{
  "schema_version": 1,
  "source_compilation_context": {
    "ms": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ms.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ms/starkville",
    "label": "Starkville, Mississippi"
  },
  "records": [
    {
      "id": "cspire-starkville-ms",
      "state": "ms",
      "kind": "facility",
      "name": "C Spire Starkville Data Center",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Oktibbeha"
      ],
      "city": "Starkville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. C Spire historical Starkville construction announcement. 23Mbuilding/electrical/cooling/securityexcludesplannedIThardware/softwarepurchases;notfullcampusactualspend.1.5MWgenerator/feedstatementnotIT. Historical2014plansnotobservedopening. Publisheddouble14footthickwallclaimimplausibleandheld,notcorrectedtoinches.52nationalTier3/4countandcertificationclaimsnotcurrentcensus/certifierproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2014-11-03",
          "The original C Spire November 3, 2014 release reports the official opening of the initial Starkville phase and describes customers using its services. This is the stated opening account, distinct from the earlier construction forecast, later ceremony publicity or independently verified first computing commissioning."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.cspire.com/cms/news/wireless/20600007/new-c-spire-world-class-business-enterprise-data-center-built-like-fort-knox",
          "host": "cspire.com",
          "date": "2014-05-20",
          "published": "2014-05-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://business.cspire.com/about/assurance-compliance",
          "host": "business.cspire.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.cspire.com/cms/news/wireless/22000005/New%20C%20Spire%20%2423%20Million%20World-Class%20Enterprise%20Data%20Center%20Opens%20for%20Business",
          "host": "www.cspire.com",
          "published": "2014-11-03",
          "date": "2014-11-03",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.42511,
        "lng": -88.87962,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "C Spire historical Starkville construction announcement",
          "fields": {
            "operator": "C Spire",
            "announcement_date": "2014-05-20",
            "locality": "Thad Cochran Research Technology and Economic Development Park, Starkville, Mississippi",
            "site_acres": 6.5,
            "initial_phase_area_sqft": 23800,
            "initial_phase_building_systems_cost_usd": 23000000,
            "historic_groundwork_start": "2013-11",
            "historical_initial_phase_completion_target": "fall2014",
            "published_generator_feed_power_mw": 1.5
          },
          "notes": [
            "23Mbuilding/electrical/cooling/securityexcludesplannedIThardware/softwarepurchases;notfullcampusactualspend.1.5MWgenerator/feedstatementnotIT. Historical2014plansnotobservedopening. Publisheddouble14footthickwallclaimimplausibleandheld,notcorrectedtoinches.52nationalTier3/4countandcertificationclaimsnotcurrentcensus/certifierproof.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.cspire.com/cms/news/wireless/20600007/new-c-spire-world-class-business-enterprise-data-center-built-like-fort-knox",
              "host": "cspire.com",
              "date": "2014-05-20",
              "published": "2014-05-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 75",
          "scope": "The complete original current provider assurance body explicitly describes its Starkville colocation service. Together with the original named opening release, this supports operator listed colocation service. The earlier May 2014 construction forecast is separate from the November 3 official opening account. Marketing claims about audits, security, tier ratings and reliability do not independently certify current compliance or physical capacity. No restricted customer audit was requested, and the official opening is not recast as an independently measured first computing commissioning instant.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_provider_named_starkville_colocation",
              "scope": "The complete original current provider assurance body explicitly describes its Starkville colocation service. Together with the original named opening release, this supports operator listed colocation service. The earlier May 2014 construction forecast is separate from the November 3 official opening account. Marketing claims about audits, security, tier ratings and reliability do not independently certify current compliance or physical capacity. No restricted customer audit was requested, and the official opening is not recast as an independently measured first computing commissioning instant."
