{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ga/douglasville",
    "label": "Douglasville, Georgia"
  },
  "records": [
    {
      "id": "flexential-atlanta-douglasville-1-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Flexential Atlanta - Douglasville 1",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "Flexential",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Page 32 gives 204,700 square feet building and 150,000 data halls; these are different floor-area scopes. This PDF does not establish a commissioning date. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
          "host": "flexential.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1700+N.+River+Rd%2C+Douglasville%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        },
        {
          "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-data-center",
          "host": "www.flexential.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.72871731191,
        "lng": -84.61789008925,
        "precision": "address",
        "basis": "Official Flexential fleet guide publishes 1700 N. River Rd, Douglasville, GA 30122 for Douglasville 1. It matches one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof or full campus. Existing status remains unknown; current operation and ownership are not certified."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round14-2026-10-14.json",
          "scope": "Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.",
          "fields": {
            "operator_named_facility": "Flexential Atlanta - Douglasville 1",
            "publisher_reported_footprint_sqft": 204700,
            "publisher_reported_critical_power_mw": 22.5,
            "power_basis": "operator critical load UPS capacity; Douglasville sections call it critical power",
            "current_measured_demand_mw": null,
            "commissioning_date": null,
            "exact_address_verified_by_this_document": false
          },
          "notes": [
            "Page 32 gives 204,700 square feet building and 150,000 data halls; these are different floor-area scopes. This PDF does not establish a commissioning date.",
            "Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "flexential.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 9, October 22, 2026",
          "scope": "Official operator street reference only. Existing status remains unknown. No canonical address, physical milestone, quantity, company role, legal jurisdiction, surveyed parcel, full campus or independent building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 33.72871731191,
                "lng": -84.61789008925,
                "precision": "address",
                "basis": "Official Flexential fleet guide publishes 1700 N. River Rd, Douglasville, GA 30122 for Douglasville 1. It matches one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof or full campus. Existing status remains unknown; current operation and ownership are not certified."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1700 N. River Rd, Douglasville, GA 30122",
              "county_fips": [
                "13097"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The official fleet guide names the Douglasville 1 facility and explicitly prints its numeric street address in the Location section. The preceding named facility page and its specification page belong to the same two page section. Its address page was visually reviewed.",
            "This is a location only review. The native unknown status and its evidence wrappers remain exact. The guide description, capacities, SLA, technical specifications and certifications do not establish commissioning or current operation and are not adopted. The existing blank canonical address is preserved.",
            "The source uses Douglasville as the facility locality. Census standardizes the same numeric North River Road address and postal code to Lithia Springs, inside the existing Douglas County context. No city, jurisdiction, ownership or title correction is inferred.",
            "The unique Census street match is used as a calculated address reference, not a building, full campus or parcel point. The public county map was inspected as a further lead; direct parcel queries failed and its other service requires a token. No parcel geometry, title or coordinate is adopted from that route."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official fleet guide, Douglasville 1 service address on PDF page 33"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1700+N.+River+Rd%2C+Douglasville%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 80",
          "scope": "Selected original fleet guide physical page 32 names the Atlanta Douglasville 1 center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_guide_named_atlanta_douglasville_1_service",
              "scope": "Selected original fleet guide physical page 32 names the Atlanta Douglasville 1 center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged."
            },
            "source_read_scope": {
              "original_owned_raw_guide_and_retrieval_receipt_reused": true,
              "no_new_request_for_denied_market_body": true,
              "original_named_provider_service_text_selected_physical_page": 32,
              "not_entire_102_page_guide_or_maps_read": true,
              "named_center_scope_not_every_inherited_component_code": true,
              "no_capacity_audit_legal_or_uptime_certification": true,
              "no_planned_expansion_or_advertised_inventory_as_completed_phase": true
            }
          },
          "notes": [
            "Selected original fleet guide physical page 32 names the Atlanta Douglasville 1 center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check66, October24,2026",
          "scope": "The named Douglasville 1 service profile identifies Flexential for the retained record. It remains separate from Douglasville 2. Capacity, standby generation and cooling advertising are not adopted as measured output or permit findings. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification.",
          "fields": {
            "company_association": {
              "name": "Flexential",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The named Douglasville 1 service profile identifies Flexential for the retained record. It remains separate from Douglasville 2. Capacity, standby generation and cooling advertising are not adopted as measured output or permit findings. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The named Douglasville 1 service profile identifies Flexential for the retained record. It remains separate from Douglasville 2. Capacity, standby generation and cooling advertising are not adopted as measured output or permit findings. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-data-center",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, status remains unknown",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "status_scope": "Selected original fleet guide physical page 32 names the Atlanta Douglasville 1 center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged."
