{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Exact retained city label subset. This is not a municipal boundary or complete city inventory. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "cities",
    "key": "va/chester",
    "label": "Chester, Virginia"
  },
  "records": [
    {
      "id": "bermuda-hundred-data-center-chesterfield-va",
      "state": "va",
      "kind": "facility",
      "name": "Bermuda Hundred Data Center (Old Bermuda Hundred Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chesterfield"
      ],
      "city": "Chester",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://opengisdata.chesterfield.gov/",
          "host": "opengisdata.chesterfield.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.chesterfield.gov/5989/Data-Centers",
          "host": "www.chesterfield.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://services3.arcgis.com/TsynfzBSE6sXfoLq/ArcGIS/rest/services/Cadastral/FeatureServer/3/query?where=UPPER%28Address%29+LIKE+%271931+OLD+BERMUDA%25%27&outFields=OBJECTID%2CMPN%2CGPIN%2CDeededAcres%2CAssessmentYear%2CAddress%2CZip%2CHouse_Num%2CStreetName%2CStreetType&returnGeometry=true&outSR=4326&f=geojson",
          "host": "services3.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "One complete official source parcel query, calculated center only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-77.40060401941975%2C37.33119928853755%2C-77.38817598058026%2C37.34108071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting; imagery acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -77.39439,
        "lat": 37.33614,
        "precision": "approximate",
        "basis": "Approximate calculated center of the complete official source parcel 8046474181. Original county computing table separately names Old Bermuda at 1931 Old Bermuda Hundred Road. One complete official physical situs query returns GPIN 8046474181. The complete source parcel and calculated center are approximate references only. Separate Peanut at 2100 Bermuda Hundred and its status or water facts are excluded. Assessment year 2024 does not establish geometry age, title or current physical stage. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://opengisdata.chesterfield.gov/",
              "host": "opengisdata.chesterfield.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county-reported_construction",
              "scope": "Chesterfield County’s July 2026 table lists Peanut LLC at 2100 Bermuda Hundred Road with three buildings under construction. Its narrative reports an agreement allowing up to 6 million gallons per day at that site; this is a maximum allowance, not measured consumption. The separate Old Bermuda project at 1931 Old Bermuda Hundred Road is listed as not approved. July remains a month-only source date; the October 27 forum is prospective."
            }
          },
          "notes": [
            "Chesterfield County’s July 2026 table lists Peanut LLC at 2100 Bermuda Hundred Road with three buildings under construction. Its narrative reports an agreement allowing up to 6 million gallons per day at that site; this is a maximum allowance, not measured consumption. The separate Old Bermuda project at 1931 Old Bermuda Hundred Road is listed as not approved. July remains a month-only source date; the October 27 forum is prospective."
          ],
          "sources": [
            {
              "url": "https://www.chesterfield.gov/5989/Data-Centers",
              "host": "www.chesterfield.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "identity-correction-20261017-bermuda",
          "scope": "Correction to an earlier project association; the earlier review remains available below.",
          "fields": {
            "project_identity_correction": "Correction to the October 17 source association: the construction label and 6 million gallons per day agreement were attached to this Old Bermuda record in error. The county table distinguishes Old Bermuda at 1931 Old Bermuda Hundred Road, listed as not approved, from Peanut LLC at 2100 Bermuda Hundred Road, listed with three buildings under construction. Peanut’s water agreement and construction report do not establish Old Bermuda’s status or water allowance. Both claims are withdrawn from this record; current physical stage remains unresolved. The county table is dated July 2026 without an exact day. No identity merge, parcel or coordinate change."
