{
  "schema_version": 1,
  "source_compilation_context": {
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "oh/hilliard",
    "label": "Hilliard, Ohio"
  },
  "records": [
    {
      "id": "aws-cosgray-hilliard-oh",
      "state": "oh",
      "kind": "facility",
      "name": "AWS Cosgray Road Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "Hilliard",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred city FAQ concerns the Scioto Darby Creek Road campus at 4186 Scioto Darby Creek Road. Do not assign its fuel-cell capacity, incentives or area to this different Hilliard record. Correct-site crosswalk required. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://hilliardohio.gov/fuel-cells/",
          "host": "hilliardohio.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.96955,
        "lng": -83.00956,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Preferred city FAQ concerns the Scioto Darby Creek Road campus at 4186 Scioto Darby Creek Road. Do not assign its fuel-cell capacity, incentives or area to this different Hilliard record. Correct-site crosswalk required.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/fuel-cells/",
              "host": "hilliardohio.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Hilliard’s fuel-cell FAQ concerns Amazon’s Scioto Darby Creek Road campus, not an independently matched Cosgray project. Its 72.9 MW is proposed generation context; approval and forecast dates do not establish current commissioning or this record’s IT capacity."
            }
          },
          "notes": [
            "Hilliard’s fuel-cell FAQ concerns Amazon’s Scioto Darby Creek Road campus, not an independently matched Cosgray project. Its 72.9 MW is proposed generation context; approval and forecast dates do not establish current commissioning or this record’s IT capacity."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/fuel-cells/",
              "host": "hilliardohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 33",
          "scope": "The current City fuel cell FAQ explicitly concerns Scioto Darby Creek Road. That separate campus project does not establish the individual current phase of this inherited Hilliard component. General AWS operations, utility generation approvals and municipality level accounts are not transferred between Cosgray, Hayden Run and Scioto Darby. Exact physical phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "separate_scioto_darby_source_does_not_resolve_this_hilliard_component",
              "scope": "The current City fuel cell FAQ explicitly concerns Scioto Darby Creek Road. That separate campus project does not establish the individual current phase of this inherited Hilliard component. General AWS operations, utility generation approvals and municipality level accounts are not transferred between Cosgray, Hayden Run and Scioto Darby. Exact physical phase remains unclear."
            }
          },
          "notes": [
            "The current City fuel cell FAQ explicitly concerns Scioto Darby Creek Road. That separate campus project does not establish the individual current phase of this inherited Hilliard component. General AWS operations, utility generation approvals and municipality level accounts are not transferred between Cosgray, Hayden Run and Scioto Darby. Exact physical phase remains unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/fuel-cells/",
              "host": "hilliardohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hilliard · Franklin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39049"
      }
    },
    {
      "id": "aws-hayden-run-hilliard-oh",
      "state": "oh",
      "kind": "facility",
      "name": "AWS Hayden Run Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "Hilliard",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred city FAQ concerns the Scioto Darby Creek Road campus at 4186 Scioto Darby Creek Road. Do not assign its fuel-cell capacity, incentives or area to this different Hilliard record. Correct-site crosswalk required. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://hilliardohio.gov/fuel-cells/",
          "host": "hilliardohio.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.94503,
        "lng": -83.0074,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Preferred city FAQ concerns the Scioto Darby Creek Road campus at 4186 Scioto Darby Creek Road. Do not assign its fuel-cell capacity, incentives or area to this different Hilliard record. Correct-site crosswalk required.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/fuel-cells/",
              "host": "hilliardohio.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Hilliard’s fuel-cell FAQ identifies a separate Scioto Darby Creek Road project. Its fuel cells, schedule and tax agreement are not independently matched to Hayden Run. No facility-specific stage, incentive or MW is transferred."
            }
          },
          "notes": [
            "Hilliard’s fuel-cell FAQ identifies a separate Scioto Darby Creek Road project. Its fuel cells, schedule and tax agreement are not independently matched to Hayden Run. No facility-specific stage, incentive or MW is transferred."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/fuel-cells/",
              "host": "hilliardohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 33",
          "scope": "The current City fuel cell FAQ explicitly concerns Scioto Darby Creek Road. That separate campus project does not establish the individual current phase of this inherited Hilliard component. General AWS operations, utility generation approvals and municipality level accounts are not transferred between Cosgray, Hayden Run and Scioto Darby. Exact physical phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "separate_scioto_darby_source_does_not_resolve_this_hilliard_component",
              "scope": "The current City fuel cell FAQ explicitly concerns Scioto Darby Creek Road. That separate campus project does not establish the individual current phase of this inherited Hilliard component. General AWS operations, utility generation approvals and municipality level accounts are not transferred between Cosgray, Hayden Run and Scioto Darby. Exact physical phase remains unclear."