    },
    {
      "id": "flexential-atlanta-douglasville-2-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Flexential Atlanta - Douglasville 2",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "Flexential",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
          "host": "flexential.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1750+N.+River+Rd%2C+Douglasville%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        },
        {
          "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center",
          "host": "www.flexential.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.flexential.com/resources/press-release/flexential-secures-strategic-real-estate-ownership-hillsboro-oregon",
          "host": "www.flexential.com",
          "published": "2026-05-28",
          "date": "2026-05-28",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.flexential.com/data-centers/portland-hillsboro-6-data-center",
          "host": "www.flexential.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.731693227468,
        "lng": -84.616202921678,
        "precision": "address",
        "basis": "Official Flexential fleet guide publishes 1750 N. River Rd, Douglasville, GA 30122 for Douglasville 2. It matches one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof or full campus. Existing status remains unknown; current operation and ownership are not certified."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round14-2026-10-14.json",
          "scope": "Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.",
          "fields": {
            "operator_named_facility": "Flexential Atlanta - Douglasville 2",
            "publisher_reported_footprint_sqft": 358000,
            "publisher_reported_critical_power_mw": 36,
            "power_basis": "operator critical load UPS capacity; Douglasville sections call it critical power",
            "current_measured_demand_mw": null,
            "commissioning_date": null,
            "exact_address_verified_by_this_document": false
          },
          "notes": [
            "Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "flexential.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 9, October 22, 2026",
          "scope": "Official operator street reference only. Existing status remains unknown. No canonical address, physical milestone, quantity, company role, legal jurisdiction, surveyed parcel, full campus or independent building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 33.731693227468,
                "lng": -84.616202921678,
                "precision": "address",
                "basis": "Official Flexential fleet guide publishes 1750 N. River Rd, Douglasville, GA 30122 for Douglasville 2. It matches one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof or full campus. Existing status remains unknown; current operation and ownership are not certified."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1750 N. River Rd, Douglasville, GA 30122",
              "county_fips": [
                "13097"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The official fleet guide names the Douglasville 2 facility and explicitly prints its numeric street address in the Location section. The preceding named facility page and its specification page belong to the same two page section. Its address page was visually reviewed.",
            "This is a location only review. The native unknown status and its evidence wrappers remain exact. The guide description, capacities, SLA, technical specifications and certifications do not establish commissioning or current operation and are not adopted. The existing blank canonical address is preserved.",
            "The source uses Douglasville as the facility locality. Census standardizes the same numeric North River Road address and postal code to Lithia Springs, inside the existing Douglas County context. No city, jurisdiction, ownership or title correction is inferred.",
            "The unique Census street match is used as a calculated address reference, not a building, full campus or parcel point. The public county map was inspected as a further lead; direct parcel queries failed and its other service requires a token. No parcel geometry, title or coordinate is adopted from that route."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official fleet guide, Douglasville 2 service address on PDF page 35"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1750+N.+River+Rd%2C+Douglasville%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 80",
          "scope": "Selected original fleet guide physical page 34 describes Douglasville 2 as a new build, advertises data halls, capacity, design and available services, and uses future oriented deployment language. These statements do not independently resolve exact current physical computing completion or commissioned service. The current original Atlanta market page returned 403 and no indexed market listing, alternate copy or new provider request was used to fill that gap. Original guide specifications, ownership and advertised inventory do not establish computing operation or an exact opening day. Current stage remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_douglasville2_new_build_advertising_exact_stage_held",
              "scope": "Selected original fleet guide physical page 34 describes Douglasville 2 as a new build, advertises data halls, capacity, design and available services, and uses future oriented deployment language. These statements do not independently resolve exact current physical computing completion or commissioned service. The current original Atlanta market page returned 403 and no indexed market listing, alternate copy or new provider request was used to fill that gap. Original guide specifications, ownership and advertised inventory do not establish computing operation or an exact opening day. Current stage remains held."
