{
  "schema_version": 1,
  "source_compilation_context": {
    "fl": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/fl.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "fl/fort-pierce",
    "label": "Fort Pierce, Florida"
  },
  "records": [
    {
      "id": "atlas-compute-ai-data-center-campus-fort-pierce-fl",
      "state": "fl",
      "kind": "facility",
      "name": "Atlas Compute AI Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Lucie"
      ],
      "city": "Fort Pierce",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Zoning-verification letter and corporate landholding are not approvals or executedpoweragreements. UnspecifiedhundredsofMWinitialIT/up-to 1 GWexpansion are vague developer claims without examined technical basis; no exactcanonicalMWorRFS. Closed-loopdesign is not quantified actualwateruse or noimpact guarantee. Other 2025 St.Lucieproposal denial is different site. NamedLLCfilings/addresses are not independently reviewed originals and cannot alone identify an operatingtenant. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://hoodline.com/2026/03/massive-ai-server-farm-sets-sights-on-fort-pierce-neighbors-want-answers/",
          "host": "hoodline.com",
          "date": "2026-03-13",
          "published": "2026-03-13",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://atlascompute.ai/",
          "host": "atlascompute.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 27.3777,
        "lng": -80.47107,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "Hoodline relays WPTVcounty statements that no formal AtlasComputeapplication/permitpackage had been received, despite developer land/utility and 2026 to 27 opening claims for a FortPierceareaGPUcampus.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Zoning-verification letter and corporate landholding are not approvals or executedpoweragreements. UnspecifiedhundredsofMWinitialIT/up-to 1 GWexpansion are vague developer claims without examined technical basis; no exactcanonicalMWorRFS. Closed-loopdesign is not quantified actualwateruse or noimpact guarantee. Other 2025 St.Lucieproposal denial is different site. NamedLLCfilings/addresses are not independently reviewed originals and cannot alone identify an operatingtenant.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://hoodline.com/2026/03/massive-ai-server-farm-sets-sights-on-fort-pierce-neighbors-want-answers/",
              "host": "hoodline.com",
              "date": "2026-03-13",
              "published": "2026-03-13",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 38",
          "scope": "The current original company home page describes an AI ready campus in Florida but gives no accepted exact Fort Pierce phase account in the reviewed body. The issuer release distribution host returned a robots denial, so that article was not fetched and its indexed investment, utility, capacity and readiness claims are not adopted. A generic designed campus headline and a passed or future readiness forecast do not establish construction or current operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "generic_florida_company_campus_without_exact_current_fort_pierce_phase",
              "scope": "The current original company home page describes an AI ready campus in Florida but gives no accepted exact Fort Pierce phase account in the reviewed body. The issuer release distribution host returned a robots denial, so that article was not fetched and its indexed investment, utility, capacity and readiness claims are not adopted. A generic designed campus headline and a passed or future readiness forecast do not establish construction or current operation."
            }
          },
          "notes": [
            "The current original company home page describes an AI ready campus in Florida but gives no accepted exact Fort Pierce phase account in the reviewed body. The issuer release distribution host returned a robots denial, so that article was not fetched and its indexed investment, utility, capacity and readiness claims are not adopted. A generic designed campus headline and a passed or future readiness forecast do not establish construction or current operation.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://atlascompute.ai/",
              "host": "atlascompute.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fort Pierce · St. Lucie · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "12111"
      }
    },
    {
      "id": "sentinel-grove-technology-park-fort-pierce-fl",
      "state": "fl",
      "kind": "facility",
      "name": "Sentinel Grove Technology Park (Project Jarvis)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Lucie"
      ],
      "city": "Fort Pierce",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. Kate Hussey, WPTV original commissioner interview: public metadata dates February23,2026; modified timestamp precedes publication same day, so no exact event time inferred. Sentinel Grove MAY withdraw; commissioner says waiting on legislation before OFFICIAL cutting ties. This is not a confirmed withdrawal/canceled project.15M sf proposal onOrangeAvenue separate from1.8M sfProjectTango inPalmBeach. ProposedSB482/484 not current enactedlaw.1.7Mgal/month belongsTango, notSentinel. No developer response or ITMW established. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wptv.com/wptv-investigates/scrapped-developer-of-st-lucie-county-data-center-project-may-withdraw-plan-amid-new-ai-legislation",
          "host": "wptv.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 27.38962,
        "lng": -80.48408,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "Kate Hussey, WPTV original commissioner interview: public metadata dates February23,2026; modified timestamp precedes publication same day, so no exact event time inferred. Sentinel Grove MAY withdraw; commissioner says waiting on legislation before OFFICIAL cutting ties. This is not a confirmed withdrawal/canceled project.15M sf proposal onOrangeAvenue separate from1.8M sfProjectTango inPalmBeach. ProposedSB482/484 not current enactedlaw.1.7Mgal/month belongsTango, notSentinel. No developer response or ITMW established.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.wptv.com/wptv-investigates/scrapped-developer-of-st-lucie-county-data-center-project-may-withdraw-plan-amid-new-ai-legislation",
              "host": "wptv.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The WPTV account says the developer may withdraw and describes a decision still pending. That qualified wording does not establish final cancellation or closure. Proposed state bills are not enacted law, and Project Tango’s water figure is a different project. Current stage remains unresolved."
            }
          },
          "notes": [
            "The WPTV account says the developer may withdraw and describes a decision still pending. That qualified wording does not establish final cancellation or closure. Proposed state bills are not enacted law, and Project Tango’s water figure is a different project. Current stage remains unresolved."
          ],
          "sources": [
            {
              "url": "https://www.wptv.com/wptv-investigates/scrapped-developer-of-st-lucie-county-data-center-project-may-withdraw-plan-amid-new-ai-legislation",
              "host": "www.wptv.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fort Pierce · St. Lucie · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "12111"
      }
    },
    {
      "id": "willow-lakes-west-midway-fort-pierce-fl",
      "state": "fl",
      "kind": "facility",
      "name": "Willow Lakes Data Center (West Midway Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Lucie"
      ],
      "city": "Fort Pierce",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Owner’s 203 acres,174 industrial and 26 commercial are parent/subarea descriptions, not additive or exactly reconciled total. Rezoning request is not approval; partner developer and separate site plan would come later. Failed surf-park financing is history, not DCtenant failure. FPLlines and man-made-lake closed-loop concept are not executed power contract, water rights or zero-water/impact certification. Commissioner conditions are prospective preferences, not issued permit terms. NoMW/IT/RFS/current construction. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wflx.com/2026/08/31/203-acre-data-center-proposed-western-st-lucie-county-near-interstate-95/",
          "host": "wflx.com",
          "date": "2026-08-31",
          "published": "2026-08-31",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 27.35282,
        "lng": -80.46888,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "WFLX reports WillowLakes submitted June rezoning for 174 acres of a 203-acre property near WestMidwayRoad/I 95 inFortPierce to enable a data center, withSeptember 17 planning review expected.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Owner’s 203 acres,174 industrial and 26 commercial are parent/subarea descriptions, not additive or exactly reconciled total. Rezoning request is not approval; partner developer and separate site plan would come later. Failed surf-park financing is history, not DCtenant failure. FPLlines and man-made-lake closed-loop concept are not executed power contract, water rights or zero-water/impact certification. Commissioner conditions are prospective preferences, not issued permit terms. NoMW/IT/RFS/current construction.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wflx.com/2026/08/31/203-acre-data-center-proposed-western-st-lucie-county-near-interstate-95/",
              "host": "wflx.com",
              "date": "2026-08-31",
              "published": "2026-08-31",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fort Pierce · St. Lucie · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "12111"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
