{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "tx/odessa",
    "label": "Odessa, Texas"
  },
  "records": [
    {
      "id": "cipher-digital-odessa-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Cipher Digital Odessa",
      "group": "operating",
      "status": "Operating",
      "crypto": true,
      "type": "Bitcoin mining data center",
      "counties": [
        "Ector"
      ],
      "city": "Odessa",
      "address": "2200 E Interstate 20, Odessa, TX 79766",
      "who": "Cipher Digital",
      "mw": null,
      "power": "",
      "power_note": "Odessa:207 MW gross energized site capacity as reported in the August 4 presentation. This is not critical IT load, metered electricity use, generation or the capacity of a separate planned HPC conversion.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cipherdigital.com/infrastructure/",
          "host": "cipherdigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://investors.cipherdigital.com/node/11731/html",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
          "host": "www.sec.gov",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_ncs=518210&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
          "host": "echodata.epa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "EPA registry context; not proof of operation"
        }
      ],
      "loc": {
        "lat": 31.86911,
        "lng": -102.54297,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Odessa · Ector County · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "operator",
            "texas_program_scope": "Exact program rows and participant roles retained. Effective/exemption dates are not opening, closure, actual tenancy, legal title or realized savings.",
            "epa_registry_scope": {
              "registry_id": "110071181368",
              "identity": "Named Cipher facility/city context matches the issuer disclosure; agency program status is not the facility operating stage.",
              "precision": "EPA coordinates are not adopted. Black Pearl reports 17,483 m accuracy with no collection method; Odessa reports address matching and 30 m accuracy. Neither independently verifies a building center."
            },
            "current_stage": "Current operator portfolio lists Odessa as operating bitcoin-mining capacity; Q2 filing identifies revenue-producing mining at this named facility. HPC lease discussions are a potential later use, not current HPC service.",
            "agency_published_address": "EPA registry names Cipher Mining Odessa Data Center at 2200 E Interstate 20, Odessa 79766, Ector County 48135. The address/registry context is retained; agency ActiveFlag Y and a stormwater program do not supply the operating label."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://cipherdigital.com/infrastructure/",
              "host": "cipherdigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://investors.cipherdigital.com/node/11731/html",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
              "host": "www.sec.gov",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_ncs=518210&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
              "host": "echodata.epa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "EPA registry context; not proof of operation"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "texas_current_program_contexts": {
              "checked": "2026-10-17",
              "reference_rows": [
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "Cipher Mining Technologies Inc. - Odessa Site",
                  "program": "Qualifying data center",
                  "registration_number": "DC453534-OW1"
                }
              ],
              "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Current qualifying data-center and large-project registered lists"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "raw_status": "operating",
      "status_field": "current_status",
      "typed_power_facts": [
        {
          "measure": "site_gross_capacity",
          "value": 207,
          "unit": "MW",
          "as_of": "2026-08-04",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-15",
          "basis": "operator_reported_capacity",
          "scope": "Odessa:207 MW gross energized site capacity as reported in the August 4 presentation. This is not critical IT load, metered electricity use, generation or the capacity of a separate planned HPC conversion.",
          "sources": [
            "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48135"
      }
    },
    {
      "id": "sangha-renewables-ector-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Sangha Renewables Ector County Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Ector"
      ],
      "city": "Odessa",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported mining capacity is not independently verified critical IT, current measured load or AI hosting. The 150 MW solar farm is separate generation, not additional mining capacity. Supplemental grid power during non-solar hours is expressly included, so no claim of continuous solar-only or fully off-grid operation. Original partner agreement and current operating status were not independently examined. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-12-12",
          "Sangha issuer release states that full energization of its Ector County mining facility was announced during a December 12, 2025 ribbon ceremony and describes mining operation at the site. This is an attributed historical company report, not independent certification of current occupancy or all subsequent phases."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://bitcoinmagazine.com/news/sangha-energizes-20-bitcoin-mining",
          "host": "bitcoinmagazine.com",
          "date": "2025-12-12",
          "published": "2025-12-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/sangha-renewables-inaugurates-20-mw-project-in-west-texas-energized-by-totalenergies-302639872.html",
          "host": "www.prnewswire.com",
          "published": "2025-12-12",
          "date": "2025-12-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.sangharenewables.com/",
          "host": "www.sangharenewables.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 31.83842,
        "lng": -102.54027,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Bitcoin Magazine reports Sangha’s announced energization and ribbon cutting for a 19.9 MW bitcoin mining facility in Ector County with TotalEnergies and Links Genco.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Reported mining capacity is not independently verified critical IT, current measured load or AI hosting. The 150 MW solar farm is separate generation, not additional mining capacity. Supplemental grid power during non-solar hours is expressly included, so no claim of continuous solar-only or fully off-grid operation. Original partner agreement and current operating status were not independently examined.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://bitcoinmagazine.com/news/sangha-energizes-20-bitcoin-mining",
              "host": "bitcoinmagazine.com",
              "date": "2025-12-12",
              "published": "2025-12-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 53",
          "scope": "Sangha original issuer release dated December 12, 2025 explicitly describes its Ector County mining facility and reports energization and operation at that time. The current general company home page does not independently verify exact present Ector computing service in this bounded review. The historical report is retained as a dated event without treating a ribbon ceremony, power availability or another company site as fresh current operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_exact_site_report_current_stage_held",
              "scope": "Sangha original issuer release dated December 12, 2025 explicitly describes its Ector County mining facility and reports energization and operation at that time. The current general company home page does not independently verify exact present Ector computing service in this bounded review. The historical report is retained as a dated event without treating a ribbon ceremony, power availability or another company site as fresh current operation."
            },
            "source_read_scope": {
              "issuer_original_project_and_ceremony_body_read": true,
              "issuer_identity_verified": true,
              "current_general_homepage_selected_sections_read": true,
              "no_technical_quantity_export": true
            }
          },
          "notes": [
            "Sangha original issuer release dated December 12, 2025 explicitly describes its Ector County mining facility and reports energization and operation at that time. The current general company home page does not independently verify exact present Ector computing service in this bounded review. The historical report is retained as a dated event without treating a ribbon ceremony, power availability or another company site as fresh current operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/sangha-renewables-inaugurates-20-mw-project-in-west-texas-energized-by-totalenergies-302639872.html",
              "host": "www.prnewswire.com",
              "published": "2025-12-12",
              "date": "2025-12-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.sangharenewables.com/",
              "host": "www.sangharenewables.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Odessa · Ector · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-12-12",
          "text": "Sangha issuer release states that full energization of its Ector County mining facility was announced during a December 12, 2025 ribbon ceremony and describes mining operation at the site. This is an attributed historical company report, not independent certification of current occupancy or all subsequent phases.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/sangha-renewables-inaugurates-20-mw-project-in-west-texas-energized-by-totalenergies-302639872.html",
              "host": "www.prnewswire.com",
              "published": "2025-12-12",
              "date": "2025-12-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48135"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
