{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "tx/red-oak",
    "label": "Red Oak, Texas"
  },
  "records": [
    {
      "id": "compass-red-oak-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Red Oak Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ellis"
      ],
      "city": "Red Oak",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No exact vote day or executed ordinance retained. State official call for moratorium is not enacted statewide restriction. DataBank financing refers to separate company/projects. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://desototribune.com/2026/05/27/red-oak-data-center-sparks-controversy-as-expansion-moves-forward/",
          "host": "desototribune.com",
          "date": "2026-05-27",
          "published": "2026-05-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.34845,
        "lng": -96.79461,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "DeSoto Tribune reports4to1 Red Oak rezoning for830-acre Compass proposal amid opposition.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No exact vote day or executed ordinance retained. State official call for moratorium is not enacted statewide restriction. DataBank financing refers to separate company/projects.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://desototribune.com/2026/05/27/red-oak-data-center-sparks-controversy-as-expansion-moves-forward/",
              "host": "desototribune.com",
              "date": "2026-05-27",
              "published": "2026-05-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Red Oak · Ellis · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48139"
      }
    },
    {
      "id": "databank-red-oak-tx",
      "state": "tx",
      "kind": "project",
      "name": "Red Oak Campus",
      "group": "building",
      "status": "Construction reported",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ellis"
      ],
      "city": "Red Oak",
      "address": "",
      "who": "DataBank",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "Prospective eight-building Red Oak campus full-buildout IT envelope. Overlaps with listed Phase 1/components; not operating, delivered, metered or utility capacity. The 240/300 MW first-phase source difference remains unresolved.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum400MWsubstation,300MWITpotential,240MWfourcards and480MWfullprogram. Wholecampus record must be parent of individualbuildings;8buildings are futureprogram. Operator describes292-acreRedOakcampus with futureeightbuildingprogram; listedfirstfour60MWbuildings are not automatically proof240MWcommissioned. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. reposted news summary, duplicate event. Operator news summary credits the DallasMorningNews and repeats the April21construction financing event. Use the separate original operator release for facts; no second financing or project count. Updated-dateApril22is not a new project event. named source. Loan is financing, not total campus capital spent or an incentive. Combined capacity applies to first three, not each building or all eight. Fully leased is not commissioned or operating. Other company credit/securitization amounts excluded.",
      "date": "",
      "events": [
        [
          "2026-06-15",
          "DataBank announced a $650 million Red Oak construction-financing upsize to a $2.65 billion campus package, separate from an $800 million corporate revolver. This dated financing announcement is not project expenditure, an opening or an independently verified loan-instrument review."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/dallas/red-oak-campus/",
          "host": "databank.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/",
          "host": "databank.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/",
          "host": "databank.com",
          "date": "2026-04-21",
          "published": "2026-04-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/",
          "host": "www.databank.com",
          "published": "2025-11-10",
          "date": "2025-11-10",
          "checked": "2026-10-16",
          "label": "DataBank construction article updated November 10, 2025"
        },
        {
          "url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/",
          "host": "www.databank.com",
          "published": "2026-06-15",
          "date": "2026-06-15",
          "checked": "2026-10-16",
          "label": "DataBank June 15 financing announcement"
        },
        {
          "url": "https://www.databank.com/resources/news/everybodys-talking-about-data-centers-now-tour-one/",
          "host": "www.databank.com",
          "published": "2026-09-22",
          "date": "2026-09-22",
          "checked": "2026-10-16",
          "label": "DataBank September 22 summary of CoStar; not the underlying loan documents"
        }
      ],
      "loc": {
        "lat": 32.36524,
        "lng": -96.81294,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "city": "Red Oak",
            "campus_acres": 292,
            "phase1_substation_mw": 400,
            "phase1_critical_it_potential_mw_max": 300,
            "full_program_critical_it_potential_mw": 480,
            "listed_buildings": [
              "DFW9",
              "DFW10",
              "DFW11",
              "DFW12"
            ],
            "advertised_each_building_it_mw": 60,
            "power_basis": "design/marketing potential; commissioning not verified"
          },
          "notes": [
            "Do not sum400MWsubstation,300MWITpotential,240MWfourcards and480MWfullprogram.",
            "Wholecampus record must be parent of individualbuildings;8buildings are futureprogram.",
            "Operator describes292-acreRedOakcampus with futureeightbuildingprogram; listedfirstfour60MWbuildings are not automatically proof240MWcommissioned.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/dallas/red-oak-campus/",
              "host": "databank.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "databank-equinix-review-round5-2026-10-14.json",
          "scope": "reposted news summary, duplicate event",
          "fields": {},
          "notes": [
