{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "tx/abilene",
    "label": "Abilene, Texas"
  },
  "records": [
    {
      "id": "lancium-crusoe-abilene-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Lancium Clean Campus (Crusoe / Stargate Site 1)",
      "group": "operating",
      "status": "First phase reported operating",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Taylor"
      ],
      "city": "Abilene",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The interview's speculation that all workloads are ChatGPT is not confirmation. Company-reported construction workforce is not permanent employment. Cooling descriptions are attributed engineering claims, not a complete water-meter audit. Future expansion is not completed or approved infrastructure. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-09-30",
          "Crusoe published its first phase Abilene operational announcement on September 30, 2025, saying that phase was up and running on Oracle Cloud Infrastructure. This is the release date, not the exact first workload or opening day, and does not certify completion of the entire planned campus."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment",
          "host": "ktxs.com",
          "date": "2026-03-05",
          "published": "2026-03-05",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
          "host": "www.crusoe.ai",
          "published": "2025-09-30",
          "date": "2025-09-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.crusoe.ai/resources/blog/crusoes-2025-impact-report",
          "host": "www.crusoe.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.30159,
        "lng": -99.89009,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "KTXS distinguishes Lancium's land/power infrastructure, Crusoe's data-center ownership and operation, and Oracle as customer at the Abilene campus, with eight buildings forecast through first-quarter 2027.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The interview's speculation that all workloads are ChatGPT is not confirmation. Company-reported construction workforce is not permanent employment. Cooling descriptions are attributed engineering claims, not a complete water-meter audit. Future expansion is not completed or approved infrastructure.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment",
              "host": "ktxs.com",
              "date": "2026-03-05",
              "published": "2026-03-05",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 21",
          "scope": "Crusoe September 30, 2025 release says the first phase of the Abilene Stargate campus is up and running on Oracle Cloud Infrastructure, with early workloads. Its current 2025 impact report account again describes that first phase as operational. First phase reported operating applies only to that delivered phase, not every planned building, all advertised campus capacity or a separate Microsoft Abilene campus. The release day is not the exact service commencement day. No provider role, actual capacity, opening field or project boundary is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "explicit_first_phase_operational_account_not_complete_campus",
              "scope": "Crusoe September 30, 2025 release says the first phase of the Abilene Stargate campus is up and running on Oracle Cloud Infrastructure, with early workloads. Its current 2025 impact report account again describes that first phase as operational. First phase reported operating applies only to that delivered phase, not every planned building, all advertised campus capacity or a separate Microsoft Abilene campus. The release day is not the exact service commencement day. No provider role, actual capacity, opening field or project boundary is changed."
            },
            "source_scope": {
              "phase_only": true,
              "current_report_repeats_first_phase_operation": true,
              "separate_microsoft_campus_not_crosswalked": true,
              "reported_construction_month_not_promoted_as_exact_day": true
            }
          },
          "notes": [
            "Crusoe September 30, 2025 release says the first phase of the Abilene Stargate campus is up and running on Oracle Cloud Infrastructure, with early workloads. Its current 2025 impact report account again describes that first phase as operational. First phase reported operating applies only to that delivered phase, not every planned building, all advertised campus capacity or a separate Microsoft Abilene campus. The release day is not the exact service commencement day. No provider role, actual capacity, opening field or project boundary is changed.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
              "host": "www.crusoe.ai",
              "published": "2025-09-30",
              "date": "2025-09-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.crusoe.ai/resources/blog/crusoes-2025-impact-report",
              "host": "www.crusoe.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Abilene · Taylor · Source context reviewed",
      "status_scope": "Crusoe September 30, 2025 release says the first phase of the Abilene Stargate campus is up and running on Oracle Cloud Infrastructure, with early workloads. Its current 2025 impact report account again describes that first phase as operational. First phase reported operating applies only to that delivered phase, not every planned building, all advertised campus capacity or a separate Microsoft Abilene campus. The release day is not the exact service commencement day. No provider role, actual capacity, opening field or project boundary is changed.",
      "event_evidence": [
        {
          "date": "2025-09-30",
          "text": "Crusoe published its first phase Abilene operational announcement on September 30, 2025, saying that phase was up and running on Oracle Cloud Infrastructure. This is the release date, not the exact first workload or opening day, and does not certify completion of the entire planned campus.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
              "host": "www.crusoe.ai",
              "published": "2025-09-30",
              "date": "2025-09-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48441"
      }
    },
    {
      "id": "stargate-abilene-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Stargate Abilene",
      "group": "operating",
      "status": "First phase reported operating",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Taylor"
      ],
      "city": "Abilene",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. SarahAsch TexasStandard January26,2026 originalinterview with TexasMonthlyreporter ChristopherCollins: Abileneconstruction/YE2026target, not observedcompletedcampus. CorrectedarticleexplicitlyWITHIN CITY, notunincorporatedassumption.4M sf/1000+acres and3.5Bprojectclaimhistorical;500BnationalStargateoverlapnotAbileneprice.85%10yrpropertytaxabatement reportedagreement, originalunread/not85%alltaxes orcashgrant.6000fluctuatingconstruction/300projectedpermanentjobs not6300netpermanent.4B20yrlocalimpactmodelmethodologyunprovided, notactualcapex. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [
        [
          "2025-09-30",
          "Crusoe published its named Abilene Stargate first phase operational account on September 30, 2025. It reported early training and inference workloads on Oracle Cloud Infrastructure. This dates the issuer release rather than an inferred first workload or whole campus opening day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/",
