  "schema_version": 1,
  "source_compilation_context": {
    "ia": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ia.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ia/west-des-moines",
    "label": "West Des Moines, Iowa"
  },
  "records": [
    {
      "id": "microsoft-alluvion-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Alluvion Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established. 6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
          "host": "wdmchamber.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.7305,
        "lng": -93.58559,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "named_campus": "Alluvion",
            "reported_total_floor_area_sqft": 1166000,
            "annual_property_tax_to_be_paid_usd": 8100000,
            "reported_public_infrastructure_built_usd": 45000000,
            "source_date": null
          },
          "notes": [
            "Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established.",
            "6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
              "host": "wdmchamber.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-ginger-east-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Ginger East Data Center",
      "group": "building",
      "status": "Agency-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status. GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/",
          "host": "gowestdesmoines.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ginger-east-data-center/",
          "host": "gowestdesmoines.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/blog/ginger-east-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2025-01-08",
          "date": "2025-01-08",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.6408,
        "lng": -93.59669,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "source_republished_report_date": "2024-07-17",
            "campus_address": "1475 SE Maffitt Lake Road",
            "historical_building_permits": 2,
            "area_each_sqft": 244676,
            "permit_valuation_each_usd": 384000000,
            "reported_contractor": "Weitz"
          },
          "notes": [
            "City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status.",
            "GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/",
              "host": "gowestdesmoines.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_reported_construction",
              "scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion."
            }
          },
          "notes": [
            "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ginger-east-data-center/",
              "host": "gowestdesmoines.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-east-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-01-08",
              "date": "2025-01-08",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "status_scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-ginger-west-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Ginger West Data Center",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.70395,
        "lng": -93.52293,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "construction_completion_target": "Summer2028; season precision only",
            "general_contractor": "Turner Construction",
            "actual_operational_date": null
          },
          "notes": [
            "Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted."
            },
            "construction_scope": {
              "estimated_completion_period": "summer 2028",
              "source_explicitly_separates_completion_from_operation": true,
              "physical_operation_verified": false
            }
          },
          "notes": [
            "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-01-08",
              "date": "2025-01-08",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "status_scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-mountain-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Mountain Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established. 6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
          "host": "wdmchamber.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.65942,
        "lng": -94.03741,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "named_campus": "Mountain",
            "reported_total_floor_area_sqft": 415000,
            "annual_property_tax_to_be_paid_usd": 1600000,
            "reported_public_infrastructure_built_usd": 10000000,
            "source_date": null
          },
          "notes": [
            "Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established.",
            "6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
              "host": "wdmchamber.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Dallas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19049"
      }
    },
    {
      "id": "microsoft-osmium-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Osmium Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Warren"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Municipal economic-development project label Completed is not an exact commissioning day or metered IT load. Do not publish generic job/benefit copy as guaranteed positions or an executed tax award. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/",
          "host": "gowestdesmoines.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.33441,
        "lng": -93.56141,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "municipal_development_stage": "Completed in2025, year precision only",
            "address": "5855 SW Kerry Street",
            "total_size_sqft": 1700000,
            "actual_operational_date": null
          },
          "notes": [
            "Municipal economic-development project label Completed is not an exact commissioning day or metered IT load. Do not publish generic job/benefit copy as guaranteed positions or an executed tax award.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/",
              "host": "gowestdesmoines.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The city project page marks Microsoft Osmium construction Completed in 2025. It does not supply an exact completion day or expressly certify customer operation and commissioning. Completed construction is not converted into operating status, an opening day or a delivered operating capacity. Physical service stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "construction_completed_year_without_operating_certification",
              "scope": "The city project page marks Microsoft Osmium construction Completed in 2025. It does not supply an exact completion day or expressly certify customer operation and commissioning. Completed construction is not converted into operating status, an opening day or a delivered operating capacity. Physical service stage remains unclear."
            },
            "completion_scope": {
              "city_reported_construction_completion_year": 2025,
              "exact_completion_day_established": false,
              "customer_service_operation_explicitly_certified": false
            }
          },
          "notes": [
            "The city project page marks Microsoft Osmium construction Completed in 2025. It does not supply an exact completion day or expressly certify customer operation and commissioning. Completed construction is not converted into operating status, an opening day or a delivered operating capacity. Physical service stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/",
              "host": "gowestdesmoines.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Warren · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19181"
      }
    },
    {
      "id": "microsoft-ruthenium-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Ruthenium Data Center",
      "group": "proposed",
      "status": "City-listed planned development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Ruthenium proposed project and county identity. Sixth campus in West Des Moines is not six buildings on this site. City crosses four counties; this site is specifically Madison County. Size listed TBD. No critical IT MW, final permit, current construction or actual opening established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/",
          "host": "gowestdesmoines.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.33074,
        "lng": -94.01553,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Ruthenium proposed project and county identity",
          "fields": {
            "publisher": "West Des Moines economic development",
            "project": "Microsoft Ruthenium",
            "stage_as_published": "Proposed",
            "location": "Veterans Parkway at Woodland Avenue",
            "county": "Madison, Iowa",
            "reported_city_microsoft_campus_ordinal": 6
          },
          "notes": [
            "Sixth campus in West Des Moines is not six buildings on this site. City crosses four counties; this site is specifically Madison County. Size listed TBD. No critical IT MW, final permit, current construction or actual opening established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/",
              "host": "gowestdesmoines.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_listed_proposed_development",
              "scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity."
            }
          },
          "notes": [
            "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/",
              "host": "gowestdesmoines.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Madison · Source context reviewed",
      "status_scope": "The city project detail lists Microsoft Ruthenium with Stage Proposed and describes a future sixth campus. City listed planned development describes this proposal. Marketing of future infrastructure and expected economic benefits is not a construction start, operation or measured jobs and capacity.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19121"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}