{
  "schema_version": 1,
  "source_compilation_context": {
    "ms": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ms.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ms/ridgeland",
    "label": "Ridgeland, Mississippi"
  },
  "records": [
    {
      "id": "aws-costas-ridgeland-ms",
      "state": "ms",
      "kind": "facility",
      "name": "AWS Costas Property Campus (Ridgeland)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Ridgeland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined investment and job commitments must not be assigned fully to each site. Warehouse and data center uses differ; historical forecast is not current delivery. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://magnoliatribune.com/?p=118379",
          "host": "magnoliatribune.com",
          "date": "2024-07-24",
          "published": "2024-07-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
          "host": "www.aboutamazon.com",
          "published": "2026-04-09",
          "date": "2026-04-09",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.63505,
        "lng": -90.03336,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Magnolia Tribune identifies Costas/Ridgeland and Canton sites within a combined Madison County AWS plan, with 2027 completion forecast.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Combined investment and job commitments must not be assigned fully to each site. Warehouse and data center uses differ; historical forecast is not current delivery.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://magnoliatribune.com/?p=118379",
              "host": "magnoliatribune.com",
              "date": "2024-07-24",
              "published": "2024-07-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 75",
          "scope": "The complete original Amazon statewide update describes Madison County investment and a Canton campus, but does not independently name the inherited Costas Ridgeland record or establish its exact campus crosswalk. Regional construction and operational staffing do not independently commission this exact record. A Canton water forecast is not a Ridgeland measured resource result. Current physical stage and separate campus identity remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "regional_amazon_account_exact_costas_ridgeland_crosswalk_held",
              "scope": "The complete original Amazon statewide update describes Madison County investment and a Canton campus, but does not independently name the inherited Costas Ridgeland record or establish its exact campus crosswalk. Regional construction and operational staffing do not independently commission this exact record. A Canton water forecast is not a Ridgeland measured resource result. Current physical stage and separate campus identity remain held."
            },
            "source_read_scope": {
              "complete_original_statewide_issuer_body_read": true,
              "county_or_canton_not_automatic_ridgeland_identity": true,
              "no_regional_staffing_or_water_forecast_as_exact_operation": true
            }
          },
          "notes": [
            "The complete original Amazon statewide update describes Madison County investment and a Canton campus, but does not independently name the inherited Costas Ridgeland record or establish its exact campus crosswalk. Regional construction and operational staffing do not independently commission this exact record. A Canton water forecast is not a Ridgeland measured resource result. Current physical stage and separate campus identity remain held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
              "host": "www.aboutamazon.com",
              "published": "2026-04-09",
              "date": "2026-04-09",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ridgeland · Madison · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28089"
      }
    },
    {
      "id": "prado-ai-jackson-metro-ms",
      "state": "ms",
      "kind": "facility",
      "name": "Prado AI / PraCon Global AI Industrial Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Ridgeland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Regulatory nondecision is neither permission, denial nor finding of lawful utility exemption. Entergy/MississippiPower CPCN arguments and developer landlord-exemption argument remain competing positions, not holdings. USD25billionlong-term goal is unfinanced aspiration, not committed campus capex; AmazonUSD1billioncomparison not this project. No exact coordinates/county/municipal ordinance assignment, criticalIT, generation size or operating date independently verified. Jackson proposed six-month pause and Ridgeland April500foot ordinance are separate jurisdictions and need originals. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/",
          "host": "web.archive.org",
          "date": "2026-06-01",
          "published": "2026-06-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.60083,
        "lng": -90.03035,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "MississippiToday reports PSC declined to issue requested declaratory opinion on PradoAI private generation/tenant-supply proposal because facts were insufficient and premature. Developer planned to proceed but still sought financing; exact location changed from Ridgeland to unspecified Jacksonmetro.",
            "independently_verified_current_operating_status": null,
            "reported_regulatory_action": "Declined requested declaratory opinion due insufficient facts",
            "regulatory_permission_verified": false,
            "exact_campus_location_verified": false
          },
          "notes": [
            "Regulatory nondecision is neither permission, denial nor finding of lawful utility exemption. Entergy/MississippiPower CPCN arguments and developer landlord-exemption argument remain competing positions, not holdings. USD25billionlong-term goal is unfinanced aspiration, not committed campus capex; AmazonUSD1billioncomparison not this project. No exact coordinates/county/municipal ordinance assignment, criticalIT, generation size or operating date independently verified. Jackson proposed six-month pause and Ridgeland April500foot ordinance are separate jurisdictions and need originals.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/",
              "host": "web.archive.org",
              "date": "2026-06-01",
              "published": "2026-06-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ridgeland · Madison · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28089"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
