{
  "schema_version": 1,
  "source_compilation_context": {
    "ne": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ne.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "ne/kearney",
    "label": "Kearney, Nebraska"
  },
  "records": [
    {
      "id": "mara-kearney-buffalo-ne",
      "state": "ne",
      "kind": "facility",
      "name": "MARA Kearney Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Buffalo"
      ],
      "city": "Kearney",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original annual report visibly read; self-reported period, redactions and number definitions control.. Peak electrical demand is not IT load, nominal site capacity or delivered energy. Annual electricity MWh is separate. January 2025 water includes an estimate of 3 HCF. Report states domestic water only and no water used for cooling; neither claim establishes zero total water or zero indirect water footprint. Report states no participation in the listed sales/use exemptions and N/A for the two incentive-payment fields; do not expand this to all taxes or subsidies. Report describes NPPD curtailment participation, not a quantified delivered response or independently verified rate agreement. The annual MWh is numerically close to one anonymous NPPD row after conversion/rounding, but NPPD names no operator. Do not assert a proven row-to-facility identity or add the two as independent consumption. Not all-field or current operating-building certification.",
      "date": "",
      "events": [
        [
          "2024-02-01",
          "The original MARA February 1, 2024 release publishes its intended operating transition at the acquired Kearney and Granbury mining sites. Its reported January 16 acquisition date differs from January 12 in the later original annual note. Neither date is silently corrected, and the forecast April transition is not certified as accomplished."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ecmp.nebraska.gov/PublicAccess/api/Document/AbobcZrAZNpJb7gsgke%C3%89aW5fNZniWK2c1ZflxM9O3rmi8KZ%C3%8171InSLiWRdK2%C3%892SnP%C3%89YoFaZyS%C3%89YR%C3%89hqHqSKSxRU%3D/",
          "host": "ecmp.nebraska.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.mara.com/news-events/press-releases/detail/1340/marathon-digital-holdings-to-assume-full-operational-control-of-its-recently-acquired-bitcoin-mining-sites",
          "host": "ir.mara.com",
          "published": "2024-02-01",
          "date": "2024-02-01",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000007/mara-20251231.htm",
          "host": "ir.mara.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 40.855,
        "lng": -99.07513,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "nebraska-annual-reports-visible-review-round51-2026-10-15.json",
          "scope": "Original annual report visibly read; self-reported period, redactions and number definitions control.",
          "fields": {},
          "notes": [
            "Peak electrical demand is not IT load, nominal site capacity or delivered energy. Annual electricity MWh is separate.",
            "January 2025 water includes an estimate of 3 HCF. Report states domestic water only and no water used for cooling; neither claim establishes zero total water or zero indirect water footprint.",
            "Report states no participation in the listed sales/use exemptions and N/A for the two incentive-payment fields; do not expand this to all taxes or subsidies.",
            "Report describes NPPD curtailment participation, not a quantified delivered response or independently verified rate agreement.",
            "The annual MWh is numerically close to one anonymous NPPD row after conversion/rounding, but NPPD names no operator. Do not assert a proven row-to-facility identity or add the two as independent consumption.",
            "Not all-field or current operating-building certification."
          ],
          "sources": [
            {
              "url": "https://ecmp.nebraska.gov/PublicAccess/api/Document/AbobcZrAZNpJb7gsgke%C3%89aW5fNZniWK2c1ZflxM9O3rmi8KZ%C3%8171InSLiWRdK2%C3%892SnP%C3%89YoFaZyS%C3%89YR%C3%89hqHqSKSxRU%3D/",
              "host": "ecmp.nebraska.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 73",
          "scope": "The complete original February 1, 2024 issuer release reports acquisition of historical operating mining sites and forecasts an operator transition. The selected original fiscal 2025 acquisition note separately dates the acquisition January 12, whereas the release says January 16. Those exact source dates remain distinct and no single corrected acquisition day is adopted. The selected annual note is a historical business combination account rather than independently verified present Kearney computing service. Future Horizon development and adjacent power reuse do not establish conversion or closure of this exact mine. Roles and current stage remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_mining_acquisition_and_transition_current_stage_held",
              "scope": "The complete original February 1, 2024 issuer release reports acquisition of historical operating mining sites and forecasts an operator transition. The selected original fiscal 2025 acquisition note separately dates the acquisition January 12, whereas the release says January 16. Those exact source dates remain distinct and no single corrected acquisition day is adopted. The selected annual note is a historical business combination account rather than independently verified present Kearney computing service. Future Horizon development and adjacent power reuse do not establish conversion or closure of this exact mine. Roles and current stage remain held."