            },
            "source_read_scope": {
              "complete_original_current_assurance_and_historical_opening_bodies_read": true,
              "explicit_named_colocation_not_certification_alone": true,
              "no_restricted_audit_requested": true,
              "no_security_tier_or_capacity_certification": true
            }
          },
          "notes": [
            "The complete original current provider assurance body explicitly describes its Starkville colocation service. Together with the original named opening release, this supports operator listed colocation service. The earlier May 2014 construction forecast is separate from the November 3 official opening account. Marketing claims about audits, security, tier ratings and reliability do not independently certify current compliance or physical capacity. No restricted customer audit was requested, and the official opening is not recast as an independently measured first computing commissioning instant.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://business.cspire.com/about/assurance-compliance",
              "host": "business.cspire.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.cspire.com/cms/news/wireless/22000005/New%20C%20Spire%20%2423%20Million%20World-Class%20Enterprise%20Data%20Center%20Opens%20for%20Business",
              "host": "www.cspire.com",
              "published": "2014-11-03",
              "date": "2014-11-03",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Starkville · Oktibbeha · Source context reviewed",
      "status_scope": "The complete original current provider assurance body explicitly describes its Starkville colocation service. Together with the original named opening release, this supports operator listed colocation service. The earlier May 2014 construction forecast is separate from the November 3 official opening account. Marketing claims about audits, security, tier ratings and reliability do not independently certify current compliance or physical capacity. No restricted customer audit was requested, and the official opening is not recast as an independently measured first computing commissioning instant.",
      "event_evidence": [
        {
          "date": "2014-11-03",
          "text": "The original C Spire November 3, 2014 release reports the official opening of the initial Starkville phase and describes customers using its services. This is the stated opening account, distinct from the earlier construction forecast, later ceremony publicity or independently verified first computing commissioning.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.cspire.com/cms/news/wireless/22000005/New%20C%20Spire%20%2423%20Million%20World-Class%20Enterprise%20Data%20Center%20Opens%20for%20Business",
              "host": "www.cspire.com",
              "published": "2014-11-03",
              "date": "2014-11-03",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28105"
      }
    },
    {
      "id": "msu-hpc2-portera-starkville-ms",
      "state": "ms",
      "kind": "facility",
      "name": "Mississippi State University HPC2  -  Malcolm A. Portera High Performance Computing Center",
      "group": "operating",
      "status": "Institution reported computing service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Oktibbeha"
      ],
      "city": "Starkville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MSU historical operating research system, funding scope. 2019 announcement is historical confirmation of housed operating research system, not fresh 2026 performance/ranking or every replacement system. 22M includes system purchase, installation and operation, not exclusively building construction. No critical IT MW, exact parcel or 2026 headcount adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2019-12-18",
          "The original Mississippi State December 18, 2019 article explicitly dates the Orion ribbon ceremony that day and locates the system at the Portera center. This is a ceremony account rather than first computing commissioning; the later January 2020 reprint date remains distinct."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer",
          "host": "newsarchive.msstate.edu",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hpc.msstate.edu/contact.php",
          "host": "www.hpc.msstate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Explicit named computing facility service street in source body"
        },
        {
          "url": "https://www.hpc.msstate.edu/HPC_Booklet.pdf",
          "host": "www.hpc.msstate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Independent named computing building and scope corroboration"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2+Research+Boulevard%2C+Starkville%2C+Mississippi+39759&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal Census street range and county response"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-88.79990381465954%2C33.46419428853755%2C-88.78805818534046%2C33.474075711462454&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting with unknown image acquisition date"
        },
        {
          "url": "https://www.hpc.msstate.edu/computing/hpc.php",
          "host": "www.hpc.msstate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lng": -88.793981,
        "lat": 33.469135,
        "precision": "address",
        "basis": "The operator HPC Building street is 2 Research Boulevard, Starkville, Mississippi 39759. Its original September 2021 booklet explicitly names that building for Malcolm A. Portera and identifies the primary data center. One literal Census street range supplies only a calculated reference in Oktibbeha County. Printed booklet ZIP 39762 versus current contact ZIP 39759 is retained, without changing canonical postal or physical facts. Existing Native group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "MSU historical operating research system, funding scope",
