{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ga/cartersville",
    "label": "Cartersville, Georgia"
  },
  "records": [
    {
      "id": "atlas-stiles-road-cartersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Atlas Development Stiles Road Data Center (Euharlee Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd",
          "host": "change.org",
          "date": "2025-11-17",
          "published": "2025-11-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.24873,
        "lng": -84.85247,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "Change.org opposition petition names AtlasDevelopment’s proposed 260,000 square-foot use at 208/329 StilesRoad, with aDecember 15,2025 Bartowconditional-permit hearing described.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd",
              "host": "change.org",
              "date": "2025-11-17",
              "published": "2025-11-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "databank-indo-cartersville-ga",
      "state": "ga",
      "kind": "project",
      "name": "DataBank Project Indo",
      "group": "approved",
      "status": "Zoning approved",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "218 Industrial Park Road, Cartersville, GA",
      "who": "DataBank",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "Approximate 200 MW +/- critical IT planning envelope described by city staff for Project Indo. Not approved utility supply, a measured load or commissioned capacity; no specific technical as-of day is stated.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-09-03",
          "Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html",
          "host": "daily-tribune.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf",
          "host": "mccmeetings.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Signed September 3, 2026 council minutes, pages 1-2 and 7"
        },
        {
          "url": "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf",
          "host": "mccmeetingspublic.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Z26-05 city case file, zoning synopsis pages 1-3"
        },
        {
          "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-47a78684740141a2bd666b0110ac1ed2.pdf",
          "host": "mccmeetings.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "September 17 council minutes, page 1 ratifies September 3 minutes"
        },
        {
          "url": "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-621d8771b7934c63b3825634b1abf945.pdf",
          "host": "mccmeetingspublic.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "September 3 second-reading staff summary; recommendation, not vote"
        }
      ],
      "loc": {
        "lat": 34.21354,
        "lng": -84.83793,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Daily Tribune reports DataBank DRI/rezoning application for69-acre218IndustrialParkRoad in Cartersville.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html",
              "host": "daily-tribune.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Primary-Campus-Holds-20261016",
          "scope": "Targeted primary campus/project stage and identity-scope review. No physical-site census, point/precision upgrade, actual delivery, metered use or legal title finding.",
          "fields": {
            "city_case_reference": "Z26-05; ordinance reference 44-26",
            "zoning_decision": {
              "adopted_on": "2026-09-03",
              "zoning_vote": "6-0",
              "variance_vote": "6-0",
              "from": "H-I (Heavy Industrial)",
              "to": "T (Technology)",
              "conditions": [
                "Conditioned on the submitted concept site plan, elevations and project descriptions, including a closed-loop water cooling system.",
                "Principal use limited to data processing, storage, hosting and related services, with associated Technology-district and customary accessory uses.",
                "No certificate of occupancy for a data center until a letter establishes electric power is available; individual buildings and subdivisions may be treated separately."
              ],
              "effective_on": null
            },
            "variance_scope": "Approved concurrent requests reduce off-street parking from 1,313 to 286 spaces and allow the front facade nearest Industrial Park Road to face away from that road. These are site-specific zoning permissions, not building or occupancy permits.",
            "published_project_location": {
              "address": "218 Industrial Park Road, Cartersville, Georgia",
              "parcel_reference": "C059-0001-001",
              "reported_acres_approx": 68.77
            },
            "proposed_technical_scope": "City staff describes an approximately 200 MW +/- critical IT data-center proposal and two data-center warehouses. This is a planning envelope, not commissioned, contracted or metered capacity. No new two-building physical census is asserted.",
            "utility_and_delivery_limits": "The case file says MEAG Power was studying power supply needs and transmission routing, with sewer flow and industrial pretreatment information still needed. It forecasts development in 2027 and staged facility delivery from 2028 through 2032, contingent on approval. No actual start, utility allocation, occupancy, opening or consumption is established.",
            "water_condition_scope": "Closed-loop water cooling is a zoning condition. It is not proof of installed equipment, zero water use, a withdrawal permit or measured consumption.",
            "approval_document_scope": "Signed September 3 council minutes record both final motions. September 17 minutes separately approve those minutes. The September 3 agenda and staff recommendation alone are not used as proof the vote passed. No automatic September 3 effective date is inferred.",
            "current_status_basis": "City Council approved Z26-05 rezoning and concurrent variances on September 3, 2026, both 6-0, with three conditions and ordinance reference 44-26. Approval is limited to zoning; final building, air, power-availability, occupancy, construction and operation are not established."
