{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ga/social-circle",
    "label": "Social Circle, Georgia"
  },
  "records": [
    {
      "id": "meta-stanton-springs-newton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Meta Newton Data Center (Stanton Springs)",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newton"
      ],
      "city": "Social Circle",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2021/03/hello-georgia/",
          "host": "datacenters.atmeta.com",
          "date": "2021-03-14",
          "published": "2021-03-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 33.55455,
        "lng": -83.85042,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "historical_planned_structure_area_sqft": 970000,
            "historical_completion_target_year": 2020
          },
          "notes": [
            "Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2021/03/hello-georgia/",
              "host": "datacenters.atmeta.com",
              "date": "2021-03-14",
              "published": "2021-03-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes."
          },
          "notes": [
            "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 05, October 23, 2026",
          "scope": "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus fact sheet, visually reviewed PDF page 1"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Social Circle · Newton · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role. This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13217"
      }
    },
    {
      "id": "tpa-social-circle-technology-park-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Social Circle Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newton"
      ],
      "city": "Social Circle",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond. Not all fields, current operation, permits, exact parcel or critical IT independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4376",
          "host": "apps.dca.ga.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Access-check target"
        }
      ],
      "loc": {
        "lat": 33.52799,
        "lng": -83.84809,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The reviewed January 2025 news account links the TPA Newton County proposal to DRI 4376; other applications in the article are separate. The original DRI route was access-limited. A filed regional review is not final county approval or construction. This is a limited news-context review, without a new stage label."
            }
          },
          "notes": [
            "The reviewed January 2025 news account links the TPA Newton County proposal to DRI 4376; other applications in the article are separate. The original DRI route was access-limited. A filed regional review is not final county approval or construction. This is a limited news-context review, without a new stage label."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4376",
              "host": "apps.dca.ga.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            },
            {
              "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
              "host": "www.bisnow.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Social Circle · Newton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13217"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
