{
  "schema_version": 1,
  "source_compilation_context": {
    "id": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/id.json",
      "updated": "2026-10-23"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "id/boise",
    "label": "Boise, Idaho"
  },
  "records": [
    {
      "id": "centeris-boise-bethel-court-id",
      "state": "id",
      "kind": "facility",
      "name": "Centeris Boise (former HP / DataSite data center)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "Boise",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Boise historical sale and occupancy readiness. 2011acquisition not2026opening/currenttenantproof. Building vacant since mid2008 does not establish current vacancy. Centeris operator crosswalk still needs currentcompany evidence. Undisclosed price not inferred from area. No numeric critical ITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://idahobusinessreview.com/?p=45117",
          "host": "idahobusinessreview.com",
          "date": "2011-06-03",
          "published": "2011-06-03",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.45098,
        "lng": -116.24127,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Boise historical sale and occupancy readiness",
          "fields": {
            "historical_facility": "former HewlettPackard BoiseDataCenter",
            "address": "9700 WestBethelCourt, Boise, Idaho",
            "reported_building_sqft": 60252,
            "purchaser": "BCC RPI Boise LLC, Benaroya and RealPropertyInvestors",
            "reported_historical_stage": "building ready for occupancy; no tenants announced June2,2011",
            "purchase_price": null
          },
          "notes": [
            "2011acquisition not2026opening/currenttenantproof. Building vacant since mid2008 does not establish current vacancy. Centeris operator crosswalk still needs currentcompany evidence. Undisclosed price not inferred from area. No numeric critical ITMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://idahobusinessreview.com/?p=45117",
              "host": "idahobusinessreview.com",
              "date": "2011-06-03",
              "published": "2011-06-03",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boise · Ada · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    },
    {
      "id": "valorc3-boise-2-id",
      "state": "id",
      "kind": "facility",
      "name": "ValorC3 Boise 2",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "Boise",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS. FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/",
          "host": "idahobusinessreview.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://valorc3.com/valorc3-boise-hyperscale-data-center-credit-facility/",
          "host": "valorc3.com",
          "published": "2026-04-29",
          "date": "2026-04-29",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://valorc3.com/valorc3-data-centers-announces-10mw-data-center-in-boise-idaho/",
          "host": "valorc3.com",
          "published": "2025-05-05",
          "date": "2025-05-05",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 43.4416,
        "lng": -116.2943,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS.",
            "FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/",
              "host": "idahobusinessreview.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator-reported_construction",
              "scope": "ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction."
            }
          },
          "notes": [
            "ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction."
          ],
          "sources": [
            {
              "url": "https://valorc3.com/valorc3-boise-hyperscale-data-center-credit-facility/",
              "host": "valorc3.com",
              "published": "2026-04-29",
              "date": "2026-04-29",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://valorc3.com/valorc3-data-centers-announces-10mw-data-center-in-boise-idaho/",
              "host": "valorc3.com",
              "published": "2025-05-05",
              "date": "2025-05-05",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boise · Ada · Source context reviewed",
      "status_scope": "ValorC3’s April 2026 financing release expressly describes continued construction of Boise 2, separately from Emerald. Its displayed April 29 publication date differs from the April 30 body dateline; neither is silently treated as a commissioning date. Forecast 2027 operation remains prospective. The label is operator-reported construction.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    },
    {
      "id": "valorc3-boise-emerald-id",
      "state": "id",
      "kind": "facility",
      "name": "ValorC3 Boise Data Center (former Fiberpipe)",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ada"
      ],
      "city": "Boise",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "Critical, total facility, utility and PER UNIT backup ratings retain separate measures. They are not added together or inserted into legacy MW totals; technical as-of dates are unpublished.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS. FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/",
          "host": "idahobusinessreview.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://valorc3.com/boise-data-center/",
          "host": "valorc3.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf",
          "host": "valorc3.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 43.41867,
        "lng": -116.19047,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "IBRMay5,2025 originalcompanyannouncement-basedreport distinguishesexistingValorC310215WEmeraldBoise fromsecondnearbyproposedfacilitywithNOexactaddress. May/earlyQ32025groundbreaking and2027completion TARGETS, notactualceremony/RFS.",
            "FourthcompanyfacilitynotfourBoisebuildings; Utah/Oklahomaseparate. Closedloopair/liquidcooling andconcurrentlymaintainabledesignnotzeroannualwater/certification. EarlierMetaKunaunderconstructionstatementhistoricalsupersededbySeptember2026operatingreport. No ITMW/spend given.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://idahobusinessreview.com/2025/05/05/valorc3-second-data-center-boise-2027/",
              "host": "idahobusinessreview.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator-listed_service",
              "scope": "ValorC3 currently offers Boise Emerald services. Its specification distinguishes 1.15 MW critical capacity from 2 MW total facility power and separate substation ratings. Redundant generators are rated 2 MW PER UNIT with no count established. Web and PDF cooling tonnage differ, so neither is adopted; consistent hot/cold-aisle wording remains qualitative. No opening day, metered usage or exact point is inferred."
            }
          },
          "notes": [
            "ValorC3 currently offers Boise Emerald services. Its specification distinguishes 1.15 MW critical capacity from 2 MW total facility power and separate substation ratings. Redundant generators are rated 2 MW PER UNIT with no count established. Web and PDF cooling tonnage differ, so neither is adopted; consistent hot/cold-aisle wording remains qualitative. No opening day, metered usage or exact point is inferred."
          ],
          "sources": [
            {
              "url": "https://valorc3.com/boise-data-center/",
              "host": "valorc3.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf",
              "host": "valorc3.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boise · Ada · Source context reviewed",
      "status_scope": "ValorC3 currently offers Boise Emerald services. Its specification distinguishes 1.15 MW critical capacity from 2 MW total facility power and separate substation ratings. Redundant generators are rated 2 MW PER UNIT with no count established. Web and PDF cooling tonnage differ, so neither is adopted; consistent hot/cold-aisle wording remains qualitative. No opening day, metered usage or exact point is inferred.",
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 1.15,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-17",
          "basis": "operator_reported_capacity",
          "scope": "Operator-listed critical capacity; not observed IT load, metered consumption, total facility power or substation capacity. Technical as-of date unpublished.",
          "sources": [
            "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf"
          ]
        },
        {
          "measure": "facility_gross_capacity",
          "value": 2,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-17",
          "basis": "operator_reported_capacity",
          "scope": "Operator-listed total facility power; not critical IT capacity, metered demand or the separate substation ratings. Technical as-of date unpublished.",
          "sources": [
            "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf"
          ]
        },
        {
          "measure": "backup_generation",
          "value": 2,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-17",
          "basis": "operator_reported_capacity",
          "scope": "Redundant generator rating PER UNIT. The source does not establish the number of units. Do not sum redundant units or interpret this as delivered generation, usable IT load, utility allocation or metered consumption. Technical as-of date unpublished.",
          "sources": [
            "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf"
          ]
        }
      ],
      "typed_water_facts": [
        {
          "measure": "cooling_type",
          "value": "Hot/cold-aisle airflow containment",
          "unit": null,
          "basis": "operator_reported_statement",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-17",
          "scope": "Qualitative operator cooling description only; not measured consumption, withdrawal, zero water use or a full independently verified cooling plant. Technical as-of date unpublished.",
          "sources": [
            "https://valorc3.com/wp-content/uploads/2026/04/24-TQT-0362_Data-Center-One-Pager_Boise_8.5x11_UPDATED_PREVIEW-1.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "16001"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
