{
  "schema_version": 1,
  "source_compilation_context": {
    "ms": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ms.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ms/clinton",
    "label": "Clinton, Mississippi"
  },
  "records": [
    {
      "id": "aws-clinton-hinds-ms",
      "state": "ms",
      "kind": "facility",
      "name": "AWS Clinton Data Center",
      "group": "building",
      "status": "Agency reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hinds"
      ],
      "city": "Clinton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Clinton municipal AWS reuse announcement. 1Bplanned investment, not actual spent or separate amount to add again to Amazon statewide25B. Reused industrial plant not newly built whole facility from scratch. Thousands of additional construction/supplychain jobs not all permanent direct onsite. Ceremony/announcement not actual customer opening; no ITMW or exact parcel in reviewed section. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-09",
          "The original Clinton City June 9, 2026 publication describes the AWS former Delphi conversion and celebrates its investment. This dates the City statement rather than an exact first construction day, commissioned computing opening or accomplished future benefits."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://clintonms.org/awsdatacenter/",
          "host": "clintonms.org",
          "date": "2026-06-09",
          "published": "2026-06-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
          "host": "www.aboutamazon.com",
          "published": "2026-04-09",
          "date": "2026-04-09",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.26649,
        "lng": -90.44266,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Clinton municipal AWS reuse announcement",
          "fields": {
            "agency": "City of Clinton, Mississippi",
            "announcement_date": "2026-06-09",
            "project_operator": "AWS",
            "project_use": "repurpose former Delphi manufacturing plant as data center",
            "planned_investment_usd": 1000000000,
            "expected_full_operation_positions_min_inclusive": 100
          },
          "notes": [
            "1Bplanned investment, not actual spent or separate amount to add again to Amazon statewide25B. Reused industrial plant not newly built whole facility from scratch. Thousands of additional construction/supplychain jobs not all permanent direct onsite. Ceremony/announcement not actual customer opening; no ITMW or exact parcel in reviewed section.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://clintonms.org/awsdatacenter/",
              "host": "clintonms.org",
              "date": "2026-06-09",
              "published": "2026-06-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 75",
          "scope": "The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_and_issuer_named_former_delphi_conversion",
              "scope": "The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred."
            },
            "source_read_scope": {
              "complete_original_city_and_issuer_bodies_read": true,
              "explicit_repurposing_not_investment_alone": true,
              "issuer_original_jsonld_date_published20260409_read": true,
              "no_statewide_savings_as_building_measurement": true,
              "no_power_water_jobs_capacity_or_role_changes": true
            }
          },
          "notes": [
            "The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://clintonms.org/awsdatacenter/",
              "host": "clintonms.org",
              "published": "2026-06-09",
              "date": "2026-06-09",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
              "host": "www.aboutamazon.com",
              "published": "2026-04-09",
              "date": "2026-04-09",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Clinton · Hinds · Source context reviewed",
      "status_scope": "The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred.",
      "event_evidence": [
        {
          "date": "2026-06-09",
          "text": "The original Clinton City June 9, 2026 publication describes the AWS former Delphi conversion and celebrates its investment. This dates the City statement rather than an exact first construction day, commissioned computing opening or accomplished future benefits.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://clintonms.org/awsdatacenter/",
              "host": "clintonms.org",
              "published": "2026-06-09",
              "date": "2026-06-09",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28049"
      }
    },
    {
      "id": "cleanspark-clinton-ms",
      "state": "ms",
      "kind": "facility",
      "name": "CleanSpark Clinton Bitcoin Mining Facilities",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Hinds"
      ],
      "city": "Clinton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Construction-in-progress acquired, not proven completed by old target. Grouped Clinton pin may represent multiple sites. Acquisition and construction contract values are separate and not current total capex. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
          "host": "s21.q4cdn.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.28424,
        "lng": -90.46203,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "asset_agreement_date": "2024-09-16",
            "acquisition_consumated_period": "2024-09",
            "reported_purchase_price_including_costs_usd": 3020000,
            "separate_construction_management_agreement_usd": 2888000,
            "old_substantial_completion_forecast": "2024-12"
          },
          "notes": [
            "Construction-in-progress acquired, not proven completed by old target. Grouped Clinton pin may represent multiple sites. Acquisition and construction contract values are separate and not current total capex.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
              "host": "s21.q4cdn.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Clinton · Hinds · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28049"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