          },
          "notes": [],
          "sources": [
            {
              "url": "https://www.chesterfield.gov/5989/Data-Centers",
              "host": "www.chesterfield.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "County project table, July 2026 source version"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 73, 2026-10-24",
          "scope": "Original county computing table separately names Old Bermuda at 1931 Old Bermuda Hundred Road. One complete official physical situs query returns GPIN 8046474181. The complete source parcel and calculated center are approximate references only. Separate Peanut at 2100 Bermuda Hundred and its status or water facts are excluded. Assessment year 2024 does not establish geometry age, title or current physical stage. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -77.39439,
                "lat": 37.33614,
                "precision": "approximate",
                "basis": "Approximate calculated center of the complete official source parcel 8046474181. Original county computing table separately names Old Bermuda at 1931 Old Bermuda Hundred Road. One complete official physical situs query returns GPIN 8046474181. The complete source parcel and calculated center are approximate references only. Separate Peanut at 2100 Bermuda Hundred and its status or water facts are excluded. Assessment year 2024 does not establish geometry age, title or current physical stage. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": "8046474181",
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "Original county computing table separately names Old Bermuda at 1931 Old Bermuda Hundred Road. One complete official physical situs query returns GPIN 8046474181. The complete source parcel and calculated center are approximate references only. Separate Peanut at 2100 Bermuda Hundred and its status or water facts are excluded. Assessment year 2024 does not establish geometry age, title or current physical stage. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.",
            "The inherited general area coordinate was not independently admitted as a reviewed source reference. Original county computing table separately names Old Bermuda at 1931 Old Bermuda Hundred Road. One complete official physical situs query returns GPIN 8046474181. The complete source parcel and calculated center are approximate references only. Separate Peanut at 2100 Bermuda Hundred and its status or water facts are excluded. Assessment year 2024 does not establish geometry age, title or current physical stage. The calculated reference is inside the unchanged retained county 51041. The measured correction is 210.4 metres. This is a source reference review, not a physical relocation. No source setting pixel supplies a coordinate or construction stage.",
            "The source setting shows extensive wooded land, an open utility corridor and scattered structures around the edges. The source parcel boundary is from the county response, never from these pixels. No computing roof or present construction stage is certified. Acquisition date is unknown."
          ],
          "sources": [
            {
              "url": "https://www.chesterfield.gov/5989/Data-Centers",
              "host": "www.chesterfield.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original named computing location, distinct from mail and technical fields"
            },
            {
              "url": "https://services3.arcgis.com/TsynfzBSE6sXfoLq/ArcGIS/rest/services/Cadastral/FeatureServer/3/query?where=UPPER%28Address%29+LIKE+%271931+OLD+BERMUDA%25%27&outFields=OBJECTID%2CMPN%2CGPIN%2CDeededAcres%2CAssessmentYear%2CAddress%2CZip%2CHouse_Num%2CStreetName%2CStreetType&returnGeometry=true&outSR=4326&f=geojson",
              "host": "services3.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "One complete official source parcel query, calculated center only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-77.40060401941975%2C37.33119928853755%2C-77.38817598058026%2C37.34108071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting; imagery acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Approximate source parcel reference, not a roof or complete campus",
      "summary": "Chester · Chesterfield · Source context reviewed",
      "status_scope": "Correction to the October 17 source association: the construction label and 6 million gallons per day agreement were attached to this Old Bermuda record in error. The county table distinguishes Old Bermuda at 1931 Old Bermuda Hundred Road, listed as not approved, from Peanut LLC at 2100 Bermuda Hundred Road, listed with three buildings under construction. Peanut’s water agreement and construction report do not establish Old Bermuda’s status or water allowance. Both claims are withdrawn from this record; current physical stage remains unresolved. The county table is dated July 2026 without an exact day. No identity merge, parcel or coordinate change.",
      "typed_water_facts": [],
      "evidence_retractions": [
        {
          "table": "events",
          "id": "event:status:encore-20261017-q057",
          "sha256": "d745dc0708a9bce7f356f76ee6657e6ebbb175a7ed6f075b2ce0b85e1790f14e",
          "reason": "Correction to the October 17 source association: the construction label and 6 million gallons per day agreement were attached to this Old Bermuda record in error. The county table distinguishes Old Bermuda at 1931 Old Bermuda Hundred Road, listed as not approved, from Peanut LLC at 2100 Bermuda Hundred Road, listed with three buildings under construction. Peanut’s water agreement and construction report do not establish Old Bermuda’s status or water allowance. Both claims are withdrawn from this record; current physical stage remains unresolved. The county table is dated July 2026 without an exact day. No identity merge, parcel or coordinate change.",
          "review_id": "identity-correction-20261017-bermuda",
          "source_urls": [
            "https://www.chesterfield.gov/5989/Data-Centers"
          ]
        },
        {
          "table": "water_facts",
          "id": "water:encore-20261017-q057:0",
          "sha256": "8f39409b74874e734005d18c5cc976723faf2bae201deb10a20a850f303c2253",