            "Operator news summary credits the DallasMorningNews and repeats the April21construction financing event. Use the separate original operator release for facts; no second financing or project count. Updated-dateApril22is not a new project event.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/resources/news/dallas-based-firm-lands-2-billion-construction-loan-for-data-center-campus/",
              "host": "databank.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "databank-equinix-review-round5-2026-10-14.json",
          "scope": "named source",
          "fields": {
            "construction_loan_usd": 2000000000,
            "financed_initial_buildings": [
              "DFW9",
              "DFW10",
              "DFW11"
            ],
            "planned_campus_buildings": 8,
            "initial_three_buildings_combined_area_sqft": 600000,
            "initial_three_buildings_combined_capacity_mw": 180,
            "power_basis": "release says power; critical IT versus gross not independently defined",
            "initial_three_buildings_lease_status": "leased as of release"
          },
          "notes": [
            "Loan is financing, not total campus capital spent or an incentive. Combined capacity applies to first three, not each building or all eight. Fully leased is not commissioned or operating. Other company credit/securitization amounts excluded.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/",
              "host": "databank.com",
              "date": "2026-04-21",
              "published": "2026-04-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "DataBank Red Oak campus and three named building program contexts.",
          "fields": {
            "current_source_scope": "The operator identifies DFW9, DFW10 and DFW11 on its Red Oak campus. A separate 2026-04-21 financing announcement concerns those three facilities.",
            "identity_limits": "These are program contexts for buildings within the existing campus record. No opening or full-campus completion is inferred.",
            "texas_program_entries": [
              {
                "registered_name": "DFW 9",
                "program": "qualifying data center",
                "registration_anchor": "DC047213-OW1",
                "program_effective_on": "2025-10-01",
                "exemption_end_on": null,
                "listed_owner_names": [
                  "DB Data Center Red Oak, LLC"
                ],
                "listed_occupant_names": [
                  "Oracle America Cloud Services LLC"
                ],
                "listed_operator_names": [
                  "Databank Holdings LTD",
                  "Oracle America, Inc."
                ]
              },
              {
                "registered_name": "DFW 10",
                "program": "qualifying data center",
                "registration_anchor": "DC961212-OW1",
                "program_effective_on": "2025-10-01",
                "exemption_end_on": null,
                "listed_owner_names": [
                  "DB Data Center Red Oak, LLC"
                ],
                "listed_occupant_names": [
                  "Oracle America Cloud Services LLC"
                ],
                "listed_operator_names": [
                  "Databank Holdings LTD",
                  "Oracle America, Inc."
                ]
              },
              {
                "registered_name": "DFW 11",
                "program": "qualifying data center",
                "registration_anchor": "DC018720-OW1",
                "program_effective_on": "2025-10-01",
                "exemption_end_on": null,
                "listed_owner_names": [
                  "DB Data Center Red Oak, LLC"
                ],
                "listed_occupant_names": [
                  "Oracle America Cloud Services LLC"
                ],
                "listed_operator_names": [
                  "Databank Holdings LTD",
                  "Oracle America, Inc."
                ]
              }
            ],
            "provider_brand": "DataBank"
          },
          "notes": [
            "The DFW12 row has an internal registration-spacing issue and remains held; it is not silently normalized into a canonical registration.",
            "Different campus headlines describe design, future phases and individual facilities. Financing, leasing and published addresses alone do not establish current operation. Status stays unclear.",
            "Program effective and exemption-end dates are not physical opening, energization or closure dates. Listed program participants do not independently verify parcel title, legal corporate relationships or current tenant occupancy.",
            "No new map coordinates, precise pins, metered use or legacy MW totals are adopted."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/dallas/red-oak-campus/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/",
              "host": "www.databank.com",
              "published": "2026-04-21",
              "date": "2026-04-21",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Provider-role display refinement: the source establishes a developer brand, not current operating service.",
          "fields": {
            "provider_role": "developer"
          },
          "notes": [
            "The main provider fact is labeled Developer. The source does not resolve the campus operating stage; status remains unclear."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/dallas/red-oak-campus/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/",
              "host": "www.databank.com",
              "published": "2026-04-21",
              "date": "2026-04-21",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "Primary-Campus-Holds-20261016",
          "scope": "Targeted primary campus/project stage and identity-scope review. No physical-site census, point/precision upgrade, actual delivery, metered use or legal title finding.",
          "fields": {
            "published_component_contexts": [
              {
                "code": "DFW9",
                "address": "3080 Batchler Rd. - Red Oak, TX 75154",
                "planned_it_capacity_mw": 60
              },
              {
                "code": "DFW10",
                "address": "3330 Batchler Rd. - Red Oak, TX 75154",
                "planned_it_capacity_mw": 60
