2CPA_SOURCE%2CPA_PLAT_NUM%2CPA_PLAT_LOT%2CPA_UPD_DATE%2CPA_ADD_DATE%2CPA_END_DATE&returnGeometry=true&outSR=4326&resultRecordCount=25&f=json", "host": "logis.loudoun.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Exact parcel identifier and complete reference geometry"}, {"url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.45166915064831%2C38.990588444125045%2C-77.4401108493517%2C38.99957155587496&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image", "host": "basemap.nationalmap.gov", "published": "", "date": "", "checked": "2026-10-23", "label": "Actually viewed setting, acquisition date unknown"}], "checked": "2026-10-23", "whole_record_certified": false}], "raw_status": "under construction", "status_field": "current_status", "status_scope": "County LandMARC lists issued building/fit-out work in its October 16, 2026 data snapshot. Construction permitted describes that administrative scope, not verified physical progress, completed operation, an occupancy certificate or delivered IT. The operator still gives future initial-occupancy targets.", "event_evidence": [{"date": "2026-04-21", "text": "EdgeCore announced combined AS01/AS02 construction financing. The $1.5 billion loan envelope is not an individual-site investment or a construction-start/opening day. Initial occupancy remained a future target.", "kind": "announced", "sources": [{"url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia", "host": "edgecore.com", "published": "2026-04-21", "date": "2026-04-21", "checked": "2026-10-16", "label": "EdgeCore AS01/AS02 financing announcement"}]}], "reviewed_area_context": {"checked": "2026-10-23", "confidence": "inference", "fips": ["51107"], "review_id": "location-codex2-context044-edgecore-as02-sterling-va", "scope": "County context review of the exact agency street only. This review adds no site reference. Any separately reviewed site reference retains its own precision and source scope. County evidence does not certify a roof, full campus, legal parcel, municipal boundary, physical stage, party role or quantity.", "source_urls": ["https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000", "https://logis.loudoun.gov/gis/rest/services/LMARC/LandMARC_Permits/MapServer/1/query?where=ParcelPIN%3D%27045465016000%27&outFields=ID%2CPermitNumber%2CPermitType%2CPermitStatus%2CParcelPIN%2CMAIN%2CADDRESSLINE1%2CADDRESSLINE2%2CADDRESSLINE3%2CPREDIRECTION%2CSTREETTYPE%2CPOSTDIRECTION%2CUNITORSUITE%2CCITY%2CSTATE%2CDESCRIPTION%2CDataSnapshot&returnGeometry=true&outSR=4326&orderByFields=ID&resultRecordCount=2000&f=json"]}, "state_name": "Virginia", "state_path": "/virginia/"}, {"id": "stargate-port-washington-wi", "state": "WI", "kind": "facility", "name": "Stargate Lighthouse Campus", "group": "building", "status": "Reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Ozaukee"], "city": "Port Washington", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Nearly1GWis AI capacity, not exact measured utility load.4.5GWStargatepartnership and40BcombinedFrontierinvestment are broader scopes. Proposed dedicated utility rate not reviewed approved tariff; no guarantee other ratepayers unaffected. Renewable generation is separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Wisconsin named certificate register with scoped building descriptions. Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.", "date": "", "events": [["2025-12-18", "The Weitz Company published its named Lighthouse construction account December 18, 2025. This is the publication date of the contractor account and does not establish an exact excavation start, completion, delivered capacity or operation."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/", "host": "vantage-dc.com", "date": "2025-10-22", "published": "2025-10-22", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx", "host": "revenue.wi.gov", "date": "2026-06-25", "published": "2026-06-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}, {"url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/", "host": "www.weitz.com", "published": "2025-12-18", "date": "2025-12-18", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 43.39307, "lng": -87.96147, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "remaining-operators-review-round5-2026-10-14.json", "scope": "named operator source", "fields": {"campus_name": "Lighthouse", "planned_investment_usd_min_exclusive": 15000000000, "planned_data_centers": 4, "planned_ai_capacity_gw_approx": 1, "scheduled_completion_year": 2028, "total_acres": 672, "development_acres": 500, "regional_infrastructure_commitment_usd_min": 175000000, "forecast_construction_jobs_min_exclusive": 4000, "forecast_long_term_jobs_min_exclusive": 1000}, "notes": ["Nearly1GWis AI capacity, not exact measured utility load.4.5GWStargatepartnership and40BcombinedFrontierinvestment are broader scopes. Proposed dedicated utility rate not reviewed approved tariff; no guarantee other ratepayers unaffected. Renewable generation is separate.