            }
          },
          "notes": [
            "The current City fuel cell FAQ explicitly concerns Scioto Darby Creek Road. That separate campus project does not establish the individual current phase of this inherited Hilliard component. General AWS operations, utility generation approvals and municipality level accounts are not transferred between Cosgray, Hayden Run and Scioto Darby. Exact physical phase remains unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/fuel-cells/",
              "host": "hilliardohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hilliard · Franklin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39049"
      }
    },
    {
      "id": "aws-scioto-darby-hilliard-oh",
      "state": "oh",
      "kind": "facility",
      "name": "AWS Scioto Darby Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "Hilliard",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Fuel-cell generation is behind-the-meter supply, not data-center critical IT capacity. City FAQ reports a construction target, not a verified start. CRA campus scope and executed agreement need separate matching. Parcel service address 4120 differs from city fuel-cell address 4186; do not move the campus pin or overwrite the parcel address.",
      "date": "",
      "events": [
        [
          "2026-09-15",
          "Hilliard published its fuel cell permit appeal withdrawal account September 15, 2026. This records the City publication and reported case action, not an independently verified ERAC filing day, data hall opening or endorsement of every project impact."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-002806'&outFields=*&f=json&returnGeometry=true&outSR=4326",
          "host": "gis.franklincountyohio.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://hilliardohio.gov/fuel-cells/",
          "host": "hilliardohio.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://hilliardohio.gov/city-of-hilliard-ends-fuel-cell-permit-appeal-calls-for-stronger-local-input/",
          "host": "hilliardohio.gov",
          "published": "2026-09-15",
          "date": "2026-09-15",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://hilliardohio.gov/wp-content/uploads/2022/07/BZA-AGENDA-PACKET-7-21-22-amended.pdf",
          "host": "hilliardohio.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actual viewed 2022 public filing names Amazon site and includes exact retained parcel"
        },
        {
          "url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D%27050-002806%27&outFields=%2A&f=json&returnGeometry=true&outSR=4326&resultRecordCount=100",
          "host": "gis.franklincountyohio.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "One exact retained county reference parcel and numeric situs"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-83.13025493775973%2C40.01445844412504%2C-83.11852506224028%2C40.02344155587495&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        },
        {
          "url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0?f=pjson",
          "host": "gis.franklincountyohio.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact county layer fields and reference mapping"
        },
        {
          "url": "https://hilliardohio.gov/wp-content/uploads/2025/11/25-7227-Notice-of-Appeal.pdf",
          "host": "hilliardohio.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actual viewed 2025 filed notice spells the complete Scioto Darby Creek street"
        }
      ],
      "loc": {
        "lng": -83.12439,
        "lat": 40.01895,
        "precision": "approximate",
        "basis": "Approximate mathematical center of the exact Franklin County Auditor GIS reference parcel 050-002806 at 4120 Scioto Darby Creek Road, Hilliard, Ohio. Actual viewed public filings independently name this site and the exact retained parcel. One of six historically filed parcels only, not a complete campus boundary. County reference mapping only, not a surveyed boundary, legal title, roof or completed full campus. Aerial date is unknown and may predate development. Existing native status remains unknown."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 1,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PARCELID": "050-002806",
                "ACRES": 143.33342767,
                "SITEADDRESS": "4120 SCIOTO DARBY CRK",
                "OWNERNME1": "AMAZON DATA SERVICES INC",
                "BLDGAREA": 695120
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D'050-002806'&outFields=*&f=json&returnGeometry=true&outSR=4326",
              "host": "gis.franklincountyohio.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "fuel_cell_generation_mw": 72.9,
            "fuel_cell_site_address": "4186 Scioto Darby Creek Road",
            "fuel_cell_site_acres_approx": 6.4,
            "city_described_data_center_campus_acres": 142,
            "fuel_cell_approval_date": "2025-09-22",
            "fuel_cell_operation_target": "2027-09",
            "city_described_cra_investment_requirement_usd": 200000000,
            "cra_investment_requirement_deadline": "2026-12-31"
          },
          "notes": [
            "Fuel-cell generation is behind-the-meter supply, not data-center critical IT capacity. City FAQ reports a construction target, not a verified start. CRA campus scope and executed agreement need separate matching. Parcel service address 4120 differs from city fuel-cell address 4186; do not move the campus pin or overwrite the parcel address.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/fuel-cells/",
              "host": "hilliardohio.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 33",
          "scope": "Hilliard September 15, 2026 release reports withdrawal of its ERAC appeal of the AEP fuel cell permit at the AWS Scioto Darby campus and describes modeled impacts and later monitoring plans. The FAQ discusses a separate fuel cell project and forecast. Power generation approval or construction and an appeal withdrawal do not establish the current individual data hall operating phase. No projected emissions, health threshold, water or power quantity is adopted as measured site performance. The existing concern item is already marked withdrawn and is not added again.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "fuel_cell_permit_appeal_followup_not_individual_compute_phase",
              "scope": "Hilliard September 15, 2026 release reports withdrawal of its ERAC appeal of the AEP fuel cell permit at the AWS Scioto Darby campus and describes modeled impacts and later monitoring plans. The FAQ discusses a separate fuel cell project and forecast. Power generation approval or construction and an appeal withdrawal do not establish the current individual data hall operating phase. No projected emissions, health threshold, water or power quantity is adopted as measured site performance. The existing concern item is already marked withdrawn and is not added again."