          "fields": {
            "institution": "Mississippi State University",
            "facility": "Malcolm A. Portera High Performance Computing Center",
            "system": "Orion",
            "ceremony_date": "2019-12-18",
            "system_funding_agency": "NOAA",
            "grants_to_purchase_install_run_system_usd": 22000000,
            "system_cabinets": 28,
            "processing_cores": 72000,
            "system_ram_terabytes": 350,
            "reported_peak_performance_petaflops": 5
          },
          "notes": [
            "2019 announcement is historical confirmation of housed operating research system, not fresh 2026 performance/ranking or every replacement system. 22M includes system purchase, installation and operation, not exclusively building construction. No critical IT MW, exact parcel or 2026 headcount adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer",
              "host": "newsarchive.msstate.edu",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 54, October 23, 2026",
          "scope": "Explicit source bound calculated street reference only. Existing Native group unknown remains unchanged. No new current computing operation, operator role, title, owner, tenant, physical milestone, quantity, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -88.793981,
                "lat": 33.469135,
                "precision": "address",
                "basis": "The operator HPC Building street is 2 Research Boulevard, Starkville, Mississippi 39759. Its original September 2021 booklet explicitly names that building for Malcolm A. Portera and identifies the primary data center. One literal Census street range supplies only a calculated reference in Oktibbeha County. Printed booklet ZIP 39762 versus current contact ZIP 39759 is retained, without changing canonical postal or physical facts. Existing Native group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2 Research Boulevard, Starkville, Mississippi 39759",
              "county_fips": [
                "28105"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original HPC operator booklet explicitly names the HPC Building as the Malcolm A. Portera High Performance Computing Center and distinguishes its primary data center from CAVS and Stennis facilities. The operator contact page separately labels the HPC Building street as 2 Research Boulevard, Starkville, Mississippi 39759. The booklet prints the same street with ZIP 39762; this postal discrepancy remains explicit and does not select another building. Box 9627 is mailing only. IGBB 403 and certificate mismatch remain held without bypass.",
            "Explicit source bound calculated street reference only. Existing Native group unknown remains unchanged. No new current computing operation, operator role, title, owner, tenant, physical milestone, quantity, roof or complete campus is certified.",
            "A research park road, large institutional buildings and parking are visible, with a sports field farther south. The point selects only the named building street range and no particular roof.",
            "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official source and complete literal street response now support only the bounded calculated street reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, not physical relocation or a new physical milestone."
          ],
          "sources": [
            {
              "url": "https://www.hpc.msstate.edu/contact.php",
              "host": "www.hpc.msstate.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Explicit named computing facility service street in source body"
            },
            {
              "url": "https://www.hpc.msstate.edu/HPC_Booklet.pdf",
              "host": "www.hpc.msstate.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Independent named computing building and scope corroboration"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2+Research+Boulevard%2C+Starkville%2C+Mississippi+39759&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal Census street range and county response"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-88.79990381465954%2C33.46419428853755%2C-88.78805818534046%2C33.474075711462454&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting with unknown image acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 75",
          "scope": "The complete original current University computing page describes active research resources including Orion, and its current contact page identifies the computing building. The original December 18, 2019 article expressly locates Orion at the Portera center. Together these support institution reported computing service at the inherited center scope. Historical rankings, later expansion metrics and different network overview figures are not current independently certified capacity. The ceremony day is separate from a later January 2020 reprint and first computing service. The oversized booklet was not read or obtained through another copy, and no alternate building or site is merged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_university_resources_and_named_portera_center",
              "scope": "The complete original current University computing page describes active research resources including Orion, and its current contact page identifies the computing building. The original December 18, 2019 article expressly locates Orion at the Portera center. Together these support institution reported computing service at the inherited center scope. Historical rankings, later expansion metrics and different network overview figures are not current independently certified capacity. The ceremony day is separate from a later January 2020 reprint and first computing service. The oversized booklet was not read or obtained through another copy, and no alternate building or site is merged."