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/", "host": "vantage-dc.com", "date": "2025-10-22", "published": "2025-10-22", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Wisconsin named certificate register with scoped building descriptions", "fields": {"certification_register_as_of": "2025-10-31", "listed_certifications": [{"entity": "Epic Hosting LLC", "date": "2024-09-24", "location": "Milky Way,Verona,WI", "scope": "Utility Building3and additions"}, {"entity": "Degas LLC", "date": "2025-02-18", "location": "County RoadA,Beaver Dam,WI", "scope": "to be constructed"}, {"entity": "Oracle America Cloud Services LLC,formerly Green Chile Ventures LLC", "date": "2025-10-31", "location": "Port Washington,WI", "scope": "four buildings at531,533,701and723E Lake Drive"}]}, "notes": ["Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx", "host": "revenue.wi.gov", "date": "2026-06-25", "published": "2026-06-25", "checked": "2026-10-14", "date_kind": "publication", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 25", "scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.", "fields": {"current_stage_evidence": {"outcome": "named_contractor_reported_construction_with_future_completion_target", "scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted."}}, "notes": ["The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.", "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."], "sources": [{"url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin", "host": "vantage-dc.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/", "host": "www.weitz.com", "published": "2025-12-18", "date": "2025-12-18", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Wisconsin · Port Washington · Ozaukee · Source context reviewed", "status_scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.", "event_evidence": [{"date": "2025-12-18", "text": "The Weitz Company published its named Lighthouse construction account December 18, 2025. This is the publication date of the contractor account and does not establish an exact excavation start, completion, delivered capacity or operation.", "kind": "announced", "sources": [{"url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/", "host": "www.weitz.com", "published": "2025-12-18", "date": "2025-12-18", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "55089"}, "state_name": "Wisconsin", "state_path": "/wisconsin/"}, {"id": "meta-cheyenne-wy", "state": "WY", "kind": "facility", "name": "Meta Cheyenne Data Center", "group": "building", "status": "Contractor-reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Laramie"], "city": "Cheyenne", "address": "", "who": "Meta", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming named recipient histories and planned project scopes. Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [["2024-07-02", "Meta published its Cheyenne campus announcement on July 2, 2024. The announcement describes future completion and construction expectations. July 2 is the announcement date, not a manufactured exact construction start or opening day."]], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf", "host": "wyoleg.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://fortisconstruction.com/project/meta-cheyenne-campus/", "host": "fortisconstruction.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/", "host": "datacenters.atmeta.com", "published": "2024-07-02", "date": "2024-07-02", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Cheyenne-Data-Center.pdf", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "loc": {"lat": 41.29553, "lng": -104.75402, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Wyoming named recipient histories and planned project scopes", "fields": {"echostar_first_sales_tax_certification_year": 2011, "microsoft_cheyenne_certified_campuses": 3, "meta_cheyenne_first_sales_tax_certification_month": "2022-10", "meta_cheyenne_reported_phase1_planned_capex_usd_approx": 800000000, "meta_cheyenne_reported_phase1_expected_direct_nonconstruction_jobs": 60, "prometheus_casper_planned_power_gw": 1.5, "prometheus_casper_power_basis": "notexplicitIT"}, "notes": ["Legislativeagencyrecipient narrative, not paid taxbenefit or per-buildingcensus. Phase1Meta forecast not fullcampusspend/currentjobs. Carbon-negative naturalgas phrase is unverified marketing, not measured emissions. TwoWyomingpackets repeat same narrative, not independent confirmations.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf", "host": "wyoleg.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 15", "scope": "The current Fortis project page expressly identifies the Cheyenne Meta campus as a campus it is building. Contractor reported construction describes that named project. Meta July 2, 2024 announcement and current linked information sheet use future completion language. Regional utility planning, future jobs, renewable energy matching and the sheet statement about operational buildings generally do not establish that Cheyenne has opened or that every campus phase is complete. The PDF path is not a verified publication or construction date.", "fields": {"current_stage_evidence": {"outcome": "contractor_reported_named_campus_construction", "scope": "The current Fortis project page expressly identifies the Cheyenne Meta campus as a campus it is building. Contractor reported construction describes that named project. Meta July 2, 2024 announcement and current linked information sheet use future completion language. Regional utility planning, future jobs, renewable energy matching and the sheet statement about operational buildings generally do not establish that Cheyenne has opened or that every campus phase is complete. The PDF path is not a verified publication or construction date."