            },
            "source_read_scope": {
              "original_owned_guide_and_receipt_reused": true,
              "original_physical_page34_selected_complete_service_and_design_text_read": true,
              "new_build_advertising_not_commissioned_computing": true,
              "denied_current_market_body_not_replaced": true,
              "no_equipment_capacity_role_or_location_change": true
            }
          },
          "notes": [
            "Selected original fleet guide physical page 34 describes Douglasville 2 as a new build, advertises data halls, capacity, design and available services, and uses future oriented deployment language. These statements do not independently resolve exact current physical computing completion or commissioned service. The current original Atlanta market page returned 403 and no indexed market listing, alternate copy or new provider request was used to fill that gap. Original guide specifications, ownership and advertised inventory do not establish computing operation or an exact opening day. Current stage remains held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check66, October24,2026",
          "scope": "The named Douglasville 2 service profile identifies Flexential for the retained record. Its target PUE and advertised liquid ready capabilities do not establish a measured environmental outcome, a commissioning date or completion of a wider campus. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification.",
          "fields": {
            "company_association": {
              "name": "Flexential",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The named Douglasville 2 service profile identifies Flexential for the retained record. Its target PUE and advertised liquid ready capabilities do not establish a measured environmental outcome, a commissioning date or completion of a wider campus. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The named Douglasville 2 service profile identifies Flexential for the retained record. Its target PUE and advertised liquid ready capabilities do not establish a measured environmental outcome, a commissioning date or completion of a wider campus. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research followup 2",
          "scope": "The freshly read original dedicated Douglasville 2 profile advertises named capability, colocation and support using a broad service template. The May 2026 issuer account refers to an earlier property acquisition without independently dating physical commissioning. No acquisition, marketing capability, design target or neighboring operating facility is substituted for an exact current computing phase. The separately unavailable Atlanta market source was not requested again, and the existing legitimate dedicated original capture was reused without a new network request. No physical status, title, location or service quantity is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_douglasville2_dedicated_profile_capability_not_commissioning",
              "scope": "The freshly read original dedicated Douglasville 2 profile advertises named capability, colocation and support using a broad service template. The May 2026 issuer account refers to an earlier property acquisition without independently dating physical commissioning. No acquisition, marketing capability, design target or neighboring operating facility is substituted for an exact current computing phase. The separately unavailable Atlanta market source was not requested again, and the existing legitimate dedicated original capture was reused without a new network request. No physical status, title, location or service quantity is promoted."
            },
            "source_read_scope": {
              "complete_relevant_named_current_operator_profile_sections_read": true,
              "original_peer_capture_and_actual_retrieval_receipt_reused": true,
              "no_new_network_request": true,
              "shared_hillsboro6_marketing_template_not_proof_of_commissioning": true,
              "service_advertising_lease_and_ownership_not_operation": true,
              "no_role_location_identity_or_quantity_promotion": true
            }
          },
          "notes": [
            "The freshly read original dedicated Douglasville 2 profile advertises named capability, colocation and support using a broad service template. The May 2026 issuer account refers to an earlier property acquisition without independently dating physical commissioning. No acquisition, marketing capability, design target or neighboring operating facility is substituted for an exact current computing phase. The separately unavailable Atlanta market source was not requested again, and the existing legitimate dedicated original capture was reused without a new network request. No physical status, title, location or service quantity is promoted.",
            "Existing identities, roles, physical placement, jurisdiction assignments, technical quantities and exact first service days remain unchanged. A publication day does not date property closing or physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.flexential.com/resources/press-release/flexential-secures-strategic-real-estate-ownership-hillsboro-oregon",
              "host": "www.flexential.com",
              "published": "2026-05-28",
              "date": "2026-05-28",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.flexential.com/data-centers/portland-hillsboro-6-data-center",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, status remains unknown",
      "summary": "Douglasville · Douglas · Source context reviewed"
    },
    {
      "id": "google-douglas-county-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Google Douglasville Data Center",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "Calendar-year 2025 operator-reported location totals. Withdrawal, discharge and consumption are separate quantities; methodology permits estimates and does not establish today’s use.",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Google 2026 quarterly performance table; named regional campus scope. Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/georgia/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.google/efficiency/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/georgia/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "host": "sustainability.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google 2026 Environmental Report"
        }
      ],
      "loc": {
        "lat": 33.68578,
        "lng": -84.76667,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "Georgia statewide page, separate location milestones",
          "fields": {
            "douglas_county_opening_year": 2007,
            "announced_new_locations_year": 2026,
            "new_locations": [
              "LaGrange",
              "Columbia County"
            ],
            "regional_committed_investment_usd_min_exclusive": 3000000000,
            "investment_scope": "Georgia statewide"
          },
          "notes": [
            "2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/georgia/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Google 2026 quarterly performance table; named regional campus scope",
          "fields": {
            "operator_reported_pue_period": "2026-Q2",
            "operator_reported_campus_pue": [
              {
                "source_campus_label": "Douglas County, Georgia",
                "quarterly_pue": 1.1,
                "trailing_twelve_month_pue": 1.09
              }
            ]
          },
          "notes": [
