{
  "schema_version": 1,
  "source_compilation_context": {
    "az": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/az.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "az/eloy",
    "label": "Eloy, Arizona"
  },
  "records": [
    {
      "id": "ryan-companies-southwest-crossing-data-park-eloy-az",
      "state": "az",
      "kind": "facility",
      "name": "Southwest Crossing Data Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pinal"
      ],
      "city": "Eloy",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Commission recommendation is not council adoption or construction. Three buildings exceeding 855,000 square feet differ from the economic study ceiling of 1.25 million square feet; do not merge both as final built area. 400 MW has no stated critical-IT basis. $687.5 million construction cost, more than $5.6 million annual direct tax and 4,800 direct construction jobs are consultant forecasts, not spending, collections or permanent jobs. Proposed 219,600 gallons/day average cap has a city-engineer exception and is not measured consumption or a claim of zero water use. End user is explicitly unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/",
          "host": "azbex.com",
          "date": "2025-01-21",
          "published": "2025-01-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.97074,
        "lng": -111.29399,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "AZBEX reports Ryan Companies pivoted the Eloy industrial proposal to Southwest Crossing Data Park, with planning commission recommending the rezoning on January 15.",
            "independently_verified_current_operating_status": null,
            "reported_water_design_average_gallons_per_day": 219600,
            "water_figure_scope": "Proposed application limit with city-engineer exception; not measured consumption",
            "executed_utility_agreement_verified": false
          },
          "notes": [
            "Commission recommendation is not council adoption or construction. Three buildings exceeding 855,000 square feet differ from the economic study ceiling of 1.25 million square feet; do not merge both as final built area. 400 MW has no stated critical-IT basis. $687.5 million construction cost, more than $5.6 million annual direct tax and 4,800 direct construction jobs are consultant forecasts, not spending, collections or permanent jobs. Proposed 219,600 gallons/day average cap has a city-engineer exception and is not measured consumption or a claim of zero water use. End user is explicitly unknown.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/",
              "host": "azbex.com",
              "date": "2025-01-21",
              "published": "2025-01-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Eloy · Pinal · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "04021"
      }
    },
    {
      "id": "vermaland-la-osa-eloy-az",
      "state": "az",
      "kind": "facility",
      "name": "La Osa Data Center Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pinal"
      ],
      "city": "Eloy",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. URL datedAugust 26 but body says updatedSeptember 29; preserve update provenance and distinguish new denial section from older future-hearing paragraph still on page. Reported denial is not independently examined original resolution, appeal judgment or permanent prohibition. Same update says Pima adopted 120 daypauseSeptember 22 andTucsonnewrulesAugust 5; those are different jurisdictions and require original scope/exception review. This later-dated Pima claim differs from round 32 Sept 24 story’s future-meeting wording; exact signed county instrument remains a follow-up, not a calendar-inferred resolution. No La Osa MW/approved water/operation inferred. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.sonorandesert.org/2026/08/26/data-centers-update/",
          "host": "sonorandesert.org",
          "date": "2026-09-29",
          "published": "2026-09-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://public.destinyhosted.com/pinaldocs/2025/PZ/20251016_135/784_PZPA01125-_La_Osa_PKT-P%26Z.pdf",
          "host": "public.destinyhosted.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 32.88763,
        "lng": -111.43981,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Coalition for Sonoran Desert Protection’s update explicitly reports Pinal supervisors denied La Osa rezoning onAugust 26,2026, after conservation-group opposition.",
            "independently_verified_current_operating_status": null,
            "advocacy_reported_rezoning_denial_date": "2026-08-26",
            "original_decision_verified": false
          },
          "notes": [
            "URL datedAugust 26 but body says updatedSeptember 29; preserve update provenance and distinguish new denial section from older future-hearing paragraph still on page. Reported denial is not independently examined original resolution, appeal judgment or permanent prohibition. Same update says Pima adopted 120 daypauseSeptember 22 andTucsonnewrulesAugust 5; those are different jurisdictions and require original scope/exception review. This later-dated Pima claim differs from round 32 Sept 24 story’s future-meeting wording; exact signed county instrument remains a follow-up, not a calendar-inferred resolution. No La Osa MW/approved water/operation inferred.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.sonorandesert.org/2026/08/26/data-centers-update/",
              "host": "sonorandesert.org",
              "date": "2026-09-29",
              "published": "2026-09-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 18",
          "scope": "The Pinal October 16, 2025 staff packet reports a Citizen Advisory Committee recommendation and records concerns about drainage, fire safety, water, trails and open space. It describes a comprehensive plan request that would allow later rezoning work. The recommendation is not a Board approval or current physical stage. Later reported August 2026 denial leads were not verified in an original decision record during this bounded review, so no cancellation, permanent closure or final legal outcome is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_advisory_recommendation_not_final_board_or_physical_outcome",
              "scope": "The Pinal October 16, 2025 staff packet reports a Citizen Advisory Committee recommendation and records concerns about drainage, fire safety, water, trails and open space. It describes a comprehensive plan request that would allow later rezoning work. The recommendation is not a Board approval or current physical stage. Later reported August 2026 denial leads were not verified in an original decision record during this bounded review, so no cancellation, permanent closure or final legal outcome is adopted."
            },
            "source_read_scope": {
              "staff_report_text_pages_read": [
                1,
                2,
                3,
                4,
                5
              ],
              "staff_summary_page_visually_read": 1,
              "advisory_recommendation_not_final_board_approval": true,
              "later_reported_outcome_primary_verification_held": true
            }
          },
          "notes": [
            "The Pinal October 16, 2025 staff packet reports a Citizen Advisory Committee recommendation and records concerns about drainage, fire safety, water, trails and open space. It describes a comprehensive plan request that would allow later rezoning work. The recommendation is not a Board approval or current physical stage. Later reported August 2026 denial leads were not verified in an original decision record during this bounded review, so no cancellation, permanent closure or final legal outcome is adopted.",
            "Roles, locations, individual physical identity, quantities and opening fields remain exact. Source dates, check dates and physical milestones stay separate."
          ],
          "sources": [
            {
              "url": "https://public.destinyhosted.com/pinaldocs/2025/PZ/20251016_135/784_PZPA01125-_La_Osa_PKT-P%26Z.pdf",
              "host": "public.destinyhosted.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Eloy · Pinal · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "04021"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