              },
              {
                "code": "DFW11",
                "address": "3320 Batchler Rd. - Red Oak, TX 75154",
                "planned_it_capacity_mw": 60
              },
              {
                "code": "DFW12",
                "address": "3440 Batchler Rd. - Red Oak, TX 75154",
                "planned_it_capacity_mw": 60
              }
            ],
            "phase_one_it_envelope_mw": 240,
            "capacity_source_difference": "Current campus headline and November 10, 2025 construction article use 240 MW for Phase 1, while the current campus narrative says up to 300 MW. The difference remains unresolved. Neither becomes a delivered amount or an additional typed sum.",
            "full_buildout_scope": "480 MW is the prospective eight-building full-buildout critical IT envelope. Four advertised 60 MW code components and the 240/300 MW first-phase alternatives overlap with it; they are not extra capacity. The separate 400 MW substation is a different measure.",
            "construction_and_target_scope": "The operator article updated November 10, 2025 says construction was underway and targets initial Ready for Service in Q2 2026. That target has passed without an accomplished opening/energization source in this review. Later financing and directory listings do not by themselves establish delivery or current service.",
            "financing_history_scope": "The June 15, 2026 release announces a $650 million campus construction-financing upsize, bringing that campus package to $2.65 billion, separately from an $800 million corporate revolver. The September 22 operator summary of CoStar reports more than $3.45 billion of campus construction financing without the underlying instruments here. These dated claims are not a verified current debt balance, project investment, tax incentive, expenditure or additive total.",
            "current_status_basis": "Construction is explicitly reported by the operator in its November 10, 2025 update; June 15, 2026 financing supports construction of a fourth building. This is a construction-phase campus context, not evidence all eight buildings are complete or that the expired Q2 2026 service target occurred. Current delivery and energized capacity remain unverified."
          },
          "notes": [
            "Field-specific review only. Original name, approximate location and wrapper, city/county context, opening field, legacy MW, financial and ownership limits remain.",
            "Campus/component and regulatory proposal units are not interchangeable with separate physical sites or complete operational capacity."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/dallas/red-oak-campus/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "DataBank primary project record"
            },
            {
              "url": "https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/",
              "host": "www.databank.com",
              "published": "2025-11-10",
              "date": "2025-11-10",
              "checked": "2026-10-16",
              "label": "DataBank construction article updated November 10, 2025"
            },
            {
              "url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/",
              "host": "www.databank.com",
              "published": "2026-06-15",
              "date": "2026-06-15",
              "checked": "2026-10-16",
              "label": "DataBank June 15 financing announcement"
            },
            {
              "url": "https://www.databank.com/resources/news/everybodys-talking-about-data-centers-now-tour-one/",
              "host": "www.databank.com",
              "published": "2026-09-22",
              "date": "2026-09-22",
              "checked": "2026-10-16",
              "label": "DataBank September 22 summary of CoStar; not the underlying loan documents"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "texas_current_program_contexts": {
              "checked": "2026-10-17",
              "reference_rows": [
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "DFW 9",
                  "program": "Qualifying data center",
                  "registration_number": "DC047213-OW1"
                },
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "DFW 10",
                  "program": "Qualifying data center",
                  "registration_number": "DC961212-OW1"
                },
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "DFW 11",
                  "program": "Qualifying data center",
                  "registration_number": "DC018720-OW1"
                }
              ],
              "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Current qualifying data-center and large-project registered lists"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 34, October 23, 2026",
          "scope": "DataBank identifies the same named Red Oak Campus in its own source. DataBank reports construction financing and plans for named Red Oak buildings. Developer per source records its development relationship only. Loans, leases, renderings and forecast capacity do not prove spent investment, commissioning, a tenant identity, current computing or completed buildings. This review records the DataBank brand relationship, without establishing legal title, sole control or a distinct legal entity. Existing status, location, address, county, quantities, dates and component identity remain exact. Undated source publication dates remain unknown.",
          "fields": {
            "company_association": {
              "name": "DataBank",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "DataBank identifies the same named Red Oak Campus in its own source. DataBank reports construction financing and plans for named Red Oak buildings. Developer per source records its development relationship only. Loans, leases, renderings and forecast capacity do not prove spent investment, commissioning, a tenant identity, current computing or completed buildings. This review records the DataBank brand relationship, without establishing legal title, sole control or a distinct legal entity. Existing status, location, address, county, quantities, dates and component identity remain exact. Undated source publication dates remain unknown."
