{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "in/merrillville",
    "label": "Merrillville, Indiana"
  },
  "records": [
    {
      "id": "karis-critical-deep-river-merrillville-in",
      "state": "in",
      "kind": "facility",
      "name": "Karis Critical Deep River Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-09-10",
          "The original Merrillville Citizen Advisory Committee memorandum records that the Karis zoning ordinance was approved by the Town Council on September 10, 2024. This dates the reported zoning action without establishing final whole campus permission, a computing opening, current construction or utility authorization."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.39543,
        "lng": -87.38018,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_karis_advisory_and_later_general_pause_physical_stage_held",
              "scope": "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified."
            },
            "source_read_scope": {
              "complete3page_original_sept9_memorandum_text_read": true,
              "later_sept10_approval_parenthetical_not_meeting_day": true,
              "july14_physical_pages16and17_extension_actually_viewed": true,
              "noon_endpoint_not_midnight_or_prior_dec31suggestion": true,
              "old_town_term_and_later_minutes_distinct": true,
              "original_july2024_planminute_robots_disallow_retained": true
            }
          },
          "notes": [
            "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-09-10",
          "text": "The original Merrillville Citizen Advisory Committee memorandum records that the Karis zoning ordinance was approved by the Town Council on September 10, 2024. This dates the reported zoning action without establishing final whole campus permission, a computing opening, current construction or utility authorization.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "province-group-merrillville-technology-park-in",
      "state": "in",
      "kind": "facility",
      "name": "Merrillville Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/huplrp0o/meeting-memo-11212024-data-center-committeee.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.39865,
        "lng": -87.35304,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_province_merrillville_proposal_history_and_general_pause_current_stage_held",
              "scope": "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition."
            },
            "source_read_scope": {
              "both_original_nov21_memorandum_text_pages_read": true,
              "blank_approval_and_execution_fields_retained": true,
              "weekday_header_conflict_not_repaired": true,
              "utility_study_and_special_exception_not_accomplished": true,
              "july14_extension_pages16and17_actually_viewed": true
            }
          },
          "notes": [
            "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/huplrp0o/meeting-memo-11212024-data-center-committeee.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "wylie-capital-broadway-merrillville-in",
      "state": "in",
      "kind": "facility",
      "name": "Wylie Capital Broadway Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/c1qpdrdq/11-20-24-meeting-memo-data-center-committeee.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.45354,
        "lng": -87.39187,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_wylie_proposal_history_and_general_pause_present_stage_held",
              "scope": "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results."
            },
            "source_read_scope": {
              "original_nov20_memorandum_selected_page1_read": true,
              "empty_original_provider_home_not_service_evidence": true,
              "july14_extension_pages16and17_actually_viewed": true,
              "no_current_site_specific_eligibility_or_stage_inferred": true
            }
          },
          "notes": [
            "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/c1qpdrdq/11-20-24-meeting-memo-data-center-committeee.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