            "Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/efficiency/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://datacenters.google/locations/georgia/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "398f42d55ca9e2ebecd3b24e2dede307ad2d9d3b653469d1efebd135488f9c17",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Douglas County, Georgia is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "annual_water_reporting": {
              "source_location": "Douglas County, GA",
              "report_year": 2026,
              "reporting_year": 2025,
              "source_page": 97,
              "unit": "Million gallons",
              "withdrawal": 440.6,
              "discharge": 73.5,
              "consumption": 367.1
            },
            "water_method_scope": "Annual calendar-year 2025 figures for the reported location, not instantaneous use, a daily rate, an approved limit or one building. Google uses metered or invoiced values when available and can estimate missing data; the table does not identify each row’s metering completeness. Consumption is calculated as withdrawal minus discharge; values are rounded. Seawater and brackish water over 1,000 mg/L total dissolved solids are excluded. Unless otherwise specified, withdrawals are potable; Douglas County includes reclaimed wastewater. No litres or daily averages are calculated.",
            "water_location_association": "Douglas County, GA is associated with this regional campus research context only; no allocation to separate expansion/street-address records or individual buildings.",
            "current_status_basis": "An operating component is supported at Google’s named Douglas County, Georgia location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
            "annual_withdrawal_components": {
              "potable_million_gallons": 46.3,
              "reclaimed_wastewater_million_gallons": 394.3,
              "total_million_gallons": 440.6
            }
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/georgia/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
              "host": "sustainability.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google 2026 Environmental Report"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check57, October24,2026",
          "scope": "Google identifies the named Douglas County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Georgia page distinguishes the existing Douglas County presence from new LaGrange and Columbia County plans. Its2003presence and2007opening wording are not converted to a new exact date or applied to the proposed projects.",
          "fields": {
            "company_association": {
              "name": "Google",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Google identifies the named Douglas County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Georgia page distinguishes the existing Douglas County presence from new LaGrange and Columbia County plans. Its2003presence and2007opening wording are not converted to a new exact date or applied to the proposed projects."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Google identifies the named Douglas County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Georgia page distinguishes the existing Douglas County presence from new LaGrange and Columbia County plans. Its2003presence and2007opening wording are not converted to a new exact date or applied to the proposed projects."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/georgia/",
              "host": "datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "status_scope": "An operating component is supported at Google’s named Douglas County, Georgia location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
      "typed_water_facts": [
        {
          "measure": "withdrawal",
          "value": 440.6,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Douglas County, GA, calendar year 2025 withdrawal; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Withdrawal combines 46.3 million gallons potable water and 394.3 million gallons reclaimed wastewater; the total is not all potable.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "discharge",
          "value": 73.5,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Douglas County, GA, calendar year 2025 discharge; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Withdrawal combines 46.3 million gallons potable water and 394.3 million gallons reclaimed wastewater; the total is not all potable.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "consumption",
          "value": 367.1,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Douglas County, GA, calendar year 2025 consumption; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Withdrawal combines 46.3 million gallons potable water and 394.3 million gallons reclaimed wastewater; the total is not all potable.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "microsoft-douglasville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Douglasville Data Center Campus",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide qualification thresholds, no named-site award. Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
          "host": "dor.georgia.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.7182,
        "lng": -84.75584,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "statewide qualification thresholds, no named-site award",
          "fields": {},
          "notes": [
            "Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
              "host": "dor.georgia.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Georgia’s tax page describes statewide high-technology equipment exemption investment thresholds by county population. It does not name Microsoft Douglasville, establish a site award, quantify savings or prove current operation. No project-specific incentive is inferred."
            }
          },
          "notes": [
            "Georgia’s tax page describes statewide high-technology equipment exemption investment thresholds by county population. It does not name Microsoft Douglasville, establish a site award, quantify savings or prove current operation. No project-specific incentive is inferred."
          ],
          "sources": [
            {
              "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
              "host": "dor.georgia.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted."
            },
            "tax_source_scope": {
              "county_threshold_table_not_named_facility_registration": true,
              "incentive_threshold_not_actual_expenditure_or_operation": true
            }
          },
          "notes": [
            "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "status_scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "vantage-douglasville-campus-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Vantage Data Centers Douglasville Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
          "host": "insidetowers.com",
          "date": "2024-08-16",
          "published": "2024-08-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.72975,
        "lng": -84.77552,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.",
            "independently_verified_current_operating_status": null,
            "site_specific_scope": "Douglasville1700000sqft/December2025forecast; Stacks Road is a different campus"
          },
          "notes": [
            "Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
              "host": "insidetowers.com",
              "date": "2024-08-16",
              "published": "2024-08-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
