{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "tx/andrews",
    "label": "Andrews, Texas"
  },
  "records": [
    {
      "id": "canaan-bear-andrews-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Bear Bitcoin Mine",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Andrews"
      ],
      "city": "Andrews",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-project portfolio, no per-site allocation. 120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-10-15",
          "Canaan published its September mining update including the three named WindHQ JV facilities, including Bear. October 15 is the publication date; September 30 is the reporting date. Neither is a facility opening or verified production allocation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html",
          "host": "prnewswire.com",
          "date": "2026-02-23",
          "published": "2026-02-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
          "host": "www.prnewswire.com",
          "published": "2026-10-15",
          "date": "2026-10-15",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 32.3049,
        "lng": -102.63766,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-release-review-round6-2026-10-14.json",
          "scope": "three-project portfolio, no per-site allocation",
          "fields": {
            "acquisition_announced_date": "2026-02-23",
            "acquired_equity_percent": 49,
            "continuing_windhq_equity_percent": 51,
            "portfolio_projects": [
              "Alborz",
              "Bear",
              "Chief Mountain"
            ],
            "portfolio_operational_power_mw": 120,
            "portfolio_transaction_consideration_usd_approx": 39750000,
            "transaction_consideration_basis": "49percent joint-venture interests plus6840mining rigs, funded with shares"
          },
          "notes": [
            "120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html",
              "host": "prnewswire.com",
              "date": "2026-02-23",
              "published": "2026-02-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 9",
          "scope": "Canaan identifies Bear as one of its three WindHQ joint venture facilities. Its October 15 unaudited update reports three active JV mining projects as of September 30, 2026, alongside operating JV computing power. Operating phase describes the mining activity reported for this JV asset. It does not certify continuous uptime or allocate JV power, hashrate, bitcoin production or financial consideration to this individual facility. No role or ownership field is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_reported_mining_phase",
              "scope": "Canaan identifies Bear as one of its three WindHQ joint venture facilities. Its October 15 unaudited update reports three active JV mining projects as of September 30, 2026, alongside operating JV computing power. Operating phase describes the mining activity reported for this JV asset. It does not certify continuous uptime or allocate JV power, hashrate, bitcoin production or financial consideration to this individual facility. No role or ownership field is changed."
            },
            "reporting_scope": {
              "issuer": "Canaan Inc.",
              "publication_channel": "Issuer supplied PRNewswire disclosure",
              "unaudited": true,
              "reporting_as_of": "2026-09-30",
              "JV_assets_named": [
                "Alborz",
                "Bear",
                "Chief Mountain"
              ],
              "JV_active_projects_reported": 3,
              "site_quantity_allocation_adopted": false,
              "ownership_fields_changed": false
            }
          },
          "notes": [
            "Canaan identifies Bear as one of its three WindHQ joint venture facilities. Its October 15 unaudited update reports three active JV mining projects as of September 30, 2026, alongside operating JV computing power. Operating phase describes the mining activity reported for this JV asset. It does not certify continuous uptime or allocate JV power, hashrate, bitcoin production or financial consideration to this individual facility. No role or ownership field is changed.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
              "host": "www.prnewswire.com",
              "published": "2026-10-15",
              "date": "2026-10-15",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html",
              "host": "www.prnewswire.com",
              "published": "2026-02-23",
              "date": "2026-02-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Andrews · Andrews · Source context reviewed",
      "status_scope": "Canaan identifies Bear as one of its three WindHQ joint venture facilities. Its October 15 unaudited update reports three active JV mining projects as of September 30, 2026, alongside operating JV computing power. Operating phase describes the mining activity reported for this JV asset. It does not certify continuous uptime or allocate JV power, hashrate, bitcoin production or financial consideration to this individual facility. No role or ownership field is changed.",
      "event_evidence": [
        {
          "date": "2026-10-15",
          "text": "Canaan published its September mining update including the three named WindHQ JV facilities, including Bear. October 15 is the publication date; September 30 is the reporting date. Neither is a facility opening or verified production allocation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
              "host": "www.prnewswire.com",
              "published": "2026-10-15",
              "date": "2026-10-15",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48003"
      }
    },
    {
      "id": "canaan-chief-mountain-andrews-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Chief Mountain Bitcoin Mine",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Andrews"
      ],
      "city": "Andrews",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-project portfolio, no per-site allocation. 120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-10-15",
          "Canaan published its September mining update including the three named WindHQ JV facilities, including Chief Mountain. October 15 is the publication date; September 30 is the reporting date. Neither is a facility opening or verified production allocation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html",
          "host": "prnewswire.com",
          "date": "2026-02-23",
          "published": "2026-02-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
          "host": "www.prnewswire.com",
          "published": "2026-10-15",
          "date": "2026-10-15",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 32.31967,
        "lng": -102.65379,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-release-review-round6-2026-10-14.json",
          "scope": "three-project portfolio, no per-site allocation",
          "fields": {
            "acquisition_announced_date": "2026-02-23",
            "acquired_equity_percent": 49,
            "continuing_windhq_equity_percent": 51,
            "portfolio_projects": [
              "Alborz",
              "Bear",
              "Chief Mountain"
            ],
            "portfolio_operational_power_mw": 120,
            "portfolio_transaction_consideration_usd_approx": 39750000,
            "transaction_consideration_basis": "49percent joint-venture interests plus6840mining rigs, funded with shares"
          },
          "notes": [
            "120MW/39.75Mare three-project transaction scope, not each of Bear/Chief Mountain. Acquisition price not new development capex. Hashrate measures bitcoin computation, not electrical MW or AI capacity. BlackPearl conversion mentioned is a separate site. No project-specific current tariff adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html",
              "host": "prnewswire.com",
              "date": "2026-02-23",
              "published": "2026-02-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 9",
          "scope": "Canaan identifies Chief Mountain as one of its three WindHQ joint venture facilities. Its October 15 unaudited update reports three active JV mining projects as of September 30, 2026, alongside operating JV computing power. Operating phase describes the mining activity reported for this JV asset. It does not certify continuous uptime or allocate JV power, hashrate, bitcoin production or financial consideration to this individual facility. No role or ownership field is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_reported_mining_phase",
              "scope": "Canaan identifies Chief Mountain as one of its three WindHQ joint venture facilities. Its October 15 unaudited update reports three active JV mining projects as of September 30, 2026, alongside operating JV computing power. Operating phase describes the mining activity reported for this JV asset. It does not certify continuous uptime or allocate JV power, hashrate, bitcoin production or financial consideration to this individual facility. No role or ownership field is changed."