          "reason": "Correction to the October 17 source association: the construction label and 6 million gallons per day agreement were attached to this Old Bermuda record in error. The county table distinguishes Old Bermuda at 1931 Old Bermuda Hundred Road, listed as not approved, from Peanut LLC at 2100 Bermuda Hundred Road, listed with three buildings under construction. Peanut’s water agreement and construction report do not establish Old Bermuda’s status or water allowance. Both claims are withdrawn from this record; current physical stage remains unresolved. The county table is dated July 2026 without an exact day. No identity merge, parcel or coordinate change.",
          "review_id": "identity-correction-20261017-bermuda",
          "source_urls": [
            "https://www.chesterfield.gov/5989/Data-Centers"
          ]
        }
      ]
    },
    {
      "id": "google-project-peanut-chester-va",
      "state": "va",
      "kind": "facility",
      "name": "Project Peanut",
      "group": "building",
      "status": "County reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chesterfield"
      ],
      "city": "Chester",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits. USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons",
          "host": "vpm.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.chesterfield.gov/5989/Data-Centers",
          "host": "www.chesterfield.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 37.39038,
        "lng": -77.59991,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json",
          "scope": "Original local reporting or attributed original syndication; project and regional groups separate.",
          "fields": {},
          "notes": [
            "VPM June22,2026 updatedJune26 names three Google Chesterfield campuses: Peanut,BermudaHundredRd; Skye,MoseleyRd; Loch,WatkinsCenterParkway.9BUSD/1500acres are combinedproject-group investment/land descriptions, not9Bpersite or spending verified. Peanutplans/buildingpermits underreview; Skye2028opening/laterexpansion target; Loch timeline conditional on permits.",
            "USACECleanWaterAct applications are not issued permits. Proposed Loch impacts about3000streamfeet/4wetlandacres and Skye8000feet/20-plusacres are separate proposed impacts; offsite mitigation/credit plans are not completed restorations. NDAs/water-cost concerns and official responses are attributed, not adjudicated wrongdoing.24centsper100assessedequipment is reported category taxrate, not all taxes.71Mover20years for a1Bexample is EDAmodel, not actual revenue from eachcampus. Two previously open IDs gain context; Loch was already reviewed elsewhere.",
            "No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.vpm.org/news/2026-06-22/google-data-centers-chesterfield-peanut-skye-loch-schneider-timmons",
              "host": "vpm.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 19",
          "scope": "The current Chesterfield page July 2026 status table explicitly lists Peanut LLC at Bermuda Hundred Road as under construction. County reported construction describes that campus table period and its named project, without certifying individual building completion, commissioning, operating service or a current provider role. The separate Upper Magnolia Green and Watkins Centre proposals are not transferred to Peanut. Source table water limits and building counts are not adopted as new quantities, and no exact construction start or opening day is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_named_project_construction_table_with_period_scope",
              "scope": "The current Chesterfield page July 2026 status table explicitly lists Peanut LLC at Bermuda Hundred Road as under construction. County reported construction describes that campus table period and its named project, without certifying individual building completion, commissioning, operating service or a current provider role. The separate Upper Magnolia Green and Watkins Centre proposals are not transferred to Peanut. Source table water limits and building counts are not adopted as new quantities, and no exact construction start or opening day is inferred."
            },
            "source_scope": {
              "county_status_table_period": "July 2026",
              "table_row_project": "Peanut LLC",
              "individual_building_completion_unverified": true,
              "source_check_not_construction_start": true,
              "no_role_or_quantity_changes": true
            }
          },
          "notes": [
            "The current Chesterfield page July 2026 status table explicitly lists Peanut LLC at Bermuda Hundred Road as under construction. County reported construction describes that campus table period and its named project, without certifying individual building completion, commissioning, operating service or a current provider role. The separate Upper Magnolia Green and Watkins Centre proposals are not transferred to Peanut. Source table water limits and building counts are not adopted as new quantities, and no exact construction start or opening day is inferred.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.chesterfield.gov/5989/Data-Centers",
              "host": "www.chesterfield.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Chester · Chesterfield · Source context reviewed",
      "status_scope": "The current Chesterfield page July 2026 status table explicitly lists Peanut LLC at Bermuda Hundred Road as under construction. County reported construction describes that campus table period and its named project, without certifying individual building completion, commissioning, operating service or a current provider role. The separate Upper Magnolia Green and Watkins Centre proposals are not transferred to Peanut. Source table water limits and building counts are not adopted as new quantities, and no exact construction start or opening day is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51041"
      }
    },
    {
      "id": "powerhouse-chirisa-chester-va",
      "state": "va",
      "kind": "facility",
      "name": "Chirisa Technology Park  -  Richmond (Chester)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chesterfield"
      ],
      "city": "Chester",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The one-GW demand and two-billion-USD plan are reported proposal figures without verified critical-IT or executed utility basis. Google Meadowville, other Google campuses, a separate 744-acre rejected planning recommendation and regional budgets must not be merged with the Chirisa project. Original approvals and the PowerHouse joint-venture/operator crosswalk remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/products/richmond-va-area-counties-split-on-data-centers",
          "host": "govtech.com",
          "date": "2025-12-02",