}, "source_scope": {"fortis_named_client": "Meta", "current_contractor_building_claim": true, "meta_sheet_page_one_visually_read": true, "sheet_path_not_publication_date": true, "generic_operational_building_certification_not_cheyenne_opening": true, "renewable_matching_not_physical_grid_mix_or_zero_site_water_measurement": true}}, "notes": ["The current Fortis project page expressly identifies the Cheyenne Meta campus as a campus it is building. Contractor reported construction describes that named project. Meta July 2, 2024 announcement and current linked information sheet use future completion language. Regional utility planning, future jobs, renewable energy matching and the sheet statement about operational buildings generally do not establish that Cheyenne has opened or that every campus phase is complete. The PDF path is not a verified publication or construction date.", "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."], "sources": [{"url": "https://fortisconstruction.com/project/meta-cheyenne-campus/", "host": "fortisconstruction.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/", "host": "datacenters.atmeta.com", "published": "2024-07-02", "date": "2024-07-02", "checked": "2026-10-23", "label": "Reviewed operator source"}, {"url": "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Cheyenne-Data-Center.pdf", "host": "datacenters.atmeta.com", "published": "", "date": "", "checked": "2026-10-23", "label": "Reviewed operator source"}], "checked": "2026-10-23", "whole_record_certified": false}, {"overlay": "Company role source check61, October24,2026", "scope": "Meta identifies the Cheyenne campus in the July2,2024 announcement and links Fortis construction information. Future operational language, advertised site totals, staffing and the Crow Creek restoration commitment do not establish current service, exact boundaries, measured withdrawal or an environmental outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.", "fields": {"company_association": {"name": "Meta", "role": "developer", "identity_scope": "provider_brand_only", "scope": "Meta identifies the Cheyenne campus in the July2,2024 announcement and links Fortis construction information. Future operational language, advertised site totals, staffing and the Crow Creek restoration commitment do not establish current service, exact boundaries, measured withdrawal or an environmental outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."}, "provider_role": "developer"}, "notes": ["Meta identifies the Cheyenne campus in the July2,2024 announcement and links Fortis construction information. Future operational language, advertised site totals, staffing and the Crow Creek restoration commitment do not establish current service, exact boundaries, measured withdrawal or an environmental outcome. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."], "sources": [{"url": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/", "host": "datacenters.atmeta.com", "published": "2024-07-02", "date": "2024-07-02", "checked": "2026-10-24", "label": "Reviewed operator source"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Wyoming · Cheyenne · Laramie · Source context reviewed", "status_scope": "The current Fortis project page expressly identifies the Cheyenne Meta campus as a campus it is building. Contractor reported construction describes that named project. Meta July 2, 2024 announcement and current linked information sheet use future completion language. Regional utility planning, future jobs, renewable energy matching and the sheet statement about operational buildings generally do not establish that Cheyenne has opened or that every campus phase is complete. The PDF path is not a verified publication or construction date.", "event_evidence": [{"date": "2024-07-02", "text": "Meta published its Cheyenne campus announcement on July 2, 2024. The announcement describes future completion and construction expectations. July 2 is the announcement date, not a manufactured exact construction start or opening day.", "kind": "announced", "sources": [{"url": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/", "host": "datacenters.atmeta.com", "published": "2024-07-02", "date": "2024-07-02", "checked": "2026-10-23", "label": "Reviewed operator source"}]}], "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "56021"}, "state_name": "Wyoming", "state_path": "/wyoming/"}, {"id": "related-digital-cheyenne-wy", "state": "WY", "kind": "facility", "name": "Related Digital Cheyenne Data Center Campus", "group": "building", "status": "Agency reported construction", "raw_status": "under construction", "status_field": "current_status", "crypto": false, "type": "Data center (inventory classification)", "counties": ["Laramie"], "city": "Cheyenne", "address": "", "who": "", "end_user": "", "mw": null, "power": "", "power_note": "", "investment": "", "jobs": "", "acres": null, "utility": "", "water": "", "incentives": "", "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming distinct recipient/type/capacity scopes. SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.", "date": "", "events": [], "timeline": [], "opened": "", "tier": "", "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf", "host": "wyoleg.