          "host": "texasstandard.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
          "host": "www.crusoe.ai",
          "published": "2025-09-30",
          "date": "2025-09-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.crusoe.ai/resources/blog/crusoes-2025-impact-report",
          "host": "www.crusoe.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.oracle.com/latam/data-centers/abilene/",
          "host": "www.oracle.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.oracle.com/latam/data-centers/",
          "host": "www.oracle.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.3165,
        "lng": -99.90637,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "SarahAsch TexasStandard January26,2026 originalinterview with TexasMonthlyreporter ChristopherCollins: Abileneconstruction/YE2026target, not observedcompletedcampus. CorrectedarticleexplicitlyWITHIN CITY, notunincorporatedassumption.4M sf/1000+acres and3.5Bprojectclaimhistorical;500BnationalStargateoverlapnotAbileneprice.85%10yrpropertytaxabatement reportedagreement, originalunread/not85%alltaxes orcashgrant.6000fluctuatingconstruction/300projectedpermanentjobs not6300netpermanent.4B20yrlocalimpactmodelmethodologyunprovided, notactualcapex.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/",
              "host": "texasstandard.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 64",
          "scope": "The complete retained original Crusoe September 30, 2025 release explicitly names the Abilene Stargate campus and reports its first phase up and running on Oracle Cloud Infrastructure with early training and inference workloads. The complete retained impact report again describes that phase as operational and distinguishes a separate Microsoft campus. The independently captured original Oracle Abilene account also says AI workloads went live, while its roster retains partial delivery and future completion. This supports first phase reported operating, without certifying the entire planned campus, actual load or a first workload day. Oracle retains a January 2026 currency footer, and Crusoe template date conflicts remain unrepaired. Retained October 23 captures preserve their actual earlier retrieval times. The original OpenAI request remains an access hold. These separate Atlas records are not asserted to be distinct physical campuses.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_stargate_first_phase_reported_running_workloads",
              "scope": "The complete retained original Crusoe September 30, 2025 release explicitly names the Abilene Stargate campus and reports its first phase up and running on Oracle Cloud Infrastructure with early training and inference workloads. The complete retained impact report again describes that phase as operational and distinguishes a separate Microsoft campus. The independently captured original Oracle Abilene account also says AI workloads went live, while its roster retains partial delivery and future completion. This supports first phase reported operating, without certifying the entire planned campus, actual load or a first workload day. Oracle retains a January 2026 currency footer, and Crusoe template date conflicts remain unrepaired. Retained October 23 captures preserve their actual earlier retrieval times. The original OpenAI request remains an access hold. These separate Atlas records are not asserted to be distinct physical campuses."
            },
            "source_read_scope": {
              "complete_retained_crusoe_release_and_impact_account_bodies_read": true,
              "complete_original_oracle_abilene_body_read": true,
              "selected_original_oracle_roster_body_and_abilene_header_read": true,
              "archival_captures_keep_original_retrievals": true,
              "original_openai_access_hold_retained": true,
              "first_phase_not_entire_campus_or_separate_microsoft_campus": true,
              "oracle_january2026_currency_footer_retained": true,
              "crusoe_template_publication_conflicts_not_repaired": true,
              "no_quantity_role_location_or_exact_opening_export": true
            }
          },
          "notes": [
            "The complete retained original Crusoe September 30, 2025 release explicitly names the Abilene Stargate campus and reports its first phase up and running on Oracle Cloud Infrastructure with early training and inference workloads. The complete retained impact report again describes that phase as operational and distinguishes a separate Microsoft campus. The independently captured original Oracle Abilene account also says AI workloads went live, while its roster retains partial delivery and future completion. This supports first phase reported operating, without certifying the entire planned campus, actual load or a first workload day. Oracle retains a January 2026 currency footer, and Crusoe template date conflicts remain unrepaired. Retained October 23 captures preserve their actual earlier retrieval times. The original OpenAI request remains an access hold. These separate Atlas records are not asserted to be distinct physical campuses.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
              "host": "www.crusoe.ai",
              "published": "2025-09-30",
              "date": "2025-09-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.crusoe.ai/resources/blog/crusoes-2025-impact-report",
              "host": "www.crusoe.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.oracle.com/latam/data-centers/abilene/",
              "host": "www.oracle.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.oracle.com/latam/data-centers/",
              "host": "www.oracle.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Abilene · Taylor · Source context reviewed",
      "status_scope": "The complete retained original Crusoe September 30, 2025 release explicitly names the Abilene Stargate campus and reports its first phase up and running on Oracle Cloud Infrastructure with early training and inference workloads. The complete retained impact report again describes that phase as operational and distinguishes a separate Microsoft campus. The independently captured original Oracle Abilene account also says AI workloads went live, while its roster retains partial delivery and future completion. This supports first phase reported operating, without certifying the entire planned campus, actual load or a first workload day. Oracle retains a January 2026 currency footer, and Crusoe template date conflicts remain unrepaired. Retained October 23 captures preserve their actual earlier retrieval times. The original OpenAI request remains an access hold. These separate Atlas records are not asserted to be distinct physical campuses.",
      "event_evidence": [
        {
          "date": "2025-09-30",
          "text": "Crusoe published its named Abilene Stargate first phase operational account on September 30, 2025. It reported early training and inference workloads on Oracle Cloud Infrastructure. This dates the issuer release rather than an inferred first workload or whole campus opening day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
              "host": "www.crusoe.ai",
              "published": "2025-09-30",
              "date": "2025-09-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48441"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