            },
            "source_read_scope": {
              "complete_original_february2024_release_body_read": true,
              "original_annual_selected_gc_acquisition_note_and_adjacent_table_read": true,
              "complete_annual_filing_not_claimed": true,
              "jan12_annual_and_jan16_release_conflict_not_harmonized": true,
              "forecast_operator_transition_not_accomplished": true,
              "no_current_role_conversion_or_closure_adopted": true
            }
          },
          "notes": [
            "The complete original February 1, 2024 issuer release reports acquisition of historical operating mining sites and forecasts an operator transition. The selected original fiscal 2025 acquisition note separately dates the acquisition January 12, whereas the release says January 16. Those exact source dates remain distinct and no single corrected acquisition day is adopted. The selected annual note is a historical business combination account rather than independently verified present Kearney computing service. Future Horizon development and adjacent power reuse do not establish conversion or closure of this exact mine. Roles and current stage remain held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://ir.mara.com/news-events/press-releases/detail/1340/marathon-digital-holdings-to-assume-full-operational-control-of-its-recently-acquired-bitcoin-mining-sites",
              "host": "ir.mara.com",
              "published": "2024-02-01",
              "date": "2024-02-01",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000007/mara-20251231.htm",
              "host": "ir.mara.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kearney · Buffalo · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-02-01",
          "text": "The original MARA February 1, 2024 release publishes its intended operating transition at the acquired Kearney and Granbury mining sites. Its reported January 16 acquisition date differs from January 12 in the later original annual note. Neither date is silently corrected, and the forecast April transition is not certified as accomplished.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://ir.mara.com/news-events/press-releases/detail/1340/marathon-digital-holdings-to-assume-full-operational-control-of-its-recently-acquired-bitcoin-mining-sites",
              "host": "ir.mara.com",
              "published": "2024-02-01",
              "date": "2024-02-01",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "31019"
      }
    },
    {
      "id": "sequitor-edge-kearney-ne",
      "state": "ne",
      "kind": "facility",
      "name": "Sequitor Edge Kearney Data Center",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Buffalo"
      ],
      "city": "Kearney",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Sequitor Kearney proposed site, land sale and LOIs. Approvedlandsaleoperatoraccountnotreadcitysignedcontract/deed. NotallDCpermitsorenergization. NonbindingLOIsnotexecutedleases.40kplannednotcurrentoperatingfloor. No numericITMWoractualcurrentheadcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-09-19",
          "The original Sequitor Edge September 19, 2025 release announces its Kearney development proposal and reports parcel sale approval. This is the issuer publication day rather than a verified earlier City vote, completed sale, construction or the forecast early 2027 computing opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/",
          "host": "sequitoredge.com",
          "date": "2025-09-19",
          "published": "2025-09-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.86834,
        "lng": -99.08969,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Sequitor Kearney proposed site, land sale and LOIs",
          "fields": {
            "developer": "Sequitor Edge",
            "land_buyer": "Shamrock Data LLC",
            "location": "Tech One Crossing, Kearney, Nebraska",
            "land_sale_approved_acres_approx": 16,
            "planned_facility_sqft": 40000,
            "operator_reported_council_land_sale_approval": "announcedSeptember19,2025",
            "service_target": "early2027",
            "tenant_commitment_stage": "nonbinding letters of intent from local organizations"
          },
          "notes": [
            "Approvedlandsaleoperatoraccountnotreadcitysignedcontract/deed. NotallDCpermitsorenergization. NonbindingLOIsnotexecutedleases.40kplannednotcurrentoperatingfloor. No numericITMWoractualcurrentheadcount.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/",
              "host": "sequitoredge.com",
              "date": "2025-09-19",
              "published": "2025-09-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 73",
          "scope": "The complete original September 19, 2025 issuer release identifies the Kearney proposal and reports City approval of a parcel sale for development. This supports a company listed proposal. Its early 2027 service forecast, prospective tenants and nonbinding letters are not computing operation, completed construction or independently verified tenants. The issuer account is not an independently read City deed or a precise earlier Council vote day. Tier and energy claims remain attributed descriptions.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_named_kearney_development_proposal",
              "scope": "The complete original September 19, 2025 issuer release identifies the Kearney proposal and reports City approval of a parcel sale for development. This supports a company listed proposal. Its early 2027 service forecast, prospective tenants and nonbinding letters are not computing operation, completed construction or independently verified tenants. The issuer account is not an independently read City deed or a precise earlier Council vote day. Tier and energy claims remain attributed descriptions."