            },
            "source_read_scope": {
              "complete_original_current_hpc_contact_and_historical_article_bodies_read": true,
              "original_article_dec18_event_and_publication_read": true,
              "later_jan2020_reprint_not_event_day": true,
              "oversized_original_booklet_not_read_or_replaced": true,
              "no_current_rank_capacity_or_technical_metric_certification": true
            }
          },
          "notes": [
            "The complete original current University computing page describes active research resources including Orion, and its current contact page identifies the computing building. The original December 18, 2019 article expressly locates Orion at the Portera center. Together these support institution reported computing service at the inherited center scope. Historical rankings, later expansion metrics and different network overview figures are not current independently certified capacity. The ceremony day is separate from a later January 2020 reprint and first computing service. The oversized booklet was not read or obtained through another copy, and no alternate building or site is merged.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.hpc.msstate.edu/computing/hpc.php",
              "host": "www.hpc.msstate.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.hpc.msstate.edu/contact.php",
              "host": "www.hpc.msstate.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer",
              "host": "www.newsarchive.msstate.edu",
              "published": "2019-12-18",
              "date": "2019-12-18",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Starkville · Oktibbeha · Source context reviewed",
      "status_scope": "The complete original current University computing page describes active research resources including Orion, and its current contact page identifies the computing building. The original December 18, 2019 article expressly locates Orion at the Portera center. Together these support institution reported computing service at the inherited center scope. Historical rankings, later expansion metrics and different network overview figures are not current independently certified capacity. The ceremony day is separate from a later January 2020 reprint and first computing service. The oversized booklet was not read or obtained through another copy, and no alternate building or site is merged.",
      "event_evidence": [
        {
          "date": "2019-12-18",
          "text": "The original Mississippi State December 18, 2019 article explicitly dates the Orion ribbon ceremony that day and locates the system at the Portera center. This is a ceremony account rather than first computing commissioning; the later January 2020 reprint date remains distinct.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer",
              "host": "www.newsarchive.msstate.edu",
              "published": "2019-12-18",
              "date": "2019-12-18",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ]
    },
    {
      "id": "starkville-industrial-park-road-crypto-mine-ms",
      "state": "ms",
      "kind": "facility",
      "name": "Starkville Industrial Park Road Cryptocurrency Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Oktibbeha"
      ],
      "city": "Starkville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. No approval, executed utility agreement, current draw or critical IT verified. Resident bill reductions are explicitly unsubstantiated for this proposal. Operator identity is not established; separate CleanSpark Mississippi acquisitions cannot identify this site. Article’s local displayed date is July 13 while UTC metadata is July 14; these are time-zone representations, not two project events. General 2023 legislation claims were not independently reviewed as law. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cryptobriefing.com/bitcoin-mine-mississippi-starkville-energy-bills/",
          "host": "cryptobriefing.com",
          "date": "2026-07-13",
          "published": "2026-07-13",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.43454,
        "lng": -88.88992,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Crypto Briefing describes an early-review Starkville bitcoin proposal near Industrial Park Road, with up to 30 MW power and 20,000 gallons/day attributed proposed demand.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No approval, executed utility agreement, current draw or critical IT verified. Resident bill reductions are explicitly unsubstantiated for this proposal. Operator identity is not established; separate CleanSpark Mississippi acquisitions cannot identify this site. Article’s local displayed date is July 13 while UTC metadata is July 14; these are time-zone representations, not two project events. General 2023 legislation claims were not independently reviewed as law.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://cryptobriefing.com/bitcoin-mine-mississippi-starkville-energy-bills/",
              "host": "cryptobriefing.com",
              "date": "2026-07-13",
              "published": "2026-07-13",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Starkville · Oktibbeha · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28105"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