          },
          "notes": [
            "Field-specific review only. Original name, approximate location and wrapper, city/county context, opening field, legacy MW, financial and ownership limits remain.",
            "Campus/component and regulatory proposal units are not interchangeable with separate physical sites or complete operational capacity."
          ],
          "sources": [
            {
              "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf",
              "host": "mccmeetings.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Signed September 3, 2026 council minutes, pages 1-2 and 7"
            },
            {
              "url": "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf",
              "host": "mccmeetingspublic.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Z26-05 city case file, zoning synopsis pages 1-3"
            },
            {
              "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-47a78684740141a2bd666b0110ac1ed2.pdf",
              "host": "mccmeetings.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "September 17 council minutes, page 1 ratifies September 3 minutes"
            },
            {
              "url": "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-621d8771b7934c63b3825634b1abf945.pdf",
              "host": "mccmeetingspublic.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "September 3 second-reading staff summary; recommendation, not vote"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "search_extra": "DataBank Project Indo Z26-05 44-26 218 Industrial Park Road C059-0001-001",
      "status_scope": "City Council approved Z26-05 rezoning and concurrent variances on September 3, 2026, both 6-0, with three conditions and ordinance reference 44-26. Approval is limited to zoning; final building, air, power-availability, occupancy, construction and operation are not established.",
      "event_evidence": [
        {
          "date": "2026-09-03",
          "text": "Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf",
              "host": "mccmeetings.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Signed September 3, 2026 council minutes, pages 1-2 and 7"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 200,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-16",
          "basis": "forecast",
          "scope": "Approximate 200 MW +/- critical IT planning envelope described by city staff for Project Indo. Not approved utility supply, a measured load or commissioned capacity; no specific technical as-of day is stated.",
          "sources": [
            "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "oakley-brown-farm-road-cartersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Oakley Real Estate Partners Brown Farm Road Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bartow generic agenda without exact-site evidence. Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf",
          "host": "cms2.revize.com",
          "date": "2026-09-02",
          "published": "2026-09-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.26054,
        "lng": -84.82223,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Bartow generic agenda without exact-site evidence",
          "fields": {},
          "notes": [
            "Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf",
              "host": "cms2.revize.com",
              "date": "2026-09-02",
              "published": "2026-09-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {},
          "notes": [
            "The original September 2026 agenda host disallows automated retrieval. No final commissioner decision is established. Directory and news claims remain leads; access failure does not qualify as a fresh field review."
          ],
          "sources": [
            {
              "url": "https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf",
              "host": "cms2.revize.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "switch-keep-2-atlanta-north-cartersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Switch KEEP 2.0 Atlanta North Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Switch phased regional-impact application. 126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061",
          "host": "apps.dca.ga.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/atlanta/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party exact campus text, scoped provider relationship reviewed"
        }
      ],
      "loc": {
        "lat": 34.23145,
        "lng": -84.87327,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Switch phased regional-impact application",
          "fields": {
            "dri_id": "4061",
            "project_name": "SwitchKEEP2.0AtlantaNorthCampus",
            "initial_phase_site_acres": 126,
            "initial_phase_buildings": 1,
            "initial_phase_completion_target": "2026-Q2",
            "overall_project_completion_target_year": 2046,
            "published_location_description": "south ofOldAlabamaRoad/BatesRoad intersection towardPauldingCountyline,CityofCartersville"
          },
          "notes": [
            "126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061",
              "host": "apps.dca.ga.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/atlanta/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