            },
            "provider_role": "developer"
          },
          "notes": [
            "DataBank identifies the same named Red Oak Campus in its own source. DataBank reports construction financing and plans for named Red Oak buildings. Developer per source records its development relationship only. Loans, leases, renderings and forecast capacity do not prove spent investment, commissioning, a tenant identity, current computing or completed buildings. This review records the DataBank brand relationship, without establishing legal title, sole control or a distinct legal entity. Existing status, location, address, county, quantities, dates and component identity remain exact. Undated source publication dates remain unknown."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/",
              "host": "www.databank.com",
              "published": "2026-04-21",
              "date": "2026-04-21",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/",
              "host": "www.databank.com",
              "published": "2026-06-15",
              "date": "2026-06-15",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.databank.com/data-centers/dallas/red-oak-campus/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Red Oak · Ellis · Source context reviewed",
      "search_extra": "DataBank Red Oak DFW9 DFW10 DFW11 DFW12 Batchler Road",
      "status_scope": "Construction is explicitly reported by the operator in its November 10, 2025 update; June 15, 2026 financing supports construction of a fourth building. This is a construction-phase campus context, not evidence all eight buildings are complete or that the expired Q2 2026 service target occurred. Current delivery and energized capacity remain unverified.",
      "event_evidence": [
        {
          "date": "2026-06-15",
          "text": "DataBank announced a $650 million Red Oak construction-financing upsize to a $2.65 billion campus package, separate from an $800 million corporate revolver. This dated financing announcement is not project expenditure, an opening or an independently verified loan-instrument review.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/",
              "host": "www.databank.com",
              "published": "2026-06-15",
              "date": "2026-06-15",
              "checked": "2026-10-16",
              "label": "DataBank June 15 financing announcement"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 480,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-16",
          "basis": "forecast",
          "scope": "Prospective eight-building Red Oak campus full-buildout IT envelope. Overlaps with listed Phase 1/components; not operating, delivered, metered or utility capacity. The 240/300 MW first-phase source difference remains unresolved.",
          "sources": [
            "https://www.databank.com/data-centers/dallas/red-oak-campus/",
            "https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48139"
      }
    },
    {
      "id": "google-red-oak-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Google Red Oak Campus",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ellis"
      ],
      "city": "Red Oak",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "Calendar-year 2025 operator-reported location totals. Withdrawal, discharge and consumption are separate quantities; methodology permits estimates and does not establish today’s use.",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Texas statewide page. 40Bnot RedOak-onlybudget.2009Texasoffices/presence not openingdata-center. CampusannouncementlabelsincludePampaandWilbarger2026but do not establish exactphysicalsitecoordinates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/texas/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/texas/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "host": "sustainability.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google 2026 Environmental Report"
        }
      ],
      "loc": {
        "lat": 32.38262,
        "lng": -96.76841,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "Texas statewide page",
          "fields": {
            "red_oak_announcement_year": 2023,
            "regional_cloud_ai_infrastructure_investment_usd": 40000000000,
            "regional_investment_through_year": 2027,
            "investment_scope": "Texas statewide"
          },
          "notes": [
            "40Bnot RedOak-onlybudget.2009Texasoffices/presence not openingdata-center. CampusannouncementlabelsincludePampaandWilbarger2026but do not establish exactphysicalsitecoordinates.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/texas/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Red Oak, Texas is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "annual_water_reporting": {
              "source_location": "Red Oak, TX",
              "report_year": 2026,
              "reporting_year": 2025,
              "source_page": 97,
              "unit": "Million gallons",
              "withdrawal": 67.0,
              "discharge": 16.6,
              "consumption": 50.4
            },
            "water_method_scope": "Annual calendar-year 2025 figures for the reported location, not instantaneous use, a daily rate, an approved limit or one building. Google uses metered or invoiced values when available and can estimate missing data; the table does not identify each row’s metering completeness. Consumption is calculated as withdrawal minus discharge; values are rounded. Seawater and brackish water over 1,000 mg/L total dissolved solids are excluded. Unless otherwise specified, withdrawals are potable; Douglas County includes reclaimed wastewater. No litres or daily averages are calculated.",
            "water_location_association": "Red Oak, TX is associated with this regional campus research context only; no allocation to separate expansion/street-address records or individual buildings.",
            "current_status_basis": "An operating component is supported at Google’s named Red Oak, Texas location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/texas/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
              "host": "sustainability.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google 2026 Environmental Report"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Red Oak · Ellis · Source context reviewed",
      "status_scope": "An operating component is supported at Google’s named Red Oak, Texas location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
      "typed_water_facts": [
        {
          "measure": "withdrawal",
          "value": 67.0,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Red Oak, TX, calendar year 2025 withdrawal; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "discharge",
          "value": 16.6,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Red Oak, TX, calendar year 2025 discharge; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "consumption",
          "value": 50.4,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Red Oak, TX, calendar year 2025 consumption; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48139"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