            },
            "source_read_scope": {
              "complete_original_issuer_release_body_read": true,
              "publication_not_city_vote_or_deed_completion": true,
              "nonbinding_letters_not_verified_tenants": true,
              "forecast2027_not_operation": true
            }
          },
          "notes": [
            "The complete original September 19, 2025 issuer release identifies the Kearney proposal and reports City approval of a parcel sale for development. This supports a company listed proposal. Its early 2027 service forecast, prospective tenants and nonbinding letters are not computing operation, completed construction or independently verified tenants. The issuer account is not an independently read City deed or a precise earlier Council vote day. Tier and energy claims remain attributed descriptions.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/",
              "host": "sequitoredge.com",
              "published": "2025-09-19",
              "date": "2025-09-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kearney · Buffalo · Source context reviewed",
      "status_scope": "The complete original September 19, 2025 issuer release identifies the Kearney proposal and reports City approval of a parcel sale for development. This supports a company listed proposal. Its early 2027 service forecast, prospective tenants and nonbinding letters are not computing operation, completed construction or independently verified tenants. The issuer account is not an independently read City deed or a precise earlier Council vote day. Tier and energy claims remain attributed descriptions.",
      "event_evidence": [
        {
          "date": "2025-09-19",
          "text": "The original Sequitor Edge September 19, 2025 release announces its Kearney development proposal and reports parcel sale approval. This is the issuer publication day rather than a verified earlier City vote, completed sale, construction or the forecast early 2027 computing opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/",
              "host": "sequitoredge.com",
              "published": "2025-09-19",
              "date": "2025-09-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "31019"
      }
    },
    {
      "id": "starwood-project-horizon-kearney-ne",
      "state": "ne",
      "kind": "facility",
      "name": "Project Horizon (Tech oNE Crossing)",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Buffalo"
      ],
      "city": "Kearney",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Starwood/Project Horizon identity is not named in this source and needs crosswalk before adopting developer identity. Proposed 368 MW is ultimate campus electrical demand, not additional to reused 100 MW, critical IT or current load. Council vote was future later September 8 in this account; no outcome assumed. First phase late 2027/full 2030 are forecasts. August zoning ordinance/report’s 55 dB average needs original measurement/time/scope definitions; code adoption is not site CUP. Small separate 5 MW proposal is not this campus. No end-user identity known. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wowt.com/2026/09/08/kearney-poised-go-all-data-centers-even-many-nebraska-towns-throttle-back/",
          "host": "wowt.com",
          "date": "2026-09-08",
          "published": "2026-09-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.projecthorizonkearney.com/",
          "host": "www.projecthorizonkearney.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.82718,
        "lng": -99.07269,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Flatwater Free Press reporting republished by WOWT describes Worldwide Mission Critical’s Tech One Crossing proposal to replace a 100 MW Marathon bitcoin mine with eventual 368 MW development under Kearney’s new code.",
            "independently_verified_current_operating_status": null,
            "developer_identity_from_this_source": "Worldwide Mission Critical; Starwood not named here",
            "reported_ultimate_electrical_mw": 368,
            "critical_it_mw": null,
            "reported_retired_mining_power_reuse_mw": 100
          },
          "notes": [
            "Starwood/Project Horizon identity is not named in this source and needs crosswalk before adopting developer identity. Proposed 368 MW is ultimate campus electrical demand, not additional to reused 100 MW, critical IT or current load. Council vote was future later September 8 in this account; no outcome assumed. First phase late 2027/full 2030 are forecasts. August zoning ordinance/report’s 55 dB average needs original measurement/time/scope definitions; code adoption is not site CUP. Small separate 5 MW proposal is not this campus. No end-user identity known.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wowt.com/2026/09/08/kearney-poised-go-all-data-centers-even-many-nebraska-towns-throttle-back/",
              "host": "wowt.com",
              "date": "2026-09-08",
              "published": "2026-09-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 73",
          "scope": "The complete original project body identifies Project Horizon as a proposed campus at Tech oNE Crossing in Buffalo County. This supports a company listed proposal at the inherited campus scope. Claims about existing adjacent mining power, future phases, planned certification, water savings, noise, rates, jobs and tax revenue are attributed design and future benefit assertions, not commissioned campus capacity or measured outcomes. The page is not independently read City approval or proof that the adjacent mine and proposed campus are the same facility. No organization role, quantity or location is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "project_original_named_horizon_proposal",
              "scope": "The complete original project body identifies Project Horizon as a proposed campus at Tech oNE Crossing in Buffalo County. This supports a company listed proposal at the inherited campus scope. Claims about existing adjacent mining power, future phases, planned certification, water savings, noise, rates, jobs and tax revenue are attributed design and future benefit assertions, not commissioned campus capacity or measured outcomes. The page is not independently read City approval or proof that the adjacent mine and proposed campus are the same facility. No organization role, quantity or location is changed."
            },
            "source_read_scope": {
              "complete_original_current_project_body_read": true,
              "adjacent_existing_mining_not_proposed_campus_operation": true,
              "no_independent_legal_approval_or_measured_environmental_benefit": true,
              "no_capacity_role_or_location_changes": true,
              "no_contact_form_submission": true
            }
          },
          "notes": [
            "The complete original project body identifies Project Horizon as a proposed campus at Tech oNE Crossing in Buffalo County. This supports a company listed proposal at the inherited campus scope. Claims about existing adjacent mining power, future phases, planned certification, water savings, noise, rates, jobs and tax revenue are attributed design and future benefit assertions, not commissioned campus capacity or measured outcomes. The page is not independently read City approval or proof that the adjacent mine and proposed campus are the same facility. No organization role, quantity or location is changed.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.projecthorizonkearney.com/",
              "host": "www.projecthorizonkearney.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kearney · Buffalo · Source context reviewed",
      "status_scope": "The complete original project body identifies Project Horizon as a proposed campus at Tech oNE Crossing in Buffalo County. This supports a company listed proposal at the inherited campus scope. Claims about existing adjacent mining power, future phases, planned certification, water savings, noise, rates, jobs and tax revenue are attributed design and future benefit assertions, not commissioned campus capacity or measured outcomes. The page is not independently read City approval or proof that the adjacent mine and proposed campus are the same facility. No organization role, quantity or location is changed.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "31019"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
