{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "tx/abernathy",
    "label": "Abernathy, Texas"
  },
  "records": [
    {
      "id": "aligned-project-caprock-hale-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Aligned Data Centers Project Caprock",
      "group": "building",
      "status": "Developer-reported groundbreaking",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hale"
      ],
      "city": "Abernathy",
      "address": "",
      "who": "Aligned Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 540MWnot explicitcriticalIT.5Bexpected regionaleconomic impact is not audited spend. Operator ratepayer/water protection statements not approved tariff or measured water findings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/",
          "host": "aligneddc.com",
          "date": "2026-04-09",
          "published": "2026-04-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.07045,
        "lng": -101.82685,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_campus_power_mw": 540,
            "campus_acres": 313,
            "planned_area_sqft": 1650000,
            "planned_facilities": 6,
            "first_facility_code": "LBB01",
            "first_service_target": "2027-Q1",
            "expected_regional_economic_investment_usd": 5000000000
          },
          "notes": [
            "540MWnot explicitcriticalIT.5Bexpected regionaleconomic impact is not audited spend. Operator ratepayer/water protection statements not approved tariff or measured water findings.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/",
              "host": "aligneddc.com",
              "date": "2026-04-09",
              "published": "2026-04-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "status-continuation-2026-10-19",
          "scope": "Aligned reports groundbreaking for Project Caprock in Hale County, beginning with an initial data center phase.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_reported_groundbreaking",
              "scope": "Aligned reports groundbreaking for Project Caprock in Hale County, beginning with an initial data center phase."
            }
          },
          "notes": [
            "A groundbreaking report does not establish completed halls or operation. The prospective service quarter remains a forecast; no exact physical-stage date is established by this review."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/",
              "host": "aligneddc.com",
              "published": "2026-04-09",
              "date": "2026-04-09",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 13, October 23, 2026",
          "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The April 9, 2026 announcement identifies Project Caprock and a planned first data center with a future service target. Neither full campus capacity nor that future target is adopted as delivered.",
          "fields": {
            "company_association": {
              "name": "Aligned Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The April 9, 2026 announcement identifies Project Caprock and a planned first data center with a future service target. Neither full campus capacity nor that future target is adopted as delivered."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The April 9, 2026 announcement identifies Project Caprock and a planned first data center with a future service target. Neither full campus capacity nor that future target is adopted as delivered.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/",
              "host": "aligneddc.com",
              "published": "2026-04-09",
              "date": "2026-04-09",
              "checked": "2026-10-23",
              "label": "First party exact named code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Abernathy · Hale · Source context reviewed",
      "status_scope": "Aligned reports groundbreaking for Project Caprock in Hale County, beginning with an initial data center phase.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48189"
      }
    },
    {
      "id": "fluidstack-abernathy-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Fluidstack Abernathy AI Campus",
      "group": "building",
      "status": "Filing reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hale"
      ],
      "city": "Abernathy",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. TeraWulf separate Abernathy sale and Hancock tenant announcement. 168MWTexas and401MWKentucky are separate projects.450Minvestment not reported sale price or total Abernathy campus capex. Signed transaction agreement does not prove later closing. Issuer reports executed Anthropic lease, but signed lease itself not inspected.19Bforecast lease revenue is neither construction investment nor tax incentive/payment.482MWKentucky utility demand remains separate from401IT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-06",
          "TeraWulf published its Abernathy interest sale agreement announcement on July 6, 2026. The later second quarter filing reports that the Company no longer holds the interest. This records the dated financial announcement, not a physical construction start, data center opening or shutdown."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/",
          "host": "investors.terawulf.com",
          "date": "2026-07-06",
          "published": "2026-07-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000092/0001083301-26-000092.pdf",
          "host": "investors.terawulf.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
          "host": "investors.terawulf.com",
          "published": "2026-07-06",
          "date": "2026-07-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/wulf-20260630.htm",
          "host": "investors.terawulf.com",
          "published": "2026-08-05",
          "date": "2026-08-05",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.08695,
        "lng": -101.84485,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "TeraWulf separate Abernathy sale and Hancock tenant announcement",
          "fields": {
