{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "tx/pecos",
    "label": "Pecos, Texas"
  },
  "records": [
    {
      "id": "core-scientific-pecos-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Core Scientific Pecos AI Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Reeves"
      ],
      "city": "Pecos",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Core Scientific two-site gross power increment, no Pecos split. NoPecos-onlysplitinreviewedpassage. HuntCounty430MWseparateproject.350energizedand590MWearly2027deliveryCoreWeaveportfoliofiguresnotPecos-only. Corporatefinancials/1.5GWpipelinecannotbecountedagainasindividualcampusload. NooriginalPecosopeningorexactparceladopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-03-02",
          "Core Scientific published results including a proposed combined power expansion across Dalton and Pecos. March 2 is the publication date. Fleet energized power and a combined expansion figure are not a Pecos opening or an individual site capacity."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results",
          "host": "investors.corescientific.com",
          "date": "2026-03-02",
          "published": "2026-03-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Core Scientific reviewed source"
        }
      ],
      "loc": {
        "lat": 31.32298,
        "lng": -103.69316,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Core Scientific two-site gross power increment, no Pecos split",
          "fields": {
            "issuer": "Core Scientific",
            "release_date": "2026-03-02",
            "combined_dalton_pecos_gross_power_increase_mw_approx": 300,
            "power_basis": "combined gross power increase across Georgia and Texas sites",
            "pecos_specific_increment_mw": null
          },
          "notes": [
            "NoPecos-onlysplitinreviewedpassage. HuntCounty430MWseparateproject.350energizedand590MWearly2027deliveryCoreWeaveportfoliofiguresnotPecos-only. Corporatefinancials/1.5GWpipelinecannotbecountedagainasindividualcampusload. NooriginalPecosopeningorexactparceladopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results",
              "host": "investors.corescientific.com",
              "date": "2026-03-02",
              "published": "2026-03-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_utility_context": {
              "issuer": "Core Scientific",
              "reporting_period": "2025-12-31",
              "source_rows": [
                {
                  "location": "Pecos, Texas",
                  "utility": "Texas New-Mexico Power",
                  "gross_utility_capacity_mw": 300
                }
              ],
              "scope": "Annual gross utility-capacity context only; not critical IT, current load, an opened phase or an unambiguous physical-site boundary. No typed MW fact or summed campus total added."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Core Scientific reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 9",
          "scope": "Core Scientific March 2, 2026 results announced a combined gross power expansion across Dalton and Pecos. The combined figure and fleet energized capacity do not establish Pecos specific delivered IT capacity or completion of its proposed expansion. Current physical stage for the inherited Pecos record remains unresolved.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "multi_site_expansion_current_site_stage_held",
              "scope": "Core Scientific March 2, 2026 results announced a combined gross power expansion across Dalton and Pecos. The combined figure and fleet energized capacity do not establish Pecos specific delivered IT capacity or completion of its proposed expansion. Current physical stage for the inherited Pecos record remains unresolved."
            }
          },
          "notes": [
            "Core Scientific March 2, 2026 results announced a combined gross power expansion across Dalton and Pecos. The combined figure and fleet energized capacity do not establish Pecos specific delivered IT capacity or completion of its proposed expansion. Current physical stage for the inherited Pecos record remains unresolved.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results",
              "host": "investors.corescientific.com",
              "published": "2026-03-02",
              "date": "2026-03-02",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pecos · Reeves · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-03-02",
          "text": "Core Scientific published results including a proposed combined power expansion across Dalton and Pecos. March 2 is the publication date. Fleet energized power and a combined expansion figure are not a Pecos opening or an individual site capacity.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results",
              "host": "investors.corescientific.com",
              "published": "2026-03-02",
              "date": "2026-03-02",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48389"
      }
    },
    {
      "id": "microsoft-pecos-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Microsoft Pecos Data Center Campus",
      "group": "proposed",
      "status": "Operator-announced plan",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Reeves"
      ],
      "city": "Pecos",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity. Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions. No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
          "host": "blogs.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 31.35984,
        "lng": -103.7334,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "announcement_date": "2026-06-22",
            "announced_capacity_mw": 2000,
            "capacity_basis": "Approximately2GW datacenter capacity; explicit criticalIT basis not stated.",
            "current_verified_it_mw": null,
            "investment": "Multibillion dollar campus planned over five to seven years; no exact total.",
            "construction_jobs_forecast_peak": "More than6000",
            "permanent_jobs_forecast": "Hundreds, no exact count",
            "initial_power_strategy": "Proposed behind-the-meter natural gas generation funded by Microsoft; later grid connection anticipated",
            "cooling": "Planned closed-loop design; cooling initial fill distinct from all-site lifecycle use."
          },
          "notes": [
            "Announced capacity, proposed generation and statewide4.7GW renewable contracts are different scopes, not additive IT capacity.",
            "Environmental controls, low-water design and no-current-grid-demand statements describe plans, not observed operations, issued permits or verified emissions.",
            "No guaranteed ready-for-service date, construction completion, exact water volume, actual jobs or final incentives established by announcement.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
              "host": "blogs.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-announced plan",
              "basis": "Microsoft’s June 22, 2026 announcement says it will build the Pecos campus over a multi-year period.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective."
          },
          "notes": [
            "The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
              "host": "blogs.microsoft.com",
              "published": "2026-06-22",
              "date": "2026-06-22",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "K3 company role review October22,2026",
          "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
            "A source read is not a construction, opening, transaction-closing or operating date."
          ],
          "sources": [
            {
              "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
              "host": "blogs.microsoft.com",
              "published": "2026-06-22",
              "date": "2026-06-22",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pecos · Reeves · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. Microsoft’s June 22, 2026 announcement says it will build the Pecos campus over a multi-year period. The announcement establishes the named plan, not accomplished construction, energized IT or operation. The Arizona illustration and existing San Antonio activity do not establish Pecos activity. Water and power design claims remain prospective.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48389"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