          "published": "2025-12-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.chesterfield.gov/5989/Data-Centers",
          "host": "www.chesterfield.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.powerhousedata.com/news/chirisa-powerhouse-launching-hyperscale-campus-in-chesterfield",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 37.40249,
        "lng": -77.56887,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces Richmond Times-Dispatch reporting on Chirisa's Meadowville proposal alongside other Richmond-region projects and policy debates.",
            "independently_verified_current_operating_status": null,
            "operator_or_site_identity_needs_crosswalk": true
          },
          "notes": [
            "The one-GW demand and two-billion-USD plan are reported proposal figures without verified critical-IT or executed utility basis. Google Meadowville, other Google campuses, a separate 744-acre rejected planning recommendation and regional budgets must not be merged with the Chirisa project. Original approvals and the PowerHouse joint-venture/operator crosswalk remain unreviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/products/richmond-va-area-counties-split-on-data-centers",
              "host": "govtech.com",
              "date": "2025-12-02",
              "published": "2025-12-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 18",
          "scope": "Chesterfield July 2026 table distinguishes existing CTP buildings, a mixed CTP 02 through 04 group and two Digital Drive buildings under construction. PowerHouse separately describes an adjacent Digital Drive venture with future delivery targets. This inherited regional Chirisa record lacks an exact crosswalk to one of those distinct components. Adjacent construction and older operating buildings do not establish its own current physical stage. No provider role, capacity, water quantity or opening is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "regional_campus_identity_not_individual_phase_crosswalk",
              "scope": "Chesterfield July 2026 table distinguishes existing CTP buildings, a mixed CTP 02 through 04 group and two Digital Drive buildings under construction. PowerHouse separately describes an adjacent Digital Drive venture with future delivery targets. This inherited regional Chirisa record lacks an exact crosswalk to one of those distinct components. Adjacent construction and older operating buildings do not establish its own current physical stage. No provider role, capacity, water quantity or opening is adopted."
            },
            "identity_scope": {
              "county_phase_table_period": "July 2026",
              "individual_building_crosswalk_verified": false,
              "adjacent_digital_drive_not_merged": true,
              "forecast_delivery_not_actual_opening": true
            }
          },
          "notes": [
            "Chesterfield July 2026 table distinguishes existing CTP buildings, a mixed CTP 02 through 04 group and two Digital Drive buildings under construction. PowerHouse separately describes an adjacent Digital Drive venture with future delivery targets. This inherited regional Chirisa record lacks an exact crosswalk to one of those distinct components. Adjacent construction and older operating buildings do not establish its own current physical stage. No provider role, capacity, water quantity or opening is adopted.",
            "Roles, locations, individual physical identity, quantities and opening fields remain exact. Source dates, check dates and physical milestones stay separate."
          ],
          "sources": [
            {
              "url": "https://www.chesterfield.gov/5989/Data-Centers",
              "host": "www.chesterfield.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.powerhousedata.com/news/chirisa-powerhouse-launching-hyperscale-campus-in-chesterfield",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Chester · Chesterfield · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51041"
      }
    },
    {
      "id": "powerhouse-ctp-02-va",
      "state": "va",
      "kind": "facility",
      "name": "PowerHouse CTP-02",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chesterfield"
      ],
      "city": "Chester",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/data-center/ctp-2",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        },
        {
          "url": "https://www.powerhousedata.com/",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 37.37263,
        "lng": -77.62127,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Dan Rabb, Bisnow December 16, 2024 original financing report: JV PowerHouse/Chirisa/Blue Owl secured $600 million construction LOAN for a 50 MW CoreWeave-leased build-to-suit at the 350-acre Richmond-area campus, with initial capacity targeted in 2025. Not proof commissioning occurred, actual capex spent or critical IT basis. Earlier 28 MW tenant deal is separate and not automatically added. $5 billion is a multi-market JV deployment ambition, not this building cost. Platform CTP-02/CTP-03 building labels and exact parcel not independently established by this article.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/national/news/data-center/coreweave-data-center-in-virginia-lands-600m-loan-127230",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "status-continuation-2026-10-19",
          "scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule."
            }
          },
          "notes": [
            "Calendar ranges and delivery forecasts do not establish actual construction progress or commissioning. The combined CTP page does not establish a separate completed stage for each building."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/ctp-2",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check72, October24,2026",
          "scope": "The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The original project page groups CTP02 and CTP03 under a developer portfolio. This association applies only to the retained CTP02 record; no second record, merged campus or allocation of combined building count or power is created. Fully leased and forecast delivery do not certify completed tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/ctp-2",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Chester · Chesterfield · Source context reviewed",
      "status_scope": "PowerHouse lists CTP-02 and CTP-03 as a development with a construction and delivery schedule.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51041"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