            "release_date": "2026-07-06",
            "abernathy_project_critical_it_mw": 168,
            "abernathy_jv_established_year": 2025,
            "terawulf_stake_sale_percent": 50.1,
            "terawulf_investment_being_monetized_usd_approx": 450000000,
            "abernathy_transaction_stage": "definitive sale agreement, closing not observed in this source",
            "kentucky_separate_project": {
              "name": "Justified Data, Hawesville",
              "announced_lease_tenant": "Anthropic",
              "announced_executed_lease_years": 20,
              "critical_it_mw": 401,
              "initial_service_target": "2027-H2",
              "full_capacity_target": "early 2028",
              "forecast_initial_term_contract_revenue_usd_approx": 19000000000
            }
          },
          "notes": [
            "168MWTexas and401MWKentucky are separate projects.450Minvestment not reported sale price or total Abernathy campus capex. Signed transaction agreement does not prove later closing. Issuer reports executed Anthropic lease, but signed lease itself not inspected.19Bforecast lease revenue is neither construction investment nor tax incentive/payment.482MWKentucky utility demand remains separate from401IT.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/",
              "host": "investors.terawulf.com",
              "date": "2026-07-06",
              "published": "2026-07-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 21",
          "scope": "TeraWulf first quarter 2026 filing explicitly reports phased construction of the Abernathy campus, with delivery targeted for the second half of 2026. Filing reported construction describes that dated company account, not commissioning or present completion. Its later second quarter filing reports sale of the Company interest after the July 6 agreement; financial divestment is not physical facility operation or shutdown. The later filing does not establish completed campus delivery. Lake Mariner operating capacity and the Anthropic Justified Data lease belong to different campuses. No ownership role, construction start, opening day or quantity is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "dated_abernathy_phased_construction_not_forecast_completion_or_financial_operation",
              "scope": "TeraWulf first quarter 2026 filing explicitly reports phased construction of the Abernathy campus, with delivery targeted for the second half of 2026. Filing reported construction describes that dated company account, not commissioning or present completion. Its later second quarter filing reports sale of the Company interest after the July 6 agreement; financial divestment is not physical facility operation or shutdown. The later filing does not establish completed campus delivery. Lake Mariner operating capacity and the Anthropic Justified Data lease belong to different campuses. No ownership role, construction start, opening day or quantity is changed."
            },
            "source_scope": {
              "physical_phase_filing_period": "first quarter 2026",
              "construction_paragraph_pdf_page_visually_read": 51,
              "delivery_forecast": "second half of 2026",
              "lake_mariner_capacity_not_abernathy_capacity": true,
              "july_financial_transaction_not_physical_milestone": true,
              "no_provider_role_change": true
            }
          },
          "notes": [
            "TeraWulf first quarter 2026 filing explicitly reports phased construction of the Abernathy campus, with delivery targeted for the second half of 2026. Filing reported construction describes that dated company account, not commissioning or present completion. Its later second quarter filing reports sale of the Company interest after the July 6 agreement; financial divestment is not physical facility operation or shutdown. The later filing does not establish completed campus delivery. Lake Mariner operating capacity and the Anthropic Justified Data lease belong to different campuses. No ownership role, construction start, opening day or quantity is changed.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000092/0001083301-26-000092.pdf",
              "host": "investors.terawulf.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
              "host": "investors.terawulf.com",
              "published": "2026-07-06",
              "date": "2026-07-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/wulf-20260630.htm",
              "host": "investors.terawulf.com",
              "published": "2026-08-05",
              "date": "2026-08-05",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Abernathy · Hale · Source context reviewed",
      "status_scope": "TeraWulf first quarter 2026 filing explicitly reports phased construction of the Abernathy campus, with delivery targeted for the second half of 2026. Filing reported construction describes that dated company account, not commissioning or present completion. Its later second quarter filing reports sale of the Company interest after the July 6 agreement; financial divestment is not physical facility operation or shutdown. The later filing does not establish completed campus delivery. Lake Mariner operating capacity and the Anthropic Justified Data lease belong to different campuses. No ownership role, construction start, opening day or quantity is changed.",
      "event_evidence": [
        {
          "date": "2026-07-06",
          "text": "TeraWulf published its Abernathy interest sale agreement announcement on July 6, 2026. The later second quarter filing reports that the Company no longer holds the interest. This records the dated financial announcement, not a physical construction start, data center opening or shutdown.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
              "host": "investors.terawulf.com",
              "published": "2026-07-06",
              "date": "2026-07-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48189"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