            },
            "reporting_scope": {
              "issuer": "Canaan Inc.",
              "publication_channel": "Issuer supplied PRNewswire disclosure",
              "unaudited": true,
              "reporting_as_of": "2026-09-30",
              "JV_assets_named": [
                "Alborz",
                "Bear",
                "Chief Mountain"
              ],
              "JV_active_projects_reported": 3,
              "site_quantity_allocation_adopted": false,
              "ownership_fields_changed": false
            }
          },
          "notes": [
            "Canaan identifies Chief Mountain as one of its three WindHQ joint venture facilities. Its October 15 unaudited update reports three active JV mining projects as of September 30, 2026, alongside operating JV computing power. Operating phase describes the mining activity reported for this JV asset. It does not certify continuous uptime or allocate JV power, hashrate, bitcoin production or financial consideration to this individual facility. No role or ownership field is changed.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
              "host": "www.prnewswire.com",
              "published": "2026-10-15",
              "date": "2026-10-15",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/canaan-inc-acquires-cipher-minings-interest-in-multiple-operational-mining-projects-totaling-4-4-ehs-in-west-texas-302694773.html",
              "host": "www.prnewswire.com",
              "published": "2026-02-23",
              "date": "2026-02-23",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Andrews · Andrews · Source context reviewed",
      "status_scope": "Canaan identifies Chief Mountain as one of its three WindHQ joint venture facilities. Its October 15 unaudited update reports three active JV mining projects as of September 30, 2026, alongside operating JV computing power. Operating phase describes the mining activity reported for this JV asset. It does not certify continuous uptime or allocate JV power, hashrate, bitcoin production or financial consideration to this individual facility. No role or ownership field is changed.",
      "event_evidence": [
        {
          "date": "2026-10-15",
          "text": "Canaan published its September mining update including the three named WindHQ JV facilities, including Chief Mountain. October 15 is the publication date; September 30 is the reporting date. Neither is a facility opening or verified production allocation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
              "host": "www.prnewswire.com",
              "published": "2026-10-15",
              "date": "2026-10-15",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48003"
      }
    },
    {
      "id": "cipher-stingray-andrews-county-tx",
      "state": "tx",
      "kind": "project",
      "name": "Cipher Digital Stingray",
      "group": "building",
      "status": "Under construction",
      "crypto": false,
      "type": "HPC data-center development",
      "counties": [
        "Andrews"
      ],
      "city": "Andrews",
      "address": "",
      "who": "Cipher Digital",
      "mw": null,
      "power": "",
      "power_note": "Stingray:70 MW critical IT capacity under contract for future phased HPC delivery, separately stated from 100 gross MW. This is not delivered or metered IT load. April/May 2027 rent milestones are targets; construction remains the supported stage.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
          "host": "www.sec.gov",
          "published": "2026-06-08",
          "date": "2026-06-08",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/exh992revduploadtoworkiv.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        }
      ],
      "loc": {
        "lat": 32.27409,
        "lng": -102.63496,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Andrews · Andrews County · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "developer",
            "current_stage": "HPC construction: earthwork, underground electrical work, foundations and steel erection disclosed as of September 30. Past energization forecasts and a signed lease do not establish current HPC operation.",
            "county_context": "Older issuer exhibit explicitly places the acquired Stingray site in Andrews County, Texas; June 2026 exhibit locates the HPC development in Andrews. No point/parcel or contact address is adopted.",
            "contracted_capacity_and_dates": "June 8 exhibit separates 100 gross MW from 70 IT MW under contract. April 1/May 1,2027 network/data-hall rent dates are targets, not accomplished operation."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
              "host": "www.sec.gov",
              "published": "2026-06-08",
              "date": "2026-06-08",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998925000003/exh992revduploadtoworkiv.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        }
      ],
      "raw_status": "under construction",
      "status_field": "current_status",
      "status_scope": "HPC construction, based on September 30 source state furnished October 13. Contracted future capacity and rent targets do not establish operating service.",
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 70,
          "unit": "MW",
          "as_of": "2026-06-08",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-15",
          "basis": "contracted",
          "scope": "Stingray:70 MW critical IT capacity under contract for future phased HPC delivery, separately stated from 100 gross MW. This is not delivered or metered IT load. April/May 2027 rent milestones are targets; construction remains the supported stage.",
          "sources": [
            "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48003"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
