  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ga/newnan",
    "label": "Newnan, Georgia"
  },
  "records": [
    {
      "id": "project-oak-walt-sanders-road-coweta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Oak Data Center (Walt Sanders Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Coweta"
      ],
      "city": "Newnan",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Existing industrial zoning is not data-center approval. Reduced 255-acre scheme distinct from earlier footprint; applicant future plan undecided. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html",
          "host": "times-herald.com",
          "date": "2026-08-25",
          "published": "2026-08-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.33099,
        "lng": -84.76181,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "rezoning-condition-change-denied",
            "reported_finding": "Newnan Times-Herald reports unanimous Coweta denial of Project Oak request to remove office/warehouse-only condition on previously industrial-zoned land.",
            "report_display_date": "2026-08-25",
            "independently_verified_current_status": null
          },
          "notes": [
            "Existing industrial zoning is not data-center approval. Reduced 255-acre scheme distinct from earlier footprint; applicant future plan undecided.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html",
              "host": "times-herald.com",
              "date": "2026-08-25",
              "published": "2026-08-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Newnan · Coweta · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13077"
      }
    },
    {
      "id": "prologis-project-sail-coweta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Sail - Prologis Data Center Campus",
      "group": "proposed",
      "status": "Project listed for development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Coweta"
      ],
      "city": "Newnan",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Coweta Project Sail nine-building concept and fiscal estimate. 100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.cowetaprojectsail.com/coweta-lp/",
          "host": "cowetaprojectsail.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.37558,
        "lng": -84.74691,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Coweta Project Sail nine-building concept and fiscal estimate",
          "fields": {
            "project": "Project Sail",
            "county": "Coweta County, Georgia",
            "planned_buildings": 9,
            "planned_data_center_area_sqft": 4340000,
            "estimated_annual_tax_at_fullbuildout_usd_approx": 100000000,
            "tax_forecast_condition": "fully assessed, completed buildout in roughly10years",
            "site_view_reference": "Wagers Mill Road"
          },
          "notes": [
            "100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.cowetaprojectsail.com/coweta-lp/",
              "host": "cowetaprojectsail.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_project_sail_planned_campus_account",
              "scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted."
            }
          },
          "notes": [
            "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.cowetaprojectsail.com/coweta-lp/",
              "host": "www.cowetaprojectsail.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Newnan · Coweta · Source context reviewed",
      "status_scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13077"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}