            },
            "concern_followup": {
              "concern_id": "concern:oh-hilliard-fuel-cell-permit-appeal-withdrawal-2026",
              "scope": "The existing current documented item already reports the same City withdrawal account. This capture rechecks that source without duplicating the concern or changing its original chronology. Its native concern review date is not renewed by this site context review.",
              "duplicate_added": false
            }
          },
          "notes": [
            "Hilliard September 15, 2026 release reports withdrawal of its ERAC appeal of the AEP fuel cell permit at the AWS Scioto Darby campus and describes modeled impacts and later monitoring plans. The FAQ discusses a separate fuel cell project and forecast. Power generation approval or construction and an appeal withdrawal do not establish the current individual data hall operating phase. No projected emissions, health threshold, water or power quantity is adopted as measured site performance. The existing concern item is already marked withdrawn and is not added again.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/fuel-cells/",
              "host": "hilliardohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://hilliardohio.gov/city-of-hilliard-ends-fuel-cell-permit-appeal-calls-for-stronger-local-input/",
              "host": "hilliardohio.gov",
              "published": "2026-09-15",
              "date": "2026-09-15",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 40, October 23, 2026",
          "scope": "Approximate remains approximate. One bounded county reference parcel only, not a complete campus. Existing native status remains unknown.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -83.12439,
                "lat": 40.01895,
                "precision": "approximate",
                "basis": "Approximate mathematical center of the exact Franklin County Auditor GIS reference parcel 050-002806 at 4120 Scioto Darby Creek Road, Hilliard, Ohio. Actual viewed public filings independently name this site and the exact retained parcel. One of six historically filed parcels only, not a complete campus boundary. County reference mapping only, not a surveyed boundary, legal title, roof or completed full campus. Aerial date is unknown and may predate development. Existing native status remains unknown."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": "050-002806",
                "identifier_field": "PARCELID",
                "objectid": 463565,
                "agency": "Franklin County Auditor GIS",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "county_codes_inferred": false,
                "filed_reference_ids": [
                  "050-003336",
                  "050-002806",
                  "050-003210",
                  "050-0002427",
                  "050-002299",
                  "050-002301"
                ],
                "complete_filed_set_adopted": false
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "The actually viewed City of Hilliard July 21, 2022 staff report PDF page 41 names the Amazon data center at 4120 Scioto Darby Road and explicitly lists 050-002806 among six parcel references. The actually viewed November 7, 2025 filed notice PDF page 1 spells 4120 Scioto Darby Creek Road for the AWS site. The current exact Franklin County parcel 050-002806 has numeric situs 4120 SCIOTO DARBY CRK. This independently joins the retained exact parcel association to the named site without selecting a neighboring owner parcel or adopting project status. Only this bounded county reference parcel is admitted, not all six parcels or a complete campus. The historical list raw 050-0002427 spelling is preserved and not silently corrected.",
            "Approximate remains approximate. One bounded county reference parcel only, not a complete campus. Existing native status remains unknown.",
            "Actually viewed wooded and open ground, streets, highway and nearby commercial forms. Acquisition date is unknown and may predate development. No new construction, absence, completed campus, future roof or present operating finding is adopted."
          ],
          "sources": [
            {
              "url": "https://hilliardohio.gov/wp-content/uploads/2022/07/BZA-AGENDA-PACKET-7-21-22-amended.pdf",
              "host": "hilliardohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actual viewed 2022 public filing names Amazon site and includes exact retained parcel"
            },
            {
              "url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0/query?where=PARCELID%3D%27050-002806%27&outFields=%2A&f=json&returnGeometry=true&outSR=4326&resultRecordCount=100",
              "host": "gis.franklincountyohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "One exact retained county reference parcel and numeric situs"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-83.13025493775973%2C40.01445844412504%2C-83.11852506224028%2C40.02344155587495&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            },
            {
              "url": "https://gis.franklincountyohio.gov/hosting/rest/services/ParcelFeatures/Parcel_Features/FeatureServer/0?f=pjson",
              "host": "gis.franklincountyohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact county layer fields and reference mapping"
            },
            {
              "url": "https://hilliardohio.gov/wp-content/uploads/2025/11/25-7227-Notice-of-Appeal.pdf",
              "host": "hilliardohio.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actual viewed 2025 filed notice spells the complete Scioto Darby Creek street"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate county reference parcel, not a confirmed building or full campus",
      "summary": "Hilliard · Franklin · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-09-15",
          "text": "Hilliard published its fuel cell permit appeal withdrawal account September 15, 2026. This records the City publication and reported case action, not an independently verified ERAC filing day, data hall opening or endorsement of every project impact.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://hilliardohio.gov/city-of-hilliard-ends-fuel-cell-permit-appeal-calls-for-stronger-local-input/",
              "host": "hilliardohio.gov",
              "published": "2026-09-15",
              "date": "2026-09-15",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ]
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