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}, {"url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf", "host": "wyoleg.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "loc": {"lat": 41.38492, "lng": -104.7101, "precision": "county", "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."}, "reviewed_evidence": [{"overlay": "government-primary-review-round7-2026-10-14.json", "scope": "Wyoming distinct recipient/type/capacity scopes", "fields": {"lunavi_government_described_use": "Cheyennecolocation", "h6coin_government_described_use": "NewcastleBitcoinmining", "prometheus_evanston_planned_power_gw": 1.2, "prometheus_evanston_power_basis": "notexplicitcriticalIT", "related_digital_cheyenne_planned_critical_it_mw_max": 302, "related_digital_campus_acres": 115, "related_digital_planned_capex_usd": 1200000000, "related_digital_first_building_area_sqft": 184000, "related_digital_first_building_completion_target": "late2026", "related_digital_anchor_tenant": "CoreWeave"}, "notes": ["SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven.", "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."], "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf", "host": "wyoleg.gov", "date": "", "published": "", "checked": "2026-10-14", "date_kind": "publication date not established", "label": "Reviewed source"}], "whole_record_certified": false}, {"overlay": "Codex 3 research cohort 71", "scope": "The selected original State program report explicitly describes the named Cheyenne Related Digital campus as currently under construction. This supports agency reported construction at that report scope. Its late 2026 completion expectation, prospective anchor tenant and earlier tax certification are not accomplished computing service, measured installed capacity or a completed phase. The selected account does not independently establish a first opening or verify all present project components.", "fields": {"current_stage_evidence": {"outcome": "agency_explicit_cheyenne_construction", "scope": "The selected original State program report explicitly describes the named Cheyenne Related Digital campus as currently under construction. This supports agency reported construction at that report scope. Its late 2026 completion expectation, prospective anchor tenant and earlier tax certification are not accomplished computing service, measured installed capacity or a completed phase. The selected account does not independently establish a first opening or verify all present project components."}, "source_read_scope": {"original_state_reports_physical_pages8_9_read": true, "explicit_construction_not_inferred_from_incentive": true, "late_2026_forecast_not_completion": true, "no_capacity_tenant_or_role_changes": true}}, "notes": ["The selected original State program report explicitly describes the named Cheyenne Related Digital campus as currently under construction. This supports agency reported construction at that report scope. Its late 2026 completion expectation, prospective anchor tenant and earlier tax certification are not accomplished computing service, measured installed capacity or a completed phase. The selected account does not independently establish a first opening or verify all present project components.", "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."], "sources": [{"url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf", "host": "wyoleg.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}, {"url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf", "host": "wyoleg.gov", "published": "", "date": "", "checked": "2026-10-24", "label": "Reviewed government record"}], "checked": "2026-10-24", "whole_record_certified": false}], "manual_source_reviewed": true, "whole_record_certified": false, "field_evidence_present": true, "inventory_label_retained": true, "precision_label": "Exact site not published; shown at county level", "summary": "Wyoming · Cheyenne · Laramie · Source context reviewed", "status_scope": "The selected original State program report explicitly describes the named Cheyenne Related Digital campus as currently under construction. This supports agency reported construction at that report scope. Its late 2026 completion expectation, prospective anchor tenant and earlier tax certification are not accomplished computing service, measured installed capacity or a completed phase. The selected account does not independently establish a first opening or verify all present project components.", "location_display": {"policy": "reviewed-map-references-2026-10-23", "decision": "withheld_unreviewed_point", "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.", "county_display": "56021"}, "state_name": "Wyoming", "state_path": "/wyoming/"}]}